SUBJECT; CEQA Finding for Countrywood General Plan
fty
Amendment and Related Projects
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
Adopt. these CEQA Findings on the Countrywood General Plan Amendment
(#1-88-CO) and related projects, applications 2791-RZ and
Development Plan 3007-88 . (Exhibit A attached)
FISCAL IMPACT
None.
BACKGROUND/REASONS FOR RECOMMENDATIONS
On July 24, 1990, the Board directed that the Countrywood General
Plan Amendment be incorporated in a consolidated General Plan
Amendment and declared their intent to approve • rezoning
applications 2791-RZ and Development Plan 3007-88, Hasseltine-Best
(Applicant) , Countrywood Congregate Care (Owner) , Pleasant Hill
area.
The Board also directed Community Development Department to prepare
the CEQA findings.
CONTINUED ON ATTACHMENT: -X- YES ' SIGNATURE-
_ RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION O BO RD COMMITTEE
APPROVE OTHER
S I GNATUR E(S 1:
. ACTION OF BOARD ON _ January 22 , 1991 APPROVED AS RECOMMENDED _X OTHER
VOTE OF SUPERVISORS
I HEREBY CERTIFY THAT THIS IS A TRUE
UNANIMOUS (ABSENT ) AND CORRECT COPY OF AN ACTION TAKEN
AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD
ABSENT: ABSTAIN:_ OF SUPERVISORS ON THE DATE SHOWN.
CC: Community Development (Orig. Dept.) ATTESTED January 22 , 1991
Public Works PHIL BATCHELOR, CLERK OF THE BOARD OF
County Administrator's Office SUPERVISORS AND COUNTY ADMINISTRATOR
Hasseltine-Best
M382,'7_RT/jn /12:country.brd BY a DEPUTY
BOARD OF SUPERVISORS
CONTRA COSTA COUNTY
RESOLUTION NO.
A RESOLUTION OF THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY
CERTIFYING REVIEW AND CONSIDERATION OF FINAL ENVIRONMENTAL IMPACT
REPORT, MAKING FINDINGS WITH RESPECT TO SIGNIFICANT IMPACTS, AND
ESTABLISHING MITIGATION MEASURES FOR AMENDMENT OF THE GENERAL
PLAN AND APPROVAL OF REZONING APPLICATION TO RE-ZONE 6.4 (+ or -)
ACRES AND A .50 ACRE COUNTY-OWNED PARCEL CONTIGUOUS AT ITS NORTH
BOUNDARY FROM PLANNED UNIT DISTRICT (P-1) TO PLANNED UNIT
DISTRICT (P-1) 2791-RZ
WHEREAS, an environmental impact report (the "EIR") for
Countrywood Congregate Care Complex General Plan Amendment,
Rezoning, and. Preliminary Development Plan (the "Project") was
prepared by Contra Costa County (the "County") pursuant to the
California Environmental Quality Act (Public Resources Code
Sections 21000, et sect.) , and Guidelines for Implementation of
the California Environmental Quality Act (14 Cal. Adm. Code
Sections 15000 et sea. , (hereafter the "State EIR Guidelines") ) ;
and
WHEREAS, the County forwarded the draft -EIR to the State
Clearing House for distribution to those agencies which have
jurisdiction by law with respect to the Project, and other
interested persons and agencies, and sought the comments of such
persons and agencies; and
WHEREAS, notice" .of the completion of the draft EIR was duly
given; and
WHEREAS, the draft EIR was thereafter reviewed and
supplemented to adopt changes suggested, to incorporate comments
received, and the County's response to said comments, and as so
revised and supplemented, a final EIR was submitted to the
Planning Commission of the County and the Board of Supervisors;
and
WHEREAS, the County Planning Commission held a duly noticed
public hearing, on the draft EIR on November 1, 1989, and all
persons expressing a desire to comment thereon or object thereto
having been heard$ and
WHEREAS, the County Planning Commission on June 12, 1990
considered the final EIR .which includes the draft EIR and the
Responses to Comments document and recommended to the Board of
Supervisors that the Final EIR be certified; that General Plan
Amendment No. 1-88-CO be approved; that Rezoning Application No.
2791-RZ be approved; and that final Development Plan No. 3007-88
ENE A
with Conditions (marked Exhibit A, (attached hereto and
incorporated herein by reference) be approved; and
WHEREAS, the Board of Supervisors considered the final EIR
including all comments received and the responses thereto.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS
OF THE COUNTY OF CONTRA COSTA THAT:
A. The County hereby finds and certifies that the Final
EIR has been completed in compliance with the California
Environmental Quality Act, as amended ("CEQA") , and the State EIR
Guidelines, and that the County has reviewed and -considered the
information contained in the .final EIR prior to making a decision
on the Project.
B. In accordance with Section 15091 of the State EIR
guidelines, the County finds that the Project will have the
following significant impacts and finds that the stated
mitigations shall be required as a part of or incorporated into
the Project to avoid or substantially lessen the noted impacts:
1. - Land Use and Visual Factors:
Impacts:
(i) Thecontrast in character between the Project
and surrounding predominantly ranch style development
would represent a significant land use and visual
impact, particularly during the interim period between
Project construction and maturation of peripheral
vegetation screening.
Mitigation:
Recommended conditions. of approval 4C and 8A are
designed respectively to achieve some design variation
and to incorporate natural appearing siding and roof
materials into the construction process. The County
finds that the EIR . recommended mitigation of a
reduction in the number of Project units is not an
acceptable means of mitigation of the referenced land
use and visual impact. A reduction in the number of
Project units, if adopted as a mitigation measure,
would permanently affect the Project in order to lessen
an impact which is primarily interim until vegetation
effects a screening of the Project site. Additionally,
the primary adverse impact of the Project the Diablo
View Road and La Playa neighborhood is only as to the
last 500 feet of Diablo View Road and the rear yards of
two or three homes on Ramada Court. Pursuant to
Section 15092 of the EIR Guidelines, a reduction in the
2
EAMMU U W
number of housing units is an inappropriate means of
mitigation to the extent that alternative mitigation
measures are available.
(ii) The proposed placement of fill in portions of
the ravine corridor would significantly impact ravine
open space, vegetative and wildlife values.
Mitigation:
Potential mitigations include a redesign of the
building footprint to reduce or eliminate the need for
ravine fill and a modification of the access road
crossing the ravine. The Board finds that it is not
practical or feasible to redesign the building
footprint as it has been carefully established so as to
provide the least impact on all adjoining residences.
The County finds, however, that the access road
crossing the ravine should be modified as set forth in
condition of approval 4D; provided, however, .. the _
specific redesign of the opening shall be a matter to
be submitted to and reviewed by the Zoning
Administrator. The final design shall be as economical
'as possible; yet it shall be designed in a fashion
which is sensitive to the described environmental
•impact. The County further finds that retention of up
,to 78% of the site in open space is in itself a
mitigation of the stated impact.
(iii) The design of the residential structure
does not take advantage of existing panoramic views.
Mitigation:
The County does not find this to be a significant
impact on the environment; as noted above, the redesign
of the site lay-out is not feasible in view of the
desire to mitigate impacts upon adjoining property
owners.
(iv) Views of the Project from the Diablo
View/LaPlaya neighborhood would be limited to the last
500 feet of Diablo View Road and the rear yards of 2 or
3 homes on Ramada Court. The Project would have a
significant adverse impact. on the semi-rural character
of the neighborhood as viewed from these locations
until peripheral landscaping matures.
Mitigation:
The County finds the stated impact to be of
interim duration only, affecting only a portion of the
3
���Q D ��
neighborhood. Condition 6 requires submittal of
landscape and irrigation plans prior to issuance of
building permits and Condition 6B imposes minimum size
requirements on the proposed trees to be planted on the
Project site. The County, therefore, finds the
incorporation of Condition 6 to be a reasonable
mitigation. The County has found it not feasible to
alter the footprint due to neighborhood impacts. The
County also finds that adverse impacts exist in the
event the height of the structure was to be lowered
because of interference with circulation and policy
plans.
(v) Project associated modifications to Diablo
View Road and Project related traffic increases would
result in a significant change in the semi-rural
character of the route between LaPlaya Road and the
Project.
Mitigation:
Condition 4A is designed to reduce Project-related
uses of Diablo View Road to insignificant levels.
Although a further mitigation measure reviewed in the
EIR included a reduction in the number of Project
units, the County finds such a reduction to be
unwarranted in that the associated reduction in traffic
would be negligible. It is specifically noted that a
previously approved Congregate Care Project on this
site with fewer units would have greater impact upon °
Diablo View Road. As noted in Section 15092 (c) of the
EIR Guidelines, therefore, the reduction in the number
of housing units is an inappropriate mitigation
measure.
(vi) ' Project open space losses would also
significantly reduce the semi-rural character of the
Diablo View Road neighborhood.
Mitigation:
Basic open space losses are an unavoidable impact.
Condition 7 is designed to minimize open space losses
by virtue of restrictions on further development of the
site.
(vii) The Project would have significant
adverse impact on southbound views from Taylor
Boulevard in the interim period between Project
construction and maturation of peripheral vegetative
screening; a similar impact exists as to views from the
Green Hills Drive neighborhood and more distant
4
surrounding view points.
Mitigation:
The EIR suggested as potential mitigations certain
building design modifications and changes in the
building footprint including an increase in the setback
from Taylor boulevard from 25 feet to 30 feet to
provide additional planting space. The County finds
that building redesign and/or changes in the footprint
are inappropriate mitigation measures for the following
reasons: first, the impacts are interim in nature
until landscape screening takes hold (Condition 6 is
designed to mitigate the impact insofar as is
possible) ; second, relocation of the building footprint
with an additional setback would compromise the
buffering of adjoining property owners, thereby
increasing impacts upon them which would be permanent
in nature.
(viii) - County approval of the Project may have
a precedent-setting effect, particularly if the current
proposed conversion of 27 single family lots to the
east along Pleasant Hill Road is also approved. The
two approvals will be expected to significantly
increase interest and intensify residential densities
along the semi-rural section of Diablo View Road west
of LaPlaya Drive.
Mitigation:
The EIR found this impact to be unavoidable if
both Projects .:are approved. The County notes that the
second Project_ referenced in the EIR is currently
inactive and has not been approved. The County further
finds that Condition 2 is designed to mitigate the
precedent setting effect of this Project by virtue of
its restriction to use of the site for retirement and
congregate care housing only. The County finally finds
that this impact is further mitigated by virtue of the
development restrictions imposed by Condition 7.
(ix) As Project tenants grow older, increased
needs for personal care may develop, changing the
nature of the Project. Associated impacts would
include possible increases in service and emergency
vehicle traffic and increased Project sensitivity- to
noise intrusion from Taylor Boulevard.
Mitigation:
Condition 2 is designed to maintain the character
5
of the Project insofar as is possible. Condition 4A is
designed to limit *use of Diablo View Road. Condition
12 imposes an acoustic study requirement and makes
noise attenuation measures subject to further review
and approval by the Zoning Administrator.
(x) The Project site has a number of locational
disadvantages with . significant adverse. impact
implications for Project residents including proximity
to Taylor Boulevard as a significant noise source and
the lack of walking proximity to recreational,
commercial, medical, civic, religious and public
transportation services.
Mitigation:
The County finds that this impact has been
mitigated by virtue of Condition 9 which requires the
provision of a van service for the residents as well .as
the preparation of a Transportation System Management . .
.. Program , and approval thereof by the Zoning
Administrator. This is a primary feature of a
congregate care facility. The County finds that _
Project residents are more likely to utilize the van
service to be provided than to walk to neighborhood
services in view of their expected age. Finally, the
open space amenities of the Project site represent a
locational advantage which alternative sites in a more
centralized location might lack. To mitigate noise
impacts, Condition 12 requires an acoustical study and
noise alteration measures subject to review and
approval by the Zoning Administrator.
(xi) There is a possibility of future conversion
of the congregate care facility to another use such as
conventional apartments.
Mitigation:
Condition 2 is designed to restrict alternative
uses of the Project. The County finds the proposed
mitigation in the EIR to require a legal instrument
attached to the project title stipulating that the site
be used exclusively for senior housing or single family
homes to be unnecessary. Adequate mitigation is
provided- by the process which requires that any future
conversion proposal would require application for a
General Plan Amendment, a rezoning, a further
environmental review, and all of the public hearings
required by such a process.
2. Population and Housing:
6
REM A
The EIR found a number of significant impacts relative to
population and housing. The EIR further found that no mitigation
measures were required by virtue of such impacts because all were
beneficial. The County finds the Project to be consistent with
its Housing Element goals regarding provision of a wide-range of
housing types to meet the needs of all age groups, provision of
housing for special . needs including the elderly, and
encouragement of semi-independent housing for the . elderly. The
County finds that no mitigation measures need be adopted relative
to population and housing impacts of the Project.
3. Transportation and -Park ing:
Impacts:
(i) The extra truck trips associated with the
Project would not have extraordinary ,road strength or
road wear implications, but busy delivery truck drivers
would tend to use . excessive speed along affected_
residential routes.
Mitigation:
Condition 4A imposes significant limitations on
. the use of Diablo View Road for access to the Project.
Condition 11F provides for appropriate signage as
determined by the Public Works Department.
(f i) Project-related traffic increases on Diablo .
View Road would be highly noticeable to residents along
this road and would represent a significant
neighborhood impact. Also, the Project through road
connection (Diablo View Road to Pleasant Hill Road)
would provide the Diablo View/LaPlaya neighborhood with
a more direct route to .west bound Pleasant Hill Road,
resulting in: (a) more traffic on Diablo View
Road/LaPlaya Drive, Del Oceano Drive, Del Rio Drive,
Del Este Street and Withers Avenue; (b) internal safety
problems . for Project residents; and (c) conflicts with
internal parking movements.
Mitigation:
The County finds that no significant change in
service level operation is expected to alter existing
intersection or roadway operations in the Project
vicinity. The county further finds that this Project
as proposed will result in a lesser increase on Diablo
View Road than would be the case if the previously
approved 70-unit congregate care Project was to be
constructed. It is noted that TIRE Index Ratings
7
reported in the EIR indicate that perceived impacts on
neighborhood quality are significant and comparable for
either Project. Conditions 4A, 11D and 11F are all
designed to mitigate that perceived impact through
severe limitations on through Project use of Diablo
View Road, construction of a standard cul-de-sac with
no access to adjacent parking and public works approval
of appropriate signage. . The County has also reserved
the right to eliminate all access to and from Diablo
Valley Road based on further analysis of project
traffic.
(iii) The proposed right turn only Project
ingress/egress at the Pleasant Hill Road access point
would be unsafe for seniors and other drivers due to
high traffic speeds on Pleasant Hill Road and the
existing road configuration. Maneuvering from this
exit point to the Pleasant Hill Road U Turn ramp to go
east-bound would also be difficult and unsafe.
Mitigation:
Conditions 4A and 11B are designed to implement
EIR recommended mitigation measures for this impact.
The County further finds that the transportation
services which will be provided to residents of the
project will minimize the number of resident drivers.
(iv) Traffic turning into the Pleasant Hill Road
entrance would also create safety conflicts with west
bound through traffic due to the lack of a right turn
lane.
Mitigation:
Conditions 4A and 11B are designed to implement
the EIR recommended mitigations.
(v) The tendency far east bound drivers on
Pleasant Hill Road, to attempt illegal left hand turns
into the site at this entrance to avoid the longer
indirect Diablo View Road route would also create '
significant safety conflicts with Pleasant Hill Road
through traffic.
Mitigation:
Conditions 4A and 11B are designed to implement
the EIR recommended mitigations.
(vi) Site distances to the north and south of the
Pleasant Hill Road/Diablo View Road intersection are
8
EKE 17 A
limited by existing vegetation. The Project would
increase related safety risks.
Mitigation:
The county finds that this impact is not directly
related to the Project but constitutes an existing
condition. Condition 4A seeks to limit Diablo View
Road access to and from the . Project.
(vii) Existing peak hour left turn delays of
the Diablo View/Pleasant Hill intersection would be
prolonged by Project residents (seniors) who would tend
to wait longer to make these turns.
Mitigation:
The County finds that the EIR recommended
mitigation of a north bound left turn lane to be added
to the Pleasant Hill approach is an inappropriate
mitigation. Condition 4A is designed to limit the use
of - Diablo View Road by Project ' residents to the
Project-provided van service. Additionally, the stated
impact is not directly Project related but is existing.
(viii) Based on comparisons with numerous other
senior housing Projects in the County, the . Project
parking ratio of .52 spaces per unit would be adequate
provided that at least 5 or 6 spaces were reserved for
visitors. Nevertheless, long-term visitor parking
could cause internal overflow parking, creating.
nuisance and emergency access problems.
Mitigation:
Condition 3 is designed to incorporate the EIR
recommended mitigation. There is further provision for
parking space regulation in the review of parking plans
by the Zoning Administrator prior to the issuance of
building permits.
(ix) The Project and its elderly residents would
significantly exacerbate pedestrian safety_ problems on
Diablo View Road due to the narrow street width,
limited sight distances, and the lack of continuous
sidewalks along the route.
Mitigation:
The County finds that the EIR-proposed mitigation
of this impact through the widening of Diablo View Road
is inappropriate. The problem of narrow width and
consequent pedestrian safety is not Project-related as
9
EW a �
it pertains to existing conditions. The Project is
required by Condition 9 to provide van service as a
preferred alternative to pedestrian access to Diablo
View Road in view of the expected ages of Project
residents. The project contains significant open space
on the site eliminating the need for walking offsite. •
Additionally, the Project will be required to comply
with County-wide Area of Benefit Fees as adopted by the
Board of Supervisors and the application of such fees
may be used to solve this existing problem. Further,
Condition 4A restricts vehicular access by way of
Diablo View Road.
(ix) Seniors are generally more dependent on
public transit. Existing transit stops are some
distance from the Project site and present potential
safety problems in terms of access.
Mitigation:
Condition 9 and its anticipated implementation of
a van service is designed to overcome the potential
dependency on public transit which this impact
addresses.
{x} The cumulative traffic impacts identified in
the EIR would not be expected to significantly alter
intersection or roadway operations in the Project
vicinity.
Mitigation:
No mitigation measure is required. The Project
will be required to pay County-wide Area of Benefit
Fees which may be used to mitigate traffic problems.
(xi) During the approximately 12-month Project
construction, heavy vehicle travel on Diablo View Road
(before the Pleasant Hill Road connection is completed)
could result in significant noise impacts and
significant roadway damage.
Mitigation:
Condition 14 is designed to implement the EIR
recommended mitigation restricting hours of operation
and access. Condition 11F permits the Public Works
Department to impose bonding requirements relative to
the construction of improvements if and as necessary.
4 . Drainage and Water Quality:
10
Impacts
(i) The proposed drainage pian would remain
essentially the same as the Plan approved for the
earlier congregate care proposal. Drainage run off
increases as a result of Project changes would not be
expected to result in significant additional adverse
impacts on the Diablo View/LaPlaya drainage system.
Mitigation:
Condition 11A requires the Project to conform to
the requirements of Division 414 of the .Subdivision
Ordinance. The design standards imposed by the Public
Works Department will be observed relative to the
Project.
(ii) The Project will contribute to significant
cumulative increases in run off within Drainage Area 46
and would thus contribute to identified (planned) needs
for increased capacities in this system.
Mitigation:
The Project is required to comply with the
drainage fee requirements for Drainage Area 46 as
adopted by the Board of Supervisors. Condition 11A
requires conformance with Division 914 of the
Subdivision ordinance.
(iii) Construction grading could also
contribute to significant down-stream sedimentation
impacts.
Mitigation:
Condition 6 requires approval of a landscape and
irrigation plan prior to issuance of building permits.
The County further finds that appropriate conditions to
mitigate construction period erosion can be implemented
by the Public Works Department under the terms of
Condition 11F and applicable grading requirements.
5. Municipal Services:
Impact:
(i) Water. The Water District does not
anticipate problems with the local water system in
meeting Project domestic water and fire flow demands.
Mitigation:
e 11
No mitigation i`s required; Condition 8C implements
EIR recommended mitigations in its requirement that
fire protection systems be subject to approval by the
Contra Costa County Consolidated Fire Protection
District.
(ii) Sewer. Project Sewer needs could be
adequately met via connections to the existing sewer
main which traverses the Project site and by making any
off-site sewer line improvements indicated as necessary
through routine analysis of sewage collection system
capacity.
Mitigation:
No mitigation is required as to this impact.
(iii) Police Services. The Project alone
would not be expected to create a need for additional
police manpower or facilities.
Mitigation:
No mitigation is required as to this impact.
(iv) Fire Protection. The Project would increase
the likelihood of fires on site. The Project design
includes adequate fire equipment access plus an
automatic sprinkler system throughout the residential
structure.
Mitigation:
The County finds that no mitigation is required by
this stated impact. Nonetheless, Condition 8A
incorporates the EIR recommended mitigation requiring
design of a fire sprinkler protection and smoke
exhaustion system and Condition 11F permits Public
Works Review and approval of all site improvement
plans. The County finds that the specific mitigation
measures recommended in the EIR relative to the width
and support requirements of the proposed ravine bridge
is adequately addressed in -Condition 11F and condition
4D requiring Zoning Administrator approval of the final
ravine crossing design.
(v) Ambulance Services. Noticeably more night
and early morning calls for emergency services can be
expected from elderly housing projects.
Mitigation:
12
The County finds that the Pian specifications
adequately address the EIR recommended mitigations.
Condition 4A limits access to Diablo View Road but does
permit emergency access. The County finds the EIR
recommended mitigation restricting ambulance service
calls to Pleasant Hill Road to be inappropriate as an
absolute prohibition.
b. ,Noise Factors:
Impact:
(i) The County's revised Noise Element forecasts
noise exposure - levels of 68dB (average) within the
proposed residential footprint because of proximity to
Taylor Boulevard. An acoustical study should be a part
of the Project approval process to insure average
interior noise levels of 45dB.
Mitigation
Although the EIR does not recommend any specific
mitigation as to this impact, Condition 12 is designed
to implement the requirement for an acoustic study.
(ii) The 10 foot high noise wall proposed along
the sites western boundary will not protect the upper
two residential stories from Taylor Boulevard impacts.
Project outdoor areas would be significantly impacted.
by Taylor boulevard noise intrusion.
Mitigation:
Condition 13 requires a sound barrier wall and/or
fencing along the west boundary, which shall be
reviewed and subject to approval by the Zoning
Administrator. The County agrees with the EIR
conclusion that a higher wall or fence than 10 feet is
infeasible in view of visual constraints. Exterior
patio areas will be at ground level, however, and it is
therefore found that the enclosure of patio areas
within atriums or other measures is an inappropriate
mitigation of this perceived impact. The County finds
that the EIR recommended mitigation of Project redesign
and/or re-orientation is inappropriate in that (a)
Conditions 12 and 13 adequately address permissible
acoustic noise levels and (b) redesign or re-
orientation of the building footprint is infeasible due
to the increased Project impact which this would cause
upon adjoining property owners.
13
MEN A
There would be noticeable intermittent
Project related traffic noise increases along Diablo
View Road west of LaPlaya Drive.
Mitigation:
Condition 4A is designed to implement the EIR
recommended mitigation of this impact.
(iv) There would be noticeable changes in the
noise environment for the 3 homes abutting the
Project' s east boundary _ due to internal Project
vehicular movements, deliveries and general activity
noise.
Mitigation:
Condition 6 is designed to implement the
recommended mitigation of construction of a noise
barrier or earthen berm. The County finds that the EIR
recommended mitigation measure of re-orientation of the
Project site plan by 180 degrees is infeasible in that
it would require a complete redesign of the Project,
force parking to the creek area, and require a
retaining wall along Taylor Boulevard. In addition,
the Project orientation is beneficial in that the
residential building will buffer adjacent homes to the
east from Taylor Boulevard noise intrusion.
(v) The planned widening of Taylor Boulevard from
four to six lanes would bring associated traffic closer
to the Project residential structure and west side
outdoor areas,
Mitigation:
The County finds that the EIR recommended
mitigation of an increase in the minimum building set
. back along Taylor Boulevard is inappropriate in view of
concerns for Project impacts upon adjoining property
owners.
(vi} Significant on-site construction period noise
impacts would be experienced by adjacent homes to the
east and north of the Project.
Mitigation:
Condition 14 is designed to implement the EIR
recommended mitigations. The County further finds this
to be an interim rather than a long-term impact.
14
(vii) Construction related vehicular traffic
would result in short-term significant noise impact
along Diablo View Road (most noticeably in the
evening) .
Mitigation:
The County finds that Condition 14 and its
implementation by the Zoning Administrator is designed
to adequately address this impact.
C. Pursuant to Sections 15089 and 15091 of the State EIR
Guidelines, the County finds that implementation of the Project
will have the following significant impacts which are
unavoidable: (a) Loss of basic open space and the contribution to
cumulative open space losses within north central Contra Costa
County, (b) the Project may constitute a precedent for increased
residential densities within the Project area; (c) limited
emergency vehicle access may impact Diablo View Road; 'and (d)
Project surface run-off will contribute to cumulative down-
stream water quality impacts.
Pursuant to Section 15091 of the State EIR Guidelines, the
County finds that changes or alterations have been required in or
incorporated into the Project which avoid or substantially lessen
the Environmental Impacts identified in the final EIR all as
specifically noted above. In addition, pursuant to Section 15093
of the State EIR Guidelines, the County finds that the benefits
of the proposed Project out-weigh its unavoidable adverse
environmental effects such that the mitigated impacts taken
together with those which are unavoidable have been deemed
acceptable. The County makes this finding based upon the
consistency of-' this Project with County Housing Element goals
regarding the provision of housing designed to meet the special
needs of the elderly in view of anticipated growth in that sector
of the population and because the facility in question represents
an attractive and stable residential development with
substantially mitigated effects upon the adjacent surroundings
and existing residential development. Based on the foregoing
statement of overriding considerations and in view of the
substantially mitigated Project impacts, the County finds that
none of the other Project alternatives listed in the EIR is a
superior alternative to the proposed Project.
D. upon approval of the Project by the Board of Supervisors,
the Director of community Development is hereby directed to file a
Notice of Determination with the County Clerk of Contra Costa
County pursuant to the provisions of Section 21152 of the Public
Resources Code and the State EIR Guidelines adopted pursuant
thereto.
15
CONDITIONS OF APPROVAL FOR DEVELOPMENT PLAN 3007-88
1. Development shall be as shown on plans submitted with the application dated
received by the Community Development Department on April 4, 1990, subject
to the conditions listed below.
2. This approval is for retirement and congregate care housing facility of not
more than 101 residential units for persons 60 years or older and as such
shall be recorded as a deed restriction on the property. A copy of the
recorded document shall be submitted to the Community Development Depart-
ment prior to occupancy. (If a residential unit is to be occupied by a
couple, one spouse must be 60 years of age or older.)
3. This approval includes and is subject to the County-owned property
contiguous to the north to be part of this development to provide for
off-street parking and a cul-de-sac turnaround at the end of Diablo View
Road.
A. In the event that the County-owned property is unavailable for parking
purposes, revised parking plans will be submitted for the review and
approval of the Zoning Administrator providing for .52 onsite parking
spaces per dwelling unit as indicated on the plans received 4/04/90. A
. maximum of 25% of spaces may be "compact" spaces. Such plans will be
reviewed and approved by the Zoning Administrator prior to the issuance of
building permits.
B. The cul-de-sac shall be designed and constructed so that it leaves a
substantial, developable parcel on the County-owned parcel of land.
The cul-de-sac shall be aligned so that it is located on both County
property and the applicant's property. The actual alignment shall be
subject to review of the Public Works Department, Road Engineering
Division, and subject to the review and approval of the Zoning
Administrator.
4. Prior to issuance of a building or grading permit, revised plans shall be
submitted to ^the Community Development Department. The plans shall be
agendized on the County. Planning Commission agenda for the review and
approval of the Planning Commission. The plans shall provide for the
following:
A. The project access to be at Pleasant Hill Road with right turns only,
and with an adequate acceleration lane and extension of the island
area to prevent left turns on Pleasant Hill Road. Channelization
shall be subject to the review of the Public Works Department, Road
Engineering Division.
B. No access to Diablo View Road except for card-gated emergency access
and allowance for use by transportation vans of the congregate care
facility and subject to review by the Contra Costa County Consolidated
Fire Protection District. The location and design of the gate and
related fencing shall be shown on revised plans. The turnaround at
the end of Diablo View Road to be constructed with no access to
adjacent parking. All off-street parking shall be shown.
2.
C. That portion of the end- of the middle wing of the building with a 10
foot setback from Taylor Boulevard shall be reduced to two-story
height and those affected residential units (3) shall be relocated to
the end of the most northerly wing providing for a height of not more
than two stories for the relocated units. Consideration shall be
given to providing a 15-foot building setback along Taylor Boulevard.
The proposed building as viewed from Taylor Boulevard and the
surrounding area shall be reduced in' height by lowering the grading
for the building pad to grade elevation of not more than 260 feet.
Retaining walls embankments and earth berms shall be shown on revised
plans including cross-section drawings. Where retaining walls are
needed they shall be of a stepped design or crib-lock design to the
extent feasible.
D. The ravine crossing shall be constructed using crib-lock retaining
walls as indicated on submitted plans and with an opening of not less
than 20 foot width and 10 foot height. The roadway for the crossing
shall have a minimum width of 20 feet and shall be widened to provide
for a separated 5 foot wide pedestrian walkway. The road grade to
Pleasant Hill Road shall not exceed 10 percent.
5. Prior to filing for grading permit, grading plans shall be submitted for
review and approval by the County Geologist and the Zoning Administrator.
6. Prior to the issuance of building permits a landscape and irrigation plan
shall be submitted to the Community Development Department. ' The plans
shall be agendized on the County Planning Commission's agenda for review
and approval. The plans shall utilize California Native Species, conform-
ing to the Contra Costa County policy on water conservation requirements
for new development. Landscaping and irrigation shall be installed prior
to occupancy.
A. Evergreen screening trees shall be planted at the east, west and north
boundaries of the property.
B. The proposed trees on the site are to be a minimum of 15 gallons in
size. The propose shrubs on the site are to be a minimum of 5 gallons
in size.
C. All embankments, earth berming and retaining walls shall be shown
together with landscaping for those area. Plans shall be submitted
for review by the two, property owners contiguous at the east boundary,
and their approval indicated with the landscape plan.
D. Existing trees which qualify as heritage trees per Ordinance Code
Section 816-4.602 that are to be preserved and may be endangered by
construction or grading activities, shall be protected at the dripline
by barricade or other suitable means.
3.
7. A scenic easement or the deeding of the development rights shall be
provided for at the area of the ravine across the south portion of the
property extending from Pleasant Hill Road north to approximately Contour
Elevation 250 feet. This shall be accomplished prior to occupancy.
S. Building design shall be similar to that shown on revised plans dated
received April 4, 1990 with the application subject to final review and
approval by the Zoning Administrator prior to issuance of a building
permit. The roofs of all buildings shall be free of such objects as air
conditioning equipment, television aerials, etc., or screened from view and
exterior lights shall be deflected so that lights shine onto applicant's
property and not toward adjacent properties.
A. Provide building colors and material to blend with the environment.
Roofing shall be of brown tone tile. Stucco walls shall be of earth-
tone colors and balconies and trim shall be natural wood.
B. Additional soundproofing shall be provided for those residential units
directly adjacent to Taylor Boulevard for a interior noise level of
less than 45 DBL.
C. Provide complete automatic fire sprinkler protection and smoke
exhaustion system for the entire building subject to approval by the
Contra Costa County Consolidated Fire Protection District.
9. Submit a TSM (Transportation System Management Program) for vans, busing,
etc., for review and approval - by the Zoning Administrator prior to
occupancy. Van service for on-call or scheduled use shall be provided for
the residents.
10. Should archaeological materials be uncovered during grading, trenching or
other on-site excavation(s), earthwork within 30 yards of these materials
shall be stopped until a professional archaeologist who is certified by the
Society for California Archaeology (SCA) and/or the Society of Professional
Archaeology (SOPA) has had an opportunity to evaluate the significance of
the find and suggest appropriate mitigation(s) , if deemed necessary.
11. Comply with drainage, road improvement, traffic and utility requirements as
follows:
A. Unless exceptions are specifically granted, this development shall
conform to the requirements of Division 914 (Drainage) of the
Subdivision Ordinance. Conformance with Division 914 includes the
following requirements:
1) Conveying all storm waters entering or originating within the
subject property, without diversion and within an adequate storm
drainage facility, to a natural watercourse having definable bed
and banks or to an existing adequate storm drainage facility
which conveys the storm waters to a natural watercourse.
MEN W
4.
This will require the improvement of some of the downstream
drainage facilities (e.g. , culverts) subject to the review and
approval of the Public Works Department.
2) Designing and constructing storm drainage facilities required by
Division 914 in compliance with specifications outlined in
Division 914 and in compliance with design standards of the
Public Works Department.
3) The design of the on-site watercourse crossing shall be subject
to the review and approval of the Public Works Department.
B. Unless exceptions are spec ifically ' granted, comply with the, require-
ments of Division 1006 (Road Dedication and Setbacks) of the County
Ordinance Code. Compliance with the Ordinance includes the following:
1) Pleasant Hill Road frontage improvements which include the
construction of an acceleration lane for west bound traffic
exiting the site and the installation of a median barrier along
the frontage to prevent left turn exits will satisfy this
requirement. All improvements shall be subject to the review and
approval of the Public works Department.
2) Traffic shall be restricted to right turn-in and right turn-out
only at the Pleasant Hill Road accessway.
3) Installing street lights on Pleasant Hill Road. The final number
and location of the lights shall be determined by the County
Traffic Eng,}neer.
C. Install all- new utility distribution services underground.
D. Construct a standard cul-de-sac, subject to the review and approval of
the Public Works Department, at the westerly terminus of Diablo View
Road. ,
E. Furnish proof to the Public Works Department, Engineering Services
Division, of the acquisition of all necessary rights of entry, permits
and/or easements for the construction of off-site, temporary or
permanent, road and drainage improvements.
F. Submit improvement plans prepared by a registered civil engineer to
the Public Works Department, Engineering Services Division, for
review; pay the inspection, plan review and applicable lighting fees.
These plans shall include any necessary traffic signage and striping
plans for review by the County Traffic Engineer. The improvement
plans shall be submitted to the Public Works Department, Engineering
Services Division, prior to the issuance of any building permit. The
review of improvement plans and payment of all fees shall be completed
prior to the clearance of any building for final inspection by the
5.
Public Works Department. If final inspection is requested prior to
construction of improvements, the applicant shall execute a road
improvement agreement with Contra Costa" County and post bonds required
by the agreement to guarantee completion of the work.
12. Prior to issuance of a grading or building permit, an acoustic study shall
be prepared to assure that the residential units shall have interior noise
level of not more than 45 dba of the CNEL scale and to further reduce noise
levels of outdoor patio and deck areas. Noise attenuation measures such as
type, size and location of sound barriers, additional grading for earth
berming, shall be shown and subject to review and approval by the Zoning
Administrator.
13. A decorative sound barrier wall and/or fencing shall be provided along the
west boundary of the property and submitted for review and approval by the
Zoning Administrator prior to constructidn.
14. Noise generating construction activities shall be limited to the hours of
7:30 A.M. , to 5:00 P.M., Monday through Friday and shall be prohibited on
State and Federal holidays. The restrictions on allowed working days may
be modified on prior written approval by the Zoning Administrator.
ADVISORY NOTE
A. This project may be subject to the requirements of the Department of Fish &
Game. The applicant should notify the Department. of Fish & Game, P.O. Box
47, Yountville, California 94599, of any proposed construction within this
development that may 'affect any fish and wildlife resources, per the Fish, &
Game Code.
B. The applicant will be required to comply with the requirements of the
Bridge/Thoroughfare Fee Ordinance for the Countywide Area of Benefit as
adopted by the Board of Supervisors.
C. Comply with the requirements of the Contra Costa County Consolidated Fire
Protection District.
D. The applicant will be required to comply with the drainage fee requirements
for Drainage Area 46 as adopted by the Board of Supervisors.
BT/aa
DPX/3007-88C.BT
3/9/90
4/04/90
4/10/90 - P/C Rev. (v)
1/16/91 - jn