Loading...
HomeMy WebLinkAboutMINUTES - 10091990 - 1.7 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY.OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: October 10, 1990 SUBJECT: Approve Construction of North Richmond Fence Project Project No.: 7567-6D8632-90, North Richmond Area SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE the Plans and General Provisions and AUTHORIZE issuance of a Purchase Order for furnishing labor and materials for the North Richmond Fence Project to Bailey Fence Company, the low bidder, in the amount of $13,918.95 and at the unit prices submitted in said bid. II. Financial Impact: The Engineer's Estimate was $13,742.50: This project including engineering and appropriate overhead charges is funded by State Subvention (70%) and Drainage Area No. 73 (30%). Ill. Reasons for Recommendations and Background: The project will fence District owned properties which may otherwise become dump sites for area residents, creating maintenance as well as public health and safety problems. These vacant properties were'used during the Wildcat and San Pablo Creeks project, which is now completed. Bids for the project were received and opened at 255 Glacier Drive, Martinez, on September 20, 1990. Continued on Attachment: X SIGNATURE: _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF.BOARD ONOCT' 9 1990 APPROVED AS RECOMMENDED X OTHER VOTE OF SUPERVISORS UNANIMOUS (ABSENT 1 AYES: NOES: , ABSENT:—. ABSTAIN: RB:drg c\130:10.t10 I hereby certify that this is a true and correct copy of Orig. Div:. Public Works (DESIGN DIV.) an action taken ana entered on the minuten of the Board of Supervisors cc: County Administrator on the'date shown.. Auditor-Controller ATTESTED: OCT '9 1990 PHIL BATCHELOR,�Clerk of the Soard Construction of Supervisors and Countv Administrator Community Development Attn: G. Almquist sir .Deputy PW Accounting Approving Plans and General Provisions for North Richmond Fence Project' October 10, 1990 Page Two III. Reasons for Recommendations and Background Cont'd.: Other bids received were as follows: 1. $16,550.36 Delta Fence Co. Five bids were solicited, and two were received. The Chief Engineer has filed with the Board of Supervisors the Plans and General Provisions for the subject project. The general prevailing rates of wages, which shall be the minimum rates paid on this project, have been filed with the Clerk of the Board and copies will be available to any interested parry upon request. The Board reviewed and considered the information contained in the final Environmental Impact Report (EIR) for the Wildcat and San Pablo Creeks Project on May 18, 1982, and certified that the EIR had been completed in compliance with the California Environmental Quality Act and adopted the findings and mitigating measures expressed in Planning Commission Resolution No. 10-1982. IV. Consequences of Negative Action: The project will not be constructed.