TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: November 3, 1992
SUBJECT: Approve Laurel Road Traffic Signal Project.
Project No.: 0662-6U4241-92, Oakley Area; CP #92-73
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE project and DETERMINE that the project is a CEQA Class 1c Categorical Exemption,
and DIRECT the Public Works Director to prepare contract plans and specifications for
construction.
DIRECT the Director of Community Development to file a Notice of Exemption with the County
Clerk.
DIRECT the Public Works Director to arrange for payment of the $25.00 handling fee to the
County Clerk for filing of the Notice of Exemption.
H. Financial Impact:
The estimated project cost of the traffic signal is $30,000 and is funded by the County Public Works
Department Road Funds.
III. Reasons for Recommendations and Background:
Laurel Elementary School, located on Laurel Road in the Oakley area, was recently opened in the
summer of this year. The County will be installing several traffic control devices in the vicinity of
the school on Laurel Road at Mercedes Lane. These traffic control devices consist of a traffic
signal and painted yellow crosswalks across Laurel Road and Mercedes Lane. The traffic signal
can be activated by pedestrians desiring to cross Laurel Road or by cars on Mercedes Lane.
Continued on Attachment: X SIGNATURE:
AdftLl
_RECON54ENDATION OF COUNTY ADMINISTRATOR
_RECOMMENDATION OF BOARD CONIIvffl E
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON NOV ` ��. APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
✓ UNANIMOUS (ABSENT )
AYES: NOES:
. ABSTAIN:AIN, ! hereby certify friar this is r+ rrt,e and correct copy i'
ABSENT
In action taken and entered on the minutes n} the
NW:fc hoard of Supervisors on the dalb shown.
c:B03.tll ATTESTED: NOV 3 Vp. �.
Contact: Nancy Wein, 313-2275 PHIL BATCHELOR,Clerk of the Beard
Orig. Div: Public Works (Rd. Engineering) of Supervisors and County Administrator
cc: GMEDA Director
Ely � � =� ie�, Oeputy
E. Kuevor, CAO
M. Avalon, Road Engineering
R. Gilchrist, Accounting
Community Development
/, 3
Approve Laurel Road Traffic Signal Project
November 3, 1992
Page 2
III. Reasons for Recommendations and Background: (Cont.)
The installation of the signal is a safety project which will provide a specific and safe location for
children attempting to cross Laurel Road to access the school.
The project has been determined to be in compliance with the General Plan and is exempt from
CEQA because it is a minor improvement to an existing facility.
IV. Consequences of Negative Action:
Delay in approving the project will result in a delay of design and construction and may jeopardize
funding.