Loading...
HomeMy WebLinkAboutMINUTES - 10111988 - 1.5 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: OCTOBER 11, 1988 SUBJECT: CHRISTEN DRIVE BRIDGE REPLACEMENT (4660-6X4085) I. RECOMMENDATION APPROVE the Joint Exercise of Powers Agreement with the City of Pleasant Hill for the Christen Drive Bridge Replacement Project; and AUTHORIZE the Chair of the Board of Supervisors to execute the Agreement. II. FINANCIAL IMPACT The project is estimated to cost $213 , 000, most of which will be funded with Federal and State Funds. The local match will be shared by the County and the City of Pleasant Hill, with the County' s share being approximately $13 , 500 for design engineering. The funding split for the project is estimated to be: FEDERAL FUNDING $138, 400 STATE FUNDING $ 26, 500 CITY OF PLEASANT HILL $ 34, 600 COUNTY ROAD FUNDS $ 13 , 500 TOTAL $213,000 The actual split will be based on final costs as specified in the Agreement. Continued on attachment: X yes Signature: Recommendation of County Administrator Recommendation of Board Committee Approve Other: Signature(s) : Action of Board on: OCT 111988 Approved as Recommended ✓' Other Vote of Supervisors I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN _Unanimous (Absent ) ACTION TAKEN AND ENTERED ON Ayes: Noes: THE MINUTES OF THE BOARD OF Absent: Abstain: SUPERVISORS ON DATE SHOWN. Attested OCT 111988 Orig. Div. :Public Works (RE) PHIL BATCHELOR, cc: County Administrator CLERK OF THE BOARD Accounting OF SUPERVISORS AND Design COUNTY ADMINISTRATOR Construction PW Director, Pleasant Hill JRB:LV BO: 11.t10 By DEPUTY C RKV Board of Supervisors October 11, 1988 Page Two III. REASON FOR RECOMMENDATION/BACKGROUND The County applied for and received a grant of Federal Highway Bridge Rehabilitation and Replacement funds for the Christen Drive bridge replacement project. The project consists of replacing the existing bridge, which is geometrically and structurally deficient, with a wider bridge on an improved vertical alignment. When originally planned, the project site was located within the unincorporated area of Contra Costa County. However, before the design was completed the location of the bridge was annexed by the City of Pleasant Hill, becoming part of the street system subject to the City's jurisdiction and maintenance. The City requested that the County complete the design and construction of the bridge rather than discontinuing the project. The purpose of the Joint Exercise of Powers Agreement is to provide for the apportionment of the project design and construction costs, duties and responsibilities between the County and the City of Pleasant Hill. The Pleasant Hill City Council approved the Agreement on August 15, 1988. IV. CONSEQUENCES OF NEGATIVE ACTION Under the Federal Highway Bridge Replacement and Rehabilitation Program the County is to be reimbursed with Federal and State funds for a portion of the design costs. If the Joint Exercise of Powers Agreement is not approved and executed, the project will be discontinued resulting in increased costs to the County if Federal or State funds are not available for reimbursement for design costs already incurred.