HomeMy WebLinkAboutMINUTES - 01051993 - 1.8 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: January 5, 1993
SUBJECT: Approval of Contract Change Order No. 4 for the West Antioch Creek project in the
Antioch area, Project No. 7579-6D8538-91
Speck Request(s) or Recommendation(s) &Background&Justification
I. Recommended Action:
APPROVE Contract Change Order No. 4 in the approximate amount of $12,000.00 and
AUTHORIZE the Chief Engineer to execute it in order to compensate the contractor, Hess
Construction, for installing additional fencing and constructing needed site drainage facilities.
II. Financial Impact:
The project contingency funds are sufficient to cover the change order costs. The source of
funds is Drainage Area 55.
III. Reasons for Recommendations and Background:
The total of Contract Change Orders 1 through 4 exceeds $25,000.00, requiring Board approval.
Site conditions required additional site drainage facilities to be constructed and additional fencing
was required to protect the flood control channel.
IV. Consequences of Negative Action:
The lack of approval would preclude payment for work required.
Continued on attachment: _yes SIGNATURE/�G?
RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON: JAN 5 1993 APPROVED AS RECOMMENDED ✓ OTHER
VOTE F SUPERVISORS
UNANIMOUS (ABSENT
AYES: NOES:
ABSENT: ABSTAIN:
Contact: B.J. Kerekes, (510) 313-2321
Orig. Div.: PW(Constr)
cc: County Administrator
Auditor-Controller
Public Works I hereby certify that this is a true and correct copy or
- Design an action taken and enteteed on the minutes of the
- Accounting, R. Gilchrist Board of Supervisors on the dateshown.
- R. Bruno ATTESTED: JAN 5 IgJ93
Contractor PHIL BATCHELOR,Cierk of the Board
Of Supervisors and County Administrator
n
KE\tt By : .�I a ✓�Ji1/r�,l —,Deputy
c:6O\\NAC-5.t1
UI