HomeMy WebLinkAboutMINUTES - 02261991 - 1.28 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: February 26, 1991 SUBJECT: Approving Plans and Specifications for Drainage Area 30A, Line A, Oakley Area. Project No.: 7557-6D8448-88, CP# 89-12 SPECIFIC REQUEST(S) OR RECOMMENDATIONS) &BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE and Plans and Specifications for the Project and ADVERTISE for bids to be received on Thursday, March 28, 1991, at 2:00 p.m. DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section 21191 of the Public Contract Code. AUTHORIZE the closure of Rose Avenue to through traffic between Cypress Road and Vinewood Drive for approximately two weeks with the exception of emergency vehicles and local residential traffic. II. Financial Impact: The estimated contract cost of the project is $389,000, funded by Drainage Area 30A (100%). 111. Reasons for Recommendations and Background: The project is needed to provide an outlet for the DA 30A Detention Basin and to reduce the potential for flooding in Drainage Area 30A. The Chief Engineer has filed with the Board of Supervisors the Plans and Specifications for the project. Continued on Attachment: X SIGNATURE: _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON FEB 2. 6 1991 APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS ✓ UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: I hereby certify that this Is a true and correct copy of EJS:drg an action taken and entered on the minutes of the c:B026.t2 Board of SupenAsors on the date Own ATTESTED: FFR 29 1991 Orig. Div: Public Works (Design Div.) PHIL BATCHELOR.Clark of the Board cc: GMEDA-Director of Supervlsors and County Administrator County Administrator-E. Kuevor Auditor/Controller •�p"h' PW Accounting Construction Road Engineering-M. Avalon Approving Plans and Specifications for Drainage Area 30A, Line A, Oakley Area. February 26, 1991 Page Two III. Reasons for Recommendations and Background Cont'd.: The general prevailing rates of wages, which shall be the minimum rates paid on this project, have been filed with the Clerk of the Board and copies will be made available to any interested party upon request. The Board reviewed and approved the project on May 8, 1990 and found, on the basis of the initial study and all comments received, that there is no substantial evidence that the project will have a significant effect on the environment and adopted the Negative Declaration. IV. Consequences of Negative Action: If the project is not approved for advertising, it will not be constructed.