HomeMy WebLinkAboutMINUTES - 01161990 - 1.55 TO.. BOARD OF SUPERVISORS IL-055 File: 245-9001/C. 4. 3 Fel: - J. Michael Walford, Public Works Director Cl.Jl tra January 16, _1990 C DATE: Cry SUBJECT: APPROVING AND AUTHORIZING EXECUTION OF CHANGE ORDER NO. 1 TO VI.+11 'ty CONTRACT FOR ABATEMENT OF SOIL AND GROUNDWATER CONTAMINATION AT 999 BLANCHE LANE, LAFAYETTE, CA (AUTHORIZATION NO. WH305A,B) SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION I. RECOMMENDATION APPROVE Change Order No. 1 to the Contract dated September 5 , 1989, for Abatement of Soil and Groundwater Contamination at 999 Blanche Lane, Lafayette, California, with Aqua Science Engineers, Inc. , and AUTHORIZE the Public Works Director to execute the Change Order, which provides for a $300,000 increase in the Guaranteed Maximum Cost, required to compensate the Contractor for actual amounts expended in doing work which could not be anticipated when the contract was executed, plus not more than 15 percent to cover profits and administration, pursuant to Public Contract Code Section 20134. II . FINANCIAL IMPACT Fundin2__will be from Road Fund accounts of the Public Works Department. III . REASONS FOR RECOMMENDATION/BACKGROUND A. On September 12 , 1989, the Board found that an emergency existed and authorized the Director of General Services to proceed, in the most expeditious manner, pursuant to Public Contract Code Section 20134, with abatement of contaminated soil and groundwater caused by leaking fuel tanks at the Public Works Department Corporation Yard at 999 Blanche Lane, Lafayette. B. A contract for abatement of contaminated soil and groundwater was executed with Aqua Science Engineers, Inc., of San Ramon, California, with an effective date of September 5, 1989. Payment under the contract was based on time and materials with a 15 percent fee and a guaranteed maximum cost of $330,000 . 00 based on an assumed scope of work. This form of contract was used because the work had to be done immediately to limit the spread of contamination and the scope of work was subject to change and expansion during the project. CONTINUED ON ATTACHMENT: 7X_ YES SIGNATURE: �f RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE J OTHER SIGNATURE S : ACTION OF BOARD ON APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE UNANIMOUS (ABSENT AND CORRECT COPY OF AN ACTION TAKEN AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN. CC: General Services Department ATTESTED .IAN 16 7990 Architectural Division PHIL BATCHELOR, CLERK OF THE BOARD OF Accounting County Administrator' s Office SUPERVISORS AND COUNTY ADMINISTRATOR County Counsel Auditor-Controller BY, DEPUTY M382/1P-Mlic Works Department AIPPROWNG AND AUTHORIZING EXECUTION OF File: 245-9001/C. 4. 3 CHANGE ORDER NO. 1 TO CONTRACT FOR January 16, 1990 ABATEMENT OF SOIL AND GROUNDWATER CONTAMINATION AT 999 BLANCHE LANE, LAFAYETTE, CALIFORNIA C. As the work progressed, the extent of contamination was found to be greater than estimated, remediation measures required by the Water Quality Control Board and the County Health Services Department were more extensive than expected and impacts on property owners caused more expense and .delay than anticipated. Consequently, the actual scope and cost of work exceeded that which was assumed under the original agreement, and a change order is required to raise the original Guaranteed Maximum Cost. 24501B01 . 04A JMW/RH: ls