SUBJECT: Report on Black Oak Estates
SPECIFIC REQUEST(S) OR RECOMMENDATIONS) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
Accept report and continue project to November 3 , 1992 to allow for
preparation of an alternative site plan by the Diablo Property
Owners Association.
FISCAL IMPACT
None.
BACKGROUND/REASONS FOR RECOMMENDATIONS
This project was heard by the Board of Supervisors on September.-
1992 . After taking testimony, the Board closed the hearing and
continued the matter to October 6, 1992 and directed staff to
respond to several issues raised in the public testimony.
RESPONSE TO BOARD CONCERNS
Alternative Site Plan
Following the hearing, the Diablo Property Owners Association has
offered to retain an architect to prepare an alternative site plan
involving less grading for the County to consider. Staff has
accepted the Association's offer subject to several conditions:
the Association' s architect must work with the applicant
and with staff;
- the alternative plan shall allow for 36 units plus.1one
additional unit that would be used for a detention basin
or a residential unit, depending on the scope, of
downstream improvements;
CONTINUED ON ATTACHMENT: X YES SIGNATURE K S"
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMI E
APPROVE OTHER
I
SIGNATURE(S) :
ACTION OF BOARD ON October 6 , 1992 APPROVED AS RECOMAENDED X OTHER
VOTE OF SUPERVISORS
I HEREBY CERTIFY THAT THIS IS A
X UNANIMOUS (ABSENT TRUE AND CORRECT COPY OF AN
AYES: NOES: ACTION TAKEN AND ENTERED ON THE
ABSENT: ABSTAIN: MINUTES OF THE BOARD OF
SUPERVISORS ON THE DATE SHOWN.
Contact: Robert Drake - 646-2091
Orig: Community Development Department ATTESTED October 6 , 1992
cc: Land Based Research & Development PHIL BATCHELOR, CLERK OF
Diablo Property Owners Association THE BOARD OF SUPERVISORS
East Bay Regional Park Dist. - Bob DoyleCOU ADMINISTRATOR
Hidden Oaks at Blackhawk - David Preiss
Mitch Avalon - Public Works Dept. BY , DEPUTY
Craig & Wood .• Architects
2 .
the alternative plan should be completed at the earliest
. possible date.
From a drainage perspective, improvement of the existing drainage
system through the Scharnell property would be of greatest benefit
to the immediate Diablo community. Improving this system would
solve the current downstream flooding of the residents on Calle Los
Callados. The 37th residential unit would not be allowed unless
the downstream owner granted permission to allow the existing
drainage system to be upgraded. If Scharnell fails to grant
permission to construct the new storm drain line, then a maximum of
36 units would be allowed, and the detention basin constructed as
proposed.
An alternative with fewer residential units may be considered where
it can be reasonably demonstrated that the economics of the project
would not be materially damaged. The lessened economic benefit
(i.e. , profit) from a smaller project would have to be matched by
a comparable reduction in the costs which have been imposed on the
project. For example, to induce a reduction in the number of
. units, the Diablo Property Owners Association might be willing to
support modifications to the project that would relieve the project
of the costs for : off-site road and drainage improvements. This
might be attained by a reduction in the downstream improvement
costs (60 cents per square foot of impervious surface) which have
been imposed on the project; or by neighborhood participation in an
assessment district to share in the costs of the required access
road improvements' to Mount Diablo Scenic Boulevard.
Further, any project approval should be subject to the following
requirements:
- residential design to maximize energy conservation preferably
by use of solar heating and cooling but minimally by use of
existing model insulation standards.
- provision of fiber optic connections to the residences.
While staff is recommending a one-month continuance, it is possible
that an additional month delay may be necessary to allow for
completion of the alternative plan and staff review.
Drainage Conditions
Due to new information presented at the Board hearing, the Flood
Control District. will conduct a study of existing drainage
conditions along Mount Diablo Scenic Boulevard, adjacent to the
project.
Staff has issued ' a letter dated September 9, 1992 to the Diablo
Country Club requesting input on the proposed project relative to
possible drainage improvements that might be proposed on the
Country Club property as a result of the project. The letter
requested a written response by September 27th. No response was
received by the deadline.
Alignment and Maintenance of Proposed Trail
Prior to the November meeting, staff intends to schedule a meeting
in the field with the representative of the Hidden Oaks at
Blackhawk Homeowners Association and with staff from the East Bay
Regional Park District. The purpose of the meeting will be to
discuss alternative trail alignments and compatibility with nearby
residences. The results of that meeting and other trail concerns
will be reviewed in a future staff report.
3 .
Trail Staging Area
At the time of the 'adoption of the Athenian School General Plan
Amendment, a trail staging area was proposed for a parcel at the
corner of Blackhawk Drive and Mount Diablo Scenic Boulevard. After
the San Ramon Valley Regional Planning Commission had voted to
recommend the designation of such a staging area as part of. the
plan, a number of nearby residents expressed concern about possible
incompatibility of such a staging area with the neighborhood. As
a result of this concern, the Board of Supervisors deleted the
staging area designation from the General Plan Amendment. The
Amendment also indicated that planning for a staging area in this
location would be further studied.
The San Ramon Valley Regional Planning Commission did not learn of
the deletion of the staging area designation until the Black Oak
Estates project came to hearing. A number of Commissioners were
disappointed in this change and requested staff to suggest possible
staging. area sites in connection with the Black Oak Estates
project. Several potential sites were identified by staff,
however, none were proposed as a requirement of the Black Oak
Estates project. Further, the Commission recommendation on the
project does not require the development of a staging area.
Several residents learned that the Commission was still interested
in developing a. staging area in the vicinity and have been
monitoring the project.
Relative to the review of the current project, the staging area
concept is a non-issue.
Scenic Corridor Definition
The private road next to the project site, Mount Diablo Scenic
Boulevard, is designated a scenic route. The area that is visible
from the road is .part of the "scenic corridor" as defined by the
General Plan Scenic Route Element. Testimony to the Board
expressed concern that the proposed development would be
incompatible with the scenic corridor policies.
The scenic route policies that are applicable to the review .of this
.project are found in the 1974 Scenic Routes Element. (The current
scenic route policies found in the 1991 Countywide General Plan are
similar to the 1974 policies. ) The relevant section of the element
is found on pages 4 and 5, and provides as follows:
"It is within this area (the scenic corridor) that
development controls, dedication, and the purchase of
easements or lands in fee simple will be required, and
public projects reviewed for compliance with this plan.
Controls should be applied to retain and enhance scenic
qualities, restrict unsightly use of land, control height
of structures, and provide site designing and
architectural guidance along the entire scenic corridor. "
The proposed project provides for many of the protective measures
identified in the element. For example, no development would be
allowed on the major knoll in the middle of the site; most of the
existing oak trees that are in proximity to Mount Diablo Scenic
Boulevard would be saved; residences adjacent to the road are
limited to single story structures; and open areas next to the road
would be protected by application of restrictive covenants. The
scenic route policies are subject to interpretation, however, staff
sees nothing with the proposed project that is inconsistent with
the scenic corridor policies.