TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE
CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSER-
VATION DISTRICT
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: OCTOBER 18, 1988
SUBJECT: Approving Plans and Specifications for Lane Drive
Paving, Project No. 7520-6B8690-88, Concord Area.
Specific Request(s) or Recommendations) & Background &
Justification
I. RECOMMENDED ACTION:
APPROVE the Plans and Specifications for the Lane Drive Paving
Project and ADVERTISE for bids to be received on Thursday,
November 17, 1988 at 2: 00 p.m.
DIRECT the Clerk of the Board to publish the Notice to
Contractors in accordance with Section 20125 of the Public
Contract Code.
II. FINANCIAL IMPACT:
The estimated contract cost of the project is $67 ,619 . It is to
be funded by Flood Control Zone 3B - 25%, State Department of
Water Resources - 75%.
III. REASONS FOR RECOMMENDATION/BACKGROUND:
The Chief Engineer has filed with the Board of Supervisors, as
the Governing Body of the Contra Costa County Flood Control and
Water Conservation District, the Plans and Specifications for the
Lane Drive Paving Project.
The general prevailing rates of wages, which shall be the minimum
rates paid on this project, have been filed with the Clerk of the
Board and copies will be made available to any interested party
upon request.
Continued on attachment: X yes Signature '
Recommendation of County Administrator
Recommendation of Board Committee
Approve Other:
Signature(s) :
Action of Board on: OCT 181988
Approved as Recommended Other
Vote of Supervisors 'I HEREBY CERTIFY THAT THIS IS
A TRUE AND CORRECT COPY OF AN
/� ACTION TAKEN AND ENTERED ON
v Unanimous (Absent ) THE MINUTES OF THE BOARD OF
Ayes: Noes: SUPERVISORS ON DATE SHOWN.
Absent: Abstain:
Attested OCT 18 1988
Orig. Div. : PW (Design) Phil Batchelor,
cc: County Administrator Clerk of the Board
Attn: E. Kuevor of Supervisors and
Auditor-Controller County Administrator
PW Accounting
Construction
Community Development
n
Attn: Gus Almquist
ML/bb By
bo:18.t10 Deputy Clbrk
f
Board Order (Lane Drive)
October 18, 1988
Page 2
This project has been determined to be in compliance with the
General Plan. The environmental impact report pertaining to the
Upper Pine Creek Project, of which this project is a part, was
reviewed by the Board on January 14, 1986 and found to be
adequate.