HomeMy WebLinkAboutMINUTES - 10271992 - 1.24 I.Al
TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA
COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: October 27, 1992
SUBJECT: Approval of Contract Change Order #3 for DA 29H, Lines A & A1, in the Oakley Area,
Project No. 4660-6X4029-90
Specific Request(s)or Recommendation(s)&Background S Justification
1. Recommended Action:
APPROVE contract change order #3 in the approximate amount of $1,100.00 and AUTHORIZE
the Chief Engineer to execute it in order to compensate the contractor, Antioch Paving Company
for additional work.
II. Financial Impact:
The project contingency funds are sufficient to cover this contract change order. This project is
funded by Oakley/North Brentwood Area of Benefit (9%), Ironhouse Sanitary District (42%), Flood
Control Drainage Area 29H (46%), and State Local Transportation Partnership Program (3%).
III. Reasons for Recommendations and Background:
Additional fence installation, not anticipated in the original design was required. The total of
contract change orders 1 through 3 exceeds $25,000.00, requiring Board approval.
IV. Consequences of Negative Action:
The lack of approval would preclude payment for work required to complete this project.
Continued on attachment: _yesSIGNATURE:
RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON: OCT 2 7 1992 APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
1/ UNANIMOUS (ABSENT
AYES: NOES:
ABSENT: ABSTAIN:
Contact: G. Byers (510) 313-2334
Orig. Div.: PW(Constr)
cc: County Administrator
Auditor-Controller
Public Works ; hereby certify that this is a true and correct copy it
.an action taken and entered on the minutes of the
- Design Board of Supervisors on the date shown.
- Accounting, R. Gilchrist ATTESTED: OU-2- 1999' 3
R. Bruno PHIL B cHELOk Clerk of the Board
of Supervisors and County Administrator
Contractor
GB:fp By � �2����A ��� ,Deputy
C:\WP51\BO\Oak-27.t10