THE BOARD OF SUPERVISORS
a CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order of October 3, 1989 by the following vote:
AYES: Supervisors Powers , Fanden, Schroder, McPeak & Torlakson
NOES: None
ABSENT: None
RESOLUTION NO.89/651
ABSTAIN: None
SUBJECT: Approving the Final EIR for Contra Costa, County
Administrative Center at Muir Road and Glacier Drive, Martinez,
County File #CP88-36, and Plans and Specifications for Forensic
Science Facility, 1960 Muir Road, Martinez, for the
Sheriff/Coroner, which is a part of the aforementioned County
Administrative Center.
Budget Line Item No. 0119-4282
Authorization No. 0928-WH282B
WHEREAS Plans and Specifications for Forensic Science Facility,
1960 Muir Road, Martinez, for the Sheriff/Coroner, have been filed
with the Board this day by the Director of General, Services; and
WHEREAS Plans and Specifications were prepared by McLellan &
Copenhagen, Inc. ; and
WHEREAS the Architect' s cost estimate for the initial
construction contract is $2, 900,000; base bid; and
WHEREAS the general prevailing rates of wages, which shall be `
the minimum rates paid on this project, have been obtained by this
Board; and
WHEREAS the project has been determined to conform with the
General Plan; and
WHEREAS the Board finds that the final Environmental Impact
Report (EIR) has been completed in compliance with the California
Environmental quality Act of 1970 and State and County Guidelines;
and
WHEREAS the Board having reviewed and consideredthe
information contained in the final EIR finds that it is an adequate
basis for making a decision on the project; and
WHEREAS the Board finds that 'the County Planning Commission, in
its capacity as the County' s hearing body for Environmental Impact
Reports, according to adopted processing procedures, has prepared a
written resolution certifying the final Environmental Impact Report
and designated Resolution 41-1989', attached hereto and made a part
hereof; and
WHEREAS the Board having studied the significant environmental
effects of this project and possible mitigation measures, as
described in the final EIR, concurs with the Planning Commission' s
findings and the rationale for each finding set forth in the
attached Planning Commission Resolution, and adopts said findings
and rationale in connection with its approval of the project;
Page 1 of 2
RESOLUTION NO. 89/651
r1A
IT IS BY THE BOARD RESOLVED that the mitigation measures
associated with the findings and described in the Planning
Commission Resolution are hereby adopted, to eliminate or
substantially lessen the effects on the environment where feasible,
and that any remaining significant effects on the environment found
to be unavoidable are acceptable due to the overriding
considerations described in the Planning Commission Resolution; and
FURTHER, , that the Architectural Division of the County General
Services Department will provide for implementation of the
mitigation measures described in the final EIR and contained in the
findings; and will monitor compliance with the mitigation measures;
and
FURTHER, that the attached Resolution by the County Planning
Commission, certifying that certain environmental documents
constitute a final EIR and that such final EIR was completed in
accordance with the California Environmental Quality Act, the State
Guidelines and County processing procedures, is hereby approved;
and
FURTHER, that the Director of Community Development is
instructed to file a Notice of Determination on the EIR with the
Contra Costa County Clerk; and
FURTHER, that the project and the Plans and Specifications
therefor are hereby approved. Bids for this work will be received
on November 2, 1989, at 2:00 p.m. , and the Clerk of this Board is
directed to publish Notice to Contractors in accordance with
Section 20125 of the Public Contract Code, inviting bids for said
work, said Notice to be published in the Concord Transcript
I hereby certify that this Is a true and correct copy of
an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: A CT 3 1989
PHIL BATCHELOR,Clerk of the Board
Of Suparolsora and County Administrator
gyi1Jl.t rsx n /�.,'`L Deputy
Orig. Dept. : General Services Dept. - Architectural Division
cc: General Services Department
Architectural Division
G.S. Accounting
Community Development
Dennis Barry
Auditor-Controller
County Administrator
D. Bell
County Counsel
Sheriff ' s Department
Consulting Architect
25017B09. 20A
GC:RDH:bg
RESOLUTION NO. 89/651