HomeMy WebLinkAboutMINUTES - 01311989 - S.2 S. 2
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on January 31 , 1989 by the following vote:
AYES: Supervisors Powers , Fanden, Schroder, McPeak $ Torlakson
NOES: None
ABSENT: None
ABSTAIN: None
------------------------------------------------------------------
------------------------------------------------------------------
SUBJECT: Drainage Complaint in Diablo Area.
Supervisor Schroder brought to the attention of the Board a
report he has received from J. Michael Walford, Public Works
Director relative to a drainage complaint at 130 El Centro, Diablo.
A copy of the report is attached and included as a part of this
document.
IT IS BY THE BOARD ORDERED that receipt of the report is
ACKNOWLEDGED.
I hereby certify that this Is a true and correct copy of
an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: J A N 3 �yyF�}
. Cf
ccPublic Works Director PHIL BATCHELOR, erk of the Board
• County Administrator of Supervisors and County Administrator
By i4��4�1�.Lt -44411 , Deputy
VICTOR J.WESTMAN OFFICE OF COUNTY COUNSEL DEPUTIES:
COUNTY COUNSEL SHARON L.ANDERSON
SILVANO B.MARCHESI CONTRA COSTA COUNTY DIANE A.BAKER
ANDREA W.CASSIDY
ARTHUR W.WALENTA JR. VICKIE L.DAWES
ASSISTANTS COUNTY ADMINISTRATIONBUILDING LILLIAN T.FUJII
P.O.BOX 69 KEVIN T KERRNNIS C. AVES
MICHAEL D.FARR
EDWARD V.LANE.JR. MARTINEZ,CALIFORNIA 94553-0006 MARY ANN MCNETT
PRINCIPAL DEPUTIES PHONE(4 t 5)94.6-2074J.RA
2074 PAUL R.
January 5, 1989 VALERIE J. NCHE
DAVID F.SCHMIDT
DIANA J.SILVER
Robert 1. Schroder .L
Supervisor, District .3 J _
510 LaGonda Way
Danville, CA 94526 C
Re: Clay & Susan Allen
130 E1 Centro, Diablo (APN 195-270-018)
Status of possible County Ordinance Code Violations
Dear Supervisor Schroder:
At the conclusion of the meeting held in your office October
27, 1988 at which you, Virginia Ramelli, Clay Allen, Neil Cooper,
their attorneys, representatives from Building Inspection,
Community Development and this office were present, you requested
this office to furnish you with a status report concerning
possible drainage/grading problems on the property.
Ben Townley of Public Works Flood Control Maintenance has
investigated the site and will send his report to you within One
week. I believe that Mr. Cooper was present during the
inspection. Apparently, there are no drainage or grading
problems but it will be necessary for the Allens to obtain a
encroachment permit to verify that creek capacity has not been
decreased as a result of the deck construction.
As we discussed at the October 27 meeting, the County may
not investigate alleged setback or other related zoning violation
allegations until the property line issue is resolved between the
parties or by court order, e.g. , in a quiet title action.
When you receive Mr. Tovmlev's report, wruld you prefer to
place the matter on the Board's agenda or should this matter be
handled by other means? Please advise.
Very truly yours,
Victor J. Westman
Couty Cu 1
By: Diana J. Silver
Deputy County Counsel
DJS/jh
cc: Bill Martindale, Building Inspection RECEIVED
Ben Townley, Public Works
JAN 61989
SUPERVISOR SCHRODER
S, 2
PUBUc W eARHfflWr
DAZE: , 1988
TO: Supexvisor Robert Schroder, District III
Fxx: J. Michael Walford, Public Works Director /
SUBJMCr: Drainage Ccuplaint, 130 El Centro, Diablo/'Z/APN 195-270-018
On October 31, 1988 our Flood Control Division received a drainage complaint
in reference to the above mentioned parcel located in Diablo.
An inspection of the creek area behind 130 E1 Centro revealed that rock had
been placed in the creek and that a deck had been constructed over a portion
of the creek.
We are concerned that the capacity of the creek may have been decreased and
are requesting that the property owners obtain an encroachment permit as
outlined in our letter of November 3, 1988 (copy attached) . As part of the
permit process, our Flood Control Division will check the adequacy of the
creek modifications with regard to storm runoff. The lawyers representing
the property owners have written to us and have assured us that a permit
will be obtained. A copy of their letter of November 25, 1988 is attached
for your information. As of this date no permit has been applied for.
If you have any questions please call Ben Townley of our Maintenance
Division at 646-4184.
JMW:BT:pc
elcentro.t12
Attach. VzECEIVED
cc: Members-Board of supervisors
D. Silver, County Counsel
Flood Control
SUPERVISOR SCHRODER
J.AchRef Watford
Contra Public Works Director
Costa Public Works Department
County 253 Giacer Drive fdton F.Kubicek
Vtarnnez. CA 94553-4S97 Deputy DRe=r
-Maurice E Atc;
Deputy Dire=;
November 3, 1988
Our File: APN 195-270-018
Clay and Susan Allen
P.O . Box 317
Diablo, CA 94528
Dear Mr. and Mrs. Allen:
It has been brought to our attention that a possible violation of the
drainage ordinance exists on your property located at 130 El Centro in
Diablo.
The possible violation is rip-rap material has been placed in the creek and
a deck has been built over the creek.
This has the potential to flood your property and other properties ad,;acent
to the creek.
You may be held responsible for any damage resulting from this condition.
You could also be found in violation of Division 1010 of the County
Ordinance Code. PIease abate this condition as soon as possible or contact
us by November 19, 1988 to discuss the situation.
Typically, work done in a creek regyires a drainage permit prior to
proceeding. Please contact 1(r. Ed King, Permit Engineer, at 646-4470 to
determine if a permit is necessary.
If you have any questions, please call Ben Townley at 646-4184.
Very truly yours,
Phillip L. Harrington
Senior Civil Engineer
Maintenance Oivision
PLH/BT/pc
allen.tll
cc: Flood Control RECEIVED
j E. King, Engineering Services
T. Borman, Maint. JAN 61989
0. Silver, County Counsel
11/21/88 Tickle File SUPERVISOR SCHRODER
1
I
i
LAW OFFICES OF
THIESSEN, GAGEN & McCOY
BRIAN D. .GAG N. A PROFESSIONAL CORPORATION VICTDR J.C CARTER
WILLIAM E.GAGEN.JA. VICTOR J.CONTI
GREGORY L MCCOY 279 FRONT STREET ROBERT M.FANUCCI
PATRICK J.MCMAHON P.O.BOX 218 KENNETH J.FISHBACH
M.SUE GREICAR DANVILLE.CALIFORNIA 94528-0218 RICHARD A.FRANKEL
MARK L ARMSTRONG BARBARA DUVAL JEWELL
UNN K.COOMBS TELEPHONE(415)937-0585 CHARLES A.KOSS
STEPHEN W.THOMAS CAROLE A.LAW
r FAX(415)838.5985 CYNTHIA LOVE MAREK
%RCi4c:J.MARKOWITZ
OF COUNSEL DIRECT DIAL ExL N DOLORES S.SARGENT
EVELYN SPIROU
WILLIAM W.BASSETT
SUE GOUGE WILLIAMSJOHN B.CLAUSEN November 25, 198$
Mr. Phillip L. Harrington RECEIVED
Senior Civil Engineer
Maintenance Division ,JAN C- 1989
Public Works Department
Contra Costa County SUPERVISOR SCHRODER
255 Glacier Drive
Martinez , CA 94553-4897
Re: Public Works Department File No. APN 195-270-018
Dear Mr. Harrington:
Our offices have been representing Mr. and Mrs . Clay and Susan
Allen, whose properties at 130 E1 Centro in Diablo regarding
matters dealing with their construction of a deck and related
work in the location gre cited in your November 3 , 1988 letter.
I would appreciate your addressing a copy of any letters to
the Allens directly to us so that we can be of assistance in
this matter.
I have requested that Mr. Allen contact the civil engineer who
advised on these matters and have him contact you directly. We
anticipate that the engineer will be contacting you shortly to
)� arrange for the applicable permitting that you have discussed in
your letter of November 3 , 1988 .
Please consider this letter to be the response to your request
that we contact you, and also our expression of willingness to
cooperate in whatever measures are deemed necessary. I also
appreciated the opportunity to talk with you briefly by phone to
confirm that we are taking this approach.
So that all involved will be aware that we want to work with you
on this matter, I am sending copies to each of the offices referred
to in your letter of November 3 , 1988 .
For reference, I just wanted to mention that the deck in question
replaced a previous deck that had been built over the entire creek;
'S'
• � 1
Mr. Phillip L. Harrington
November 25 , 1988
Page 2
the present deck extends only part way across where the previous
deck extended all the way across to a fence on the far side of
the creekbed. For this reason, we believe that the demolition
of the previous deck by the Allens, and its replacement with
the substantially smaller deck that is now in place, reduced,
rather than increasing, any potential of problems from the
creek.
Naturally we will defer to the civil engineers that will be
representing the Allens and look forward to resolving this
matter on a"! cooperative basis.
Please feel free to call at -any time if you have any questions
regarding the progress of this matter.
Very truly yours,
THIESSEN,, GAGEN & Mc COY
A Professional Corporation
Kenneth J. Fishbach
KJF:ek
cc: Mr. Ed King, Engineering Services
Mr. Ben Townley, Road Maintenance Div.
T. Borman, Maintenance
Flood Control
D. Silver, County Counsel
39-19699