Loading...
HomeMy WebLinkAboutMINUTES - 01121993 - H.10 H. 10 Contra TO: BOARD OF SUPERVISORS Costa County FROM: HARVEY E. BRAGDON DIRECTOR OF COMMUNITY DEVELOPMENT DATE: January 12, 1993 SUBJECT: HEARING ON REZONING APPLICATION 2967-RZ AND COMPANION APPLICATIONS D.P. 3029-91 AND SUBDIVISION 7704, TO REZONE 12 . 14 ACRES OF LAND FROM GENERAL AGRICULTURAL DISTRICT (A-2) TO PLANNED UNIT DISTRICT (P-1) , FOR 64 LOTS. SUBJECT PROPERTY IS LOCATED IN THE OAKLEY AREA. APPLICATION FILED BY BELLECCI AND ASSOCIATES AND NORTH STATE DEVELOPMENT. SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS 1. Accept the environmental documentation prepared for this project as being adequate. 2. Approve Rezoning Application 2967-RZ, D.P. 3.029-91 and Subdivision 7704 subject to the conditions of the East County Regional Planning Commission with amendment recommended by the Public Works Department. 3. Adopt the East County Regional Planning commission's findings as set forth in Resolution No. 56-1992 as the determination for these actions. 4. Introduce the ordinance giving effect to the aforesaid rezoning, waive reading and set forth date for adoption of same. BACKGROUND/REASONS FOR RECOMMENDATIONS On September 21, 1992, the East County Regional Planning Commission, after taking testimony, recommended that the Board of Supervisors approve this project for 64 lots subiect to the Conditions of ADDroval . The East County Regional Planning Commission also advises that the County fulfill its obligation to provide community water to the three residences north of the detention basin in this area. The application was scheduled for hearing before the Board of Supervisors on November 17, 1992, December 8 and December 15, 1992. The application hearing was rescheduled at the request of the applicant. The Public Works Department has informed staff that they recommend a change in the Conditions of Approval concerning construction of storm drainage facilities. A copy of their memo is attached. FISCAL IMPACT None CONTINUED ON ATTACHMENT: x YES SIGURJ6 RECOMMENDATION OF COUNTY ADMINISTRATOR RECO ARD COMMITTEE APPROVE OTHER SIGNATURE(S) : ACTION OF BOARD ON -Tanuary 12 . 1993 APPROVED AS RECOMMENDED OTHER On December 8, 1992, the Board of Supervisors continued to this date the hearing on the recommendation of the East County Regional Planning Commission on the request by Bellecci and Associates (applicant) and North State Development (owner) for approval to rezone 12. 14 acres of land from General Agricultural District (A-2) to Planned Unit Development District (P-1) ( 2967-RZ) , for approval of a final development plan' to develop the ,site with 65 single family residences (County File 3029-91) , and ,for approval of a vesting tentative map to subdivide the 12.14 acre site into 65 single family residential lots (Subdivision 7704) in the Oakley area. Dennis Barry, Community Development Department, presented the staff report on the proposed project. He commented on the proposed modified condition of approval submitted in a memo from the Public Works Department dated December 19, 1992. Mr. Barry also advised of the staff recommendation that the Board accept the environmental documentation prepared for the project as adequate, approve rezoning application 2967-RZ, development plan 3029-91 and Subdivision 7704 subject to the conditions of the East County Regional Planning Commission with the amendment recommended by Public Works with respect to drainage and the indemnification condition, adopt the East County Planning Commission Resolution 56-1992 as the basis for the determination .and introduce the ordinance giving effect to the aforesaid rezoning, waive reading and set the date for adoption of same. The public hearing was opened and the following person appeared to speak: Dick Sestero, 4021 Port Chicago Highway, Concord, representing North State Development Company, expressed concurrence with the conditions including the drainage condition and the indemnity condition. Supervisor Torlakson requested clarification on the position of the Oakley Municipal Area Council. Frank Bellecci, Bellecci and Associates, representing the North State Development Company, responded that OMAC had approved the proposal and that neighbors' concerns relative to Gumtree had been resolved. The public hearing was closed. Supervisor Torlakson moved approval of the staff recommendations along with an additional condition that the installation of the electric car recharging system be under further review by the Zoning Administrator and subject to the final adoption of Board policy through the Energy Committee. IT IS BY THE BOARD ORDERED that recommendations 1, 2 with amended conditions (Exhibit A attached) , 3, and 4 are APPROVED; .and Ordinance No. 93-14 is INTRODUCED, reading waived, and January 26, 1993 is set for adoption of same. VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A UNANIMOUS (ABSENT TRUE AND CORRECT COPY OF AN AYES: 1 . II . IV, V NOES: None ACTION TAKEN AND ENTERED ON THE ABSENT: None ABSTAIN: III MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN— crig:. Community Development Department ATTESTE 93 cc: Bellecci & Associates PHIL BATCHELOR, CLERK OF North State Development THE BOARD OF SUPERVISORS Public Works-Mitch Avalon CO ADMINISTRATOR Health Dept. Env. Health DEPUTY County Counsel BY Assessor Oakley Fire Protection Di-st. 2 PUBLIC WORKS DEPARTMENT 92�EC 2 C �' CONTRA COSTA COUNTY t.}'::t. DATE: December 19, 1992 TO: Art Beresford, Project Planner FROM: Steven J. Wright, Associate Civil Engineer, Road Engineering SUBJECT: Subdivision 7704, Modification to November 17, 1992 Recommendations to the Board of Supervisors Please modify Subdivision 7704 Condition of Approval 21.A.4. to read as follows: 21.A.4) Constructing storm drainage facilities pursuant to Drainage Area 29H as follows: (a) Convey all stormwaters entering or originating within the subject property, without diversion and within an adequate storm drainage facility to a natural watercourse having definable bed and banks or to an eadsting adequate storm drainage facility which conveys the stormwaters to a natural watercourse. (b) Construct the portion of Line B from Basin #2 to the existing portion of Line B on the south side of Oakley Road upon the completion of outfall Line A of Drainage Area 29H by the developer of Subdivision 7330, or if more than the initial 20 units are constructed on this property. (c) Construct that portion of Basin #2 and that portion of Line B which are located within the boundary of the future Meadow Glen Unit II - Subdivision 7707. (d) After the completion of the first 20 units on this property, the applicant may build additional units if outfall Line A is not completed provided it can demonstrate, on the basis of Contra Costa County Public Works Department Office Standard 62, that Basin #2 has the necessary infiltration capacity to accommodate stormwater runoff from the additional units. SW:sjw A:7704D.t10 CC: P. Harrington, Flood Control CONDITIONS OF APPROVAL FOR 2967-RZ AS APPROVED BY THE BOARD OF SUPERVISORS - JANUARY 12, 1993 1 . This approval is. based upon the exhibits received by the Community Development Department as follows. A. Revised vesting tentative map dated received April 1, 1992 for 2967-RZ, Subdivision 7704, and D.P. 3029-91 for 65 lots and single family residences on the 12.14 acre site together with a preliminary grading plan on same sheet. This approval is for 64 lots (one lot between Lots #1 and #11 shall be eliminated). Remaining lots in this area shall be proportionally widened with both lots at the corner of proposed "A" Street and Gum Tree Road being at least 60 feet wide. 2. Sewage disposal serving the property concerned with this application shall be provided by the Ironhouse Sanitary District. 3. Water servicing this property concerned with this development shall be provided by the Oakley Water District. 4. Comply with the requirements of the Oakley Fire Protection District, including the provisions of water supply and fire hydrants as determined by the District. 5. The total number of lots shall not exceed 64. The development may be developed in phases subject to the review and approval of the Zoning Administrator. AB/aa RZXVIII/2967-RZC.AB 9/9/92 9/21/92 - EC (a) ��UU� � l1U , '~~ ' ' . ' CONDITIONS OF—APPR AND SUBDIVISION 7704 AS APPROVED BY THE BOARD OF SUPERVISORS-JANUARY 12, 1993 1This approval is based upon the exhibits received by the Community Development Department asfollows: A. Revised vesting tentative map dated nyoaivod April 1, 1992 for 2987-RZ, 3029- 91 and Subdivision 77O4for 64lots and single family residences mnthe 12'14 acre site together with a preliminary grading plan onsame sheet. This approval is for 64 lots (one lot between Lots#1and #11shall be eliminated). Remaining lots in this area shall be proportionally widened with both of the lots at the corner of proposed "A" Street and Gurn Tree Road being atleast 6O feet wide. 2. Development may be done in phases subject to the review and approval of the Zoning Administrator. The approval for final development plan 3O2S-81shall run concurrently with the approval of Subdivision 7704' This approval is for three (3) years. One three year extension can be granted if requested in writing prior to the expiration date of this project extension request must be accompanied with the proper foe. 3. Any revision ofinterna| circulation plan and lot layouts mhoU be subject tothe review and approval of the Zoning Administrator. Prior to recording the final map, submit for ' the review and approval ofthe Zoning Administrator, a site plan showing detailed house locations, typical elevations, driveways and fencing plans and street tree locations. _ 4. Guide for deve|oprpantand use provisions for this site shall beamfollows: A. Set-back of residential units shall be varied between 15 and 20 feet. All garages will have mset-back mfmtleast 2Ofeet ifthey face directly onto the street' Front yard set-backs may be reduced to 15 feet forcovered porches or other living areas mfthe residences. Sidoy8rd rnininnurna shall be 5 feet with o total aggregate mideyard of 10 feet. Rear yard nlinirnurnm are 15 feet for residences. The lots that back uptoGum Tree Road shall have @ secondary set back of 20 feet' The residences of this development shall be of neutral color and have complementary colors. All garages within this project shall be built with vertical open garage doora-' Residences constructed mnLots #1 ' #2O and #21 to #28 shall belimited toone story. This fact shall be noted on the deeds for these lots. Uses on the |mtg shall conform to the R-G zoning district. . Detached shed setbacks and lot coverage shall conform 'to the R'G zoning district. 5. Shou|darchaeo|ogica|nmateria|sbeuncmvermdduhnggrading,trenchngorotharon-mhg excavation(s), earthwork within 30 yards of these materials shall be stopped until a professional archaeologist who is certified by the Society for California Archaeology (SCA) and/or the Society ofProfessional Archaeology (SC]PA) has had anopportunity tpevaluate the significance of the find and suggest appropriate mitigation(s), if deemed necessary. 2. 6. Sewage Disposal serving the property concerned with this development shall be provided by the Ironhouse Sanitary District. Prior to recording the final map a Will Serve from the Ironhouse Sanitary District shall be submitted. 7. Water supply for this development shall be provided by the Oakley Water District. Prior to recording the final map a Will Serve letter from the Oakley Water District shall be submitted. 8. Where a lot/parcel is located within 300 feet of a high voltage electric transmission line, the applicant shall record the following notice: "The subject property is located near a high voltage electric transmission line. Purchasers should be aware that there is ongoing research on possible potential adverse .health effects caused by the exposure to a magnetic field generated by high voltage lines. Although much more research is needed before the question of whether magnetic fields actually cause adverse health effects can be resolved, the basis for such an hypothesis is established. At this time no risk assessment has been made." When a Final Subdivision Public Report issued by the California Department of Real Estate is required, the applicant shall also request that the Department of Real Estate insert the above note in the report. 9. The following statement shall be recorded at the County Recorder's Office for each parcel to notify future owners of the parcels that they own property in an agricultural area: "This document shall serve as notification that you have purchased land in an agricultural area where you may regularly find farm equipment using local roads; farm equipment causing dust; crop dusting and spraying occurring regularly; burning associated with agricultural activities; noise associated with farm equipment and aerial crop dusting and certain animals and flies may exist on surrounding properties. This statement is, again, notification that this is part of the agricultural way of life in the open space areas of Contra Costa County and you should be fully aware of this at the time of purchase." 10. Comply with the following construction, noise, dust and litter control requirements: A. Noise generating construction activities, including such things as power generators, shall be limited to the hours of 7:30 A.M. to 5:00 P.M., Monday through Friday, and shall be prohibited on State and Federal holidays. The restrictions on allowed working days may be modified on prior written approval by the Zoning Administrator. 7FMUS�U� Q ' 3. ' B. The project sponsor shall require their contractors and subcontractors to fit all internal combustion engines with mufflers which are in good condition and shall locate stationary noise-generating equipment such as air compressors and concrete pumpers as far away from existing residences as possible. C. At least one week prior to commencement of grading, the applicant shall post the mita and rnaU to the owners of property within 300 feet of the exterior boundary of the project site notice that construction work will commence. The notice shall include o list of contact persons with name, dtio, phone number and area of responsibility. The person responsible for maintaining the list shall be included. The list shall be kept current at all times and shall consist of persons with authority to indicate and implement corrective action in their area of responsibility. The names of the individual responsible for noise and litter control shall be expressly identified in the notice. The notice shall be reissued with each phase of mna'n/ grading activity. A copy of the notice shall be concurrently transmitted to the oVnnrnuni<y Development Department. The notice shall be accompanied by a list of the names and addresses of the property owners noticed, and a rnop identifying the area noticed. O. Adust and litter control program shall be submitted for the navi8vv and approval of the Zoning Administrator. Any violation of the approved program or applicable ordinances shall require an immediate work stoppage. Construction work shall not be allowed to resume unti/, if necessary, an appropriate construction bond has been posted. E. The applicant ahoU make e good-faith effort to avoid interference with existing neighborhood traffic flows. Prior to issuance of building permits, the proposed roads serving this development ohoU be constructed to provide access to each lot. This shall include provision for an on-site area in which to park earth moving equipment. 11. At least 30 days prior to recording a Final Map, issuance of m grading permit, or installation of improvements orutilities, submit a preliminary geology, soil, and foundation report meeting the requirements of Subdivision Ordinance Section 94-4.420 for review and approval of the (Zoning Administrator). Improvement, grading, and building plans shall carry out the recommendations of the approved report. 12. The report required above shall include evaluation of the potential for liquefaction, seismic settlement 13' Record a statement to run with deeds to the property acknowledging the approved- report by title, author (firm), and dote, calling attention 1mapproved reCornmmendations, and noting that the report is available from the seller. E ' . , . 4. ' 14' Prior to the issuance of building permits the mpo|kosn1a shall mubnlh o detailed Transportation Demand Management(TDM) Plan for review and approval of the Zoning Administrator (unless otherwise required byaTDM [)rdinance)' The approved T[)W0 Plan shall baoperative prior tofinal inspection by the Building Inspection Department Iof residences within this development. 15. Provision of a Child Care Facility or program is required for this development. The program shall be submitted for the review and approval of the Zoning Administrator prior tothe filing of the Final Map. 16. Prior to or concurrent with final map approval the applicant agrees to participate in provision Of funding to maintain or augment police services by voting to approve a special tax for the subdivisions area at the per parcel annual amount (for the appropriate CPI adjustments) established bythe Board ofSupervisors. The request to establish edistrict shall bomade atleast 6Odays prior 10 anticipated request tmrecord the final map. 17. At least 30 days prior to requesting the recording of the final. map for the site the applicant shall submit a landscape plan conforming the County's Water Conservation Policies. A. Native, drought tolerant plants shall be used.wheneverieasiWo. B. Landscaping along all streets, set-backs and each front yard shall conform to the County Landscape Guidelines. /4typical front yard landscaping plan shall be submitted for review and approval of the Zoning Administrator. The plan implemented prior to occupancy of the various residences onthe site. - ' C. Submit a street tree planting plan prior to recording the final map. A rnimirnunm one 15 gallon street tree shall be planted oneach non-corner lot. Corner lots shall have at least three street trees planted on them. D. All landscaping mhoU be maintained by the developer until occupancy or annexation to alandscape and lighting district. The applicant shall berequired to annex if and when the district is formed. Future homeowners mhoU be notified by deed notice of the fact this site is within a landscape and lighting district. ' E. The masonry wall proposed along Gum Tree shall not be straight along its' ' entire frontage. There shall betwo tVthree set backs oftwo tothree feet each to help eliminate the affects of a long Straight wall. The masonry xvaU,co|or and finish shall be reviewed and approved by the Zoning Administrator. The masonry wall shall be constructed prior toissuance ofbuilding permits onany lots of this subdivision. 8�YY&yU&DU U 00 � � n ' , 5. F. The sites frontage on Gum*Tree Road shall be suitably landscaped with a row of suitable drought tolerant trees. The trees shall be planted on a maximum of 20 foot centers and shall be maintained by the developer until the area is annexed into a landscape and lighting district. G. Fence design and location shall be shown on the landscape plan. The fencing shall be designed to stand-up in the sandy soil of the site by use of suitably spaced cement pilaster or wood o|od metal poles or other means acceptable to the Zoning Administrator. Fencing shall be established aiong all sides of the site that do not front upon streets. H. Grading cdona aheU include an erosion p[otection for all slopes greater than 5 feet or more in height. Slope hydronluk:hing shall be used as recommended by a Certified Landscape Architect. 18. Prior to recording the final rnop for this project, the developer shall submit Will Serve letters from the Antioch School District. 18' Comply with the requirements of the Contra Costa Water District in regards to the irrigation lateral that crosses the site. Prior to recording the final map for this development or issuance of grading permits, the applicants shall submit a letter from the Water District indicating that an agreement has,been reached in this area. . 20. The following pertain to drainage, rood and utility improvements and will require the review and approval of the Public Works Department. 21 . The following requirements pertaining to drainage, road' and utility improvements will require the review and approval of the Public Works Department: A. An accordance with Section 92'2.008 of the County Ordinance Code' this subdivision shall conform to the provisions of the County Subdivision Ordinance (Title 8). Any exceptions therefrom must be specifically listed in this conditional approval statement. Conformance with the Ordinance includes the following requirements. . 1) Constructing road improvements along the frontage of Live Oak Avenue. a) ' Constructing curb, four-foot six-inch sidewalk (width measured from curb taco), a complete curb return, necessary longitudinal and transverse drainage' and necessary pavement widening and tapers along the frontage will satisfy this requirement. The ultimate alignment of Live Oak Avenue is available from the Public Works Department, Road Engineering Division' b> The face of curb ohoU be ton feet from the ultimate right of way line. ��D� � ' ' ^ ' G. -2} Installing street~lights and annexing the property' toCounty Service Area L-100 for maintenance of the street lights. The final number and location of the lights shall be determined by the Public Works DepaM- rnen1' Road Engineering Division. 3} Install all new utility distribution service underground. 4) Constructing storm drainage facilities pursuant tmDrainage Area 2SHam follows: o) Convey all sto/rnvvoteroentering or originating within the subject prnpHrty, without diversion and within an adequate mtmrrn drainage facility 1oe natural watercourse having definable bad and banks or to an existing adequate storm drainage facility which conveys the atorrmvvateratoa natu.a| watercourse. b> Construct the portion of Line 8 from Basin #2 to the existing portion of Line B on the south side of Oakley Road upon the completion of outfall Line A of Drainage Area 29H by the developer ofSubdivision 733O' orifmore than the initial 2Ounits are constructed on this property. c> Construct that portion of Basin #2 and that portion of Line B which are located within the boundary of the future Meadow Glen Unit || ' Subdivision 7707. d) After the completion of the first 20 units on this property, the applicant may build additional units if outfall Line A is not completed provided itcan demonstrate, onthe-basis of Contra Costa County Public Works Department Office Standard 62, that Basin #2has the necessary infiltration capacity toaccommodate stornnvvater run-off from the additional units. 5> Designing and constructing storm drainage facilities required by the Ordinance incompliance with specifications outlined in Division 914 of the Ordinance and in compliance with design standards of the Public Works Department. ) Installing, within a dedicated drainage easgrnent, any portion of the drainage system which conveys run-off from public streets. 7) On all public roads-with longitudinal slopes of eight percent or less, all public pedestrian access ways shall bedesigned inaccordance with Title 24 (Handicap access). This mha|l include all driveway depressions as , °well ashandicap ramps. - y=YYCUUC�U0 8� . . ' ^ 7. 8) Submitting imn -6 nns-nt'cJans prepared by a registered oki| engineer, payment ofreview and inspection fees' and security for all improve- ments required rnprVve'rnentarmquired by the Ordinance Code o, the conditions of approval for this subdivision. These plans shall include any necessary traffic signage and striping plans for review by the Public Works Department, Road Engineering Division. 8> Submitting a Final Map prepared by o registered civil engineer or licensed land surveyor. B. Convey tothe County' by Offer of Dedication, additional right of way on Live Oak Avenue as required for the planned future width of 86 feet. C. Provide for adequate sight distance for a design speed of 45 MPH at the intersection of Live Oak Avenue and Gunn Tree Lane in accordance with CALTRANS standards. D. Provide for adequate sight distance for adesign speed of 25 MPH at lots 55 and 56 in accordance with CALTRANS standards. Provide sight distance easements ifnecessary. E. Construct o half width roadway to County Public road standards, including curb' gutter and oidavva|k' within the existing 60 foot County right of vvoy' known as Gum Tree Lane, from Live Oak Avenue t0the easterly side of the right ofway dedicated bySubdivision 71G5for Hagar Lane. The face of curb shall be 10 feet from the right mfway line. Construct a nlinicnucn pavement width on Gum Tree Lane of 28 feet. Construct one half ofa County standard cul-de-sac at the eastern end of Gum Tree Lane with the back of the cul-de-sac face of curb 10 feet from the easterly right of way dedicated by Subdivision 7165 for Hagar Lane. Provide apedestrian and bicycle connection from the Gum Tree Lane toB Monte Loop at the cul-de-sac. ' F. Relinquish abutter's rights ofaccess along Gum Tree Lane with the exception a 56-foot wide opening for "A" Street and a fifteen foot wide pedestrian access from the cu|'de-aac. G. Construct the on-site road system toCounty public road standards and convey to the County, by Offer of Dedication, the corresponding right of way. H. Prevent storm drainage, originating On the property and conveyed in a concentrated rnumne,, from draining across the sidewalks and driveways. 8. I. Install permanent landscaping and automatic irrigation facilities within the border areas, and install interim landscaping features within the future road areas, if any. All work shall be done in accordance with the guidelines and standards of the County. Funding of, and maintenance of, the new plantings shall be guaranteed by the developer until the expiration of the plant establish- ment period and, until funds are available through a landscaping district. J. Apply to the Public Works Department for annexation to the County Landscap- ing District AD 1979-3 (LL-2) for the future maintenance of landscaping and irrigation facilities in borders and other areas ("open space" is specifically excluded). K. Submit landscaping plans to the Public Works Department and pay the plan review and field inspection fees. All landscaping and irrigation facilities shall be maintained by the applicant until funds become available for their mainte- nance by the County after final inspection is cleared. L. Furnish proof to the Public Works Department, Engineering Services Division, of the acquisition of all necessary right of entry, permits and/or easements for the construction of off-site, temporary or permanent, road and drainage improvements. M. If, after good faith negotiations, the applicant is unable to acquire necessary rights of way and easements, he shall enter into an agreement with the County to complete the necessary improvements at such time as the County acquires the necessary interests in accordance with Section 66462 and 66462.5 of the Subdivision Map Act. N.- Prior to filing the Final Map, apply to the Public Works Department for annexation of the property to Drainage Area 290 for the maintenance and operation of the drainage area's drainage facilities. The application will require a metes and bounds description of the property. 0. Provide deed notification to those parcels that front EI Lago Drive, El Monte Loop and "A" Street, and install signage at the end of the road, to inform prospective property owners that El Lago Drive, El Monte Loop and "A" Street may be extended in the future. 22. Pursuant to Government Code Section 66474.9,the applicant(including the subdivider or any agent thereof) shall defend, indemnify, and hold harmless the Contra Costa County Community Development Department and its agents, officers, and employees from any claim, action, or proceeding against the Department (the County) or its agents, officers, or employees to attack, set aside, void, or annul, the Agency's RIME A ' ^ ' S. approval concerning this subdivision (SUB 77O4and D.P. 3029-91) map application, which action iebrought Within the time period provided for inSection GG4S8.37. The County will promptly notify the subdivider of any such claim,action, or proceeding and cooperate fully inthe defense. 23. The garage area of each residence shall be wired for electric car recharging, subject to the review and approval of the Zoning Administrator subject to adoption of final Board policy. ADVISORY NOTES A. The East County Regional Planning Commission strongly advises that the County fulfill its obligation to provide community domestic water supply to the three residences located north ofthe detention basin. B. Comply with the Park Dedication Fee Ordinance. " C. Comply with the requirements of the konhousm Sanitary District. ` D. Comply with the requirements of the Oakley Water District. E. Comply with the requirements of the Building Inspection Department. Building Permits are required prior tothe construction ofresidences onthe site. AGrading Permit shall be required for this project. F. Comply with the requirements of the Oakley Fire Protection District. G. The applicant will be required to n0rnp|y with the requirements of the Bridge/Thoroughfare Fee Ordinance for the Oakley/North Brentwood Area of Benefits as adopted by the Board of Supervisors. . H. The applicant will be required to comply with the drainage fee raquirernenta'for Drainage Area 25H as adopted by the Board of Supervisors. ' |' Certain improvements required bythe Conditions of Approval for this development or the County Subdivision Ordinance Code may be eligible for credit or reimbursement against said fee. The d6vo|oper should contact the Public VVVrhs Department to personally determine the extent of any credit or reimbursement for which he might be eligible. ~ ' , lO. - J. The applicant shall be required to comply with all rules, regulations, and procedures of the National Pollutant Discharge Elimination System (NPDES) for municipal, construc- tion and industrial activities as promulgated by the California State Water Resources Control Board, or any of its Regional Water Quality Control Boards (San Francisco Bay- Region || orCentral Valley ' Region V). AB/sj/aa RZXV1U/2697C'RZ.AB 9/9/B2 . 9/21/S2 - EC (a) 1/12/93 - BS <o> - ` REZONING APPLICATION #2967-RZ A-2 TO P-1 DEVELOPMENT PLAN 3029-91 SUBDIVISION 7704 BELLECCI & ASSOCIATES (Applicant) NORTH STATE DEVELOPMENT (Owners) OAKLEY AREA A REQUEST TO REZONE 12.14 ACRES OF LAND FROM A-2 TO P-1 FOR 64 LOTS. BOARD OF SUPERVISORS CONTRA COSTA COUNTY JANUARY 12, 1993 - 2: 00 P.M. Contra TO: BOARD OF SUPERVISORS :. Costa n! FROM: HARVEY E. BRAGDON _ County DIRECTOR OF COMMUNITY DEVELOPMENT srq couri`�t cF DATE: January 12, 1993 SUBJECT: HEARING ON REZONING APPLICATION 2967-RZ AND COMPANION APPLICATIONS D.P. 3029-91 AND SUBDIVISION 7704, TO REZONE 12.14 ACRES OF LAND FROM GENERAL AGRICULTURAL DISTRICT (A-2) TO PLANNED UNIT DISTRICT (P-1) , FOR 64 LOTS. SUBJECT PROPERTY IS LOCATED IN THE OAKLEY AREA. APPLICATION FILED BY BELLECCI AND ASSOCIATES AND NORTH STATE DEVELOPMENT. SPECIFIC REQUEST(S) OR RECOMMENDATIONS) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS 1. Accept the environmental documentation prepared for this project as being adequate. 2. Approve Rezoning Application 2967-RZ, D.P. 3.029-91' and Subdivision 7704 subject to the conditions of the East County Regional Planning Commission (Exhibit A) , with amendment recommended by the Public Works Department. 3. Adopt the East County Regional Planning Commission's findings as set forth in Resolution No. 56-1992 as the determination for these actions. 4. Introduce the ordinance giving effect to the aforesaid rezoning, waive reading and set forth date for adoption of same. BACKGROUND/REASONS FOR RECOMMENDATIONS On September 21, 1992, the East County Regional Planning Commission, after taking testimony, recommended that the Board of Supervisors approve this project for 64 lots subject to the Conditions of Approval (Exhibit A) and findings attached. CONTINUED ON ATTACHMENT: X YES SIG UR 94 di — RECOMMENDATION OF COUNTY ADMINISTRATOR RECO ARD COMMITTEE APPROVE OTHER SIGNATURE(S) : ACTION OF BOARD ON APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A UNANIMOUS (ABSENT TRUE AND CORRECT COPY OF AN AYES: NOES: ACTION TAKEN AND ENTERED ON THE ABSENT: ABSTAIN: MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. Orig: Community Development Department ATTESTED cc: Bellecci & Associates PHIL BATCHELOR, CLERK OF North State Development THE BOARD OF SUPERVISORS Public Works-Mitch Avalon AND COUNTY ADMINISTRATOR Health Dept. Env. Health BY , DEPUTY 71 Page Two The East County Regional Planning Commission also advises that the County fulfill its obligation to provide community water to the three residences north of the detention basin in this area. The application was scheduled for hearing before the Board of Supervisors on November 17, 1992, December 8 and December 15, 1992. The application hearing was rescheduled .at the request of the applicant. The Public Works Department has informed staff that they recommend a change in the Conditions of Approval concerning construction of storm drainage facilities. A copy of their memo is attached. FISCAL IMPACT None RESOLUTION NO. 56-1992 RESOLUTION OF THE EAST COUNTY REGIONAL PLANNING COMMISSION OF THE- COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, INCORPORATING FINDINGS AND RECOMMENDATIONS ON THE REQUESTED CHANGE BY BELLECCI & ASSOCIATES (APPLICANT) AND NORTH STATE DEVELOPMENT (OWNER) , (2967- RZ) I IN THE ORDINANCE CODE SECTION PERTAINING TO THE PRECISE ZONING FOR THE OAKLEY AREA OF SAID COUNTY. WHEREAS, a request .by Bellecci & Associates (Applicant) and North State Development (Owner) (2967-RZ) to rezone land in the Oakley area from General Agriculture (A-2) District to Planned Unit District (Pw-l) , was received on August 30, 1991; and WHEREAS, in connection with applicant's requests, an Initial Study of Environmental Significance was prepared by the, ommunity Development Department which determined that the the, entitlements would not have any significant adverse environmental impacts; and WHEREAS, for purposes of compliance with provisions of the California Environmental Quality Act and State and County CEQA guidelines, a Negative Declaration of Environmental Significance was prepared, posted and circulated; and WHEREAS, after notice was lawfully given, a public hearing was scheduled before the East County Regional Planning Commission on Monday, September 21, 1992; whereat all persons interested might appear and be heArd;* and WHEREAS, on Monday, September 21, . 1992, the East County Regional Planning commission having fully' reviewed, considered and evaluated all the, testimony, and evidence submitted' in this matter; and NOW, THEREFORE, BE IT .RESOLVED that East County Regional Planning commission recommends to the Board of Supervisors of the County of Contra Costa, State of California, that the rezoning request of Bellecci & Associates (Applicant) and North State Development (owner) (2967-RZ) be approved to rezone 12.14± acres of land from General Agricultural District (A-2) to Planned Unit District. (P-1) , along with Final Development Plan 3029-91 and Subdivision 7704, and that this zoning change be made as indicated on the finding maps entitled: Page G-24 & H-24 of the County's 1978 Zoning Map. BE IT FURTHER RESOLVED that the reasons for -these recommendations are as .follows: 1. The project as formulated complies with the requirements of the County General Plan. Page Two RESOLUTION NO. 56-1992 2. The project will provide needed-entry level housing for the area. 3. The project will constitute a residential environment of sustained desirability and stability and will be in harmony with the surrounding neighborhood and community. BE IT FURTHER RESOLVED that the Chair and the Secretary of the East County Regional Planning Commission shall respectively sign and attest the certified copy of this resolution and deliver the same to the Board of Supervisors all in accordance with the Planning Laws of the StateofCalifornia. The instructions by the East County Regional..) Planning Commission to prepare this resolution were given by motion of the East County Regional Planning commission on Monday, September 21, 1992, by the following vote: AYES: Commissioners Sobalvarro, Planchon, Hanson, Wetzel NOES: - Commissioners - None ABSENT: , Commissioners - Andrieu, Hern, Maybee ABSTAIN: Commissioners - None I, Earl Wetzel, Chair of the East County Regional Planning Commission of the County of Contra Costa, State- of California, hereby certify that the foregoing was duly called and held in accordance with the law on Monday, October 12.. 1992, and this resolution was duly and -regularly passed and adopted -by the following vote of. the Commission: AYES: Commissioners - Plancho'n, Hanson, SobalvArro, Wetzel NOES: Commissioners - None ABSENT: Commissioners Andrieu, Hern, Maybee ABSTAIN: Commissioners None Page Three RESOLUTION NO. 56-1992 EARL WETZEL Chair of the East County Regional Planning Commission, County of Contra Costa, State of California ATTEST: Secretary of the East County Regional Planning Commission, County of Contra Costa, State of California AB/df 2967-RZ.res Findings Map ------ A•2 ---------------------- } P.1 -. EL M DR LU .44 M EE RD ' ' NUT TREE LN Z X1'2` P•'� —R 40 R• 0 F a W.CYPRESS: x , LTJ Rezone From I To?-I Area I, Aa-%- W P-1'2--r_-1_ —Chairman of the East County Regional Planning Commission,Contra Costa County,State of California, do hereby certify that this is a true and correct copy of PA(-E� 114A� indicating thereon the decision of the East County Regional Planning _ Commission in the matter of 75y �•t SgAnIc k "I_j Chairman of the East C&nty Regional Planning Commission,State of California ATTE Sgr6tary A t East County Regional Planning Commission,State of California PUBLIC WORKS DEPARTMENT 2 r CONTRA COSTA COUNTY DATE: December 19, 1992 TO. Art Beresford, Project Planner FROM: Steven J. Wright, Associate Civil Engineer, Road Engineering L SUBJECT: Subdivision 7704, Modification to November 17, 1992 Recommendations to the Board of Supervisors Please modify Subdivision 7704 Condition of Approval 21.A.4. to read as fol�ws: 21.A.4) Constructing storm drainage facilities pursuant to Drainage .Area 29H as follows: (a) Convey all stormwaters entering or originating within the subject property, without diversion and within an adequate storm drainage facility to a natural watercourse having definable bed and banks or to an existing adequate storm drainage facility which conveys the stormwaters to a natural watercourse. (b) Construct the portion of Line B from Basin #2 to the existing portion of Line B on the south side of Oakley Road upon the completion of outfall Line A of Drainage Area 29H by the developer of Subdivision 7330, or if more than the initial 20 units are constructed on this property. (c) Construct that portion of Basin #2 and that portion of Line B which are located within the boundary of the future Meadow Glen Unit II - Subdivision 7707. (d) After the completion of the first 20 units on this property, the applicant may build additional units if outfall Line A is not completed provided it can demonstrate, on the basis of Contra Costa County Public Works Department Office Standard 62, that Basin #2 has the necessary infiltration capacity to. accommodate stormwater runoff from the additional units. SW:sjw A:7704DA10 CC: P. Harrington, Flood Control M. Avalon M. Lysons E1 ` ` EXHIBIT "A" CONDITIONS OF APPROVAL FOR 2967-RZ AS APPROVED.. BY THE EAST COUNTY REGIONAL PLANNING COMMISSION - SEPTEMBER 21., 1992 1 . This approval is based upon.thaexhibits received by the Cornrnunhv Development Department aehd|ovvm:' A. Revised vesting tentative map dated received April 1, 1992 for 2967-RZ, Subdivision 7704, and D.P. 3039'91 for 65 lots and single family residences on the 12.14 acre site together with a preliminary grading plan on same sheet. This approval is for 64 |o10 (one lot between Lots #1 and #11 ahoU be eliminated). Remaining lots inthis area shall be proportionally widened with both |Ota at the corner of proposed "A" Street and Gum Tree Road being at least 60 feet wide. 2. Sewage disposal serving the property concerned.with this application shall be provided by the |ronhouae Sanitary District. /�L� 3. VVata/men�cingthis property concerned vv�h��adeveVpnmentshaUbeprov/dedbvthe Oakley Water District. 4. Co' o|y with the requirements of the Oakley Fire Protection District, including the provisions ofwater supply and fire hydrants as determined by the District. 5. The total number Oflots shall not exceed G4' The development may bedeveloped in phases subject tothe review and approval of the Zoning Administrator. AB/aa RZXVU|/2967-RZC'AB S/S/S2 B/21/S2 - EC (o) ' ` ' EXHIBIT "*A" CONDITIONS OF APPROVAL FOR ,.T.HE FINAL DEVELOPMENT PLAN 3029-91 -AND SUBDIVISION 7704 AS APPROVED BY THE EAST COUNTY REGIONAL PLANNING COMMISSION - SEPTEMBER 21, 19 1. This approval is based upon the exhibits received by the Community Development Department aafollows: A Revised vesting tentative map dated received April 1^ 1992 for 2987-R2' 3029- 91 and Subdivision 7704for G4lots and oing|efarni|yresidences onthe 12.14 acre site together with apreliminary grading plan onsame sheet. This approval is for 64|Ots (one lot between Lots #1 and #11 shall be e|inminat8d). Remaining lots in this area shall be proportionally widened with both of the lots at the corner of proposed °A" Street and Gum Tree Road being at least 60 feet wide. ` 2. Development may be done in phases subject to the review and approval of the Zoning Administrator. The approval for final development plan 3028'91 ahoU run concurrently with the approval of Subdivision 7704' This approval iofor three (3) yea,rl. One three year extension can begranted ifrequested inwriting prior tothe oxpiratinMdate ofthis project extension request must ba accompanied with the proper fee. 3' Any revision of internal circulation plan and lot layouts shall be subject to the review and approval of the Zoning Administrator. Prior torecording the final map, submit for the review and approval of the Zoning Administrator, a site plan showing detailed house locations, typical elevations, driveways and fencing plans and street tree locations. 4. Guide for development and us provisions for this site shall be as follows: A. Set-back of residential units shall be varied between 15 and 2{} feet. All gar rages en willhave m set-back of at least 20 feet if they face directly onto the street. Front yard set-backs may be reduced to 15 feet for covered porches or other |iV\nQ areas of the residences. Sidey@rd minimums shall be 5 feet with ' a total aggregate oidayord of 10 feet. Rear yard rninirnunnm are 15 feet for ' residences. The lots that back uptoGum Tree Road shall have osecondary set back of 20 feet' The residences of this development shall be of neutral color and have complementary colors. All garages within this project shall be built with vertical open garage doors. Residences constructed onLots #1' #2O and #21 to #28 ehe|| be limited to one story. This fact shall be noted on the deeds for these lots. Uses on the lots shall cowforrn to the R-G zoning district. Detached shed setbacks and lot coverage aho|| conform to the R-8 zoning district. 5' Should archaeological materials be uncovered during grading,trenching or other on-site excavation(s), earthwork within 30 Yards of these materials shall be stopped until a professional archaeologist who is certified by the Society for California Archaeology (SCA) and/or the Society of Professional Archaeology (SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation(s), if deemed necessary. , . . 2. ' G. Sewage Disposal serving the property concerned with this develop nnent shall be provided by the \ronhouue Sanitary District. Prior to recording the final map aWill Serve from the kmnhnuaaSanitary District shall besubmitted. 7. Water supply for this development shall be provided by the Oakley Water District. Prior to recording the final map aVVi|i Serve letter from the Oakley Water District shall be submitted. 8' Where a lot/parcel is located within 300 feet of a high voltage electric transmission Une. the applicant shall record the following notice: "The subject property is located near a high voltage electric transmission line. Pun:hosong should be avvana thatthere is � ongoing research onpossible potential adverse health effects") caused by the exposure too magnetic field generated by high voltage lines. Although much more research is needed before the question nfwhether magnetic fields actually cause adverse health effects can be resolved, the basis for such an hypothesis is established. Atthis time norisk assessment has been nlade." ` \A/han a Final Subdivision Public Report issued by the California Department of Real Estate is required, the applicant shall also request that the Department of Real Estate insert the above note inthe report. S. The fuU)ovx\ng statement shall be recorded at the County Recorder's Office for each parcel to notify future mxxners of the parcels that they own property in an agricultural area: "This document shall serve as notification that you have purchased land inenagricultural area where you may regularly find farm equipment using local roads; farm equipment causing dust; crop dusting and spraying occurring regularly; burning- - associated with agricultural activities; noise associated with farm equipment and aerial crop dusting and certain animals and flies _ may exist on surrounding properties'' This statement is, again, notification that this is part of the agricultural way of life in the Open apace areas pfContra Costa Cnuntyond you should be fully avvang of this at the tinm6mf purchase." 10' Comply with the following construction, noise, dust and litter control requirements: ' A. Noise generating construction aotivitias, including such things as power generators, shall be limited to the hours of 7:30 A.M. to 5:00 P'&4', Monday through Friday, and shall be prohibited on State and Federal holidays. The restrictions on allowed working days may bemodified Onprior written approval by the Zoning Administrator. . . . . 3. B. The project opmnoorahaUrequire theircontractorsondmuboontractmrmtmfit8U internal combustion engines with mufflers which are in good condition and shall locate stationary noise-generating equipment such as air compressors and concrete pumpers eofaraway from existing residences as possible.' C. At least one week prior tn commencement Of grading' the applicant shall post the site and mail to the owners of property within 300 feet of the exterior boundary ofthe project SitenCticatha1oonStruotionvvu,kvviUcmnmnmence. The notice shall include m list ofcontact persons with name, title, phone number and area cfresponsibility. The person responsible for maintaining the list shall be included. The list shall be kept current atall times and shall consist of persons with authority to'indicate and implement corrective action in their area of responsibility. The names ofthe individual responsible for qJise and litter control shall beexpressly identified in the notice. The nmticemhdY| be reissued with each phase of major grading activity. A copy of the notice shall be concurrently transmitted to the community Development Department. The notice shall be accompanied by o list of the names and addresses of the property owners noticed, and a map identifying the area noticed. D. A dust and litter control program shall be submitted for the review and approval of the Zoning Administrator. Any violation of the approved program or applicable ordinances shall require animmediate work stoppage. Construction work shall not be allowed to resume until, if necessary, an appropriate ' construction bond has been posted. E. The applicant shall make good-faith effort toavoid interference with existing neighborhood traffic flows. Prior 10issuance of building permits, the proposed roads serving this development shall b8constructed tOprovide access to each lOt. This shall include provision for an on-site area in which to park earth moving equipment. 11. At least 30 days prior to recording a Final Map, issuance of e grading permit, or installation of improvements or utilities, submit a preliminary geo|ogy, moi|, and foundation report meeting the requirements of Subdivision Ordinance Section 94-4.420 . for rawiavv and approval of the (Zoning Administrator). Improvement, grading, and building plans shall carry out the recommendations of the approved report. 12. The report required above shall include evaluation of the potential for liquefaction, seismic settlement 13. Record a statement to run with deeds to the property acknowledging the approved report by title, author (firm), and date, call'ing attention to approved recommendations, and noting that the report isavailable from the S8Ue[. . . . 4. 14' Prior to the issuance of building permits the applicants shall submit a detailed Transportation Demand Management (TDM) Plan for review and approval of the Zoning Administrator (unless otherwise required by a TOM Ordinance). The approved TC>K8 Plan shall be operative prior tofinal inspection by the Building Inspection Department ofresidences within this development. 15' Provision of o Child Cara Facility or program is required for this development. The prmgnon) shall be submitted for the review and approval of the Zoning Administrator prior tothe filing of the Final Map. 16' Prior to orconcurrent with fin8| map approval the applicant agrees to participate in provision of funding to maintain or augment pn|iCg services by voting 10approve o special tax for the subdivisions area at the per parcel annual a (for the appropriate CP| adjustments) established bythe Board ofSupervisors. The request to establish adistrict shall bamade atleast G0days prior toanticipated request t¢ record the final map. 17. At least 30 days prior to requesting the recording of the final rnbp for the site the applicant shall submit s landscape plan conforming the County's Water Conservation Policies. A. Nadve.drOughttolerant plants shall beused whenever feasible. B. Landscaping along all m1/oetm, set-backs and each front yard shall conform 1m the County Landscape Guidelines. Atypica| front yard landscaping plan shall be submitted for review and approval of the Zoning Administrator. The plan implemented prior to Occupancy of the various residences on the site. C. Submit street tree planting plan prior torecording the final map. A rninirnu[n one 15gallon street tree shall beplanted mneach nmrioornarlot. Corner lots aheU have at least three street trees planted on them. ' D. All landscaping shall be maintained by the developer until occupancy or annexation to m landscape and lighting district. The applicant shall be required to annex if and when the district is formed. Future homeowners shall be notified by dead notice of the fact this site is within a landscape and lighting district. _ E. The masonry wall proposed along Gum Tree shall not be straight along its' entire frontage. There shall betwo 10three set backs nftwo tothree feet each to help eliminate the affects of a long straight wall. The masonry vvaU color and finish shall be reviewed and approved bythe Zoning Administrator. The masonry wall oheU be constructed prior 10issuance of building permits mnany lots ofthis subdivision. ^ 5' F. The sites frontage on Gum.Tree Road shall be suitably landscaped with a row of suitable drought tolerant trees. The trees shall be planted on mnn@xinnurn of 20 foot centers and oheU be maintained by the developer until the area is annexed into elandscape and lighting district' G. Fence design and location shall be shown on the landscape plan. The.fencing shall be designed to stand-up in the sandy soil of the site by use of suitably spaced cement pilaster or wood clad metal poles or other means acceptable to the Zoning Administrator. Fencing shall be established along all sides of the site that do not front upon otm»atm. H. Grading plans ahmU include an erosion protection for all slopes greater than 5 feet or more in height. Slope kvdronnu|uhing shall be used asrHcmended by . � aCardfied Landscape Architect. 18' Prior torecording the final map for this project, the developer shall submit Will Serve |ott8na from the Antioch School District. 19. Comply with the requirements of the Contra Costa Water District in regards to the irrigation lateral that crosses the site. Prior to recording the final map for thio development orissuance nfgrading permits, the applicants shall submit oletter from the Water District indicating that an agreement has been reached in this area. 20' The following pertain todrainage, road and utility improvements and will require the review and approval of the Public Works Department. 21' The following requirements partaining to drainage, road, and utility improvements will require the review and approval of the Public VVmrko Department: A. In accordance with Section 82-2.006 of the County Ordinance Code, this subdivision shall co6f ornmtothe provisions Cfthe County Subdivision Ordinance (Tido 9). Any exceptions therefrom must be specifically listed in this conditional approval ��atenwent' Conformance with the Ordinanceincludes the following requirements. 1) Constructing road improvements o|nngthefrVntagenfUveOakAvenue. ' ' a. Constructing curb, h]upfowtsix-inch sidewalk (width measured from curb face)' a oOrnp|e1e curb return, necessary longitudinal and transverse drainage, and necessary pavement widening and tapers o|Vn0 the frontage will satisfy this requirement. The ultimate alignment of Live Oak Avenue is available from the Public Works Department, Road Engineering Division. b. The face of curb shall be ten feet from the ultimate right of way line. 6. 2) Installing street lights and annexing the property to County Service Area L-100 for maintenance of the street lights. The final number and location of the lights shall be determined by the Public Works Depart- ment, Road Engineering Division. 3) Install all new utility distribution service underground. 4) Conveying all storm waters entering or originating within the subject property, without diversion and within an adequate storm drainage facility, to a natural watercourse having definable bed and banks or to an existing adequate storm drainage facility which conveys the storm waters to a natural watercourse. This will require the construction of a portion of Line.B from Basin #2 to the existing portion ofine B on the south side of Oakley Road, and a portion of Basin #2 that'itproportional to this developments runoff into the basin. The applicant should also participate in the construction of Line A of the Drainage Area 29H plan with Subdivision 7330. 5) Designing and constructing storm drainage facilities required by the Ordinance in compliance.with specifications outlined in Division 914 of the Ordinance and in compliance with design standards of the Public Works Department. 6) Installing, within a dedicated drainage easement, any portion of the drainage system which conveys run-off from public streets. 7) On all public roads with longitudinal slopes of eight percent or less, all public pedestrian access ways shall be designed in accordance with Title 24 (Handicap access). This shall include all driveway depressions as well as handicap ramps. 8) Submitting improvement plans prepared by a registered civil engineer, payment of review and inspection fees, and security for all improve- ments required by the Ordinance Code or the conditions of approval for this subdivision. These plans shall include any necessary traffic signage and striping plans forreview by the Public Works Department, Road Engineering Division. 9) Submitting a Final Map prepared by a registered civil engineer or licensed land surveyor. B. Convey to the County, by Offer of Dedication, additional right of way on Live Oak Avenue as required for the planned future width of 66 feet. 7. C. Provide for adequate sight distance for a design speed of 45 MPH at the intersection of Live Oak Avenue and Gum Tree Lane in accordance with CALTRANS standards. D. Provide for adequate sight distance for a design speed of 25 MPH at lots 55 and 56 in accordance with CALTRANS standards. Provide sight distance easements if necessary. E. Construct a half width roadway to County Public road standards, including curb, gutter and sidewalk, within the existing 60 foot County right of way, known as Gum Tree Lane, from Live Oak Avenue to the easterly side of the right of way dedicated by Subdivision 7165 for Hagar Lane. The face of curb shall be 10 feet from the right of way line. Construct a minim pavement width on Gum Tree Lane of 28 feet. Construct one half of a Cou ty standard cul-de-sac at the eastern end of Gum Tree Lane with the back of the cul-de-sac face of curb 10 feet from the easterly right of way dedicated by Subdivision 7165 for Hagar Lane. Provide a pedestrian and bicycle connection from the Gum Tree Lane to EI Monte Loop at the cul-de-sac. F. Relinquish abutter's rights of access along Gum Tree Lane with the exception a 56-foot wide opening for "A" Street and a fifteen foot wide pedestrian access from the cul-de-sac. G. Construct the on-site road system to County public road standards and convey to the County, by Offer of Dedication, the corresponding right of way. H. Prevent storm drainage, originating on the property and conveyed in a concentrated manner, from draining across the sidewalks and driveways. I. Install permanent landscaping and automatic irrigation facilities within the border areas, and install interim landscaping features within the future road areas, if any. All work shall be done in accordance with the guidelines and standards of the County. Funding of, and maintenance of, the new plantings shall be guaranteed by the developer until the expiration of the plant establish- ment period and, until funds are available through a landscaping district. J. Apply to the Public Works Department for annexation to the County Landscap- ing District AD 1979-3 (LL-2) for the future maintenance of landscaping and irrigation facilities in borders and other areas ("open space" is specifically excluded). K. Submit landscaping plans to the Public Works Department and pay the plan review and field inspection fees. All landscaping and irrigation facilities shall be maintained by the applicant until funds become available for their mainte- nance by the County after final inspection is cleared. . . . 8' ' L. Furnish proof to the Public Works Department, Engineering Services Division, of the acquisition of all necessary right of entry, permits and/or easements for the construction of off-site, temporary or permanent, road and drainage improvements. M. If, after good faith negotiations, the applicant iounable to acquire necessary rights of way and easements, he shall enter into an agreement with the County to complete the necessary improvements at such time as the County acquires the necessary interests in accordance with Section 66462 and 66462.5 of the Subdivision Map Act. N. Prior to filing the Final K4ep' apply to the Public Works Department for annexation of the property to Drainage Area 290 for theand operation ofthe drainage area's drainage facilities. The app|ioatilnwill require a metes and bounds description of the property' ` C)' Provide deed notification t0those parcels that front B Lago Drive, B Monte Loop and "A" Street' and install signage at the end of the road, to inform prospective property owners that E| LggoDhv8' B Kqonta1oopand "A" Street may haextended inthe future. ADVISORY NOTES A. The East County Regional Planning Commission strongly advises that the County fulfill its obligation to provide community donneedc vvotar supply tothe three residences located north of the detention basin. B. Comply with the Park Dedication Fee Ordinance. C. Comply with the requirements of Lhg |ronhouae Sanitary District. D. Com. .� withthe requirements of the Oakley Water District. E. Comply with the requirements of the Building Inspection Department. Building Permits are required prior tothe construction ofresidences onthe site. AGrading Permit shall be required for this project. F. Comply with the requirements of the Oakley Fire Protection District. G. The applicant will be required to comply with the requirements of the Bridge/Thoroughfare Fee Ordinance for the Oakley/North Brentwood Area of Benefits as adopted by the Board of Supervisors. H. The. applicant will be required to cVnlo|y with the drainage fee requirements for Drainage Area 29Haaadopted by the Board of Supervisors. . . . . . 8' - |. Certain improvements required by the Conditions of Approval for this development or the County Subdivision Ordinance Code may be g|iQib|a for credit or reimbursement against said foe. The developer should contact the Public Works Department to personally determine the extent ofany credit orreimbursement for which hemight be eligible. J. The applicant shall be required to comply with all rules, regulations, and procedures of the National Pollutant Discharge Elimination System (0PDE8) for municipal, construc- tion and industrial activities as promulgated by the California State Water Resources Control Board, or any of its Regional Water Quality Control Boards (San Francisco Bay- Region 11 or Central Valley - Region V). /\B/ni/om r RZX\/U|/2687C-RZ.AB 8/S/92 S/21/92 - EC (a) ^ ' ^ 5VY 7 70 041-030-016 041-030-018 041-030-028 ALAN & ANITA ADAMS RUBEN & MURIEL SKAGGS RICHARD & ROSARIA CAGLE-*" 500 TATE LANE 4460 LIVE OAK ROAD RT. 1 BOX 255G OAKLEY, CA 94561 OAKLEY, CA 9456.1 OAKLEY, CA 94561 041-030-029 041-030-035 041-100-017 MADELEVA TATE DOUGLAS & NINA BURIAN 300 TATE LN. RT 1 BX 255F HAGAR LN OAKLEY, CA 94561 OAKLEY, CA 94561 0*K1.&Y, CA nttt A14770CIf 'U4;07v 041-100-018K 041-100-019 041-100-021 2(t',22',23' OW_/Co^0/4 NORTH STATE DEVELOPMENT CO. MORRISON HOMES KIT & DOROTHY CARPENTER 4300 RAILROAD AVE. 2255 CONTRA COSTA BLVD #200 RT. I BOX 225 LIVE OAK PITTSBURG, CA 94565 PLEASANT HILL, CA 94523 OAKLEY, CA 94561 041-100-024 'A\e 041-100-026-\- 041-100-027 'k— GARY & BARBARA MELLO RICHARD & SUSAN GARRISON WAYNE &)INDA MYERS RT. 1 BOX 224-C 4580 QUARTER LN. 4540 QUARTER LN. OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEY, CA 94561 041-100-028 JC 041-100-029 041-100-030 LARRY & DIDI DEL CHIARO CHARLES GARRISON JR. ANTHONY & MARY JANE MELLO RT 1 BX 224-D RT. 1 BOX 225-N RT. 1 BOX 255-P OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEY, CA 94561 041-110-011 041-110-019 041-170-001 & 025 sg2 ! 085 TOM & JESSIE RANEY '( MORRISON HOMES MORRISON HOMES RT. 1 BOX 255-A 2255 CONTRA COSTA BLVD #200 2255 CONTRA COSTA BLVD 9200 OAKLEY, CA 94561 PLEASANT HILL, CA 94523 PLEASANT HILL, CA 94523 Aw /70-00 7— w.;4. r C �O 410 Le 'f /Z- A tOA J V 57 7/1/ 04 CA Bellecci & Associates 2290 Diamond Blvd. #100 Concord, CA 94520 . � �� � ' . . 'A�endalt�nn x ~ 1� . / Community Development Contra Costa County EAST COUNTY REGIONAL-PLANNING COMMISSION MONDAY, SEPTEMBER 21, 1992 - 7:00 P.M. i INTRODUCTION ` BELLECCI & ASSOCIATES (Applicant) NORTH STATE DEVELOPMENT (Owner) County File #2gG7-RZ' The applicant requests approval torezone 12.14acres ofland from General Agriculture District A-2 to Planned Unit Development District P-1. BELLECCI & ASSOCIATES .(Apolicant) NORTH STATE DEVELOPMENT (Owner) County File #3029-91 . The applicant requests approval of a final development plan to develop the srite with 65 single family residential. Subdivision 7704: BELLECCI & ASSOCIATES (Applicant): NORTH STATE DEVELOP- MENT (Owner): The applicant request approval of a vesting tentative map to subdivide -- 12.14 --- -- -- 65 lots.— Subject property for the above referenced projects consist of most of Parcel Aof MS 85-75 and a small portion of Parcel D of MS 7-74' The site fronts for approximately G30feet onthe north side mfGum Tree Road approximately 31(} feet east nfLive Oak Avenue in the Oakley area. (A-2) (ZA: G-24 & H-24) (CT 3020'00) (Parcel No. 041- 10O-02O) ` U. . Staff recommends that the East County Regional Planning Commission adopt a resolution recommending that the Board of Supervisors approve this plan of development subject tVthe attached Conditions of Approval.. Ui GENERAL INFORMATION A. The site is designated Single Family Residential H' hCensityon the 1991 County General Plan (5'7'2DU/Net Acre). Areas tothe north, east and west are also designated Single Family Residential High Density. Properties to the south of the site across Gum Tree Road are designated Single Family Residential Low Density and Single Family Residential Very Low Density. The 'proposal conforms tothe General Plan for the area, with a net acreage 0f 9.14 acres and with 65 units the density of the site is 7.1 dwelling units per net acre. B. Present zoning - General Agricultural District (A-2). Proposed Zoning - Planned Unit District (P'1). ' . r . C. Negative Declaration mfEnm"mmrnanta| Significance was posted for this project on June 4' 1892. D. : The soil onthe site im Delhi Sand. This is Class 3 soil and is not considered prime agricultural land. E. The surrounding-areo is-a- mix -oƒ remaining larger - - parcels and ongoing ra�d�nt�| d�v� opn��nt The proposal would baanextension ofpending subdivisions tpthe north and east nfthe site. )ara are approved subdivision north and east 0fthe site extending to Empire Avenue. The properties immediately west and southwest ofthe site also have approved subdivisions onthem. Properties tothe south ofthe site,across Gum Tree Road, are generally larger parcels of 1 acre or more in size. R/' A. Todate nowritten comments have been received. B. See attached letter. ' C. Nmcomments on this application. D. There is alow possibility of archaeological sites. Further study for archaeological resources is not recommended. E. See attached letter. F. Building Inspection Department: 1. Grading Permit will be required for the earth work necessary todevelop all parcels inthe above subdivision. 2- Submit four #Q copies of plans showing the existing contours, the extent Ofthe proposed grading, drainage improvements and general site development. ' 3. F1an accompanying the application for. building permits shallshowthe - a»iadnQ contours, the extent of the proposed grading and drainage irnprnv8rnents and shall be reviewed by the grading section prior to issuance. 4, Prior to issuance .of buildings and/Or grading permits in above subdivi- sions, a preliminary soils investigation report prepared by a licensed soils ubdk/i-8iVns, apre|inninorymVi|sinvemhQatiVnreponpraparedbya|icenmodaoi|s engineer will be required. It shall reports on the ability of the sites to support the improvements anticipated and shall include recommended foundation design to achieve maximum stability of the proposed structure. 2 ' . ) 5' A `..ansedsoils angina&may Ile required -control grading operations and to report on ability of the site to support the improvements anticipated. 6' Typical cross sections of the proposed access road improvements shall beshown onthe above plans. ' G. The |ronhouae Sanitary District has the following comments relating to this project: ' |runhmuoe Sanitary District will ide sewer service to this projectmubkaotto the capacity available inthe collections system and treatment plan otthe time of issuance of the Building Permit and subject to the following recommended conditions: _ 1' .All construction tocomply with the conditions and specifications Ofthe |ronhouse Sanitary District. 2. Payment of all.applicable faaa as required by Ordinance. �~I 3' Sewer service is required per |rmnhouao Sanitary [h�".ot Ordinance. Property is within 150 feet ofan existing sewer. H. Oakley Water District: The district will supply water in accordance with districts regulations and specifications. |. Contra Costa Water District: See attached letter. J. See attached letter. V. ROAD AND DRAINAGE CONSIDERATIONS ` The attached conditions of approval based on the September 1991 tentative map, ' include road and drainage mgquinamngn1m. The applicant should be fully aware of the County Subdivision Ordinance Code requirements as they pertain to this development. The proposed development islocated inDrainage Area 28H. Nofurther development will beallowed in Drainage Area 29H until Line Aofthe Drainage Area 28H plan has been constructed. The proposed development should participate in the cost of the construction ofLine Aofthe Drainage Area 28Hplan with proposed subdivision 733O' \8' STAFF DISCUSSION/EVALUATION OF PROJECT The rezoning ofthe site from General Agricultural District to Planned Unit District will bring the size zoning into conformance with the General Plan for the area. The proposed density of 7'1 dwelling units is per net acre it in conformance with the General Plan for the area and the site. The General Plan designates the site aasingle family residential high density with a density range of 5 to 7.2 dwelling units per acre. 3 Thus, the overall ensity of the proposal is near maximum density allowed for by the General Plan. As mentioned above, the property to the south is designated either Single Family Residential Low Density, this is the area generally west of proposed "A" street or Single Family Residential Very Low Density, this is the area generally south of Gum Tree Road and east of "A" Street. Because of this and because of the narrow lots-' proposed.along "A" Street, staff is recommending that the number of lots in that area be reduced by 1 on each side of proposed "A" Street. In other words, one lot between Lot #1 and #11 would be eliminated and one lot between Lots #12 through #20 would be eliminated, the remaining lots would be widened with a requirement that Lots #1 and #20 have a width of at least 60 feet, since they are corner lots. The development building set-back requirements should, in general, comply with the requirements of the R-6 Zoning District except that areas such as living rooms or porches should be allowed a slightly lesser set-back of 15 feet rather than the 20 feet required. Of course, garages should havethe proper setback of 20 feet from any road. The Gum Tree frontage of the site needs to be properly fenced with a concrete masonry wall. The color and finish of the wall should be reviewed and approved by the Zoning Administrator. The strip along the Gum Tree Road. fr6nta5e of this site should be landscaped with suitable trees, preferably a suitable type of-Eucalyptus in line with the name of the street, so that the area has a more pleasing appearance.. Trees should be planted on relatively close centers.so that they quickly will grow up and form the appearance of a row of trees along that side of the road. The other perimeters of the site not fronting upon road should be suitably fenced with solid wood fences with cement or wood clad metal poles designed to hold the fence up in the sandy soil found on the site. The front yards of the various"residences proposed for this development shall be landscaped prior to occupance as required for other subdivisions in the area. Prior to recording the final map for this development, the developer will have to reach agreements with the water and sanitary districts providing water and sewage service to the site. Agreement also needs to be reached with the Antioch School District for school services. The development is over 30 units and will have to make provisions for child care need per County Ordinances. A Transportation Demand Management (TDM) Plan will also be required prior to development of this site per County Ordinance. 4 ` , VII. CONCLUSION Based upon the staff report and the general plan designation ofthemitefureingmfammUy residential high density, staff recommends that the East County Regional Planning Commission adopt a Resolution recommending that the Board of Supervisors approve this development for 63{athey than the 85 proposed lots. Tha Cornnniaaiodmhuu|d recommend that one lot between proposed Lots#1through #I1baeliminated and one lot between Lots #12 and #20 be eliminated and those lots inthat area be proportion- ally widened. The development should be approved subject to the attached Conditions of Approval. RZXVU|/2697-RZ.AB/sj September 9, 1892 ' ` 5 . ) . ' CONDITIONS OF APPROVAL FOR 2967-RZ 1This approval is based upon the exhibits received by-the Community Development Department osfoUovvs.- A' Revise vesting tentative map 'dated received April 1~ l9S2 for 2987-RZ, Subdivision 7704, and D.P. 30 29-81 for 65 lots and single family residences on the 12.14acre site together with a preliminary grading plan on same sheet. This approval is for 03 lots (one lot between Lots #1 and #11 shall be eliminated and one !m1 between Lots #12 thru #20 shall be eliminated). Remaining lots in this area shall be proportionally widened with the |o1a at the corner,ofproposed °A" Street and Gum Tree Road being atleast GOfeet wide. 2' Sewage disposal serving the property concerned with this app|icat ion shall baprovided bythe lronhousa Sanitary District. 3' Water servicing this property concerned with ovidedbythe Oakley Water District. � 4' Comply with the requirements of the Oakley Fire Protection District, including the provisions ofwater supply and fire hydrants as determined by the District. 5' The total number oflots shall not exceed 83. The development may bodeveloped in phases subject tothe review and approval of the Zoning Administrator. ' ' - ` . . . . CONDITIONS OF APPROVAL FOR THE FINAL DEVELOPME T PLAN 3029-91 AND SUBDIVISION 7704 ' 1 ' This approval is based upon the exhibits received by the Connnmunity .Devo|opnngnt Department asfollows: A. Revise vesting tentative map dated received April 1, l982for 29G7-RZ' 3O28- Bland Subdivision 77O4for 65lots and single family residences onthe 12.14 acre site togetherwith apreliminary grading plan mnsame sheet. This approval is for 63 lots (one lot between Lots #1 and #11 shall be eliminated and one lot between Lots #12thru #20 shall be eliminated). Remaining lots in this area shall be proportionally widened with the lots at the corner of proposed "A" Street and (3unn Tree Road being at least GO feet wide. 2' Development |may be done in phasoaubjeuttotherevievxmndapprmva| Vfthe Zoning Administrator. The approval for final development plan 3029-91 shallconcurrently with the approval ofSubdivision 77O4' This approval iofor three (3) y6ffrs. One three year extension can be granted if requested in writing prior to the expiration date of this project extension request must be accompanied with the proper fee. 3' Any revision of internal circulation o|on and lot layouts shall besubject tothe review and approval mfthe Zoning Administrator. Prior to recording the final map, submit for the review and approval of the Zoning Administrator, a site plan showing.detailed house locations, typical elevations, driveways and fencing plans and street tree locations. 4' Guide for development and use provisions for this site shall be as follows: A. Set-back of residential units shall be varied between 15 and 20 feet. All QanyOas }miU have a set-back of at least 20 feat if they face directly onto the street' Front yard set-backs may bnreduced to15feet for covered porches or other living areas nfthe rGm\danCas. S\d8Vard minimums shall be 5 feet with t. a . m1a| aQgragatesideyard of 10 feeRear yard nl\ninnurns are 15 feet. The lots that back up to Gum Tree Road shall have a secondary set back of 20 feet. The residences of this development oho|i be of neutral color- and have complementary colors. All garages within this project shaUbebui|tvvithnertica| open garage doors. ' 5' Should archaeological materials be uncovered during grading,trenching or other on-site excavation(s), earthwork within 30 yards of these materials shall be stopped until a professional archaeologist who is certified by the Society for California Archaeology (SCA) and/or the Society of Professional Archaeology (SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation(s), if deemed necessary. 6' Sewage D\sposa| serving the property concerned with this development shall be provided by th8konhouS8 Sanitary District. Prior torecording the final map a Will Serve from the in}nhOuaa Sanitary District shall be submitted. ' 7' Water supply for this development shall be provided by the Oakley Water District. Prior to recording the final map a Will Serve letter from the Oakley Water Diat ic1 shall be submitted. 8' Where a,iot/oan:g| is located within 300 feet of a high voltage electric transmission line, the-applicant shall record the following notice: "The au6)oot property is located near a high voltage electric transmission line. Purchasers should be avvana that there is ongoing research on possible potential adverse health effects caused bythe exposure to a magnetic field generated by high voltage lines. Although much more research is needed before the question ofuvhethermagnetic fields actually cause adverse health effects can beresolved, the basis for such anhypothesis is established. Atthis time Porisk assessment has been rnade'" . When a Final Subdivision Public Report issued by the California Depaltment of Rme| Estate is required, the applicant shall also request that the Depo,trnahtlUf Real Estate .insert the above note in the report. 9' The following statement shall be recorded at the County Recorder's Office for each parcel to notify future owners of the parcels that they own property in an agricultural area: "This document shall serve as notification that you have purchased land in anagricultural area where you may regularly find farm equipment using local roads; farm equipment causing dust; crap dusting and spraying occurring regularly; burning associated with agricultural activities;noise associated with farm equipment and aerial crop dusting and certain animals and flies may exist mnsurrounding properties. This statement is, again, notification that this is part ofthe agricultural way of life in the open space areas of Contra Costa County and you should be fully ovvore of this atthetime of purchase." 10' Comply with the following construction, noise, dust and litter control requirements: A. Noise generating construction activities, including such things ns power generators, shall be limited 10the hours of7:3OA.K4' to 5:00 P'K4` Monday through Friday, and shall be prohibited on State and Federal holidays. The restrictions on allowed working days may be modified on prio-r written approval by the Zoning Administrator. B' The project sponsor shall require their contractors and subcontractors tofit all internal combustion engines with mufflers which are in good condition and shall locate stationary noise-generating equipment such as mi/ compressors and oononata pumpers asfar away from existing residences as possible. C. At least One week prior to commencement of grading, the applicant shall post the site and mail tn the Vvvnmrm of property of the exterior ` --` boundary ofthe project site notice that construction vvorkvvU|oomrnence' The notice shall include a list of contact persons with name, title, phone number and area qfresponsibility. The person namAoneiNe for maintaining the list shall be included. The list shall be kept current+atall times and shall consist of, ' . persons with authority toindicate and implement conaCtiveacdonintheirGrea of responsibility. The names of the individual responsible for noise and litter control shall beexpressly identified inthe notice. The notice shall bereissued with each phase ofmajor grading activity. A copy of the notice shall be concurrently transmitted to the community Development Department. The notice mheU be accompanied by list ofthe names and addresses of the property owners noticed, and a map identifying the area noticed. D. A dust and litter control program shall be submitted for the review and approval of the Zoning Administrator. Any violation of the approved program or applicable ordinances shall require animmediate work mtoppaConstruction work shall not be allowed to rgounng until, if necessary,In appropriate construction bond has been posted. E. Theo����aU make good-faith o�� � a�d interference with existing neighborhood traffic flows. Prior toissuance ofbuilding permits, the proposed roads serving this development shall beconstructed toprovide access toeach |#t' This shall include provision for an on-site area in which to park earth moving equipment. 11 . At least 30 days prior to recording a Final Map, issuance of a grading permit, or installation of improvements or utilities, submit a preliminary geology, soil, and f oundation report meeting the requirements of Subdivision Ordinance Section 94-4.420 for review and approval Of the (Zoning Administrator). Improvement, grading' and building plans shall odrry out the.recommendations of the approved report' 12' The report msqUimod above shall include evaluation of the potential for liquefaction, . seismic settlement 13. Record a statement torun with deeds tothe property acknowledging the approved report by title,author (firm), and date, calling attention to approved recommendations, and noting that the report is available from the meUgr' 14' Ph0v to the issuance of building permits the applicants shall submit a detailed Transportation Demand Management (TDM) Plan for review and approval of the Zoning Administrator (unless otherwise required byaTDM Ordinance). The approved TDM Plan shall be operative prior tOfinal inspection by the Building Inspection Department ofresidences within this development. 15. Provision of a Child Care Facility or program is required for this development. The program shall be submitted for the review and approval of the Zoning Administrator prior tothe filing of the Final Map. * ' 16' Prior to or concurrent with final map approval the monkcont agrees to participate in provision of funding tomaintain oraugment police services by voting to approve a special tax for the subdivisions area at the per parcel annual amount (for the appropriate CPI adjustments) established bYthe Board ofSupervisors- The request to establish adistrict shall bemade otleast '60 days prior toanticipated request 1mrecord the final map. 17' At least 30 days priorto requesting the recording of the final rnep for the site the applicant shall submit alandscape plan conforming the County'eWater Conservation Policies. A. Native, drought tolerant plants shall be used whenever feasible. B. Landscaping along all streets, set-backs and'aachfront yard shall conform to the County Landscape Guidelines. /\ typical front yard landscaping plan mhoU be submitted for raxiavv and approval of the Zoning Administrator. The plan implemented prior to occupancy of the various residences on t e site. C. Submit street tree planting plan prior to recording the final map. Arn\nirnumn One 15 gallon street tmga shall be planted on each non-corner lot. Corner lots ahoU have at least three street trees planted on them. [) All landscaping shall be maintained by the developer until occupancy or annexation toalandscape and lighting district. The applicant shall borequired to annex if and when the district is formed. Future hornaqvvneny shall be notified by deed notice of the fact this site is within a landscape and lighting district. E. The masonry wall proposed along Gum Tree mho | not be straight along its' entire frontage. There shall betwo tothree set backs oftwo tothree feet each to help eliminate the affects of a |omg.straight vyaU' The masonry vvoU color and finish shall be reviewed and approved bythe Zoning Administrator. The masonry wall shall be'oonstxucted prior to issuance of building permits on any |o'm of this subdivision. F. The�ites frontage on Gum Tree Road shall be suitably landscaped-with a row ofsuitable drought tolerant trees. The trees shall bep|antedonamaximum of 20 foot centers and shall be maintained by`the developer until the area is annexed into alandscape and lighting district. �. G. Fence design and location shall be shown onthe landscape plan. The fencing shall be designed to stand-up in the sandy soil of the site by use of suitably spaced cement pilaster orwood clad metal poles orother means acceptable tO the Zoning Administrator. Fencing shall be established along all sides of the site that do not front upon streets. ' H. Grading plans shall include an erosion protection for all slopes greater than 5 feet Cvmore iOheight. Slope hndrVnnU|chinQshall bGused asrecommended by a Certified Landscape Architect. v ' 18' Prior torecording h e final map for this project, the developer shall submit Will Serve letters from the Antioch School District. 19' Cmnno|y with the requirements of the Contra Costa Water District in regards to the irrigation lateral that crosses the site. Prior to recording the final map for this development orissuance ofgrading permits, the applicants shall submit a letter from the Water District indicating that an agreement has been reached in this area. 20' The following pertain to drainage, road and utility improvements and will require the review and approval of the Public Works Department. 21' The following requirements pertaining to drainage, road, and utility improvements will require the noViavx and approval of the Public Works Department: A. In accordance with 8aodon 92-2.006 of the County Ordinance Code, this subdivision shall conform tothe provisions 8fthe County SubdivitionOrdinanoe ' (Title 9)' Any exceptions therefrom must be opecificaUyF|isted in this conditional approval statement. Conformance with the Ordinance includes the following requirements. 1- Constructing road improvements along the frontagb ofLive Oak Avenue. a. Constructing curb, four-foot six-inch sidewalk (width measured from curb face), a complete curb return, necessary longitudinal and transverse drainage, and necessary pavement widening and tapers along the frontage will satisfy this requirement. The u!bnna1e alignment of Live Oak Avenue is available from the Public Works Department, Road Engineering Division. b' The face Vfcurb shall baten feet from the ultimate right ofway line. ' 2. Installing street lights and annexing the property tVCounty Service Area L-100 for maintenance of the street lights. The final number and location of the lights mhmU be determined by .the Public VVorho Department, Road Engineering Division. 3' Install all new utility distribution service underground. 4' Conveying all storm waters entering or originating within the muNeo1 property, without diversion and within an adequate storm drainage facility, to natural watercourse having definable bad and banks or to an existing adequate storm drainage facility which conveys the storm waters to a natural watercourse. This will require the construction of a portion of Line Bfromn Basin #23tothe existing portion of Line B on the mouth side of Oakley Road~ and o portion of Basin #2 that is proportional t� t�iSd�v�iOpO0�Ot� runoff basin.iO. �lFhapplicant pr0p� should also participate in the construction of Lino Aofthe Drainage Area 29H plan with Subdivision 7330. . . ! . Designing and constructing otmrnn drainage facilities required by the Ordinance incompliance with specifications outlined inDivision 914mf ' the Ordinance and in compliance with design standards of the Public Works Department. ` 8' Installing, within a dedicated drainage easement, any portion of the drainage system which conveys run-off from public streets. 7. On all public roads with longitudinal slopes of eight percent or |eaa' all public pedestrian access vvayashaUbedoo\Qnadinacoondanoexvithllde 24 (Handicap aCoasS). This shaUinc|ude all driveway depressions as well amhandicap ramps. S. Submitting improvement plans prepared b« o registered civil engineer, payment of review and inspection fees, and security for all improvements required by the Ordinance Code or the conditions of approval for this subdivision. These plans shall include,Iny necessary traffic signage and striping plans for review by the rPub|ic Works Department, Road Engineering Division. 9. Submitting a Final W1op pnopomgd by a registered civil engineer or licensed land surveyor. B. Convey tothe County, by Offer of Dedication, additional right ofway on Live Oak Avenue as required for the planned future width of GG feat. C. Provide for adequate might distance for a design speed of 45 MPH at the intersection of Live Oak Avenue and Gum Tnaa Lane in accordance with C/\[[RANSetandaods. D. Provide for sight distance for a design speed of 25 MPH at lots 55 and 56 in accordance with CALTRANS standards. Provide sight dimtenoa easements ifnecessary. E. Construct a half width roadway to County Public road standards, including curb, gutter and sidewalk, within the existing 60 foot County right of way, known as CSunn Tree Lane, from Live Oak Avenue to the easterly side of the right ofway dedicated bySubdivision 7185 for Hagar Lane. The face ofcurb shall be 10 feet from the right of way line. Construct a rnininnVrn pavement width OnGum Tree Lane Vf28feet. Construct one half ofaCounty standard cul-de-sac at the eastern end of Gum Tree Lane with the back of the cul-de-sac face ofcurb 10 feet from the easterly right ofway dedicated by Subdivision 7lG5for HagorLane. Provide a pedestrian and bicycle connection fronnthe Gunn Tree Lane to E| Monte Loop at the cul-de-sac. F. Relinquish abutter's rights ofaccess along Gum Tree Lane with the exception o5G-footwide opening for "A" Street and afifteen foot wide pedestrian access from the cul-de-sac. . . , . G. Construct the on-site road system to County public road standards and convey to the County, by Offer of Dedication, the corresponding right of way. H. Prevent storm drainmga, originating on the property and conveyed in a concentrated manner, from draining across the sidewalks and driveways. L Install permanent landscaping and automatic irrigation taoi|hies within the border areas, and install interim landscaping features within the future rood orm8s' if any. All vvorkohaUbe done in accordance with the guidelines and standards of the County. Funding of, and maintenance of, the new plantings aheU be guaranteed by the developer until the expiration of the plant establishment period and, until funds are available through a landscaping district. J. Apply to the Public VVPrka Department for annexation to the County Landscaping District AD 1979'3 (LL-2) for the future maintenance of landscaping and irrigation facilities inbordonamndother areae (y�Upenspace" is � specifically excluded). K. Submit landscaping plans to the Public VVovkm Department and pay the plan review and field inspection fees. All landscaping and irrigation facilities shall be maintained by the applicant until funds become available for their maintenance by the County after final inspection is cleared. L. Furnish proof to the Public Works Department, EngineeringServices Division, of the acquisition of all necessary right of entry, permits and/or easements for the construction of off-site, temporary or permanent, road and drainage improvements. M. If, after good faith negotiations, the applicant is unable to,acquire necessary rights ofway and easements, hashall enter into anagreement with the County to complete the necessary improvements at such time as the County acquires the necessary interests in accordance with Section 66462 and 66462.5 of the Subdivision Map Act. N. Prior to filing the Final Map, apply to the Public Works Department for annexation of the property to Drainage Area� 28O for the maintenance and operation ofthe drainage area's drainage f$oi|idSe' The application will require o metes and bounds description of the property. O' Provide deed notification tothose parcels that front E| Lago Drive, B Monte Loop and "/\" Street, and install signage at the end of the road, to inform prospective property owners that E| Lagn [>hve' E| Monte Loop and "A" Street nnayba,axtend8d inthe future. . ADVISORY NOTES ' A. Comply with the Park Dedication Fee Ordinance. B. Comply with the requirements of the |ronhoume Sanitary District. C. Comply with the requirements ofthe Oakley Water District. D. Complywith the requirements of the Building Inspection Department. Building Permits any required prior tothe construction of residences on the site. A Grading Permit shall be required for' this project. ' E. Comply with the requirements of the Oakley Fire Protection District. F. The applicant vviU- be required to comply with the requirerqents of the Bridge/Thoroughfare Fee Ordinance for the Oakley/North BrentvvoodAFeo of Benefits ` as adopted by the Board of Supervisors. G. The applicant will be, required to cornp|y'vvith the drainage fee requirements for Drainage Area 29H as adopted by the Board of Supervisors. H. Certain improvements required bythe Conditions of Approval for this development or the County Subdivision Ordinance Code may be eligible for credit or reimbursement against said fee. The developer should contact the Public Works [JapaMLrnent to personally determine the extent of any credit or reimbursement for which he might be eligible. |' The applicant shall berequired to comply with all rules, regulations, and procedures of the National Pollutant Discharge Elimination System (NPC>ES) for municipal, construction and industrial activities as promulgated by the California StateWatar Resources Control Board, or any ofits Regional Water Quality Control Boards (Son Francisco Bay ' Region || or Central Valley - Region V)' RZXV|U/2897C-RZ.AB/SJ September 9, 1982 ` ' ^ OAKLEY FIRE PROTECTION DISTRICT`` -`'-i-'`" P. o. Box 207 Oakley, California 94561 Business Phone{415} 625-2119 September 17, 1991 Contra Costa County Community Development Department 651 Pine Street, North Wing - 4th Floor Martinez, CA 94553 ATTN: Art Beresford SUBJECT: Subdivision 7704, Meadow Glen Hagar Lane .& Gum Tree Road Oakley, CA Dear Mr. Beresford: We have reviewed the Development Plan, application, dated August 30, 1991, for the ,subject project. The application is to allow . 68 single family homes subdivision. This project is subject to fire and life safety requirements of the Uniform Fire Code, as adopted by Contra Costa County Ordinance 89-71, and the applicable provisions of the California State Fire Marshal's regulations. If this project is approved, we request that the following Uniform Fire. Code and State Fire Marshal requirements be included as Conditions of Approval: SPECIFIC CONDITIONS: 1. The developer shall provide an adequate and reliable water supply for fire protection with a minimum fire flow of 1,000 GPM. Required fire flow shall be delivered from not more than two (2) hydrants flowing simultaneously while. maintaining 20 pounds residual -pressure in the main. [10.301(c) UFC] STANDARD CONDITIONS: 2 . The developer shall provide access roadways with all-weather driving surfaces of not less than 20 feet of unobstructed width, and not less than 13'- 611 of vertical clearance, to within 150 feet of all portions of the exterior walls of every building. Access roads shall not exceed 20% grade, shall have a minimum outside turning radius of 42 feet, and must be capable of supporting the imposed loads of fire apparatus (20 tons) . [10.207 UFC] 3 . Dead-end fire department access roads in excess of 150 feet long shall be provided with approved provisions for the turning around of fire department apparatus. (10.207 (h) UFC] C.C.Co. Comm. Dev. Dept. S1249PD.917 September 17, 1991 Page 2 4. Fire hydrants shall *be installed, in service and capable of delivering the required fire flow prior to issuance of building permits for combustible construction. Water supply shall be provided via public water mains approved and accepted by the City Engineering Department. (10. 301 (c) & 10.301(e) UFC] 5. The developer shall provide illuminated addressing located on all buildings in such a manner as to be plainly visible and legible from the street or road fronting the property. [10.208 UFC] 6. The developer shall be required to contribute Fire Facility Fees to mitigate operational costs 'associated with increased service demands throughout the Fire District. Fire Facility Fees are currently 'set at the rate of $480.00 per individual residential dwelling unit. The developer shall pay all required Fire Facility Fees prior to the issuance of any building permit. 7. The developer shall submit two (2) sets of Improvement Plans to the Fire District for review and comment prior to construction. [2 . 206 UFC] The conditions specified above are intended to ensure that the project is in general compliance with applicable fire codes and regulations enforced by the Oakley Fire Protection District. Review of subsequent plan submittals, required above, may result in additional requirements. Projects beginning construction -more than one (1) year from approval may also be subject to additional requirements. It is requested that a copy of the Conditions of Approval for this project be forwarded to our office when complied and adopted by your agency. if you have any questions regarding this review, please contact the undersigned at (510) 757-1303 Ext. 22 between the hours of 8:00 - 9: 00 a.m. and 4: 00 - '5.: 00 p.m. (Monday through Friday) . Sincerely, JOE TOVAR Fire Chief BILL BANOVITZ JT:BB:rh Fire InspectYr pc: North State Dev. Co. Sub 7704 - S124900PD00 _tolfika' CONTRA COSTA WATER DISTRICT 1331 Concord Avenue - i P.O.Box H2O Concord,CA 94524 R"' (415)674-8000 FAX(415)674-8122, (415)439-9169 Toll Free from Se tember 30, 1991 Eastern Contra Costa County p Directors Bette Boatmun President An Beresford Ronald E.Butler Contra Costa County Vice President Community Development Donald P Freitas 651 Pine Street,4th Floor,North Wing Daniel L Pellegrini Martinez,CA 94553-0095 Paul F.Hughey Ed Seegmiller Subject: Subdivision No.7704-Meadow Glen- U. S. Bureau of Reclamation Lateral General Manager 6.2,21" RCP-H-50-16'Waterline Easement, at Oakley.- File No. 792400 Dear Mr. Beresford: Please be advised that the U. S. Bureau of Reclamation has an easement for Lateral 6.2, a 21" RCP-H-50 pipe within the proposed subdivision 7704. Contra Costa Water District operates and maintains this facility and permanent access must be provided. Also,the developer shall prevent drainage from his property to enter the Contra Costa Canal facilities,all run-off drainage must be diverted to a public storm drain facility,per Contra Costa County Ordinance 914-2.006,and Contra Costa Water District Regulation 1.04.110. All plans,specifications, and design criteria within or adjacent to the•canal facilities must be reviewed and approved by the District and the U. S. Bureau of Reclamation before construction. If you have any questions,please do not hesitate to call me.. Very truly yours, _ 1 _/'Antonio E. Rocha Engineering Technician 11 Engineering Department (510) 674-8076 AER/dc Enclosures cc: Stan Applegate Panos Kokkas (� Richard K. Rainey Sheriff-Coroner Contra' SHERIFF-CORONER P.O. Box 391 Costa As ttttn E RupE Martinez,California 94553-0039 As'-'Z her- (415) 646- COu�fif G@Fiild I Mitogltika ``ll Ass�tar h&4t: Ro#oer U Davis? Assistant-SherOf' September 27, 1991 Mr. Art Beresford Community Development Department 651 Pine Street, North Wing, 4th Floor Martinez, CA 94553 RE: County File No. 2967-R2 DP3029-91 TR7704 y Dear Mr. Beresford, I am writing in response to your Agency Comment Request Form for the proposed Meadow Glen subdivision in Oakley. We use a formula developed from Crime Prevention through Environmental Design to determine increase in population. There are 68 homes proposed in the development and based on the formula the increase in population would be over 300 individuals. Although this particular development may not impact our calls for service; this project coupled with other projects would increase our services. We are therefore, requesting that the development be annexed into the P6 Special Police District which would provide funding for law enforcement services. In terms of traffic flow, there are several entrances from the project that would allow for easy access of emergency vehicles as long as the street widths met the minimum standards. Should you require additional information, please do not hesitate to contact me at 313-2721. Sincerely, RICHARD K. RAINEY Sheriff-Coroner - r Catherine A. Bezick Community Relations Unit AN EQUAL OPPORTUNITY EMPLOYER ANTIOCH UNIFIWCHOOL DISTRICT a S I O'G*Street-P.O.Box 7W Antioch.california O"F HONE{510}706¢100-FAX.(510)757-2937 ALAN J.NEWELL,J.D. K JAMES R.WELLS.Ph.D. SUSOF SCIiOOLS 92 IHA ASSLSTANr VJPERMVNDENr BUSINESS SERMES DENNIS GOETTSCH JAMES M.PATTON ASS15TANT SUPERIMV-D ..PERSONNEL SERVICES DIRECTOR RESEARCH AND DEVELOPMENT' LYNN STRAIGHT,Ph.D. JAN NIEBERLEIN ASUSTANTSWIEWTENDFNI'EDUCATIONAL ES DEV -V' D DIRECTOR COMMISSION March 20, 1992 Mr. Frank P. Bellecci Bellecci & Associates. Inc. 2290.Diamond Boulevard, Suite 100 Concord, California 94520 Subject: Will Serve Letter for Tract 7704 - APN #041-100-022 Dear Mr. Bellecci: This is to inform you that this is a "will serve" letter for Tract 7704 (APN #041-100-022), and that the children from that tract will be served by the Antioch Unified School District. The children will be placed in schools in the District. At this time we cannot indicate which schools the children will attend. Placement will take place when the subdivision, generates the children. Should you have any questions about this, please feel free to contact me. Yours very truly, James R. Wells Assistant Superintendent, Business Services JRW:bmc cc: Art Beresford Daniel Bort Greg Mattson California Environmental Quality Act NOTICE OF Completion of Environmental Impact Report [TXXI Negative Declaration of Environmental Significance CONTRA COSTA COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 651 Pine Street North Wing - 4th Floor- Martinez, California 94553-0095 Telephone: (510) 646-2031 Contact Person Art Beresford Project Description and Location: BELLECCI &ASSOCIATES (Applicant) - NORTH STATE DEVELOPMENT (Owner), County File #2967-RZ: The applicant requests approval to rezone 12.14 acres of land from General Agricultural District (A-2) to Planned Unit Development District (P-1). BELLECCI &ASSOCIATES (Applicant) - NORTH STATE DEVELOPMENT (Owner), County File #3029-91; The applicant requests approval of a final development plan to develop the site with 65 Single Family Residences. SUBDIVISION 7704(Applicant: Bellecci&Associates) (Owner: North State Development)The applicant requests approval of a vesting tentative map to subdivide the 12.14 acre site into 65 Single Family Residential lots. Subject property for the above referenced projects, consists of most of Parcel A of Ms 85-75 and a portion of Parcel D of MS 7-74. The site fronts for approximately 990 feet on the north side of Gum Tree Road approximately 310 feet east of Live Oak Avenue in the Oakley area. (A-2) (ZA:G-24 & H-24 ) (CT 3020-00 ) (Parcel #041-100-022 & 041-100-020) THIS IS A NOTICE OF STAFF'S DETERMINATION OF THE ENVIRONMENTAL IMPACT OF THE ABOVE PROJECT. YOU WILL BE FURTHER NOTIFIED OF THE PROJECT'S HEARING DATE WHERE YOU CAN COMMENT ON THIS DETERMINATION AND THE PROJECT IF YOU WISH. Based on the foregoing review,the project will not result in any potentially significant environmental impacts. The Environmental impact Report or Justification for Negative Declaration is available for review at the address below: Contra Costa County Community Development Department 4th Floor, North Wing, Administration Building 651 Pine Street Martinez, CA Review Period for Environmental impact Report or Negative Declaration: aAh� el� 12�2 2 thru Mu-x AP 9 R 12./89 By Communityde4vZ14Anep4aMm-�eme.