Loading...
HomeMy WebLinkAboutMINUTES - 01241989 - 2.2 TO: BOARD OF SUPERVISORS FROM: Phil Batchelor, County Administrator DATE: January 24 , 1989 SUBJECT: County Computerized Mapping System (CMS) Specific Request(s) or Recommendation(s) & Background & Justification I. RECOMMENDATION ACCEPT and APPROVE the report from the County Ad- ministrator recommending implementation of a County Computer Mapping System (CMS) , and 1. AUTHORIZE the Public Works Director to commence implementation of the proposed CMS by computerizing the County Base Maps, and 2 . APPROVE adding two project positions for computer aided drafting functions in the Public Works Department, and Continued on attachment: X yes Signature: bt4 Recommendation of County Administrator Recommendation of Board Committee Approve Other: Signature(s) : Action of Board on: JAN 2 4 1989 Approved as Recommended_ Other Vote of Supervisors I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN Unanimous (Absent ) ACTION TAKEN AND ENTERED ON Ayes: Noes: THE MINUTES OF THE BOARD OF Absent: Abstain: SUPERVISORS ON DATE SHOWN. Attachment A: Policy on Outside Attested JAN 2 4 1989 Agency Participation PHIL BATCHELOR, in C.C.C. Computer CLERK OF THE BOARD Mapping System OF SUPERVISORS AND Attachment B: October 26, 1988 memo COUNTY ADMINISTRATOR Computerization of County Base Maps Attachment C: Summary Schedule of Events �-- to Implement CMS/GIS By Attachment D: Responses from Cities and DEPUTY CLERK and Special Districts . regarding their interest in CMS/GIS Orig: County Administrator' s Office cc: County Assessor County Building Inspector County Auditor/Controller County Counsel Community Development Dir. Public Works Director Data Processing Division Land Information Steering Comm. via Wick Smith 3 . APPOINT the Land Information System Steering Committee to also function as the CMS Steering Committee, and 4. DESIGNATE the LIS Coordinator, Wick Smith, as Coor- dinator for CMS, and 5. ADOPT the attached policy on Outside Agency Participa- tion in the Contra Costa County Computerized Mapping System, and 6. REQUEST County Counsel to prepare a standard CMS membership agreement for execution by participating cities and special districts, and 7 . DIRECT the Public Works Director and LIS Coordinator to submit a report to the Board in ninety days time documenting their success in attracting cities and special districts to membership in the CMS program. II. FINANCIAL IMPACT Implementation of the CMS is expected to cost the Public Works Department a total of $732 , 000 over Fiscal Years 1988-89, 1989-90, and 1990-91. The Department has developed an internal funding package of $765, 000, which includes a 5% contingency. The Department' s funding consists of $100, 000 in new fee revenue, $165, 000 in equipment charge revenues, $200, 000 from the road and drainage programs, and $300, 000 from the Department' s overhead. It is expected that the Department will realize annual savings of at least $150, 000 per year in mapping costs and an increase in annual revenues of approximately $100, 000 from the sale of com- puterized map data to the cities and special districts. The estimated payback for the program is less than four years. Additional hardware and software costs of approximately $180, 000 will be incurred in Fiscal Year 1990-91 to provide access to the CMS for the Assessors Office, Building Inspection and Community Development Departments. These costs will be funded by the proceeds from the sale of map data and equipment use charges. III. REASONS FOR RECOMMENDATION/BACKGROUND On May 23 , 1988, staff presented to the Board the report "Contra Costa County Geographic Information System Feasibil- ity and Benefit-Cost Study" which recommended the implement- ation of a Geographic Information System (GIS) . At that time the Board requested that the County Administrator and the Land Information System Steering Committee report back to the Board on how the system could be funded. As indicated in the report, the first step in implementation of such a system must be the computerization of the County Base Maps. Realizing the need for computerized Base Maps and the need for computer design of public improvements, the Public Works Department has acquired over the past two years equipment and knowledge that allows computerization of the base maps at this time. A detail discussion of their proposal is contained in the attached October 26, 1988, memo. There are four compelling reasons for proceeding with the computerizing of the base maps at this time. * Significant cost savings to the Public Works mapping program are attainable through computerization. The volume of new parcels and continued map maintenance dictates that the Department' s mapping program must be computerized if we are to continue the program without continual increases in annual budget. * The Public Works Department is expending considerable effort in manually maintaining inventories and retriev- ing data relating to public improvements and work performed. A reduction in this effort is not possible without a CMS data base for geographic storage of data. * Many of the cities and special districts need an up-to- date computerized map of the quality of our base map. The needs of these cities and districts must be met if we want to maintain a standardized map for countywide use. Otherwise, they will proceed to implement individual maps which will result in our having a dozen different maps that are not compatible. * Other County departments can also realize significant cost savings through the use of computerized maps combined with land information data, i.e. GIS. The Public Works Department road and drainage programs have been subventing the County Base Mapping Program because of its importance to the operation of the department. Without base maps, Public Works office and field personnel cannot efficiently respond to complaints and organize daily work assignments. County liability exposure demands that the Department maintain infrastructure inventories. They must evaluate the frequency of accidents. They must evaluate their maintenance activities to document timely response to deficiencies in the operating road and drainage systems. The Department cannot afford to continue manual maintenance and retrieval of road and drainage system data. The $500, 000 in road, drainage, and overhead funding will quickly be returned to these programs via the cost saving from a computerized system. Implementation of the system will not result in any reduction of road maintenance effort. It will eliminate the future need for road and drainage program subvention of the base mapping program. Attached is a program schedule outlining the major ac- tivities that will occur in the implementation of the CMS. Of particular note is activity #4 which calls for active marketing of the map data base to potential users. Through this effort it is expected that an annual revenue of at least $100, 000 will be attainable for further implementation and maintenance of the CMS. Staff has contacted many of the cities and special districts that will benefit from a CMS/GIS. A report will be submitted to the Board in ninety days indicating the progress and success of our marketing efforts. The first revenues will be used to finance the purchase of computer equipment for the County Assessor, Building Inspection and Community Development departments. These departments will pay back the advanced funds through an hourly computer terminal charge as the equipment is used to access the CMS data. The Public Works Department needs additional temporary staff to complete the tasks needed to implement the CMS. Their present staff is fully committed to current projects which have a high priority. The Department will explore with the Personnel Department the feasibility of filling the tempor- ary project Computer Drafter positions with college students from Diablo Valley College or the University of California or with persons referred to us by the Center for Independent Living. We have indicated below some of the many anticipated uses for the CMS and attachable data. * Accident and Crime Scene Mapping * Analysis of Land Use and Non-Point Source Pollution of Storm Waters * Countywide Flood Insurance Maps * Land Use Mapping * Mapping of Geologic Data Relating to Slides and Earthquake Faults * Mapping of Hazardous Materials Sites * Mapping of Riparian Areas to be Preserved * Road and Drainage Facility Inventories * Road and Drainage Complaints and Work Records As noted above, the Public Works Road and Drainage Programs will benefit significantly through the computerization of the Base Maps and the recording of inventories, accidents, complaints, and work records. Considerable time is present- ly being spent manually recording and retrieving these data. The cost saving to this program will quickly offset their initial financial participation in CMS. The funds from these programs are to be returned via road and drainage data entry into the CMS database. IV. CONSEQUENCES OF NEGATIVE ACTION Failure to computerize the mapping system at this time, will result in the creation of many non-integrated mapping systems countywide. Further, the Public Works Department will be unable to maintain a current County Base Map without a significant increase in budget. The anticipated savings to other departments will not be attained. Finally, the Road and Drainage programs will suffer from continuation of manual systems for tracking inventories, complaints, accidents and work activity. MFK:rs BO: 17.tl ' f! A'ITAC SvOlYr A BOARD OF SUPERVISORS POLICY ON OUTSIDE AGENCY PARTICIPATION IN THE CONTRA COSTA CO= CCKR= MAPPING SYSTEM (CMS) . A countywide computer mapping system based on the County base maps will yield numerous benefits to other agencies. To insure that the recipients of the benefits help finance some of the system development and maintenance costs, this Board adopts the following policy: 1.. The County shall convey CMS membership to any city that: a) adopts a $25/lot new parcel fee payable to Contra Costa County for the purpose of updating the system to reflect new parcels, and b) pays an annual membership fee of $.05 per parcel for all parcels located in said city. 2. The County shall convey CMS membership to any special district that pays an annual. membership fee of $0.10 per parcel for all parcels located in said district. 3. The county shall provide the following services to CMS members. a) County base map books, individual basemap sheets, and special composite base maps shall be provided. User shall pay the cost of providing the maps. b) Computer data tapes shall be provided upon request.. User shall pay the cost of the tape, data maintenance, computer time, and staff labor for processing. c) On line computer to computer access will be allowed. User shall pay the cost of computer time, monthly connection charge, and staff labor for interface. d) Dedicated files for individual agency geographic data storage will be provided. Users shall pay the cost of computer time, staff labor for any processing time, and an annual storage fee. 4. Non-CMS members will be allowed to purchase County base map books, individual base map sheets, and special composite base maps at a fixed price for each item which shall reflect the items prorate cost share for-development of the data. 5. Non-CMS members will not be allowed to secure computer data tapes, on- line computer access, or data storage files. MFK:.j eo bosup.tl ATTAC-R J B PUBLIC WORKS DEPARTIMMENT - CONTRA COSTA COUNTY DATE: October 26 , 1933 TO: Phil Batchelor, Counts Aaministrator FROM: J. Michael Wal ford, Public Worts Director i SIIBJE=: Ccnputer_zation of County Base maps For several vears we have been exploring howt«e could financa a Geographic Information System (GIS) and, at a lower level, how we could finance the digitizing or the existing County base maps to vield a Computer Mapping Sys tem (CIS) . The purpose of this repot` is to obtain Your approval to move ahead with digitizing the base maps. The report addresses: * why we must move ahead. with at least the full computerization. of the base maps yielding the desired CIS. * Who will receive an immediate benefit from the CIS. * Raw much implementation of the CMS will cast. * How we will finance the short-term cos-1-s. * Now we- will recover a significant portion of the short-term and fu-cu=e cost; by selling C:2S. servlcas to others. * Howthe C:TS: will reduce the costs for the GIS" pilot study and ultimate GIS . Our inmediata problem The County has maintained a base mapping systam. for many years. The maps are. drawn at 100 and. 300 scale and produced in book form at 600 scale.. The -*laps are used by the public. and 'many agencies, i. e. cities, special districts, ane. other County depar ents. In the past, we updated the maps continuously, and we published a completa set of up- to-data Maps , in book form, every other year. For some tize, we have been drawing the new man updates on. our Intagraph CA.00 System- By using the. c--=utas we aet more accurat_ :Naps in approximately one-half the time; the department' s goal is to attain even. greater savings by fully computerizing all. of our base maps. Next. year we need to publish the updatad mans. However, au_?- base maps are c:zrntly in t-da pieces, i.e. the old maps are still r=- on myiar (hard copy) and all of our updates are in digital form in the computer. We es'imata that Lour person years of labor will be needed to t_ansf_r the digital map data onto the old mylar map sheets . This worst will cast $230 , 000 , and it will be wasted when we digitize the base maps in 1990 or 1991 as a part of a CMS or GIS. We must move ahead with the digitizing of the old base maps at this time to save this cost. '�el1�r• `� '-,_ a r'^*�rr-�.-: _ter: ti1aDDinC �'•lSt�!?i ((".TCS Numerous r=_per:s and ar-_iclas have ,een cn the Gene=_-s c= C1aVi_.0 a CMS . " t-acted.eQ as F.:Cnlblt5 �s aP.C: a=? C D1S5 CL `:vC re-nor pracared eXmr?ssly. for Contra Costa County_ on c^.mDu'Cer_zed zapping. 'T he =_.St repor:, "I=f -mentation Stratagy :or D1C2.tiz2.nG the Ccunt_r- . *aide Base Maps into the Centra Cassa Count-,, -w Decarent or Pr1b11C '�vor.'<S Computer ;Tapping Svsz--rq, " 1s' a draft repot, by 3SI -Consultants , :na. It discusses the benefits or a CXS to the various County departments and the ex-mectad. 5av=ngs that are possible =rom having a digital parcal man. The report indicates a combined annual savings of $250 , 000 fcr seven depa-mments, and 'ie estimated savings do not include savings on map updates for new parcels using the computer, which, is tries as Last as hand drafting. Nor does the report reflect the benefits to the Sherif=' s Departaent in being able to graphically annotate locations of various t-7mes of crime. Similar benefits are achievable by the cities and special districts includi_nc the Flood Control District. Two cities have alreadv star-ted. their own computer mapping systems because the County is not showing progress in develop_ mens of a Count,,-wide CIS.. The useability and economic savings of a Countywide CXS will be significantly Less if all of the cities develop their individual mapping systems. The second report is the "Contra Costa Ccunt�r Computer Mapping System Executive Summary, " prepared by Plangraphics Inc. , and reczntlrr presented to the Board or Sumervisors. The razor-- also discuss.as the advantages of GIS/CTAS to government, and on Page 11 it shows a proposed =S' configuration serving the County departments mentioned above. As indicated. in both reports , a C:-.S is the. gateway to graphically storing and retrieving all kinds of data. ,:rom. stop sign locations to Land use activities., from assessed proper-y values to armed robbers sites . Our. _crop_ osed G=S is needed for all three aiternarive GTS systams identified in the repot-. The report indicates $800, 000 to $1, 000 , 000 for digitizing a parcel map laver. Eights percent of. these costs will be behind us when all of the base maps are loaded into the comnutar. What eve *cant to do We want to immediately start a course of action leading to the complete digitizing of the Counter Base Map System and all of the recently Created subdivision lots. We wane to allocate resources to keep the resultant CMS constant-1v up-to-data to provide to the Assessor' s Offlcs drawn base mans or all new Subdivisions within t7,;a weeks of _==e recording of the map . Similar service would be provided for the fire districts , cities, and other County deparcents. To+ accomplish the above we must complete the following tasks. The first Live tasks are the same as discussed. in the BSi Consultants Remo= (Ex-ftibit A, Pages 12-15) 2 Taste C^S� 1. $ 20 , 000 and database Sty:C�Ilre :aCulr 2 Ze ltS. 2 . Canvey- the Caunty-wide parcel-basad map to 275 , 000 digital format. 3 . Configure the database structura, and program the soft- 50, 000 war= tc perform high-priority applications. 4 . 3c-ui_e additional hardware and saft'vare necessary to 163 , 000 store the database and produce quality mans upbri demand. S. Establish C:IS systam manaaement and apnlicat_an 50 , 000 operational procedures ; link CMS to LIS database. 6.. Allocate t*ao person years of department Labor, to 172 , 000 completa systam implementation and data-graphic files. ESTIMIATZ TOTAL. COST $732, 000 Tasks 1, 3 , 5 and 5 will reguire staff labor from our department. We propose hir=ng two pro]ect position (MBD operators for fie teen months to absorb the extra workload. To avoid the cost of additional. comcutar terminals and. work space. for these new positions , we promose implementing a "siring shi.,11 in our CADD operations. One at. our (=ux -ens seri cr Drafters would be assigned to super-rise the swing- shift work. As prsviously noted, we have pressing needs fcr a CMS , i. e. more e=_icient mapping, road and drainage inventories, t_af,ic safety monitoring, etc. We believe other denar,ents, i. e. the Assessors Off:ca, also have an immediate need far CMS. To. help them get szarzad, we propose. that they useour unoccupied t_rminals during theswing shi:t. cost of the assessors mans could be made under an arrangement of. this sort until they can purchase their own hardware, software, and communication equipment to access the C:?S from their office. How will we -finance the costs in the short-term We propose to use a multitude of sources to fund the estimated $732 , 000 cost plus a 20% contingency of $146, 000 . ;3e have indicated the funding sources below. Because the activities will be oc:srr_nq over two fiscal. .rears , the demand on the funding sources will also be spread over two fiscal vears, as shown in Exhibit C attached. 3 .-.e �'1.^.de,4 =curry �na_�es aca_:-,sz a-- prcjac_s usi^g DD. 2 . Th_ Flccd (:on7:_c1 Dis:.r_cc (FCD) has al_sadv 2 , 000 acreec _Z =ur.d o he :-gaps ear Dry 29 30 and 56 . 3 . _ lood Ccrtrol Diszri c- . (FCD) ccrit_ibution to 50 , 000 es_ablis&'n CIS far Dist= c_ Drainage maintenance inventories. 4 . Countv Drainage maintenance ccnt_ibut_cn to establish 25, 000 CMS for Counzy Drainage maintananca inventories. 5 . Count:r Road Fund ccnty_buzion to establisft. C:4S for 1-00 , 000 road -riainzananca inventarj and traffic safety data. 6 . Por-ion or Public YJer'{s 0650 Bucket that must be 230 , 000 allocated to complete manning update. 7 . Portion of Public Works 0650 Budget allocation Lor 30 , 000 C UDD prcgramming supnor- activity. 3 . Base mapping revenue from development Lee. 100 , 000 9 . Advance or funds from Public Worts 0650 Budget 153 . 000 TOTAL FTJDJDING (including 20% contingency) $378 , 000 The equipment and soft-aar=_ costs will be smread� to all users or our Intaaraph terminals , . i..e. enaineer_ng and base mapping users. The electrostatic pl,c=ar, and_ soLtaare_ will. eliminate the current delav being experiencad. in the platting or engineering- drawing. The contributions from the Flood Control Diszrict, County Drainage. Maintenance and Road Fund will be annUed toward the- futsra development c--sts far the various graphic data bases needed in their _esmective programs . These ccszs are eligible engineering charges that can be charged acgainst these restrict-ad revenue sources . The $230 , 000 represents the 0650 Budget cost that will be incurred if the base :nap book is produced without Computerizing the man. The $30 , 000 represents a par-icn of our annual overhead allocation for the next t:No Years for CADD syst=m development, i. e. , a para of the 0650 Budget overhead. rate. The base mapping revenue from development zees is esti.-mated to be $100 , 000 . It, is based on 4 , 000 new lots in the unincor'aorated Ccunty area during the next. t:qo _years. The fee is $25/lat. The last source is a. $153 , 000 advance by the P'.iblic Works 0630 Budget. The above allocations rNi11 r=qui;=_ additional tightening or our overhead and these ccs--s will prevent us =tom lowering cur 65% overread rate back to 60% as we had hoped. Orr vune 24 , 1983 we sent a memo to DeRavca Bell e: --ioring the feasibility of a Public Facilities. Loan to. help =inanca p- Cos— Cost. after fur-her discussion, he and Milton Kubica, have concluded that the costs far tie CMS do not cualifv under the Public Facilities loan program guidelines . Realizing the sign-ficant future_ benefits to us and other government entities, by Lziplementing the CMS now, we are prepared to bear these costs within our budget constraints . 4 ' 'LaT'lC�rnr-. =' -�anr- - ^'o^i -a "ter-:V�r•i _ ^rlyC^ S2'_�"'' r'� r 'a Ce5 We have .our paten.-a_ mem h-- s =�.i users or =e Sy seem be C.;aar"ed e1_ _a1_ SL-tare of, z::e acs-ZZ . i br=e= ci-iscusslon of t.%,�ese potential revenue sources is _Jrpvi ded below. k portion of these new revenues `Mould be used to raimburse p he 06 0 ?lldget advance and the funds provided by Roads , Ccunt-r Ora i nate and 7=). I. New 7 ct devslocer `ee Our 4ng the past Live years, Contra C.csta Caunty has axper encad develacment creatine an average of 6 , 500 new lots each year. Las` year the Board of Supervisors adopted a $25 per lot vee to be assessed an all developments creating ne*a lots. The tee was established to help finance ..scme of the base mapping costs. The fee will generate approximately $50 , 000 annualiv in the uninccrporated County area. We propose asking all of the cities to adopt a similar Lae schedule; This would v_ ield an additional $100 , 000 Lar updating the maps. 2. Sell acc=ss to CMS . We pian to explcre the feasibility of selling access to CMS to the cities and sa_ ecial dist=cts. The cast far access would be based an the man area used (size of city) , the extent of use with regard to graphic data. storage, and computer processing time. To prevent. multipie users from degrading our C?U processing t me, we would regulre all. users to use "stand alone" units , i . e. our C?U becomes a Ll le ser•rer. The users would bear all. of. the necassary hardware, sof—wars and, communication costs to iumniement their use. iff one—;1al= of the cities carticinatad in a program of this kind wewould expect to realize a revenue of at least S60 , 000 annually. By us ina this- annraach., the cost to each city wouldbe: less than one auarnar of. the cost. of. developing- anti. maintaining their- own map base. 3 . uam crcducticn. We anticiaata a significant. increase in demand I= Special maps once the CIS is operational. We procose charging a surcharge on aur production Costs to recover some or our CIS develatment costs. The surcharge would also apply tc all of the County base *pan books that we sell. 4.. Final nal man checkinC. We plan to exlore the feasibility of providing a servica to the cities in the- area of final map closure checking. Each new subdivision must be checked for mathematical accurac-r. In the process of loading- all neva lots into the campuzar for updating the base man, the, computer- automatically notes anv mathematical errors in the Final Mian that are related to the dimensions an the new lots. We believe some cities may want us to do this checking work `or them prior to their accenting the mad. We. fully exec_ to recover the total CAS investment. before 1992 through production labor savings and revenues from ser�rica to others, a three year pay back. r-•z 1n_cabin Sen (C-` ' The GIS ='eDCr', "Contra Ccsza Counzv Computar ?app nq Sys-am Summary" _ndicatas :tat all _~ram altar:ative systems should have a digitized parcal map laver. Our proccs2d CMS ,gill provide this laver, and _c r_presents a s_cniricanzinvestment toward implementation of- the GIS pilot study and ;he ultimata GIS . In addition our wcrk will star= developnent of Linkage bet-ween the CMS and the County Land Information Systa-m (Task =5 above) . It is conceivable that our work to implement a =S using our base :naps will reduce the GIS pilot study by up to $100 , 000 . What we need 'From your office Listed below are the ammrovals we need from your office to imp_ lenient t+zis proposal. * Clearance for Data Processing and Public Works to start the tasks needed for full commuterization of the base mamms and development of the LIS linkage. * Clearance to hire two project position CADD operators (or Senior Drafters) . * Clearance to purchase necassary hardware and software. * Clearance that our financing plan is acceptable. Su=ar*r We must move ahead with digitizing our bassmaps to provide a Computerized. Mapping System'.. By proceeding with the CHS now our- department can allocate $230 , 000 to. the task in lieu of spending the money to manually draft' the u-cdate lots on the old mv_ lar mans. =n addition, we expect to save at least $130 , 000 a vear ?.-n *'utT.=e map updating costs, i. e. $50 , 000 by using the computer to draw the new lots and $100 , 000 by avoiding the manual drafting to updating the mylars. Fuirther, the BSI Consultants Report estimates that there is a cmllective cost. savings of $250 , 000 per year for seven County demaz=ents if, a CAS is in place. We :gust move ahead now. JMW:11F'K.md. carpt. tl0 Attactments: Exhibit A BSI Consultants, Inc. Reeort Exhib it. B - Plangraphics, Inc. Reno r- Exhibit. 0 Estimated Cash Flow for CMS Proaram mmlementation Exhibit D - Board Order an GIS Presentation cc: K. Harts-Tavlo r, CAO R. Nash, Auditor/ControLler F. Ward, CAO W. Smith, Auditor/Controller J. Gregory, CAO J. Causev, Public Works *. _{ubicek, Public Worts . R. Nugent, Public Worts M. Mitchell, Public Works M. Bensal, Public Worsts M. Johnson, Data Processing C. Hansen, Public Worsts • 6 - V (Y r-I o � H z � O N N c 4A P W Fi 0, - E r•• -� O L O m S o a a q o ro •o S fA N 7 LL 0 -9 L m O > \ O p O Q) L z \ 1n N \ P O \ > Fq .D N \ ro a) 0, r N O ro I O \ \ o E q � \ O L S M m \ N O LL 69 L N \ a 0 0 N S G O L) o a z o S O W 1 O ar = N N C) i+ (A O W P C •Co ')00 \ )n CL P -a \ m c o a \ to U r \ \ m � N q ro U Y c 9 = S N 0 d W ro ro r LL0) a, 0 0 0 0 0 0 o . O 0 +,d 0 0 0 0 0 0 o m o 0 o m o O o �+ o O N O M O O O -0 E -• W Y .- ... v v v M J 0 tl O 1!1 v v v )!1 1A O O O v v v a) a• O O )n ul O f- m N 3 W _ a0 a) N V L O N v roe+ u a) a c >- LOC a) 7 •. W . OC a1 N N u LL ro t q b+ • c Y ••. at Y S N.L Y O c N 4- -•ro S m u c a) L 4- m 7 = = N to Y N E 41 Y O L—.--• N Y ro c Y m c t ar u m N-� C m > L 7 m U L >. CC N Y 7 m Y c0 Y O ro••- Y a)••- O u N a Y a) N •.- C N a a1 C Y S 7 Y Y m L 7 Y O W L O a N 7 ro a) u N u c Y O O L C Y u m c .x N E N c q Y u N c C a N O N E O a) >.a ) O O O C YY Y u) 4) • W ••- ••- >• u a1 3 Y•� 4- Y u Y Y a) m ro c c Y E N N +• ro L 2 41 C 7 4- C C N E N 4) 7 C a+•-- m Y O T c 7 Q0 •� >. •- m a rn N E O 4) L c (7 u v v m v- -0 o - O a) .0 W O m ++ E E m N \ •.- U ro C C 3 L u L N (A a) L L Q Y a v) m •N �+ .m m D m Y O (/ O a O) a T al U a) m L 01 a) Y N f m A a O c 4- N L Y 4- m c m a) > u Y a 3 m e u L N a) L) Y -0 L N a >= m a)•.- E .•- E 4) Wm 7 0 O a u 0 N O 0a C- a) m •� 0 m Y Cu c. O N 4- E W O L O N YY c 1O O O +•• m 3t Y 9! O >�E O to L N >. --•4• Y E 0 N L m m Y C X Y u u -U L N O Y W O u a) u N U qk Y O) a) L a) c a m 0. m L (a 7 3 c ro CL-14 a) E U 41E N () O E 7 7 C C v 3 o m O 0 0 �c L m u t o 3 'U a) h m 4- a+ -� O .D O 7 > 4) 3 L) u E a m O al O Y 7Y m m L L L N E m C L ++ 3 O m 3 m a) (4 L O N a N Y N m c m a O) 7 E t U m L z c a) c L Y a Y 3 L c m >. O C E a O m N O w m > m U v- O E O :3.0 U m O E H Y u 0 4- E 4- N a u C o 7 ' 7 a C o m m + - v w o Y o o • m o c >.a 4) Y L a� Y 7 L a) c Y aro O m N L7 E -•^ m 7 C -0 ro m m t.- N 4- Y C o U•.- U 4t CO L L Y 0 u m it m a) Y C a. q c +-• C NC"O v) c L m m E m W Ju c C Y >. u u • 'o L O .0 •-ro -O O a L'a O N a m Y N L L a O L a) a L N a) c a c c m c u N Y a) C F 7 a) C 7 N o a O 7 ro - a 4- a C-�c O E -0 t a m m m v mL L c ro m u o In m a N 3 E m o m m 4- N 0 4 m m a) Y 0 m y m c o (D 0 0 7 L L CO Y E u E o L 0 a L o c L o N u 13o•- E LL a m C to m a 4- u Y L m -0 to o u u o m m -• a m Y o 7 m O a) m E••- U O u m U v+ O N 0,0 - L E W L aJ u u a) m a) C a)4- 0 C a) a) a) C a L m a) a O m u 0 0 •+t a 7 4) L N Y C Y Y Y a 41-0 a Y Y Y m O O C N m U Y (a C w N a) U Oro m a) Ya a)•- al a1 T a) m a) O ro 7 o a) 01 al E Y N a! Y m O -• a1 L Y N N .-Y- a1 -�4- Y > a al v)ro E H N a•.- a) u u Y Y a 4- a m CL.- a c•� (! > a/ a a a m a1 a a) m Y Y 41 u) E Y > 0 L O L•O E m E E ro E > Of > E E E a 0) N E N Y Y W o w Y o c v L 7-+ mc 04, 00 00 o m a) (1 L•- a) o o O E L N 7 O m O o 000 -r L) q in a a Cl Y m u 0 u Y U E u r v C a > 0 u u u -. m q C0 U CO r W u u u t- u .- N M 1(1 1A 10 c0 •--N M�t q •- •-- •-- •- .- v v..