HomeMy WebLinkAboutMINUTES - 02131990 - 1.11 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: February 13, 1990
SUBJECT: APPROVE Contract Change Order Number 7 for the Drainage Area 56 Lindsey
Basin Project, No. 7566-6D8462-86 in the Oakley Area.
Specific Request(s) or Recommendation(s) & Background &Justification
RECOMMENDED ACTION:
APPROVE Contract Change Order No. 7 and AUTHORIZE the Chief Engineer to execute it in the
approximate amount of $2,000.00 to compensate the contractor Oliver DeSilva, Inc. for Increases in
contract work..
FINANCIAL IMPACT:
The project is funded by Drainage Area 56 of the Contra Costa County Flood Control and Water
Conservation District.
REASONS FOR RECOMMENDATION/BACKGROUND:
Steel Blocking, required in the metal beam guard rail, was omitted from the original design. The
cumulative total of this and previous contract change order exceeds $25,000.00 and requires Board
Approval.
CONSEQUENCES OF NEGATIVE ACTION:
The lack of APPROVAL would preclude payment for work required to complete this project.
Continued on Attachment: SIGNATURE: m—"�
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON February 13, 1990 APPROVED AS RECOMMENDED X OTHER
VOTE OF SUPERVISORS
X UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
Orig. Div.: PW (Constr.)
cc: County Administrator I hereby certify that this Is a true and correct copy of
Auditor-Controller an action taken and entered on the minutes of the
Board of Supe�srs on the date shown.
Public Works-Design ATTESTED: - 6 13 19gf]
Accounting PHIL BATCHELOR,Clerk of the Board
R. Bruno Of Supervisors and County Administrator
Contractor
/tt I.J.r. .Deputy
a:DA56-13.T2