HomeMy WebLinkAboutMINUTES - 09081992 - 1.5B 1,5"5 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on September 8, 1992 by the following vote: AYES: Supervisors-Powers, Fanden, Schroder, Torlakson and McPeak NOES: None ABSENT: None ABSTAIN: None RESOLUTION NO. 92/ 585 SUBJECT: A Resolution of Intent with regard to County Local Match and the Congestion Mitigation and Air Quality Program (CMAQ) for the San Pablo Dam Road Signals and Interconnection Project. Project # 0662-6R4275. The Board of Supervisors of Contra Costa County RESOLVE: WHEREAS, the County has applied and been recommended for $505,600 in CMAQ funding for the San Pablo Dam Road Signals and Interconnection Project from Interstate 80 to May Road in the EI Sobrante area. New signals would be installed at the intersection of Milton Road and Clark Road. Interconnection would take place between Interstate 80 and May Road incorporating nine signals along 2.2 miles. The project is scheduled for the 1993 Transportation Improvement Program (TIP) adopted by the Metropolitan Transportation Commission (MTC) and approved by the Federal Highway Administration. WHEREAS, a prerequisite for inclusion in the 1993 TIP is the adoption of a local resolution stating that the San Pablo Dam Road Signals and Interconnection Project will be constructed as described above and on the County's Intermodal Surface Transportation Efficiency Act (ISTEA) application. WHEREAS, MTC has indicated that CMAQ projects will be eligible for State Traffic Management System (TSM) funds. Further, MTC has estimated that the San Pablo Dam Interconnect project will be eligible for $78,600 in TSM funds. WHEREAS, $99,300 local matching funds will be provided by the Richmond/EI Sobrante Area of Benefit and that the County understands that the CMAQ funding is fixed at$505,000, and therefore, any cost increases can not be expected to be funded with the CMAQ funds. No General Fund money will be expended. NOW, THEREFORE, the Board of Supervisors of Contra Costa County, by adopting this resolution of intent, does hereby authorize the local match for the San Pablo Dam Road Signals and Interconnection Project, and direct the Public Works Director to construct the project as described herein. hereby certify that the foregoing is a true and correct copy of an order entered on the minutes of the Board of Supervisors at the aforesaid date. CPB:pe c:ResSanPablo.t9 I hereby certify that this Is a true and correct copy,t an action taken and entered on the minutes of the Orig. Div: Public Works (Road Engineering) Board of Supers on the date shown. Contact: Heather Ballenger, Public Works ATTESTED. ry8 1992, cc: M. Shiu, Deputy PW Director PHIL BATCHELOR,Clerk of the Board M. Avalon, Road Engineering of Supervisors and County Administrator H. Ballenger, Road Engineering ^ , R. Gilchrist, Accounting By Deputy S. Goetz, Community Development C. Monsen, CCTA RESOLUTION NO. 92/ 585