HomeMy WebLinkAboutMINUTES - 12111990 - 1.2 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: December 11, 1990 SUBJECT: APPROVING Appian Way Triangle Widening Project, EI Sobrante Area. Project No.: 0662-6R4056-88 SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE Project, and FIND, on the basis of the initial study and all comments received, that there is no substantial evidence that the project will have a significant effect on the environment, ADOPT the Negative Declaration, and DIRECT the Public Works Director to begin right-of-way acquisition and to prepare contract plans and specifications for construction. DIRECT the Director of Community Development to file a Notice of Determination with the County Clerk. 11. Financial Impact: The estimated project cost is $2,054,000.00, funded by Federal Aid Urban funds (86%) and local Area of Benefit funds (14%). III. Reasons for Recommendations and Background: The project is needed to increase the capacity of the Appian Way/Valley View Intersection and improve access to 1-80 and San Pablo Dam Road. The project has been determined to be in compliance with the General Plan. A Negative Declaration of environmental significance pertaining to this project was published on August 24, 1990. One resident expressed concern regarding potential slope stability problems in the area. A soils consultant was hired and found no compelling evidence for the existence of a slide or instability of proposed slopes. The Board has considered the negative declaration together with all comments received during the public review period. Continued on Attachment: X SIGNATURE: fth r RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF.BOARD COMMITTEE APPROVE _ OTHER SIGNATURE(S): ACTION OF BOARD ON DEC 11 1990 APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS k/ UNANIMOUS (ABSENT_ ) .AYES: NOES: ABSENT: ABSTAIN: I hereby car*that this Is a tnm and correct copy of an action taken and entered on the minutes of the BN:drg Board of Supervisors on the date shown. c\BO:11.t12 ATTESTED: W,, 11 1990 _ PHIL BATCHELOR.Clerk of the Board Orig. Div: Public Works (Design Division) of Supervisors and County Administrator cc: County Administrator �o���� �n� Community Development By Deputy Road Engineering AAOt ING Appian Wayg Widening Triangle Project, EI Sobrante Area. A2 9 j December 11, 1990 Page Two IV. Consequences of Negative Action: Delay in approving the project will result in a delay of design and construction and may jeopardize funding. 1