HomeMy WebLinkAboutMINUTES - 01221991 - 1.5 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: January 22, 1991
SUBJECT: Approving Plans and Specifications for Blum Road Widening
Project No.: 0662-6R4197-90, Martinez Area.
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE the Plans and Specifications for the Project and ADVERTISE for bids to be received
on Thursday, February 28, 1991 at 2:00 p.m.
DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section
20392 of the Public Contract Code.
II. Financial Impact:
The estimated contract cost of the project is $30,000, funded by CSAC Bonds (100%).
III. Reasons for Recommendations and Background:
The project is needed to mitigate traffic impact at the Blum Road/Pacheco Boulevard
intersection, due to the construction of the Central County Corporation Yard and Fuel Facility
at Imhoff Drive.
The Public Works Director has filed with the Board of Supervisors the Plans and Specifications
of the project.
The general prevailing rates of wages, which shall be the minimum rates paid on this project,
have been filed with the Clerk of the Board and copies will be made available to any interested
party upon request.
Continued on Attachment: X SIGNATURE:
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON JAN 2 2 IJ91 APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
I hereby certify that this Is a true and correct copy of
JD:drg an action taken and entered on the minutes of the
c\BO:22.tl Board of SupkrWwr on the data
1991 ATTESTED: JAN 2
Orig. Div: Public Works (Design Division) PHIL BATCHELOR,clerk of the Board
cc: County Admin.: Attn: E. Kuevor OfSupervlsorsandCounty Administrator
Auditor Controller BYA,��,,,, �„�,,,�;
Deputy
PW Accounting
Construction
Road Engineering-M. Avalon
c
,. As
Approving Plans and Specifications for Blum Road Widening
January 22, 1991
Page Two
III. Reasons for Recommendations and Background Cont'd:
The Board reviewed and approved the project as a part of the Central County Corporation Yard
on June 20, 1989 and certified that the Final Environmental Impact Report for the project was
completed in compliance with the California Environmental Quality Act, that the Final EIR was
presented to the Board and the Board reviewed and considered the information contained in
it, and found that the project will have certain environmental effects and adopted the findings
and mitigation measures expressed in Planning commission Resolution 22-1989 which will
mitigate those effects.
A Notice of Determination was filed with the County Clerk on June 20, 1989.
IV. Consequences of Negative Action:
If the project is not approved for advertising, there will be insufficient west-bound left turn lane
storage capacity at the Blum Road/Pacheco Boulevard intersection, and heavy equipment
vehicle traffic will have to exit the Central Yard on roads other than Blum Road. Also, Condition
of Approval 20A6 of Development Plan DP 3050-88, that requires this work, will not be satisfied.