HomeMy WebLinkAboutMINUTES - 02141992 - 1.4 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: January 14, 1992 SUBJECT: Increase of Project Contingency Funds and Approval of Contract Change Order Nos. 11 and 12 for the Miranda Avenue Bicycle Route Project in the Alamo area, Project No. 0662-6R4128-89 Specific Request(s)or Recommendation(s) &Background&Justification I. Recommended Action: APPROVE Project Contingency Fund increase of $13,500.00 and Contract Change Order Nos. 11 and 12 in the approximate amounts of$6,000.00 and $7,500.00 respectively, and AUTHORIZE the Public Works Director to execute them in order to compensate the contractor, Vintage Paving & Grading, for work resulting from changes in design and field conditions. II. Financial Impact: The source for the increase in the contingency fund will be the Alamo Area of Benefit. III. Reasons for Recommendations and Background: The cumulative total of Contract Orders Nos. 1 through 12 exceeds $25,000.00, requiring Board approval. The original contract plans were modified since the contract was first awarded to Vintage Grading and Paving. Additional quantities of asphalt concrete were generated by a revised typical road section for the modified plans. In addition, during the course of the roadway excavation work on the west side of Miranda Avenue, unsuitable subgrade became exposed. This and other unforseen conditions resulted in additional force-account work. IV. Consequences of Negative Action: The lack of approval would preclude payment for work required. Continued on attachment: β€”yes SIGNATURE; r RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON: JAN 11 1992 APPROVED AS RECOMMENDED βœ“ OTHER VOTE OF SUPERVISORS βœ“ UNANIMOUS (ABSENT AYES: NOES: ABSENT: ABSTAIN: Orig. Div.: PW(Constr) cc: County Administrator Auditor-Controller Public Works - Design I hereby certify that this is a true and correct copy of - Accounting, R. Gilchrist an action taken and entered on the minutes of the - R. Bruno Board of Supervlsors on the date shown. Contractor ATTESTED: β€”)AN 14 1992 PHIL BATCHELOR,Cterk of the Board ofsupervisorsand County Administrator NW\fp By SGA c:BO\BO14.t1