HomeMy WebLinkAboutMINUTES - 01121993 - 1.8 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: January 12, 1993 SUBJECT: ADDENDUM TO THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE SAN RAMON CREEK IMPROVEMENT PROJECT Project No.: 7520-668318 SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE the Addendum to the Final Environmental Impact Report (FEIR), County File #PW 85- 55, CP #92-84, for the San Ramon Creek Improvement Project and FIND that Assessor's Parcel No. (APN) 187-110-006 is needed for drainage improvements on San Ramon Creek. II. Financiallmpact: Funds for acquisition of the additional property will come from the Flood Control Zone 3B funds. III. Reasons for Recommendations and Background: The Addendum to the FEIR for the San Ramon Creek Improvement Project will provide for the acquisition of an additional parcel (APN 187-110-006) to provide for adequate drainage improvements on San Ramon Creek. The Addendum is consistent with County policies and does not lead directly or indirectly to significant physical changes in the project, nor does it alter the adequacy or the completeness of the environmental impacts and mitigation measures identified in the FEIR. Therefore, an Addendum to the FEIR is appropriate. IV. Consequences of Negative Action: Without approval of the Addendum to the FEIR, adequate drainage could not be provided. Continued on Attachment: x SIGNATURE: llflat444 f _ RECOMMENDATION OF COUNTY ADMINISTRATOR . RECOMMENDATION OF BOARD COMMITTEE APPROVE _ OTHER SIGNATURE(S): ACTION F B R JAN 12 1993 APPR COMMENM V OTHER I VOTE OF SUPERVISORS V- UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: BF:kd a:BO\BO12.t1 I hereby certify that this Is a true and correct copy �f Contact: Phil Harrington,313-2285 an action taken and entsied on the minutes of tre Orig. Div: Public Works (FC) i Hoard of Supervisors on the datb shown. cc: J. P. Murphy, Flood Control ATTESTED: JAN 12 1.993 County Administrator PHIL BATCHELOR,Clerk of the Board Community Development of Supervisors and County Administrator Building Inspection County Counsel Aj By �L »_ _ A� 'Oeputy County Assessor County Treasurer -Tax Collector County Auditor - Controller See Page Two ADDENDUM TO FINAL EIR FOR SAN RAMON CREEK IMPROVEMENT January 12, 1993 Page Two V. Germany, Design R. Babst, Real Property Chief Engineer Flood Control Engineering Accounting Engineering Services i I