HomeMy WebLinkAboutMINUTES - 02271990 - 2.5 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: FEBRUARY 27, 1990
SUBJECT: PREAPPLICATION TO THE FAA FOR NOISE MONITORING SYSTEM, DRAINAGE
IMPROVEMENTS AND SAFETY AREA GRADING, AND A NEW ROTATING BEACON AT
BUCHANAN FIELD AIRPORT (AIP #3-06-0050-07)
I. Recommended Action:
AUTHORIZE the Public Works Director to submit a preapplication to the FAA for a noise
monitoring system, drainage improvements, and a new rotating beacon at Buchanan Field
Airport; and
REPLACE Board Order dated January 9, 1990 for AIP #3-06-0050-08 with this Board Order;
and
CHANGE Project Number 3-06-0050-07 on Board Order dated December 12, 1989 to Project
Number 3-06-0050-05.
II. Financial Impact:
The estimated cost of the project is $509,215. The project is eligible for 80% federal funding
which amounts to $426,224. The remaining 20%, $82,991, will be paid from the Airport
Enterprise Fund.
III. Reasons for Recommendations and Background:
See Page 2.
Continued on Attachment: SIGNATURE:
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON FEB 2 7 1990 APPROVED AS RECOMMENDED _X OTHER
VOTE OF SUPERVISORS
UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
HEW:dg
bfa07.bo
Orig. Div: Airports I hereby certify that this is a um and correct copy of
cc: County Administrator an action taken and entered on the minutes of to
Board of Supero FEB 2�
date shown.
Public Works Director ATTESTED: --
Public Works Accounting PHIL BATCHELOR,Clerk of the Board
Auditor/Controller of Superylaors and County Adminlstrator
Aviation Advisory Committee � .
Federal Aviation Administration a �"""=•De '
Hodges and Shutt
Preapplication for AIP "07"
February 27, 1990
Page 2
III. Reasons for Recommendations and Background:
On January 9, 1990, the Board of Supervisors approved submittal of a preapplication to the
FAA for noise monitoring equipment. This is being resubmitted to the Board because the FAA
has requested that we submit only one preapplication that includes all the work needed to use
up all of this year's entitlement money ($426,224). Therefore, the noise monitoring equipment
has now been included in this new preapplication, along with necessary drainage improve-
ments to comply with FAA safety guidelines and a new rotating beacon to meet new FAA
standards. The January 9 Board Order identified the project as Project No. 3-06-0050-08.. This
new preapplication, including the noise monitoring equipment, will be identified as FAA Project
No. 3-06-0050-07 replacing Project "08". Project #3-06-0050-08 no longer exists.
On December 12, 1989, the Board approved a modification to AIP #3-06-0050-05 which
indicated the modification project would be identified as AIP #3-06-0050-07. However, the
modification will remain a part of the "05" project for the present time which leaves the new
project to be identified as "07".