TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: January 5, 1993
SUBJECT: Approving Drainage Area 29C Improvements Project, Oakley Area.
Project No. 7555-6D8507-92, CP #92-86.
Specific Request(s) or Recommendation(s) & Background & Justification
I. RECOMMENDED ACTION:
APPROVE Project, and
DETERMINE that the project is a California Environmental Quality Act Class 1 b Categorical Exemption,
and DIRECT the Chief Engineer to prepare contract plans and specifications for construction.
DIRECT the Director of Community Development to file a Notice of Exemption with the County Clerk.
DIRECT the Chief Engineer to arrange for payment of the $25.00 handling fee to the County Clerk for
filing of the Notice of Exemption.
II. FINANCIAL IMPACT:
The estimated project cost is $201,000, funded by Drainage Area 29C (100%).
III. REASONS FOR RECOMMENDATION/BACKGROUND:
The project includes installing pipes parallel to existing segments of Line G and Drainage Area 29D,
Line AA, and the relocation of an existing soundwall north of Ironwood Lane.
It is needed to improve the area-wide storm drainage capabilities.
Continued on Attachment: X SIGNATURE:
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON .3 APPROVED AS RECOMMENDED OTHER
VOTE
,,OF SUPERVISORS
L/ UNANIMOUS (ABSENT 1
AYES: NOES:
ABSENT: ABSTAIN:
JY:jlg
c\BO:bo5a.t1
I hereby certify that this is a true and correct copy 7f
Orig. Div: Public Works (Design Division) an action taken and entered on the minutes of tt+e
Contact: Eric When,313-2242 Board of Supervisors on the date shown.
cc: County Administrator ATTESTED: JAN 1993
Attn: E. Kuevor PHIL BATCHELOR,Cierk of the Board
Auditor-Controller of Supervisors and un ry Administrator
PW Accounting
Construction By ,Deputy
Community Development
Approving Drainage Area 29C Improvements Project, Oakley Area
January 5, 1993
Page 2
The project has been determined to be in compliance with the General Plan and is exempt from CEQA
because it consists of minor alterations of existing public facilities involving no expansion of use per
Section 15301 of the CEQA Guidelines.
IV. CONSEQUENCES OF NEGATIVE ACTION:
Delay in approving the project will result in a delay of design and construction and may jeopardize
funding.