HomeMy WebLinkAboutMINUTES - 02231993 - 1.125 � rES� Department of Energy Western Area Power Administration Sacramento Area Office 1825 Bell Street,Suite 105 FEB 3 199 Sacramento,California 95825 RECEIVE® Mr. Tom Torlakson FEB 8 Chairperson Contra Costa County Board of Supervisors CLERK BOARD OF SUPERVISORS 631 Pine Street CONTRA COSTA CO. Martinez, CA 94533 Dear Mr. Torlakson: The construction of the California-Oregon Transmission Project (COTP) , which began in October 1990, is nearing completion. The Project included upgrading an existing double-circuit 230-kV line to 500-kV from Cottonwood to the Sacramento River near Rio Vista and construction of a new 500-kV line from the Sacramento River to Tracy. This letter is to inform you that Western Area Power Administration will energize the line in mid-February, 1993. Once the line is placed into service, we ask that you exercise caution in working around the transmission line. Some items to be noted are: 1. Irrigation with aluminum pipes. Do not let the pipes come within 17 feet of the conductors (wires) . 2. Use of farm equipment. A clearance of 17 feet is to be maintained from the conductors. 3. Awareness of tower locations to prevent damage to towers. If your property is managed or leased by someone else, we will appreciate your advising them of this information. Thank you for your cooperation during this project. If you have any questions regarding activities around the transmission line, please contact me at (916) 649-4420. Sincerely, Jose P. Vigil Realty Officer