Loading...
HomeMy WebLinkAboutMINUTES - 09081992 - 1.37 /. 37 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: September 8, 1992 SUBJECT: Approval of project contingency fund. increase of $10,000.00 and Authorize the Chief Engineer to execute Contract Change Order No. 2 for the D.A. 29H, Lines A & A-1 project in the Oakley area, Project No. 7569-6D8454-90 Specific Request(s)or Recommendation(s)&Background&Justification I. Recommended Action: APPROVE project contingency fund increase of $10,000.00 and Contract Change Order No. 2 in the approximate amount of $50,900.00, and AUTHORIZE the Chief Engineer to execute it in order to compensate the contractor, Antioch Paving Co., Inc., for work resulting from changes in design and field conditions. II. Financial Impact: This project is funded by Oakley/North Brentwood Area of Benefit (9%), Ironhouse Sanitary District (42%), Flood Control Drainage Area 29H (46%), and State Local Transportation Partnership Program (3%). This change order will be funded by Flood Control Drainage Area 29H. III. Reasons for Recommendations and Background: The original contract plans were modified since the contract was first awarded to Antioch Paving Co., Inc. Because this contract change order exceeds $25,000.00, Board approval is required. Because this Contract Change Order exceeds the project contingency fund, an increase in the project contingency fund is required. IV. Consequences of Negative Action: The lack of Approval would preclude payment for work required. Continued on attachment: —yes SIGNATURE: RECOMMENDATION RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON: SEP 8 1992 APPROVED AS RECOMMENDED OTHER VOT F SUPERVISORS UNANIMOUS (ABSENT AYE'9: NOES: ABSENT: ABSTAIN: Contact: B.J. Kerekes, (510) 313-2321 Orig. Div.: PW(Constr) cc: County Administrator Auditor-Controller Public Works I hereby certify that this Is a true and correct copy Y - Design an action taken and entered on the minutes of the Accounting, R. Gilchrist Board of Supervisors on the date shown, - R. Bruno ATTESTED: SEP R ,, '1992 Contractor PHIL BATCHELOR,Clerk of the Board of Supervisors and County Administrator JF:tt c:BO\DA29H-8.t9 By Deputy ._ ,