HomeMy WebLinkAboutMINUTES - 01241989 - 1.7 . . 1- 7
TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE
CONTRA COSTA COUNTY FLOOD CONTROL AND WATER
CONSERVATION DISTRICT
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: JANUARY 24, 1989
SUBJECT: Approve and Authorize the Execution of an Agreement
with the City of Concord for Construction of Culvert
and Guardrail Improvements, Upper Pine Creek Project,
Flood Control Zone 3B, Concord Area.
Specific Request(s) or Recommendation(s) & Background &
Justification
I. RECOMMENDATION
APPROVE and AUTHORIZE the Chair of the Board to execute an
agreement with the City of Concord for construction of culvert
and guardrail improvements as part of , the Upper Pine Creek
Project.
II. FINANCIAL IMPACT
The City will pay 0. 5916 percent of the total project cost,
approximately $32, 200, as its share of engineering and design,
construction and contract supervision and administration costs
for the additional work.
III. REASONS FOR RECOMMENDATION/BACKGROUND
The Upper Pine Creek Project '' required the construction of
additional culverts at Treat Boulevard and San Miguel Road to
provide adequate hydraulic capacity. The City plans to widen
Treat Boulevard in the future. In order to accommodate the road
widening and to provide added safety, the City requested a 16-
foot 6-inch increase in the length of both the new and the
existing culverts at Treat Boulevard and the construction of
guardrailing at the approaches to the Treat Boulevard and San
Miguel Road culvert crossings. The City agreed to pay its
proportionate share of actual costs based upon the ratio of
estimated culvert extension and guardrailing construction cost to
total project construction cost.
Continued on attachment: X yes Signature:
Recommendation of County Administrator
Recommendation of Board Committee
Approve Other:
Signature(s) :
Action of Board on: JAN 241989
Approved as Recommended ' Other
Vote of Supervisors I HEREBY CERTIFY THAT THIS IS
A TRUE AND CORRECT COPY OF AN
X _ Unanimous (Absent ) ACTION TAKEN AND ENTERED ON
Ayes: Noes: THE MINUTES OF THE BOARD OF
Absent: Abstain: SUPERVISORS ON DATE SHOWN.
Attested JAN 24 1999
Orig. Div. : Public Works (DESIGN) PHIL BATCHELOR,
cc: Accounting CLERK OF THE BOARD
OF SUPERVISORS AND
COUNTY ADMINISTRATOR
GC:bb
BO:24.t1 ,
By Deputy
Agr. w/City of Concord
1/24/89
IV. CONSEQUENCES OF NEGATIVE ACTION
Failure to incorporate the City's requested work will damage the
cooperative relationship between the Flood Control District and
the City.