HomeMy WebLinkAboutMINUTES - 02041992 - 1.11 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA
COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: February 4, 1992
SUBJECT: Authorize the Issuance of a Purchase Order to Santa Fe Pacific Pipelines, Inc. for Utility
Relocations, San Pablo Creek Channel Improvements Project, North Richmond Area,
(Project No. 7567-6D8607)
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
Authorize the issuance of a purchase order to Santa Fe Pacific Pipelines, Inc. to issue the
purchase order in the amount of $151,000 to Santa Fe Pacific Pipelines, Inc. for the relocation
of a petroleum pipeline for the San Pablo Creek Channel Improvements Project in the North
Richmond area.
II. Financial Impact:
The total relocation cost of $151,000 is reimbursable from the California Department of Water
Resources at the rate of 70.0%. The local share of $45,300 will be paid from Drainage Area 73
(No. 7567-6D8607).
III. Reasons for Recommendations and Background:
By order of the Board of Supervisors, dated June 17, 1986, the Flood Control District approved
an agreement with the Corps of Engineers, the terms of which require the relocation of utility
facilities for construction of the Wildcat Creek and San Pablo Creek Channel Improvements
project. The required relocation includes the facility owned by Santa Fe Pacific Pipeline, Inc.
crossing San Pablo Creek.
Continued on Attachment: X SIGNATURE:/
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON FEB 4 1992 APPROVED AS RECOMMENDED OTHER
VOTE F SUPERVISORS
UNANIMOUS (ABSENT
AYES: NOES:
ABSENT: ABSTAIN:
I hereby certify that this Is a true and correct copy of
an action taken and entaied on the minutes of the
JJ:jlg :hoard of SupervIsorson the date shown.
c\BO:bo28.tl ATTESTED: EER 4 1992
PHIL BATCHELOR,Cterlr of the Board
Orig. Div: Public Works (Design Division) of supervisors and Co my Administrator
cc: County Administrator ,,A Q,V ' , -
Auditor-Controller By � `�- - ,oep°�'
PW Accounting: W. Quever
Authorize the Issuance of a Purchase Order to Santa Fe Pacific Pipelines, Inc. for Utility Relocations,
San Pablo Creek Channel Improvements Project
Page 2
January 28, 1992
IV. Consequences of Negative Action:
If the petroleum pipeline is not relocated, the channel improvements for San Pablo Creek cannot
be constructed.