HomeMy WebLinkAboutMINUTES - 02121991 - 1.5 1,5A
TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: February 12, 1991
SUBJECT: Approve and Authorize the Chair to Execute Program Supplement No. 002 for the
Signalization of Port Chicago Highway at Lynnbrook Street.
Project No.: 0662-6R1060
SPECIFIC REQUEST(S) OR RECOMMENDATIONS) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Chair of the Board of Supervisors to execute Program
Supplement No. 002 which provides State-Local Transportation Partnership Funds for the
signalization of Port Chicago Highway at Lynnbrook Street.
II. Financial Impact:
Execution of Program Supplement No. 002 will allow the County to receive State-Local
Transportation Partnership Funds for a portion of the total project cost. The estimated project
cost of$119,900 includes construction engineering, construction and contingencies. State funds
will be used to reimburse the County for approximately 22% of the estimated project cost. The
remaining 78% will be funded by the West Pittsburg Area of Benefit.
III. Reasons for Recommendations and Background:
On June 27, 1989 the Board of Supervisors approved a resolution authorizing the Public Works
Director to apply for State-Local Transportation Partnership Funds for various road improvement
projects. The project described by Program Supplement No. 002 is one of several projects that
will receive State funding under Senate Bill 300.
The project involves the signalization and striping of the Port Chicago Highway and Lynnbrook
Street intersection.
Continued on Attachment: X SIGNATURE: .���u�C
RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON FEB 12 1991 APPROVED AS RECOMMENDED X OTHER
VOTE OF SUPERVISORS
UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN: i hereby certify that this is a true and correct copy of
an action taken and entered on the minutes of the
NW:eh Board of Supervisors on the date shown.
c:6012a.t2 ATTESTED: FFB 12 1991 __
PHIL BATCHELOR,Clerk of the Board
Orig. Div: Public Works (Road Engineering) of Supervisors and County Administrator
cc: R. Gilchrist, Accounting 2J
sy . 4 .Deputy
Program Supplement No. 002 for Signalization of Port Chicago Highway at Lynnbrook Street.
February 12, 1991
Page Two
IV. Consequences of Negative Action:
The County will not receive State-Local Transportation Partnership Funds for this project.
TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: February 12, 1991
SUBJECT: Approve and Authorize the Chair to Execute Program Supplement No. 003 for Widening
Byron Highway at Byron Elementary School.
Project No.: 0662-6R1060
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Chair of the Board of Supervisors to execute Program
Supplement No. 003 which provides State-Local Transportation Partnership Funds for widening
Byron Highway at Byron Elementary School.
11. Financial Impact:
Execution of Program Supplement No. 003 will allow the County to receive State-Local
Transportation Partnership Funds for a portion of the total project cost. The estimated project
cost of $39,967 construction engineering, construction and contingencies. State funds will be
used to reimburse the County for approximately 21% of the estimated project cost. The
remaining 79% will be funded by the Discovery Bay Area of Benefit.
III. Reasons for Recommendations and Background:
On June 27, 1989 the Board of Supervisors approved a resolution authorizing the Public Works
Director to apply for State-Local Transportation Partnership Funds for various road improvement
projects. The project described by Program Supplement No. 003 is one of several projects that
will receive State funding under Senate Bill 300.
The project involves widening Byron Highway at Byron Elementary School to create area for a
left turn lane. The proposed left turn lane will be 55 feet long and provide a storage area for
southbound cars waiting to enter the elementary school parking lot. Currently no such lane
exists and cars stopping in the southbound lane to turn left
//create a hazard for other vehicles.
Continued on Attachment: X SIGNATURE: ��TLtir.C2u
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER '
SIGNATURE(S):
ACTION OF BOARD ON 'FEB 12 1991 APPROVED AS RECOMMENDED X OTHER
VOTE OF SUPERVISORS
UNANIMOUS (ABSENT ]� )
AYES: NOES:
ABSENT: ABSTAIN: I hereby certHy that this Is a true and correct copy of
an action taken and entered on the minutes of the
NW:eh Board of Supe isors the date show
c:BO12b.t2 ATTESTED: Sn.
EB 2 1991
PHIL BATCHELOR,Clerk of the Board
Orig. Div: Public Works (Road Engineering) ofSuperylsorsand County Administrator
cc: R. Gilchrist, Accounting ey �� _ if •
- oeputy
Program Supplement No. 003 for Widening Byron Highway at Byron Elementary School.
February 12, 1991
Page Two
IV. Consequences of Negative Action:
The County will not receive State-Local Transportation Partnership Funds for this project.
TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: February 12, 1991
SUBJECT: Approve and Authorize the Chair to Execute Program Supplement No. 004 for the
Realignment and Reconstruction of Neroly Road near Terra Verde Lane.
Project No.: 0662-6R1060
SPECIFIC REQUEST(S) OR RECOMMENDATIONS) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Chair of the Board of Supervisors to execute Program
Supplement No. 004 which provides State-Local Transportation Partnership Funds for the
realignment and reconstruction of Neroly Road from Terra Verde Lane to a point 1450 feet
south.
II. Financial Impact:
Execution of Program Supplement No. 004 will allow the County to receive State-Local
Transportation Partnership Funds for a portion of the total project cost. The estimated project
cost of$143,386 includes construction engineering, construction and contingencies. State funds
will be used to reimburse the County for approximately 22% of the estimated project cost. The
remaining 78% will be funded by the Oakley/North Brentwood Area of Benefit.
III. Reasons for Recommendations and Background:
�7
On June 27, 1989 the Board of Supervisors approved a resolution authorizing the Public Works
Director to apply for State-Local Transportation Partnership Funds for various road improvement
projects. The project described by Program Supplement No. 004 is one of several projects that
will receive State funding under Senate Bill 300.
Continued on Attachment: X SIGNATURE:
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON FEB 12 1991 APPROVED AS RECOMMENDED X OTHER _
VOTE OF SUPERVISORS
X UNANIMOUS (ABSENT _Ir )
AYES: NOES:
ABSENT: ABSTAIN: I hereby certify that this Is a true and correct copy of
an action taken and entered on the minutes of the
NW:eh Board of Supervisors on the date shown.
c:BO12c.t2 ATTESTED: FFR 12 1q91
PHIL BATCHELOR,Clerk of the Board
Orig. Div: Public Works (Road Engineering) of Supervisors and County Administrator
cc: R. Gilchrist, Accounting
By 1 ,��,�aA ���a� ,
Program Supplement No. 004 for Realignment and Reconstruction of Neroly Road from Terra Verde
Lane to a point 1450 feet south.
February 12, 1991
Page Two
III. Reasons for Recommendations and Background: (Cont.)
The project involves the realignment of Neroly Road from Terra Verde Lane to a point
approximately 1450 feet south. The improvement to the horizontal curve in this area will allow,
traffic on Neroly Road to travel more efficiently and safely. Reconstruction of the current
roadway will also be done due to the change in road realignment.
IV. Consequences of Negative Action:
The County will not receive State-Local Transportation Partnership Funds.
TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: February 12, 1891
SUBJECT: Approve and Authorize the Chair to Execute Program Supplement No. 005 for Signaliza-
tion of Willow Pass Road and Alves Lane.
Project No.: 0662-6R1060
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Chair of the Board of Supervisors to execute Program
Supplement No. 005 which provides State-Local Transportation Partnership Funds for the
signalization of Willow Pass Road and Alves Lane.
II. Financial Impact:
Execution of Program Supplement No. 005 will allow the County to receive, State-Local
Transportation Partnership Funds for a portion of the total project cost. The estimated project
cost of$86,900 includes construction engineering, construction and contingencies. State funds
will be used to reimburse the County for approximately 22% of the estimated project cost. The
remaining 78% will be funded by the West Pittsburg Area of Benefit.
III. Reasons for Recommendations and Background:
On June 27, 1989 the Board of Supervisors approved a resolution authorizing the Public Works
Director to apply for State-Local Transportation Partnership Funds for various roadimprovement
projects. The project described by Program Supplement No. 005 is one of several projects that
will receive state funding under Senate Bill 300.
The project involves the signalization of Willow Pass Road and Alves Lane.
Continued on Attachment: x SIGNATURE:�7� -;��/
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON FEB APPROVED AS-RECOMMENDED _X_ OTHER
VOTE OF SUPERVISORS
_X UNANIMOUS (ABSENT 17r )
AYES: NOES:
ABSENT: ABSTAIN: I hereby certify that this Is a true and correct copy of
an action taken and entered on the minutes of the
NW:eh Board of Supery}�gr oq t de91 own.
c:BO12d.t2 ATTESTED: �t tj 1 �y
PHIL BATCHELOR,Clerk of the Board
Orig. Div: Public Works (Road Engineering) of Supervisors and county Administrator
cc: R. Gilchrist, Accounting By ; Deputy
Program Supplement No. 005 for Signalization of Willow Pass Road and Alves Lane.
February 12, 1991
Page Two
IV. Consequences of Negative Action:
The County will not receive State-Local Transportation Partnership Funds for this project.
TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: February 12, 1991
SUBJECT: Approve and Authorize the Chair to Execute Program Supplement No. 006 for Widening
on Cypress Road and O'Hara Avenue.
Project No.: 0662-6191060
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Chair of the Board of Supervisors to execute Program
Supplement No.-006 which provides State-Local Transportation Partnership Funds for the
widening of Cypress Road and O'Hara Avenue.
ll. Financial Impact:
Execution of Program Supplement No. 006 will allow the County to receive State-Local
Transportation Partnership Funds for a portion of the total project cost. The estimated project
cost of$123,686 includes construction engineering, construction and contingencies. State funds
will be used to reimburse the County for approximately 22% of the estimated project cost. The
remaining 78% will be funded by the Oakley/North Brentwood Area of Benefit.
III. Reasons for Recommendations and Background:
On June 27, 1989 the Board of Supervisors approved a resolution authorizing the Public Works
Director to apply for State-Local Transportation Partnership Funds for various road improvement
projects. The project.described by Program Supplement No. 006 is one of several projects that
will receive state funding under Senate Bill 300.
Continued on Attachment: x SIGNATURE:Z1
ZZ
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON FEB 12 1991 APPROVED AS RECOMMENDED X OTHER
VOTE OF SUPERVISORS
UNANIMOUS (ABSENT T� )
AYES: NOES:
ABSENT: ABSTAIN: I hereby certify that this Is a true and correct copy of
an action taken and entered on the minutes of the
NW:eh Board of Supervisors or rtthe 1aotQ�own.
c:BO12e.t2 ATTESTED: 1 f9y9
PHIL BATCHELOR,Clerk of the Board
Orig. Div: Public Works (Road Engineering) of Supervisors and Co my Administrator
cc: R. Gilchrist, Accounting
By ��f -� .Deputy
Program Supplement No. 006 for Widening on Cypress Road and O'Hara Avenue.
February 12, 1991
Page Two
III. Reasons for Recommendations and Background: (Cont.)
The project involves widening Cypress Road and O'Hara Avenue in the vicinity of the Oakley
Middle School. Cypress Road will be widened for approximately 1040 feet east from O'Hara
Avenue and restriped to provide bike lanes. O'Hara Avenue will improved for 930 feet south of
its intersection with Cypress Road. The project will improve both roadways for student and
vehicle traffic around the middle school.
IV. Consequences of Negative Action:
The County will not receive State-Local Transportation Partnership Funds for this project.
*" g �
T
TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: February 12, 1991
SUBJECT: Approve and Authorize the Chair to Execute Program Supplement No. 007 for Widening
and Overlay on Bailey Road in West Pittsburg.
Project No.: 00662-6111060 .
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Chair of the Board of Supervisors to execute Program
Supplement No. 007 which provides State-Local Transportation Partnership Funds for the
widening of Bailey Road from Canal Road to the EBMUD aqueduct and an overlay project to
Willow Pass Road.
II. Financial Impact:
Execution of Program Supplement No. 007 will allow the County to receive State-Local
Transportation Partnership Funds for a portion of the total project cost. The estimated project
cost of$446,779 includes construction engineering, construction and contingencies. State funds
will be used to reimburse the County for approximately 22% of the estimated project cost. The
remaining 78% will be funded by the West Pittsburg Area of Benefit.
III. Reasons for Recommendations and Background:
On June 27, 1989 the Board of Supervisors approved a resolution authorizing the Public Works
Directory to apply for State-Local Transportation Partnership Funds for various road
improvement projects. The project described by Program Supplement No. 007 is one of several
projects that will receive state funding under Senate Bill 300.
Continued on Attachment: x SIGNATURE: � [�
ZZ
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON FEB 12 1991 APPROVED AS RECOMMENDED X OTHER
VOTE OF SUPERVISORS
X UNANIMOUS (ABSENT
AYES: NOES:
ABSENT: ABSTAIN: I hereby certify that this is a true and correct copy of
an action taken and entered on the minutes of the
NW:eh Board of Supervisor on the date shown.
c:BO12f.t2 ATTESTED: FEB 12 1991 --
PHIL BATCHELOR,Clerk of the Board
Orig. Div: Public Works (Road Engineering) of Supervisors and County Administrator
cc: R. Gilchrist, Accounting n
BY Tl� n,l nw ��1.�� .Deputy
Program Supplement No. 007 for Widening and Overlay on Bailey Road in the City of Pittsburg.
February 12, 1991
Page Two.
.III. Reasons for Recommenations and Background: (Cont.)
The project consists of the widening and overlay of Bailey Road in West Pittsburg. The widening
project limits are from Canal Road north to the EBMUD aqueduct. The overlay project is from
Canal Road north to Willow Pass Road.
IV. Consequences of Negative Action:
The County will not receive State-Local Transportation Partnership Funds for this project.
•+ /s�i
TO: BOARD OF SUPERVISORS
FROM: J.-MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: February 12, 1991
SUBJECT: Approve and Authorize the Chair to Execute Program Supplement No. 008 for a Shoulder
Reconstruction Project on Willow Pass.Road from Bailey Road to Pittsburg City Limits.
Project No.: 0662-6R1060
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Chair of the Board of Supervisors to execute Program
Supplement No.008 which provides State-Local Transportation Partnership Funds for a shoulder
reconstruction project on Willow Pass Road from Bailey Road to Pittsburg city limits.
Il. Financial Impact:
Execution of Program Supplement No. 008 will allow the County to receive State-Local
Transportation Partnership Funds for a portion of the total project cost. The estimated project
cost of$168,887 includes construction engineering, construction and contingencies. State funds
will be used to reimburse the County for approximately 9% of the estimated project cost.
Federal funds and the West Pittsburg Area of Benefit will provide funding for the remaining 91%.
Ill. Reasons for Recommendations and Background:
On June 27, 1989 the Board of Supervisors approved a resolution authorizing the Public Works
Director to apply for State-Local Transportation Partnership Funds for various road improvement
projects. The project described by Project Supplement No.. 008 is one of several projects that
will receive state funding under Senate Bill 300.
Continued on Attachment: x SIGNATURE:
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON FEB 12 1991 APPROVED AS RECOMMENDED_� OTHER
VOTE OF SUPERVISORS
C UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN: I hereby certify that this Is a true and correct copy of
an action taken and entered on the minutes of the
NW:eh Board of Supervisors on the date shown.
c:61
012g.02 ATTESTED: FFR 2 19A1
PHIL BATCHELOR,Clerk of the Board
of Supervisors and unty Administrator
Orig. Div: Public Works (Road Engineering) By ,NputY
cc: R. Gilchrist, Accounting
l. •I
"a A S
Program Supplement No. 008 for Shoulder Reconstruction Project on Willow Pass Road from Bailey
Road to Pittsburg City Limits.
February 12, 1991
Page Two
III. Reasons for Recommendations and Background: (Cont.)
The project involves the reconstruction of road shoulders and the installation of thermoplastic
striping on Willow Pass Road from Bailey Road to the Pittsburg city limits.
IV. Consequences of Negative Action:
The County will not receive State Local Transportation Partnership Funds for this project.