HomeMy WebLinkAboutMINUTES - 10151991 - H.2 q .. Z
TO: BOARD OF SUPERVISORS ?�"sE'L Contra
�r-
FROM: Phil Batchelor, County Administrator i. Costa
October 15, 1991 �osr ,. ��� County
DATE: a'C56U
SUBJECT: FIRST EXTENSION OF URGENCY INTERIM INCREASE IN VARIOUS FEES
FOR THE BUILDING INSPECTION, COMMUNITY DEVELOPMENT AND
PUBLIC WORKS DEPARTMENTS
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS:
Adopt first extension of urgency interim resolution increasing
land development fees " and other fees for Building Inspection,
Community Development and Public Works Departments .
FISCAL IMPACT:
This action will enable these departments to continue collection
of fee revenue.
BACKGROUND/REASONS FOR RECOMMENDATIONS:
On September 17, 1991, the Board of Supervisors adopted a
permanent and an urgency interim resolution to increase land
development fees . The permanent resolution will not become
effective until 60 days after its passage; whereas, the urgency
interim resolution was effective immediately for a 30-day period.
Both resolutions dealt with the same fees.
Approval of an extension of the urgency interim resolution will
enable Building Inspection, Community Development, and Public
Works Departments to continue fee collection at the new level for
another 30 days . An extension is necessary until the permanent
resolution becomes effective.
CONTINUED ON ATTACHMENT: RYES SIGNATURE:
Lo
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON OCT ! 199! APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
�- I HEREBY CERTIFY THAT THIS IS A TRUE
UNANIMOUS(ABSENT ) AND CORRECT COPY OF AN ACTION TAKEN
AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD
ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN.
Co Counsel OCT 15 Ii
CC: Au 1 or-Controller - Paul Abelson ATTESTED
Building Inspection PHIL BATCHELOR,CLERK OF THE BOARD OF
Community Development SUPERVISORS AND COUNTY ADMINISTRATOR
County Administrator - Linda Bulkeley
GGMEDA
M382 (109pbllc Works BY DEPUTY
N. CA BIA - Guy Bjerke
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Resolution on October 15, 1991, by four/fifths vote as_
follows :
AYES: Supervisors Schroder, McPeak, Torlakson and Powers
NOES: None
ABSENT: Supervisor Fanden
ABSTAIN: None
SUBJECT: First Extension of Urgency ) RESOLUTION NO. 91-684
Adoption-of Revised Fees for ) (Gov. Code, S 66017 )
Land Development Applications, )
Permits, Inspections, Plan )
Checking, Map Checking and )
Other Related Services )
The Board of Supervisors of Contra Costa County resolves as follows :
A. BACKGROUND, FINDINGS .
1 . The County of Contra Costa has conducted an extensive and
exhaustive analysis of its services, the costs reasonably borne of
providing those services, the beneficiaries of those services, and the
revenues produced by those paying fees and charges for special services.
2 . The County wishes to comply with both the letter and the
spirit of Article XIIIB of the California Constitution and limit the
growth of taxes .
3 . The County desires to establish a policy of recovering the
full costs reasonably borne of providing special services of a voluntary
and limited nature, so that general taxes are not diverted from general
services of a broad nature and used to unfairly and inequitably subsidize
special services .
4 . On August 12, 1991, the Board of Supervisors adopted
Ordinance No. 91-40, establishing its policy on the recovery of costs,
particularly, the percentage of costs reasonably borne from users of
County services and directing staff as to the methodology for
implementing said ordinance.
5 . On September 17, 1991, the Board of Supervisors adopted
Resolution No. 91-tion , establishing fees for land development
applications, permits, inspections, plan checking, map checking and other
related services, which fees ( "Development Fees " ) adhere to the policy of
the Board of Supervisors, set forth in Ordinance No. 91-40, to recover
that percentage of costs reasonably borne, as determined by the Board in
said Ordinance. Said fees primarily include fees to be charged to
development projects (Gov. Code, 966000) ; therefore, pursuant to
Government Code Section 66017, shall not become effective until 60 days
after passage of the aforementioned resolution.
6 . By separate resolution on September 17, 1991 (Resolution
No. 91- 631) , the Board found there is an urgent need for the protection
of public health, welfare and safety for the immediate increase and
establishment of the Development Fees and therefore adopted said
Development Fees on an urgency interim basis . Pursuant to Government
Code section 66017 , said urgency interim adoption is extended for 30
days . The Board of Supervisors hereby finds that public notice and
hearing was provided in accordance with Government Code section 66016 and
66017 .
RESOLUTION NO. 91/684
B. FIRST EXTENSION OF URGENCY ADOPTION OF FEES .
1 . Fee Schedule Adoption. Pursuant to Government Code Section
66017, the fees set forth in Exhibit A, attached hereto and incorporated
herein by this reference, are hereby extended for 30 days, and shall be
charged and collected for the services enumerated therein.
2 . Separate Fee for Each Process . All fees set by this
resolution are for each identified process . Additional fees shall be
required for each additional process or service that is requested or
required. Where fees are indicated on a per unit of measurement basis,
the fee is for each identified unit or portion thereof within the
indicated ranges go. such units .
3 . Added Fees and Refunds . Where additional. fees must be
charged and collected for completed staff work, or where a refund of
excess deposited monies is due, and where such charge or refund is ten
dollars ( $10 . 00 ) or less, a` charge or refund need not be made, pursuant
to the requirements of Government Code Sections 29373 . 1 and 29375 . 1 and
amendments thereto provided said requirements are met .
4 . Defining and Timing of Fee Schedule. Definitions regarding
and the timing of the implementation of the herein enumerated fee
schedule shall be as set forth herein.
S . Interpretation. This Resolution may be interpreted by the
several County department heads in consultation with the County
Administrator. If there is a conflict between two fees, the lower in
dollar amount of the two shall be applied.
6 . Severability. If any portion of this resolution is
declared invalid or unenforceable by a court of competent jurisdiction,
the Board of Supervisors hereby declares that it would have adopted the
remainder of this Resolution regardless ' of the absence of the invalid
part(s ) .
7 . Repealer. All resolutions and other actions of the Board
of Supervisors in conflict with the contents of this Resolution are
repealed to the extent of any conflict, during the operative dates of the
conflicting provisions of this Resolution. Obligations existing under
any resolution or other Board action repealed by this section shall not
be affected, and shall remain in full force and effect .
S . Effective and Expiration Dates . This resolution becomes
effective immediately upon adoption on October 15, 1991 and shall be
operative for thirty ( 30) days, (through November 14, 1991 ) , pursuant to
Government Code section 66017 .
Orig. Dept: County Administrator i hereby certify that this is a true and correct copy of
cc: Public Works an action taken and entered on the minutes of the
County Counsel Board of saperWscU(!T tr date§t� r.
County Auditor-Controller ATTESTED: � , fOQI
PHIL BATCHELOR,Clerk=Qt the i3Oa►d
Building Inspection of Sup rWoom and County Admtnistrator
Community Development
Northern California BIA ByDeputy
Attn : Guy S . Bjerke
Gr+lEnA
LTF:ct
1-5a:',urgency
RESOLUTION NO. 91/684
Exhibit A
1 of 12
FEE SCHEDULE
S-001 Building Plan Check 65% of Building
Permit + hourly rate
for additional plan
review required
because of
incomplete or
changed plans .
5-002 Construction Inspection
Building Permit Fees (A-C) Based on fee schedule and
evaluation table.
A. Building Permit Fee Schedule. The fee for each permit
shall be as set forth in Table No. 3-A of the edition of the
Uniform Building Code adopted by reference as the County
Building Code. A copy of the code shall be on file for
public reference at the Building Inspection Department.
B. Valuation Table. The total valuation to be used with
the Building Permit Fee Schedule shall be determined using
the Building Valuation Data contained in the Building
Standards Magazine, published by the International
Conference of Building Officials, Whittier, California. The
data in the June issue of each year shall be used for the
ensuing fiscal year. A copy of the June issue shall be on
file for public reference at the Building Inspection
Department.
The determination of value or valuation under any of the
provisions of the County Building Code shall be made by the
Director of Building Inspection. The value to be used in
computing the building permit fee shall be the total value
of all construction work for which the permit is issued, as
well as all finish work, painting, roofing, mechanical,
electrical, plumbing, heating, air conditioning, elevators,
fire extinguishing systems and any other permanently
installed equipment. Contractor overhead and profit shall
be included. The value of grading, retaining walls, paving
and other site work, and any demolition work, shall be
included unless such work has been included in other permits
issued by the Building Department.
C. Miscellaneous Fees
Change of Occupancy $20 . 00
Solar Permit $35 .00
CA Energy Comm. Requirements 25% of the building
permit fee and 25%
of the plan review
review
Electrical Permit Fees ( 1-18)
1 . Minimum fee $ 25 . 00/permit
2 . New Dwellings $10 .00/dwelling unit
and $2 .50/100 sq.
ft.
3. Swimming Pools Permit
Electrical grounding,
bonding, connection
underwater lighting
units $14 . 00/permit
Connecting under water
lighting to existing
wiring system $15 . 00/permit
Page 2 of 12
S-002 Construction Inspection (continued)
4 . Storable Swimming Pools, Hot Tubs
and Decorative Fountains $20. 00/permit
5 . Electrical Power Distribution Poles
a. Construction Power Poles
0-200 ampere electric service $25 . 00/Permit
Over 201 ampere electric service $30 . 00/Permit
Additional sub-feeders and
distribution power $10 . 00
b. Permanent Power Poles $25 . 00/Permit
6 . Restore Service $25 . 00/Permit
7 . Air Conditioning $25 . 00/dwelling unit
8 . Low Voltage, Protective, Security
Signal and Communication Circuits $25 . 00/Permit
9 . Mobile Home and Trailer Parks .
See Chapter 5 of Title 25 of the California Code of
Regulations . Fees for items not included in the schedule
shall be set forth in this resolution.
10. Solar Heating and/or Cooling System '
Installations Permit $25 . 00/dwelling unit
11 . Dwelling Unit Landscape Lawn
Water System $25 . 00/dwelling unit
12 . Open Air Sales Lots and
Decorative Lighting $25 . 00/permit
13 . Electric Signs and Outline
Lighting Inspection
First illuminated sign $25.00/inspection
Additional illuminated signs $ 5.00
14 . Addition and Alteration to
Dwelling Unit
600 square feet $25 . 00/permit
Each additional 100 square foot $ 2 .50
15 . Swimming Pools
Community and ground fault inter-
rupter tests
First test $60 .00
Retests $35 . 00
16 . Common Water. Facilities $35 . 00
17 . Miscellaneous Permit $25 .00/permit
18. Commercial or Industrial Permit
a. Electrical permit in conjunction 20% of the building
with a building permit permit fee; $25
miAimum
b. Electrical permit issued in
conjunction with a building permit
for the shell%
1) Including system grounding, $25 . 00
but without partitions, feeder
conductors and distributing
equipment
Page 3 of 12
5-002 Construction Inspection (continued)
2 ) With service equipment and 2% of the building
distributing system. permit fee
c. For food market, restaurant, and 35% of the building
food service facility Type V-N, permit fee
d. Other food market 65% of the building
permit fee.
e. Landscape and parking lot
lighting
10 or less lighting outlets $100
Each additional 10 outlets $ 50
Plumbing Permit Fees ( 1-12)
1 . New Residences $10 . 00/permit
$ 2 .50/100 sq. ft.
2 . Restore Gas Utility Services $25 . 00/permit
3 . Swimming Pools, Storable Swimming $20. 00
Pools, Hot Tubs and Decorative
Fountain ,
Commercial Pool $25. 00
4 . Emergency Fuel Gas Repair $20 .00
5 . Conversion $20 .00
6 . Solar Heating and Cooling System $25 . 00/dwelling unit
7 . Dwelling Unit Landscape Lawn $20 . 00 dwelling unit
Watering System
8 . Addition and .Alteration to
Dwelling Units
a. Up to 600 square feet $20 . 00/permit
b. Each additional 100 square feet $ 2 . 50
9 . Miscellaneous Permit not issued
in conjunction with with a building
permit
a. Commercial application $25. 00/permit
b. Residential application $20 . 00/permit
10 . Non-residential Fee Schedule
a. Plumbing permit obtained with a 8% of the building
building permit permit fee. , $25 .00
minimum.
b. Plumbing permit obtained with
a building permit for the shell :
1 . Without partitions or $25 . 00/permit
individual fixtures
roughed in
2 . With fixtures roughed in 2% of the building
permit fee.:
C . Food markets 10% of the building
permit fee; $25
minimum
Page 4 of 12
S-002 Construction Inspection (continued)
11 . Special Inspection $40 . 00/hour
minimum 1 hour
12 . Commercial Landscape, Lawn Watering $35 . 00/permit
System
Mechanical Permit Fees ( 1-11)
1 . New Residences $10 . 00/permit
$ 2 . 00/100 sq. ft.
2 . Restore Gas Utility Services $25 . 00/permit
3 . Fireplace $20 . 00/permit
4 . Swimming Pools, Storable Swimming $15 . 00
Pools, Hot Tubs and Decorative
Fountains
Commercial Pool $20 . 00
S . Air Conditioning $25. 00/dwelling unit
6 . Emergency Fuel Gas Repair $20 . 00/permit
7 . Conversion $20. 00/permit
8 . Addition and Alteration to
Dwelling Units
a) Up to 600 square feet $20 .00/inspection
b) Each 100 square feet $ 2 . 00
9 . Solar Heating $25 . 00/dwelling unit
10 . Miscellaneous Fees
a) Miscellaneous permits not obtained
with a building permit, or itemised
above
1 . Commercial application $25 . 00
2 . Residential application $20 .00
b) Special Inspection $40/hour
1 hour minimum
11 . Non-residential Fee Schedule
a) Mechanical permit obtained with 7% of the building
a building permit permit fee; $25
minimum
b) Mechanical permit obtained with
a building permit for the
building shell :
1) Without mechanical equipment $25 . 00/permit
2) With equipment set 2% of the building
permit fee.
c) Permit for a food market 2% of the building
permit fee; $25
minimum
y
Page 5 of 12
S-002 Construction Inspection (continued)
S-003 Grading Plan Check & Inspection
Improvement Valuation:
$100,00 or less 5% or $100 minimum
$100, 001 and up $5,000 plus 4 .5% of
the valuation in
excess of $100,000
Additional fee if:
Work goes over one year 1% of uncompleted
work + $100
Work goes over 2 years 2% of uncompleted
work + $100
S-004 Building $40/permit
Demolition
Fees
S-005 Mobile Home $25 + $2/lot for
Park Annual licensing +
Inspection $4/mobile
home lot for annual
inspection.
S-006 Mobile Home
Permit
Inspection
Application Fee $20/hour
Inspection $100 + $30 for each
hour over one hour
Reinspection $60 + $30 for each
half hour over one
hour
S-007 Permanent Same as Construction
Mobile Home Inspection.
Inspection
S-008 R-Form Part of 40% ,sur-
Complaint charge on building
Investigation permit.
S-009 R-Form Site $250/investigation +
Investigation hourly rate for
travel time outside
County.
S-010 County Code $170/report
Compliance
S-011 Records Information Research
Retrieval Research $15/15 mins .
Photocopy $ . 10/page.
Certified first page - $4 .50,
additional pages -
$1 .00.
S-012 Evidence Reproduction $35/request +
copying and mileage
for witness fee.
$15 evidence
subpoena fee,
$ . 10/sheet for
8 1/2 x 11
documents,
$ .20/sheet for
larger documents .
S-013 Certificate $450/application.
of Compliance
Review
Page 6 of 12
Development Plan Reviews (S-014-S-016)
5-014 Multiple Family/Commercial $. 15 sq. ft. of
floor area or $4,300
+$140/unit.
5-015 Exterior $2,000/permit
Change
5-016 No Exterior $1,440/permit
Change
5-017- Time. Extension-Administrative $120/permit or
application
S-018 Public Hearing $400/application
S-019 General Plan Amendment Review $10,000 + $100/acre
per application
5-020 General Plan Part of 40% sur-
Maintenance charge on building
permit.
Land Use Permits (S-21-S-31)
S-021 Permit Quarry $3,700 + $50/acre
per permit
5-022 Quarry Reclamation $1,200 + $50/acre
per permit
5-023 Caretaker Mobile Home $1,440/permit
5-024 Family Member Mobile Home $100/permit
S-025 Residential Care Facility $2, 060 for first
3,000 sq. ft + $20/
additional 1,000 sq.
ft. or portion
thereof .
5-026 Home Occupation $500/permit
5-027 Second Residency/Unit $1,620/permit
5-028 Development Plan Combo. $1,380 + development
plan.
S-029 Others $11870/permit if
project cost greater
than $100,000, add
1/2% of value of
project cost.
5-029A Solid Waste Disposal Review $1,000 minimum
deposit, hourly
rate + other actual
costs .
S-030 Admin. Permit Gas Wells $430/permit
5-031 Gas Well Ordinance $1,500/permit
S-032 Lot Line Adjust Review $190/parcel
Page 7 of 12
Tentative Subdivision Map Review (S-033 - S-034)
S-033 Major
5-30 lots (units) $4,640 + $145/lot
(unit) for units
1-30 .
3.1-100 lots (units) $8,990 + $75/lot
(unit) for units
31-100
101 or more lots (units) $14,240 + $50/lot
(unit) for units 101
and up + $250 for
transportation
planning.
S-034. Minor $3,480 + $230/lot
(unit)
S-035 Condo. Conversion Tentative Map
1-30 lots (units) $1, 360 + $100/lot
(unit) for units
1-30 .
31-100 lots (unit) $4,360 + $75/
lot (unit) - for units
31-100 .
101 or more lots (units) $9,610 + $50/lot
(unit) for units 101
and up.
S-036 Lot Split $1,040/application
Planned Unit Development (S-037 - S-040)
S-037 Rezoning Review-Residential
1-30 units $3,270 + $100/unit
for units 1-30.
31-100 units $6,270 + $75/unit
for units 31-100 .
101 or more units $11,520 + $50/unit
for units 101 and up
+ $250 for transpor-
tation planning.
S-038 Rezoning $3,960 . If over
Review 25,000 sq. ft. of
Commercial/ floor area, addi-
Industrial tional $ . 15/sq. ft.
Residential $250 for trans-
portation planning.
S-039 Final $2,460/application
Development
Plan Review
S-040 Tentative $2,050/application
Subdivision
Map Review
S-041- Rezoning Review $4,220, if
Commercial/Industrial industrial
project add $250 for
transportation
planning.
Page 8 of 12
S-042 Rezoning Review-Other $1,200/application
S-043 Zone Variance-Public Hrg. $1, 180/application
5-044 Zone Variance $760/application
Administrative
5-045 Sign $390/application
Review
5-046 Waiver Review $110/request
5-047 Planning Commission
Appeal Review
Non-Applicant and Single
Family Residence $110/appeal
All others $500/appeal
5-048 Appeals to the Board
Non-Applicant and Single
Family Residence $110/appeal
All others $500/appeal
S-049 Reconsideration Review
Non-Applicant and Single
Family Residence $110/appeal
All others $500/appeal
5-050 Agricultural Preserve $500/application
Rezoning Review
S-051 Agricultural Preserve $2,500/application
Cancellation Review
S-052 Planning Surcharge 40% surcharge on
building permit
S-053 Operation of County Service Hourly rate
Areas & Districts
S-054 Recycling Program Review
1 applicant $100,000/year
2 applicants $200,000/year
S-055 Solid Waste Management Plan $ . 95/ton
S-056 Hazardous Waste Application
Determination $1,680 + $70/hour
Review' for staff time over
25 hours .
Monitoring $2, 020/yr. + $70/hr
86/100 for staff time over
30 hours .
Mitigation Reimbursement by
Monitoring applicant.
(not 86/100)
5-057 Environmental 30% surcharge on
Impact Review contract total.
Page 9 of 12
S-059 County Water Wetland Hourly rate.
Agency Review
S-060 Consulting Hourly rate.
Services
(transportation)
S-061 Growth Management Part of 40%
Task Force Review surcharge on
building permit fee.
S-062 Measure C Part of 40%
Growth Mgmt. surcharge on
Plan building permit fee.
S-063 Non-EIR CA $45/application
Environmental
Quality Act
Compliance
Review
S-064 EIR for County Projects Hourly rate.
S-065 Child Care Application Review $465/application
S-066 Code Enforcement Part of 40% sur-
charge on building
permit.
S-067 Counter Work Part of 40% sur-
charge on building
permit.
S-068 Final Map Check $1,450 + $25/lot
including 2
corrections or
revisions . After
3rd review, hourly
rate.
S-069 Parcel Map $1, 300 + $25/lot
including 2
corrections or
revisions . After
3rd review, hourly
rate.
S-070 Map Check - Records of Survey Hourly ,rate charged
against $400 deposit
with a $200 minimum.
S-071 Map Check - Lot Line Adjustment Hourly rate charged
against $400 deposit
with a $200 minimum.
Public Improvement Plan Checks (S-072 - S-075)
S-072 Major
Based on Improvement Cost:
0-$25,000 9% . $1,000 minimum.
All work performed
after 3rd review
charged at hourly
rate.
$25, 000-$50, 000 $2,250 + 7% of
amount over $25,000 .
$1, 000 minimum.
All work performed
after 3rd review
charged at hourly
rate.
Page 10 of 12
Public Improvement Plan Checks (S-072 - S-075) - continued
$50, 001 or more $4,000 +2% of amount
over $50,000.
$1,000 minimum.
All work performed
after 3rd review
charged at hourly
rate.
S-073 Minor
Based on Improvement Cost:
0-$25,000 9% . $1,000 minimum.
All work performed
after 3rd review
charged at hourly
rate.
$25, 000-$50,000 $2250 + 7% of amount
over $25,000. All
work performed after
3rd review charged
at hourly rate.
$50, 001 or more $4,000 +2% of amount
over $50,000. All
work performed after
3rd review charged
at hourly rate.
S-074 Land Use Permit
Based on Improvement Cost_:
0-$25, 000 9% . $1,000 minimum.
All work performed
after 3rd review
charged at hourly
rate.
$25, 000-$50,000 $2,250 + 7% of
amount over $25,000 .
All work performed
after 3rd review
charged at hourly
rate.
$50, 001 or more $4 ,000 +2% of amount
over $50,000. All
work performed after
3rd review charged
at hourly rate.
S-075 Development Plan
Based on Improvement Cost:
0-$25, 000 9% . $1,000 minimum.
All work performed
after 3rd review
charged at hourly
rate.
S
$25, 000-$50,000 $2,250 + 7% of
amount over $25,000.
All work performed
after 3rd review
charged at hourly
rate.
$50,001 or more $4, 000 +2% of amount
over $50,000. All
work performed
after 3rd review
charged at hourly
rate.
w
Page 11 of 12
S-076 Drainage Review Hourly charge
(no improvement plans) against $1,000
deposit.
Public Improvement Inspection (S-077 - S-080)
S-077 Major Improvement
Valuation•
$100,000 or less 8%
$100, 001 or more 4 .5% $8, 000 + 4 .5% in
excess above
$100, 000
Additional fees when
work goes over 1 year 1% of uncompleted
work + $100
work goes over 2 years 2% of uncompleted
work + $100
S-078 Minor Improvement
Valuation:
$100, 000 or less 8%
$100, 001 or more $8,000 + 4 .5% in
excess of $100, 000
Additional fees when
work goes over 1 year 1% of uncompleted
work + $100
work goes over 2 years 2% of uncompleted
work + $100
S-079 Land Use Permit Improvement Valuation
Valuation:
$10.0, 000 or less 8%
$100,001 or more $8,000 + 4 .5% in
excess of $100,000
Additional fees when
work goes over 1 year 1% of uncompleted
work + $100
work goes over 2 years 2% of uncompleted
work + $100
S-080 Development Plan Improvement
Valuation:
$100, 000 or less 8%
$100, 001 or more $8, 000 + 4 .5% in
excess of $100,000
Additional fees when
work goes over 1 year 1% of uncompleted
work + $100
work goes over 2 years 2% of uncompleted
work + $100
S-081 Application Review for Encroachment Encroachments within
Permit county R/W: small
$35; large (eng.
plans rqd. ) - $35 +
hourly rate.
Utility Encroach-
ments : Time and
materials, one hour
minimum.
S-082 Inspection of Encroachment Permit Small - $100
Large - $100 +
hourly rate.
Page 12 of 12
S-082 Inspection of Encroachment Permit - continued
Utility inspections
hourly rate. Un-
permitted inspection
double inspection
and permit costs,
$300 minimum.
Permit, but no
inspection notifi-
cation (48 hour
notice) - $100 +
hourly rate.
S-083 Flood Control District Encroachment Small - $140
Large (eng. plans
required) - $140
+ hourly rate.
Temporary Right of
Entry Permit - $50
S-084 Storm Drain Easement Encroachment Hourly rate charged
against deposit.
$100 minimum fee.
S-085 House Moving Review and Inspection $450 + $70/hour in
excess of 4 hours .
S-086 Street Vacation Review In-use area - $1,700
deposit with hourly
rate charges.
Unused area - $900
deposit with hourly
rate charges .
When map required,
add mapping fees.
Map exists - $1,000
deposit with hourly
rate charges . If no
map exists - $2,700
deposit with hourly
rate charges.
S-087 Temporary Street Closure Review $180/request.
May be less when
Board of
Supervisors
approves temporary
street closure.
S-088 Certificate of Correction $270/certificate.
Review