Loading...
HomeMy WebLinkAboutMINUTES - 02281989 - 1.89 File: 245-8901/B. 4 Ogg THE BOARD OF SUPERVISORS CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on February 28, 1989, by the following vote: AYES: Supervisors Powers , Fanden, McPeak and Torlakson NOES: None ABSENT: Supervisor, Schroder SUBJECT: Award of Contract for Removal of Fuel Tanks at County Corporation Yard 999 Blanche Lane Lafayette Budget Line Item No. 4425-4305 Authorization No. 0928-WH305B Bidder Total Amount Bond Amounts W-T Universal $45,100. 00 Labor & Mats. $22, 550 .00 Engineering, Inc. Including Faithful Performance 610 Industrial Way $20, 250 Base Bid, $45,100 .00 Benicia, CA 94510 $2, 100 .Add. Alt. No. 1, and $22,750 Add Alt. No. 2 Bay Area General R.S. Egan & Co. Engineering, Inc. Concord, California Diablo, California Petroleum Engineering, Inc. Warren E. Gomes Excavating, Inc. Santa Rosa, California Rio Vista, California W.D. Construction, Inc. Ferma Corp. San Jose, California Mt. View, California Minter & Fahy Construction Delta Bay Builders, Inc. Company! Inc Antioch, California Pacheco, California Goebel Paving, Grading & Scott Company of California Underground, Inc. Oakland, California Petaluma, California RAMCON M.P.H. , Inc. West Sacramento, California Santa Rosa, California North Cal Construction Stockton, California The above-captioned project. and the specifications therefor being approved, Addendum No. 1 being issued, and bids being duly invited and received by the Director of General Services; and The bidders listed second and third above having notified the Director of General Services of mistakes in their bids, and the bidder listed last above having submitted an incomplete bid; and The Director of General Services recommending that the bid listed first above is the lowest responsible bid and this Board concurring and so finding; IT IS BY THE BOARD ORDERED that the bidders listed second, third, and last above shall be relieved of their bids and that their bid security all be returned; Page 1 of 2 _ `hy IT IS FURTHER ORDERED that the contract for the furnishing of labor anal materials for said work is awarded to said first listed bidder at the listed amount and at the unit prices submitted in said bid; and that said contract shall present two good and sufficient surety bonds as indicated above; and that the General Services Department shall prepare the contract therefor; and IT IS FURTHER ORDERED that after the contractor has signed the contract and returned it, together with bonds as noted above and any required certificates of insurance or other required documents, and the Director of General Services has reviewed and found them to be sufficient, the Director of General Services is authorized to sign the contract for this board; and IT IS FURTHER ORDERED that in accordance with the project specifications and/or upon signature of the contract by the Director of General Services, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for security shall be returned; and IT IS FURTHER ORDERED that the Director of General Services is authorized to sign any escrow agreements prepared for this project to permit the substitution of securities for moneys withheld by the County to ensure performance under the contract, pursuant to Section 4590 of the Government Code; and IT IS FURTHER ORDERED that the Director of General Services is authorized to consent to the substitution of another person as a subcontractor, in any of the situations listed and after the written notice specified in Public Contract Code Section 4107, provided written objections to such substitution are not submitted by the listed subcontractor in accordance with Section 4107. 1 horeby certify that this Is a true and correct Copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: FEU$ 1989 PHIL BATCHELOR,Clerk of the Board of Supervisors and County Administrator By ,Deputy Orig. Dept.- General Services Dept. - Architectural Division cc: General Services Department Architectural Division G.S. Accounting Lease Management Division Auditor-Controller Contractor (Via Arch Div) 24501B02. 21A. GB:dp Page 2 of 2