Loading...
HomeMy WebLinkAboutMINUTES - 11051991 - H.1 TO: BOARD OF SUPERVISORS Phil Batchelor, County Administrator ,;; s, Contra FROM: Costa n. s J County DATE: November 5, 1991 SUBJECT: SECOND EXTENSION OF URGENCY INTERIM INCREASE IN VARIOUS FEES FOR THE BUILDING INSPECTION, COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENTS SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDATIONS: Adopt second extension of urgency interim resolution increasing land development fees and other fees for Building Inspection, Community Development and Public Works Departments. FISCAL IMPACT: This action will enable these departments to continue collection of fee revenue. BACKGROUND/REASONS FOR RECOMMENDATIONS: A second extension is necessary to continue collecting fees at the new levels approved on September 17, 1991 . On that date, the Board of Supervisors adopted a permanent and an urgency interim resolution to increase land development fees . The permanent resolution will not become effective until 60 days after its passage; whereas, the urgency interim resolution was effective immediately for a 30-day period. Both resolutions dealt with the same fees . Approval of a second extension of the urgency interim resolution will enable Building Inspection, Community Development, and Public Works Departments to continue fee collection at the new level for another 30 days . An extension is necessary until the permanent resolution becomes effective. CONTINUED ON ATTACHMENT: YES SIGNATURE: ` RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE yAPPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON November 5, 1991 APPROVED AS RECOMMENDED —X OTHER The hearing was opened; no one appeared to speak; the hearing was closed. The Board ADOPTED Resolution No. 91/737. VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE X UNANIMOUS(ABSENT I I ) AND CORRECT COPY OF AN ACTION TAKEN AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN. cc: Auditor-Controller - Paul Abelson ATTESTED November 5, 1991 Building Inspection PHIL BATCHELOR,CLERK OF THE BOARD OF Community Development SUPERVISORS AND COUNTY ADMINISTRATOR County Administrator - Linda Bulkeley County Counsel M382 GME D8 BY DEPUTY N TBIA - Guy Bjerke yo(,o Public Works v THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Resolution on November 5,. 1991, by four/fifths vote as follows: AYES: Supervisors Schroder, McPeak, Torlakson, Powers NOES: Supervisor Fanden ABSENT: None ABSTAIN: None SUBJECT: Second Extension of Urgency ) RESOLUTION NOI. .91,E-737 Adoptio&"bf Revised Fees for ) (Gov. Code, $ 66017) Land Development Applications, ) Permits, Inspections, Plan . ) Checking, Map Checking and ) Other Related Services ) The Board of Supervisors. of Contra Costa County resolves as follows: A. BACKGROUND, FINDINGS. 1 . The County of Contra Costa has conducted an extensive and exhaustive analysis of its services, the costs reasonablyl borne of providing those services, the beneficiaries of those services, and the revenues produced by those paying fees and charges for special services. 2 . The County wishes to comply with both the letter and the spirit of Article XIIIB of the California Constitution and limit the growth of taxes . 3 . The County desires to establish a policy of recovering the full costs reasonably borne of providing special services of a voluntary and limited nature, so that general taxes are not diverted 'from general services of a broad nature and used to unfairly and inequitably subsidize special services . 4 . On August 12, 1991, the Board of Supervisors adopted Ordinance No. 91-40, establishing its policy on the recovery of costs, particularly, the percentage of costs reasonably borne from users of County services and directing staff as to the methodology for implementing said ordinance. 5 . On September 17, 1991, the Board of Supervisors adopted Resolution No. 91-r130 , establishing fees for land development applications, permits, inspections, plan checking, map checking and other related services, which fees ( "Development Fees" ) adhere to the policy of the Board of Supervisors, set forth in Ordinance No. 91-40, to recover that percentage of costs reasonably borne, as determined by the Board in said Ordinance. Said fees . primarily include fees to be charged to development projects (Gov. Code, 566000) ; therefore, pursuant to Government Code Section 66017, shall not become effective until 60 days after passage of the aforementioned resolution. 6 . By separate resolution on September 17, 1991 (Resolution No. 91. 631 ) , the Board found there is an urgent need for the protection of public health, welfare and safety for the immediate increase and establishment of the Development Fees and therefore adopted said Development Fees on an urgency interim basis . By Resolution adopted pursuant to Government Code section 66017, said urgency adoption. of Development Fees was extended for 30 days (Resolution No. 91 cR4 ) . Pursuant to Government Code section 66017, the urgency adoption of the Development Fees is further extended for a second 30-day period. The Board hereby finds that public notice and hearing was provided in accordance with Government Code section 66016 and 66017 . RESOLUTION NO. 91/737 w B. SECOND EXTENSION OF URGENCY ADOPTION OF FEES. 1 . Fee- Schedule-Adoption, Pursuant to Government Code Section 66017, the fees set forth in Exhibit A, attached hereto and incorporated herein by this reference, are hereby extended for a second 30-day period, and shall be charged and collected for the services enumerated therein. 2. Separate Fee for Each Process . All fees set by this resolution are for each identified process. Additional fees shall be required for each additional process or service that is requested or required. Where fees are indicated on a per unit of measurement basis, the fee is for w&ch identified unit or portion thereof within the indicated ranges of such units . I 3 . Added Fees and Refunds . Where additional fees must be charged and collected for completed staff work, or where a refund of excess deposited monies is due, and where such charge or refund is ten dollars ($10.00) or less, a charge or refund need not be made, pursuant to the requirements of Government Code Sections 29373,1 and 29375.1 and amendments thereto provided said requirements are met. 4 . Defining and Timing of Fee Schedule. Definitions regarding and the timing of the implementation of the herein enumerated fee schedule shall be as set forth herein. 1 5. Interpretation. This Resolution may be interpreted by the several County department heads in consultation with the County Administrator. If there is a conflict between two fees, the lower in dollar amount of the two shall be applied. 6 . Severability; If any portion of this resolution is declared invalid or unenforceable by a court of competent jurisdiction, the Board of Supervisors hereby declares that it would have adopted the remainder of this Resolution regardless of the absence of the invalid part(s) . 7 . Repealer. All resolutions and other actions of the Board of. Supervisors in conflict with the contents of this Resolution are repealed to the extent of any conflict, during the operative dates of the conflicting provisions of this Resolution. Obligations existing under any resolution or other Board action repealed by this section shall not be affected, and shall remain in full force and effect. 8. Effective and Expiration Dates . This . resolution becomes effective immediately upon adoption on November 5 , 1991 and shall be operative for thirty (30) days, pursuant to Government Code section 66017. I hereby certify that this is a true and correct copy of Orig.. Dept: County Administrator an action taken r!-id entered on the minutes of the cc: Public Works Board of Supervisors on the date shown. County Counsel ATTESTED; County Auditor-Controller PHIL BATCHELOR, 'ierk of the Board Building. Inspection of Supervisors and County Administrator Community Development Northern California BIA By Attn: Guy S. B jerke .deputy RESOLUTION NO. 91/737 LTF:ct ctlas\urgency f Exhibit A 1 of 12 FEE SCHEDULE 5-001 Building Plan Check 55% of Building Permit + hourly rate for additional plan review required because of incomplete or changed plans . 5-002 Construction Inspection Building Permit Fees (A-C) Based on fee schedule and evaluation table. A. Building Permit Fee Schedule. The fee for each permit shall be as set forth in Table No.3-A of the edition of the k Uniform Building Code adopted by reference as the County- Building ountyBuilding Code. A copy of the code shall be on file for public reference at the Building Inspection Department. z B. Valuation Table. The total valuation to be used with the Building Permit Fee Schedule shall be determined using . , the Building Valuation Data contained in the ! Building Standards Magazine, published by . the International Conference of Building Officials, Whittier, California. The data in the June issue of each year shall be used for the ensuing fiscal year. A copy of the June issue shall be on : file for public reference at the Building Inspection Department. ( Y The determination of value or valuation under any of the provisions of the County Building Code shall !be made by the Director of Building Inspection. The value . to be used in computing the building permit fee shall be the total value of all construction work for which the permit ' is issued, as well as all finish work, painting, roofing, mechanical, electrical, plumbing, heating, 'air conditioning, elevators, fire extinguishing systems and any other permanently installed equipment. Contractor overhead, and profit shall be included. The value of grading, retaining walls, paving and other site work, and any demolition work, Ishall be included unless such work 'has been included in other permits issued by the Building Department. C. Miscellaneous Fees Change of Occupancy $20.00 Solar Permit $35.00 CA Energy Comm. Requirements 25% of the building permit fee and 25% of the plan! review review Electrical Permit Fees ( 1-18) 1. Minimum fee $ 25.00/permit 2 . New Dwellings $10.00/dwelling unit and $2 .50/100 sq. ; ft. I 3. Swimming Pools Permit Electrical 'grounding.. bonding, connection underwater lighting units $14 . 00/permit R Connecting under water lighting to .existing wiring system $15.00/permit i x G i Page 2 of 12 S-002 Construction Inspection (continued) 4 . Storable Swimming Pools, Hot Tubs and Decorative Fountains $20. 00/permit 5 . Electrical Power Distribution Poles a. Construction Power Poles 0-200 ampere electric service $25 .00/Permit- Over 201 ampere electric service $30 .00/Permit Additional sub-feeders and distribution power 4 . $10 . 00 b. Permanent Power Poles $25 .00/Permit 6 . Restore Service $25 .00/Permit 7 . Air Conditioning $25. 00/dwelling unit • 80 Low Voltage, Protective, Security 4,Jx Signal and Communication Circuits $25:00./Permit 9 + Mobile Home and Trailer Parks. . See Chapter 5 of Title 25 of the California Code of Regulations . Fees for items not included in the schedule shall be set forth in this resolution. �F.t 10. Solar Heating and/or Cooling System '. Installations Permit $25. 00/dwelling unit 11. Dwelling Unit Landscape Lawn Water System $25 .00/dwelling unit r.f 12 . Open Air Sales Lots and Decorative Lighting $25.00/permit 13 . Electric Signs and Outline Lighting Inspection First illuminated sign $25 .00/inspection Additional illuminated signs $ 5 . 00 14 . Addition and Alteration to Dwelling Unit 600 square feet $25 . 00/permit Each additional 100 square foot $ 2 .50 15 . Swimming Pools Community and ground fault inter- rupter tests First test $60. 00 Retests $35 .00 16 . Common Water•, Facilities $35 .00 17 . Miscellaneous Permit $25.00/permit 18. Commercial or Industrial Permit a. Electrical permit in conjunction 20% of the building with a building permit permit fee; $25 miAimum b. Electrical permit issued in . conjunction with a building permit for the shell : 1) Including system grounding, $25 .00 but without partitions, feeder conductors and distributing equipment Page 3 of 12 S-002 Construction Inspection (continued) 2) With service equipment and 2% of1the building distributing system, permit fee c. For food market, restaurant, and 35% of the building food service facility Type V-N, permit fee d. other food market 65% of the building permit fee. e. Landscape and parking lot lighting 10 or less lighting outlets $100 Each additional 10 outlets $ 50 Plumbing Permit Fees ( 1-12) 1 . New Residences $10 .0,0/permit $ 2.50/100- sq. ft. 2 . Restore Gas Utility Services $25.00/permit 3 . Swimming Pools, Storable Swimming $20.00 Pools, Hot Tubs and Decorative Fountain Commercial Pool $25 .00 4 . Emergency Fuel Gas Repair $20.00 5 . Conversion $20 .00 6 . Solar Heating and Cooling System $25 . 00/dwelling unit 7 . Dwelling Unit Landscape Lawn $201.00 dwelling unit Watering System 8. ' Addition and •Alteration to Dwelling Units a. Up to 600 square feet $20 . 00/permit b. Each additional 100 square feet $ 2 .50 9. Miscellaneous Permit not issued in conjunction with with a building permit a. Commercial application $25 .00/permit b. Residential application $20.00/permit 10. Non-residential Fee Schedule a. Plumbing permit obtained with a 8% of the building building permit permit fee. $25.00 : t minimum. b. Plumbing permit obtained with a building permit for the shell: 1 . Without partitions or $25.00/permit individual fixtures roughed in 2 . With fixtures roughed in 2% of the building permit fee. C. Food markets 10% of the building permit fee; $25 L Page 4 of 12 S-002 Construction Inspection (continued) 11. Special Inspection $40.00/hour minimum 1 hour 12 . Commercial Landscape, Lawn Watering $35. 00/permit System Mechanical Permit Fees ( 1-11) k 1. New Residences $10.00/permit $ 2 .00/100 sq. ft. ;y A . Restore Gas Utility Services $25 .00/permit 3. Fireplace $20.00/permit 4 . Swimming Pools, Storable Swimming $15.00 Pools, Hot Tubs and Decorative w Fountains Commercial Pool $20 .00 Air Conditioning $25.00/dwelling unit 6. Emergency Fuel Gas Repair $20.00/permit s 7. Conversion $20.00/permit 8. Addition and Alteration to Dwelling Units U square p to 600 feet $20.00/inspection 1106_,. b) Each . 100 square feet $ 2 .00 9 . _ Solar Heating $25 .00/dwelling unit 10 . Miscellaneous Fees a) Miscellaneous permits not obtained with a building permit, or itemized above 1. Commercial application $25 .00 2 . Residential application $20 .00 i . b) Special Inspection $40/hour t. 1 hour minimum 11. Non-residential Fee Schedule u a) Mechanical permit obtained with 7% of the building a building permit permit fee; $25 v minimum b) Mechanical permit obtained with a building permit for the building shell: ` 1) Without mechanical equipment $25.00/permit 2) With equipment set 2% of the building permit fee. c) . Permit fora food market 2% of the building permit fee; $25 minimum a Page 5 of 12 S-002 Construction Inspection (continued) S-003 Grading Plan Check & Inspection Improvement Valuation: $100,00 or less 5% or $100 minimum $100, 001 and up $5,000 -plus 4.5% of the valuation in excess of $100,000 Additional fee if: Work goes over one year 1% of; uncompleted work !+ $100 Work goes over 2 years 21 of uncompleted work + $100 S-004 Building $40/permit Demolition Fees S-005 Mobile Home $25 + $2/lot for Park Annual licensing + Inspection $4/mobile home lot for annual inspection. S-006 Mobile Home Permit Inspection Application Fee $20/hour- Inspection $100 + $30 for each hour over one hour Reinspection $60 + $30 for' each half hour over one hour S-007 Permanent Same as Construction . Mobile Home Inspection. Inspection S-008 R-Form Part of;, 40% sur Complaint charge on building Investigation permit. ` S-009 R-Form Site $250/investigation +' f Investigation hourly rate 'for travel time,outside ' County. s i S-010 County Code $170/Ieport Compliance t S-011 Records Information Research Retrieval Research $15/15 mins. Photocopy $ . 10/page. Certified firstipage - $4 .50, additional pages - y $1.001 ' L S-012 Evidence Reproduction $35/request + copying and mileage for witness fee. { $15 evidence subpoena fee, p $. 10/sheet for 8 1/2 x 11 documents, $.20/sheet -for larger documents . S-013 Certificate $450/application. ` of Compliance Review Y ' 1 Page 6 of 12 Development Plan Reviews (5-014-S-016.) S-014 Multiple Family/Commercial $. 15 sq. ft. of floor area or $4, 300 +$140/unit. S-015 Exterior $2,000/permit Change S-016 No Exterior $1,440/permit - - Change S-017- Time- Extension-Administrative $120/permit or application S-018 Public Hearing $400/application S-019 General Plan Amendment Review $10,000 + $100/acre per application '5-020 General Plan Part of 40% sur- Maintenance charge on building permit. Land Use Permits (S-21-S-31) S-021 Permit Quarry $3,700 + $50/acre per permit S=022 Quarry Reclamation $1,200 + $50/acre per permit S-023 Caretaker Mobile Home $1,440/permit S-024 Family Member Mobile Home $100/permit S-025 Residential Care Facility $2,060 for first 3,000 sq. ft* + $20/ additional 1,000 sq. ft. or portion thereof. S-026 Home Occupation $500/permit . S-027 Second Residency/Uftit $1,620/permit S-028 Development Plan Combo. $1,380 + development plan. S-029 Others $1,870/permit if project cost greater than $100,000, add 1/2% of value of project cost. S-029A Solid Waste Disposal Review $1,000 minimum deposit, hourly rate + other actual costs. S-030 Admin. Permit Gas Wells $430/permit S-031 Gas Well Ordinance $1,500/permit L--S-032 Lot Line Adjust Review $190/parcel Page 7 of 12 Tentative Subdivision Map Review (S-033 - S-034) S-033 Major 5-30 -lots (units) $4,640 + $145/lot (unit] for units 1-30. 1 _. 3.1-100 lots (units) $8,990 +. $75/.lot (unit) for units 31-100 101 or more lots (units) $14,240 + $50/lot (unit) for units 101' and up + $250 for transportation planning., S-034 • Minor $3,480 + $230/lot (unit) S-035 Condo. Conversion Tentative Map 1-30 lots (units) $1,360 + $100/lot (unit) for units 1-30.1 31-100 lots (unit) $4,360 + $75/ lot (unit) for units 31-100 . 101 or more lots (units) $9,610 + $50/lot (unit) for units 101 and up. S-036 Lot Split $1,040/application Planned Unit Development (S-037 - S-040) S-037 Rezoning Review-Residential 1-30 units $3,270 + $100/unit for units 1-30. 31-100 units $6,270 + $75/unit for units 31-100 . i 101 or more units $11,520 + $50/unit for units 101 and uF + $250 for transpor- tation planning. S-038 Rezoning $3,960 . If over Review 25,060 sq. ft. of Commercial/ floor area, addi- Industrial tional $. 15/sq. ft. Residential $250Ifor trans- portation planning. S-039 Final $2,460/application Development Plan Review S-040 Tentative $21050/application Subdivision Map Review S-041- Rezoning Review $4,220, if Commercial/Industrial industrial project add $250 fox transportation planning. ff` f: Page 8 of 12 5-042 Rezoning Review-Other $1,200/application S-043 Zone Variance-Public Hrg. $1, 180/application S-044 Zone Variance $760/application j Administrative S`='04.5 Sign $390/application Review A S 046 `Waiver Review $110/request 5-047 Planning Commission Appeal Review Non-Applicant and Single Family Residence $110/appeal All others $500/appeal S-048 Appeals to the Board Non-Applicant and Single Family Residence $110/appeal All others $500/appeal ' S-049 Reconsideration Review Non-Applicant and Single . Family Residence $110/appeal All others $500/appeal S=050 Agricultural Preserve $500/application Rezoning Review 5-051 Agricultural Preserve $2,500/application Cancellation Review S-052 Planning Surcharge 40$ surcharge on building permit 5-053 Operation of County Service Hourly rate Areas & Districts 5-054 Recycling Program Review 4 1 applicant $1001000/year 2 applicants $200,000/year JJ f s', = S-055 Solid Waste Management Plan $.95/ton 5-056 Hazardous Waste Application Determination $1,680 + $70/hour Review' s for staff time over 25 hours Monitoring $21020/yr. + $70/hr 86/100 for .staff time over 30 hours. Mitigation Reimbursement by . Monitoring applicant ' (not 861100) S-057 Environmental 30% surcharge on Impact Review contract total. s s Page 9 of 12 S-059 County Water Wetland Hourly rate. Agency Review S-060 Consulting Hourlly rate. Services (transportation) S-061 Growth Management Part of 40% Task Force Review surcharge on building permit fee. S-062 Measure C Part of 40% Growth Mgmt. surcharge on Plan building permit fee. S-063 Non-EIR CA $45/application Environmental Quality Act Compliance Review S-064 EIR for County Projects Hourly rate. S-065 Child Care Application Review $465/application S-066 Code Enforcement Part of 40% sur-. charge on building permit. S-067 Counter Work Part of 40% sur- charge on building permit. S-068 Final Map Check $1,450 + $25/lot including 2 corrections or revisions. After 3rd review, hourly rate. S-069 Parcel Map $1,300 + $25/lot including 2 corrections or revisions . After 3rd review, hourly rate. , S-070 Map Check - Records of Survey Hourly, rate charged i against $400 deposit , with { $200 minimum. ," S-071 Map Check - Lot Line Adjustment Hourly rate charged again6t .$400 deposit ! with a $200 minimum. .1 Public Improvement Plan Checks (S-072 - S-075) Y S-072 Major Based on Improvement Cost: 0-$25,000 9% . $1,000 minimum...q All work performed after 3rd review - charged at hourly rate. i $251000-$50,000 $2,250 + 7% of amount over $25, 000 . $1,000 minimum. All work performed i after 3rd review j charged at hourly f rate. Page 10 of 12 Public Improvement Plan Checks (S-072 - S-075) - continued $50,001 or more $4,000 +2% of amount over $50,000. $1,000 minimum. All work performed after 3rd review charged at hourly rate. S-073 Minor Based on Improvement Cost: 0-$25,000. . 9% . $1,000 minimum. All work performed after 3rd review charged at hourly rate. $25,000-$50,000 $2250 + 7% of amount over $25,000. All work performed after 3rd review charged at hourly rate. $50,001 or more $4,000 +2% of amount over $50,000 . All work performed after 3rd review charged at hourly rate. 8-.074 Land Use Permit Based on Improvement Cost: 0-$25,000 9%. $1,000 minimum. All work performed after 3rd review charged at hourly rate. $25,000-$50,000 $2,250 + 7% of amount over $25,000. All work performed after 3rd review charged at hourly rate. $50,001 or more $4,000 +2$ of amount over $50,000. All .. work performed after 3rd review charged at hourly rate. S-075 Development Plan = rBased on Im rovement Cost: �Ju X, ;r 0-$25,000 9%. $1,000 minimum. All work performed after 3rd review ' charged at hourly rate. $25,000-$50,000 $2,250 + 7% of amount over $25,000. All work performed after 3rd review charged at hourly rate. i .. $50,001 or more $4,000 +2% of amount k over $50,000. All work performed ' after 3rd review charged at hourly i3 t rate. } r Page 11 of 12 S-076 Drainage Review Hourly charge s, (no improvement plans) against $1,000 deposit. R F, Public Improvement Inspection (S-077 - S-080) J Y S-077 Major Improvement Valuation: $100, 000 or less 8% $100, 001 or more 4 .5% - . $8,000 + 4 .5% in excess above $100,000 Additional fees when work goes over 1 year 1% of! uncompleted work + $100 work goes over 2 years 2% of uncompleted work + $100 S-078 Minor Improvement Valuation: $100,000 or less 8% $100,001 or more $8,000 + 4 .5%,,in excess of $100,000 Additional fees when work goes over 1 year 1% of uncompleted work + $100 ' z r work 'goes over 2 years 2% of uncompleted J work + $100 w S-079 Land Use Permit Improvement Valuation Valuation: $100, 000 or less 8% $100, 001 or more $8,000 + 4 .5% in excess of $100,000 Additional fees when work goes over 1 year 1% of uncompleted work + $100 work goes over 2 years 2% of uncompleted work + $100 S-080 Development Plan Improvement Valuation: $100,000 or less 8% $100,001 or more $8,000 + 4 .5% in . excess of $100,000 Additional fees when work goes over 1 year 1% of uncompleted work + $100 work goes over 2 years 2% of uncompleted work + $100 t S-081 Application Review for Encroachment Encroachments within Permit county R1W: small . $35; large (eng. plans; rgd. ) - $35 + hourly rate. Utility Encroach- ments': Time and materials, one hour minimum. S-082 Inspection of Encroachment Permit Small - $100 Large - $100 + hourly rate. a Page 12 of 12 S-082 Inspection of Encroachment Permit - continued Utility inspections hourly rate. Un- permitted inspection double inspection and permit costs, $300 minimum. Permit,. but no inspection notifi- cation (48 hour notice) - $100 + hourly rate. " a S=08.3 Flood Control District Encroachment Small - $140 Large (eng. plans required) - $140 + hourly rate. Temporary Right of Entry Permit - $50 S=084 Storm Drain Easement Encroachment Hourly rate charged against deposit. $100 minimum fee. S-085 House Moving Review and Inspection $450 + $70/hour in excess of 4 hours. S-086 Street Vacation Review In-use area - $1,700 deposit with hourly rate charges. Unused area - $900 deposit with hourly rate charges . When map required, add mapping. fees. Map exists $1,000 deposit with hourly rate charges. If no map exists- - $2,700 deposit with hourly rate charges. S=087 Temporary Street Closure Review $180/request. May be less when Board of Supervisors approves temporary street closure. 'S-088 Certificate of Correction $270/certificate. ' Review if it