HomeMy WebLinkAboutMINUTES - 10221991 - 1.5 Oro'ving the Camino Tassajara Road Realignment and Bridge Replacement at Tassajara Creek
Page Two
October
III. Reasons for Recommendations and'Background:
The existing bridge on Camino Tassajara Road at Tassajara Creek has been determined by the
HBRR evaluation process, to be in need of replacement. To replace the existing bridge and
maintain through traffic during construction the roadway will have to be realigned.
The project; has been determined to be in compliance with the General Plan. A Negative
Declaration of environmental significance pertaining to this project was noticed on June 28, 1990.
The Board has considered the negative declaration together- with all comments received during
the public review period.
M Consequences of Negative Action:
Delay in approving the project will result in a delay of design,and construction and will result in
a loss of funding.
TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: October 22, 1991
SUBJECT: Approving the Camino Tassajara Road Realignment and Bridge Replacement at Tassajara
Creek
Project No.: 0662-6114072-88, CP #89-110
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE the Camino Tassajara Road Realignment and Bridge Replacement Project at
Tassajara Creek.
FIND, on the basis of the initial study and all comments received, that there is no substantial
evidence that the project will have a significant effect on the environment, ADOPT the Negative
Declaration for the Camino Tassajara Road Realignment and Bridge Replacement Project at
Tassajara Creek and DIRECT the Public Works Director to begin right-of-way acquisition and to
prepare contract plans and specifications for construction and DIRECT the Director of
Community Development to file a Notice of Determination with the County Clerk.
DIRECT the Public Works Director to arrange for payment of the $25.00 handling fee to the
County Clerk.
DIRECT the Public Works Director to arrange for the $1,250.00 Fish and Game filing fee to be
transferred to the County Clerk for filing of the Notice of Determination.
II. Financial Impact:
The estimated project cost is $750,000, funded by Hazardous Bridge Rehabilitation. and
Replacement Fund (HBRR) (86%) and Developer Fees (14%).
Continued on Attachment: X SIGNATURE:—
RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ONOCT 2 2 1991 APPROVED AS RECOMMENDED _� OTHER
VOTE OF SUPERVISORS
V" UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
I hereby certify that this is a true and correct copy of
an action taken and entered on the minutes of the
:jlg Board of SuperAs�+rsors on the own.
c\BO:10.t17 ATTESTED: _moi!� 2 W
PHIL BATCHELOR,Clark of the Board
Orig. Div: Public Works (Design Division) of Supervisors and Countyadminlatrator
cc: County Admin.: E. Kuevor
Community Development By a '
PW Accounting
Road Engineering-H. Ballenger