MINUTES - 10041988 - 1.59
1-059 TO: REDEVELOPMENT AGENCY FROM: PHIL BATCHELOR, EXECUTIVE DIRECTOR DATE: October 4 , 1988 SUBJECT: APPROVE Contract Change Order No. 12 for the Pleasant Hill BART Station Area Street Improvements Project, Phase IIB, Project No. 7891-6X5591-85 . Specific Request(s) or Recommendation(s) & Background & Justification RECOMMENDED ACTION: APPROVE Contingency increase of $260, 000, and AUTHORIZE the Chief Engineer to execute Contract Change Order No. 12 to Gallagher & Burk, Inc. of Oakland, CA. , in the amount of $270, 656 . 99, to provide for changes in the planned work for the Pleasant Hill BART Street Improvements Project, Phase IIB, Project No. 7891-6X5591-85. FINANCIAL IMPACT: Funds are available from development fees for the Pleasant Hill BART Specific Plan area. In addition $50, 000 of the changes are reimburseable from various utilities. Continued on attachment: X yes Signature: U Recommendation of Executive Director Recommendation of Agency Committee Approve Other: Signature(s) : Action of Agency on: October 4, 1988 Approved as Recommended X Other Vote of Commissioners I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN X Unanimous(Absentlll) ' AND ENTERED ON THE MINUTES OF THE Ayes: Noes: REDEVELOPMENT AGENCY ON DATE SHOWN. Absent: Abstain: Attested October 4, 1988 Orig. Div. : Redevelopment(Const) Phil Batchelor cc: Redevelopment Director Agency Secretary Auditor-Controller Chief Engineer By0hAAJ0c,' ) DEPUTY LT/s a bo: 4 .t10 REASONS FOR RECOMMENDATIONIBACKGROUND: The Agency is constructing major street improvements for the Pleasant Hill BART Specific Plan area. This contract change order provides additional funds for construction of widening of Cherry Lane due to unforeseen existing conditions. This change order also provides for additional work due to various changed or unforeseen conditions encountered throughout the jobsite. This change order also balances out previously authorized quantities of work. Because this change order and the previously approved change orders collectively exceed $25, 000, Agency approval is required . CONSEQUENCES OF NEGATIVE ACTION: Failure to approve the change order will significantly delay construction of the improvements as well as impact public access to the previously approved projects. CONTRA COSTA COUNTY c-a RevtseD(s•ss )x-zz PUBLIC WORKS DEPARTMENT SHEET OF CONTRACT CHANGE ORDER NO. Z' REV.NO. SUPPL.NO. ROP,D NAME W.O.NO. PROJECT NO. DATE f !4�/ 6A/z% 51�75o+-r f1 roti RP�h.�loPw,P�,f A,9�'crc7 - P��f:� ITB 55 `Qi- ✓,.17 /3/9Ss TO: Gp l f Q �Au L+ / G. CONTRACTOR. Cha a re uested b r's/6401 � You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:This change order is not effective until approved by the Deputy Public Works Director,Operations and Flood Control. *** NOTE TO TYPIST----AT LEAST 3 APPROVALS NEEDED FROM BACK SIDE BEFORE TYPING ***' H r•V L LL//�1 twyl I„�'' a /� �-�-�1 1 - /.O►-� �' �-r r.a.7 f7 77e-4 C.ow, w+o G.� / .'f X 745 c c L r c� o w; /a Z 6 97 A-1 kelf4/1— of C mNr -GT Q�,,.,,r rf �rrefs INC21=45E 6-DA, 7'2l�, j QvANT1T71=S fl T' CaN77zf?c i� �iLIC LS: Ph ef Pr.-raV cy• •, L I«/"rte I, +r /(0 3cfo . oa t9p,5 • /0 4g5'o 1--, + Iso _ f 8F cics 2 /3,ocA!, 63 oso, 04 47,21 o I1 • 1 ©o o►, 8.670 T /� r �J , �4 Cep.,! p / /a1.z? ON `Z 0O �`ZZ I 1518 $F , o S PGvc ro s 4 2-e, 7Z ,Oo Z9o-'e � � J t�.nofl 7.3��fl Mr6DX1.35 S ' S. 4m o, oo f3s6�U • 19 7ZF tl .3 o Hlmor (,o e�fc a ��• v t°r .90 SF 6SS`�o t/3,3 �p 20 2 rq + 5.3� vee e e«-4 ......le--q 77 (T,,,' T 7- rr /oc ! ey, s70j� , ESTIMATED COST DECREASE $ INCREASE $ SP e BY REASON OF THIS CHANGE Q(a,yeWORKING DAYS EXTENSION OF TIME WILL BE ALLOWED NOTES TO TYPIST: 1. In/t ��r� w. 11w4 +?H�7`' -is resident engineer 2. Type "Signature Not Required" in contractor signature space when the change order is solely a Balancing Change Order . i/b- , uipment and materials approved by the Engineer as necessary, will be paid for in accordance with the provisions e ontract specifications relating to extra work at force account. ent approved by the Engineer as necessary will be paid at the rental rate shown above, plus 158. deration of any adjustments due in accordance with C.S. Sec. 4 will be deferred until such time as the final ity has been determined for any of the applicable items listed above. (Note: Use only on major items of work an adjustment is to be made. Ref. C.S. Sec. 4) eu of the provisions in C.S. Sec. 4, no adjustments shall be made in the contract unit prices of any of the items d above. ((Note to Resident Engineers Use only on major items of work where no adjustmentis to be made. to C.S. Sec. 4)) ermination of any contract time extension for the work herein specified shall be deferred until the completion of such work. 6. The contractor agrees to accept $ as full compensation for all of-the work described above, and no additional compensation will be allowed ere or. _ C-3 (Revised Nov. 1985) CONTRA COSTA COUNTY C-3REVISED(8-85)X-22 PUBLIC WORKS DEPARTMENT SHEET OF CONTRACT CHANGE ORDER NO. —L�_ REV.NO. SUPPL.NO. ROAD NAME W.O.NO. PROJECT NO. DATE TO: CONTRACTOR. Change requested b You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:This change order is not effective until approved by the Deputy Public Works Director,Operations and Flood Control. *** NOTE TO TYPIST----AT LEAST 3 APPROVALS NEEDED FROM BACK SIDE BEFORE TYPING. **- 4 29 4 ,6, /bo.e9 tflHar 5frvc.tvrc (T,0, T H,N, 5/," a° 51 73sG,.I P4 G-7 I oa�+ /oo,Ax z33 63 / - ?3r 7 Z l�'o �- gZ,7�o Frn,s�i a�rl /•�<741� 14r�cf 5/ n 9L os1� /35•0o Pc - le Foo. o© t e , / / . 0/2L6 0,95 F /B,4� ✓ , f ( k8 Boo4-F(t- toy,6/o Li"k/ o�i 51<r� % �t , c �o•fS b �P� t 7- 5A11114- Ir do =!� G /7 oo /74<0. hlop lcP 40)c _pr C- /77.7 go. AC 0 66 � P4 t b.��,o Lff L :6ri S:411 r:rv9r 1.cr bo -je32p0.00 w Zoo. � 6,6 74q 6g 3 �2•�0 �f�u �, �/ -��r�.ror tic+ `e - -"4c YS ot, ,-,p Z,J 7S"-f' ZY.o �a 4GP fS0.0% 7rcr., c-r S, ,k C_',/0 r -A IF �2S7S70 ,S�gD.oa +/a0,o� leo 0' 0 30 2 S �K o - Po Bosco Po 80S100 f /oo,00/o PQ 7000�o Cl lS/x2"'54ce io - 0. Qe9770.00 + 7o0.0�0 �j 00.0 PC � coo,oo L F 4 4 7 Z� 4/o +� /s;9 I " • 131 ss t F(+l5% 2 �►.� Co,,��,t-l'� @ el66 , 54s �- • 83 H27SLF + IS ole 4�r CPC „d., .P,, -�l.Ga �/� 7/ 82, QO6t 28.60 8 46� LF +I3Z.7�. 2uCF-- �p.,�/�,7`_�e l4 �� /•S5_,14 P_ 723. 8.56 / 72.7OQ o ESTIMATED COST DECREASE $ INCREASE $ BY REASON OF THIS CHANGE WORKING DAYS EXTENSION OF TIME WILL BE ALLOWED i NOTES TO TYPIST: 1. is resident engineer 2. Type "Signature Not Required” in contractor signature space when the change order is solely a Balancing Change Order . 1. Labor, equipment and materials approved by the Engineer as necessary, will be paid for in accordance with the provision of the contract specifications relating to extra work at force account. 2. Equipment approved by the Engineer as necessary will be paid at the rental rate shown above, plus 15%. 3. Consideration of any adjustments due in accordance with C.S. Sec. 4 will be deferred until such time as the final quantity has been determined for any of the applicable items listed above. (Note: Use only on major items of work where an adjustment is to be made. Ref. C.S. Sec. 4) 4. In lieu of the provisions in C.S. Sec. 4, no adjustments shall be made in the contract unit prices of any of the items listed above. ((Note to Resident Engineer: Use only on major items of work where no adjustment is to be made. Ref. to C.S. Sec. 4)) 5. A determination of any contract time extension for the work herein specified shall be deferred until the completion of such work. 6. The contractor agrees to accept $ as full compensation for all of the work described above, and no additional compensation will be allowed ere or. C-3 (Revised Nov. 1985) / ' C-3REVISED 18-85)X-22 CONTRA COSTA COUNTY PUBLIC WORKS DEPARTMENT SHEET OF e CONTRACT CHANGE ORDER NO. _�L REV.NO. SUPPL.NO. ROAD NAME W.O.NO. PROJECT NO. DATE TO: CONTRACTOR. Change requested b You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:This change order is not effective until approved by the Deputy Public Works Director,Operations and Flood Control. *** NOTE TO TYPIST----AT LEAST 3 APPROVALS NEEDED FROM BACK SIDE BEFORE TYPING ***' 98. 77LF t3.Sj 12 :l PVC Lic 39ge.po o l 6+33,3�e 12 ✓QI„ �S7.S0=10 1- S7S.00 �t 33, 3 oS z Pti + z e,6�, g c r� /S o4 P a 6 30.0 0 + I + 3315% oQ Cr . -3 N E 10 8 If o0 20 . 0--/0 y t Z S P }- Soo.o a- 2 e VEC e /e r, 0S eo Z. •^y •� c r o 12 .J�/� SF f- .S'7,0�.. 1�oVfi+,�t.,'� P,..•,o � a... /'«S•^) �rvL��h . 2 3 Zee. t- 1`f�3 e l.,op 5TrwdLlr e T r-' T 317, til-7,0 rf'L0 r Cb leer � o J 3 e f P 9 ♦ $D.o�/s PC, s e 2�::. o� F r Al SDMH 0 o ;a.0 st S * 61 �1 e4.-. (,1000/j) 3 JL N-A Lb SecoNU r. c 0jai, lk 3 ew (3 GD3; 4-1- +�g-b vl ? r4 OGV6 % 431 D,O,) T ESTIMATED COST : DECREASE $ INCREASE $ BY REASON OF THIS CHANGE WORKING DAYS EXTENSION OF TIME WILL BE ALLOWED NOTES TO TYPIST: 1. is resident engineer 2. Type "Signature Not Required" in contractor signature space when the change order is solely a Balancing Change Order . 1. Labor, equipment and materials approved by the Engineer as necessary, will be paid for in accordance with the provisions of the contract specifications relating to extra work at force account. 2. Equipment approved by the Engineer as necessary will be paid at the rental rate shown above, plus 15%. 3. Consideration of any adjustments due in accordance with C.S. Sec. 4 will be deferred until such time as the final quantity has been determined for any of the applicable items listed above. (Note: Use only on major items of work where an adjustment is to be made. Ref. C.S. Sec. 4) 4. In lieu of the provisions in C.S. Sec. 4, no adjustments shall be made in the contract unit prices of any of the items listed above. ((Note to Resident Engineer: Use only on major items of work where no adjustment is to be made. Ref. to C.S. Sec. 4)) 5. A determination of any contract time extension for the work herein specified shall be deferred until the completion of such work. 6. The contractor agrees to accept $ as full compensation for all of-the work described above, and no additional compensation will be allowed ere or. C-3 (Revised Nov. 1985) C•3REVISED 18-851X-22 CONTRA COSTA COUNTY PUBLIC WORKS DEPARTMENT SHEET OF r CONTRACT CHANGE ORDER NO. Z REV.NO. SUPPL NO. ROAD NAME W.O.NO. PROJECT NO. DATE TO: CONTRACTOR.. Change requested b You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:This change order is not effective until approved by the Deputy Public Works Director,Operations and Flood Control. *** NOTE TO TYPIST----AT LEAST 3 APPROVALS NEEDED FROM BACK SIDE BEFORE TYPING 98. 77Lft3.S/_ JZ evc 4(0,00Z_LFPIZ,vc o l e-16+33,30 12 Vdve CC 7So� E S7S�oo �t 33, 3 n9- z PS + 8.6�e g '' 1 c 1,, /S o4 �,a 6 3a.o o + I + o.o �0 8�f2 " , (D -t'37o.ca Z J P (16 SOC.O p 2 D 2j, c r Q $_ r 12 -5_70SF -bX7--'7w /�4veF+rr���. f.vie a.. 1e'ed`r') / 4--cLA,* 3 Ze. - 11,3 17. FM711.1- rvc -vr rt id¢ , e^ @ 739-, 00 ' ✓ Fti7cl, 0 /. Z6 /r ,ls�� IM��•or Si rf.,HrVe� f"�rr�. 0Ytj ?� f 40 Goy. a 1 a 0"/a '� JL It .tb Suo.a' i I e• PJ2,1L 001or- I{ 3 e w & Go 4-6 -8—b R of ? T ESTIMATED COST : DECREASE $ INCREASE $ BY REASON OF THIS CHANGE WORKING DAYS EXTENSION OF TIME WILL BE ALLOWED NOTES TO TYPIST: 1. is resident engineer - 2. Type "Signature Not Required" in contractor signature space when the change order is solely a Balancing Change Order . 1. Labor, equipment and materials approved by the Engineer as necessary, will be paid for in accordance with the provisions of the contract specifications relating to extra work at force account. 2. Equipment approved by the Engineer as necessary will be paid at the rental rate shown above, plus 158. 3. Consideration of any adjustments due in accordance with C.S. Sec. 4 will be deferred until such time as the final quantity has been determined for any of the applicable items listed above. (Notes Use only on major items of work where an adjustment is to be made. Ref. C.S. Sec. 4) 4. In lieu of the provisions in C.S. Sec. 4, no adjustments shall be made in the contract unit prices of any of the items listed above. ((Note to Resident Engineer: Use only on major items of work where no adjustment is to be made. Ref. to C.S. Sec. 4)) 5. A determination of any contract time extension for the work herein specified shall be deferred until the completion of such work. 6. The contractor agrees to accept $ as full compensation for all of-the work described above, and no additional compensation will be a owe ere or. C-3 (Revised Nov. 1985) CONTRA COSTA COUNTY C-3 REVISED(8-85)x-22 PUBLIC WORKS DEPARTMENT SHEET OF CONTRACT CHANGE ORDER NO. 1 REV.N0. SUPPL.NO. ROAD NAME W.O.NO. PROJECT NO. DATE TO: CONTRACTOR. Change requested b You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:This change order Is not effective until approved by the Deputy Public Works Director,Operations and Flood Control. ** NOTE TO TYPIST----AT LEAST 3 APPROVALS NEEDED FROM BACK SIDE BEFORE TYPING *** 2, fieC R E-4.5- i_ ce, TR A<-T` !J N t r/F.C, A 7- c.O Al T2 A-C, /c GS' �m 44�y>� Tti -YZ.b'7. .e f vbbose �,00 Ty 396 38.so -15 IS- 000 Ll= - !8•��o Mlroor o,�cr 7� S -!o cvr 7•c 1' o zl � 9 16 bre hr.?er,A2 2 Z 3�� - ZS"o o �r•,or7r�cTv T' D n f l 74 0 o a. / o, m o t o Zg �P4 '�DO.P Min6ph 7�-rr.c /YvAt i 'Ta [= .M 7 Bo �22�p 00 �.`._._. . r f!f p0. lop=, 34 5/ LF -53 •°I /8�RCI° 61. fiTf7.�o' GF 3�! /�• on .�.Ja Z�l� L/C -37 7Wc/,, li �. S o d'7,�o. _.. ..._.... 8 3S;%o 3z 4/1 %Go��.' �.l,��t f4�troN 'Z9S�.CO../�M.__.s�.... 29Sa.mo �_• 070 • Qo -�4�'... ._ µ oa970,o o IX •„,'o O' X770,no �- O, '37J'�: 70 Z 01: o,oo so o'�o 7S l t24 ,50 X S' / 4 ESTIMATED COST DECREASE $ INCREASE $ BY REASON OF THIS CHANGE WORKING DAYS. EXTENSION OF TIME WILL BE ALLOWED NOTES TO TYPIST: 1. is resident engineer 2. Type "Signature Not Required” in contractor signature space when the change order is solely a Balancing Change Order . 1. Labor, equipment and materials approved by the Engineer as necessary, will''be paid for in accordance with the provisions of the contract specifications relating to extra work at force account. 2. Equipment approved by the Engineer as necessary will be paid at the rental rate shown above, plus 158. 3. Consideration of any adjustments due in accordance with C.S. Sec. 4 will be deferred until such time as the final quantity has been determined for any of the applicable items listed above. (Notes Use only on major items of work where an adjustment is to be made. Ref. C.S. Sec. 4) 4. In lieu of the provisions in C.S. Sec. 4, no adjustments shall be made in the contract unit prices of any of the items listed above. ((Note to Resident Engineers Use only on major items of work where no adjustment is to be made. Ref. to C.S. Sec. 4)) S. A determination of any contract time extension for the work herein specified shall be deferred until the completion of such work. 6. The contractor agrees to accept $ as full compensation for all of the work described above, and no additional compensation will be allowed ere or. C-3 (Revised Nov. 1985) CONTRA COSTA COUNTY C-3 REVISED(8-85)X-22 PUBLIC WORKS DEPARTMENT SHEET _OF • CONTRACT CHANGE ORDER NO. ��REV.NO. SUPPL,NO. ROAD NAME W.O.NO. PROJECT NO. DATE Tor CONTRACTOR. - Change requested b You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications . on this contract. NOTE:This change order Is not effective until approved by the Deputy Public Works Director,Operations and.Flood Control. ** NOTE TO TYPIST----AT LEAST 3 APPROVALS NEEDED FROM BACK SIDE BEFORE TYPING ***� ZSo o 6 /0, 0. CL C'C=. 6 zs- ' O ��9y8 �,1� �10,6 7p ✓G �0+. � � /'6LC �18o Lr .�SB� ?a � �.0 a 'f• r. 8 7e,s - 58.37 S,rv(c-a co., 1�0., R se 0 9 ;'3o LIG a l�sfoll` pvc- IZ y2? o0 n r oo. .. JS -t'o,6 �o ti �' �. f>✓G P C 40.00 � 4`'.._.___._... .�_.,�'.__ 600.00 -- (o,(o �o of 44 C Ito 7Z,o• 6-33.3 ' I�8 3 E4 -ZS�.D�o -I-ZfI 'N � �/3c,oa �,.� 3Soo,,,, —zs•o "/o ,f F /os o o _&q x6 F, tfi•, /oS,00 /L -33. 3 r 2DO ^ O e..,.r o C "/G its' / -/oO o% 4 /[' n Z -goo.o7. 4'114 t" o/aw 007,oo ca 7�-.oQ 07, 6 Z9/ L, - -z�t� 57`4^/�t` cE' @ •3S cF y� -27. 2 7 St�,o'1�.� Lower .G'r'S or«..''diti✓� "`MH vSD.Vo PG `'T .' 4,s o,oo •�- o ESTIMATED COST DECREASE $ INCREASE $ BY REASON OF THIS CHANGE WORKING DAYS EXTENSION OF TIME WILL BE ALLOWED NOTES TO TYPIST: 1. is resident engineer 2. Type "Signature Not Required" in contractor signature space when the change order is solely a Balancing Change Order . 1. Labor, equipment and materials approved:by the Engineer' asnecessary, will be paid for in accordance with the provisions of the contract specifications relating to extra work at force account. 2. Equipment approved by the Engineer as necessary will be paid at the rental rate shown above, plus 158. 3. Consideration of any adjustments due in accordance with C.S. Sec. 4 will be deferred until such time as the final quantity has been determined for any of the applicable.items listed above. (Note: Use only on major items of work where an adjustment is to be made, Ref. C.S, sec. 4) 4. In lieu of the provisions in C.S.-Sec. 4, no adjustments shall be made in the contract unit prices of any of the items listed above. ((Note to Resident Engineer: Use only on major items of work where no adjustment is to be made. Ref. to C.S. Sec. 4)) 5. A determination of any contract time extension for the work herein specified shall be deferred until the completion of such work. 6. The contractor agrees to accept S as full compensation for all of the work described above, and no additional compensation will be allowed ere or. C-3 (Revised Nov. 1985) CONTRA COSTA COUNTY c•3nt?vISED(8-951 X-22 PUBLIC WORKS bEpARTMENT' +2i+'' '' %'°'SNEET OF CONTRACT CNANGE ORDER NO. REV. :SUPPL NO. nom NAME W.O.NO. PRO CT NO. DAI E TO: CONTRACTOR. Change requested b You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not Included In the plans and specifications on this contract. NOTE:This change order Is not effective until approved by the Deputy Public Works Director,Operations and Flood Control. **** NOTE TO TYPIST----AT LEAST 3 APPROVALS 'NEEDED FROM BACK SIDE BEFORE TYPING -e T ,., .�•• .�.......- ..,w.,mom• max' �.;_. ,� ov-smak2- L�,z- �,�, _ ....,.gin--:.vT•�.•�.:.. ,:�:...•.-•....,.... .,,•... ..�.•:.-+ fo — �r U /� 91G5,00 — o-�,.Q `�•�o,��"�-� _ •. !�1 , 455", L3 1: ESTIMATED COST s DECREASE .$ INCREASE $ BY REASON OF THIS CHANGE WORKING DAYS EXTENSION OF TIME WILL BE ALLOWED 'NOTES TO TYPIST: 1. is resident engineer 2. Type "Signature Not Required" in contractor signature space when the change order is solely a Balancing Change Order . 1. Labor, equipment and materials approved by the Engineer as necessary, will be paid for In accordance with the provisior of the contract specifications relating to extra work at force account. 2. Equippmment approved by the Engineer es necessary will be paid at the rental rate shown above, plus 151. 3. Consideration of any adjustments due in accordance with C.B. Sec. 4 will be deferred until such time as the final quantity hes been determined for any of the applicable ltems,listed above. (Notes Use only on major.items of work where an adjustment Is to be made. Ref. C.S. Sec. 4) 4. In lieu of the provisions in C.s. sec, 4, no adjustments shall be made In the contract unit prices of any of the Items listed above. ((Note to Resident Engineers Use only on major items of work where no adjustment in to be made. Re(. to C.S. sec. 4)) 5. A determination of any contract time extension for the work herein specified shall be deferred until the completion of such work. 6. The contractor agrees to eceept 8 as full compensation for all of the work described above, and no additional compensation will bee owe ere or. CONTRA COSTA COUNTY C-3 nEVISED 18-e5)x-22 PUBLIC WORKS DEPARTMENT ,:;; ..: ' SHEET � OF CONTRACT CHANGE ORDER NO. REV.NO. SUPPL.NO. ROAD AM W.O.NO. PROJECT NO. DAIE TO: CONTRACTOR Chanue requested by You are hereby directed to make the herein described changes from the pians and specifications or do the lollowirp described work not included In the plans and specifications on this contract. NOTE:This change order Is not effective until approved by the Deputy Public Works Director,Operations and Flood Control. **** NOTE TO TYPIST----AT LEAST 3 APPROVALS 'NEEDED FROM BACK SIDE BEFORE TYPING *** 13_ 1 At C to G A 5 L L X T 2 A- k/S)_ :/¢ A4 o i✓1�"S: 7774,:D I h/ Gov T'(2 f}�,Z'-- c 4A-N Gr 6 c��e.v 2f • cC4:> ....... 111Crc0r 'e ZlirC Cohh el Lt tv4l er rvrGt S99. 3 Z Lt` E eGon al-cr SP►� v« � c�0 6 'Z J /h 5f4 if irrf O L— sleev e- 2 1� M �. ower 'c�..�r �►, ti 1,o le �8_ S -7--ar N 1 sf../l dlrd & f 7Z . ZZ e to s: :Teld C 0 Af' (le,0116 Ad A o coo ' S A d 4r L, 4 I� .,s „ 6 _ is z . 7 14 J1 De tele aver 1 C (or:'., 2S;o0 . -r ►� r� .s,. r.-_. ..... . _.�....___ .__...- 8 411, o ESTIMATED COST t DECREASE $ - INCREASE $ BY REASON OF THIS CHANGE WORKING DAYS EXTENSION OF TIME WILL BE ALLOWED NOTES TO TYPIST: 1. is resident engineer 2. Type "Signature- Not- Required" in contractor signature space when the change order is solely a Balancing Change order . 1. Labor, equipment and materiels approved by"the Enginew as necessary, will be paid for in accordance with the provisions of the contract specifications relating to extra work at force account, 2. Equipment approved by the Engineer an necessary will be paid at the rental rate shown above, plus 151. 1. Consideration of any adjustments due in accordance.with C.S. Seo. 4 will be deferred until such time as the final quantity has been determined for any of the applicable items•listed above. .(Notet Use only on major items of work where an adjustment is to be made. Rel. C.S. Sec: 4) .,r6. �• • .; :_ . • 4. in lieu of the provisions in C.S. Seo. 4, no adjustments shall be made in the contract unit prices of any of the items listed above. ((Note to Resident Engineers Use only on major Items of work where no adjustment in to be made. Ref. to C.S. Sec. 4)) 5. A determination of any contract time extension-forkhe'work herein specified shall be deferred until the completion of such work. 6. The contractor agrees to scrap' $ •he.t ' ull'iaoiapeneation for all of the work described above, and no additional compensation will be allows ace ot6",Q.1 iv l 1 I CONTRA COSTA COUNTY C_3"EVISE00-e5)x-22 PUBLIC WORKS DEPARTMENT;, SHEET .S-1- OF CONTRACT CHANGE ORDER NO. / " REV.NO. SUPPL NO. ROAD NAME W.O.NO. �j PROJECT NO. DATE TO: CONTRACTOR. Change requested b You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not Included in the plans end specificslions on this contract. NOTE:This change order Is not effective until approved by'the Deputy Public Works Director,Operations and Flood Control. **** NOTE TO TYPIST----AT LEAST 3 APPROVALS 'NEEDED FROM BACK SIDE BEFORE TYPING *� z de14 2Z . pro T �a c- a w► � 1 � . �oc�. o 0 t ave avCl- AWIC e A. Cy InL:-/- /, I-C- , : " %/-a t f o, I Gy W 7,00 54. J;o,ov 1! Ce-tw tdenl'ryo Cha AI- . 7oo or 0 x / 23 2g �3 ESTIMATED COST : DECREASE $- INCREASE $ BY REASON OF THIS CHANGE WORKING DAYS EXTENSION OF TIME WILL BE ALLOWED NOTES TO TYPIST: 1. is resident engineer 2. Type "Signature Not Required" in contractor signature space when the change order is solely a Balancing Change Order . 1. Labor, equipment and materials approved by the Engineer as necessary, will be paid for in accordance with the provisiol of the contract specifications relating to extra work at force account. 2. Equipment approved by the Engineer as necessary will be paid at the rental rate shown above, plus 151. 3. Consideration of any adjustments due in accordance with C.S. Sec. / will be deferred until such time as the final quantity hes been determined for any of the applicable items.lieted above. (Notes Use only on major items of work where an adjustment is to be made. Pel. C.B. Sec. 1) 4: In 1leu of the provisions In C.S. Sec. 1, no adjustments shall be made in the contract unit prices of any of the Items listed above. ((Note to Resident Engineers Use only on major items of work where no adjustment is to be made. Ref, to C.S, sec. 4)1 5. A determination of any contract time extension for the work herein specified shall be deferred until the completion of such work. 6. The contractor agrees to accept $ as full compensation for all of the work described above, and no additional compensation will bee aowe ere or.. r'-1 r11-0nn.t 11— rnp-s CONTRA COSTA COUNTY C-3 REVISED(9-85)x-22 PUBLIC WORKS DEPARTMENT. _ _.. SHEET OF -. ... '- ;. _ '. ':i�' :':Gi .�:''r'•"'t%23r..`pl :"i. :S.i�O� ��� ::°?':itr�` .. .,wi.7j � ., CONTRACT CHANGE ORDER NO. REV.NO. SUPPL.NO. ROAD NAME W.O.NO. PROJE CT NO. DATE �,; . .. . f ii: V! I. a..� t:'C, O' jnT. ;,CtISE D r,.,i V, TO: * ' +'''T CONTRACTOR Chanue requested by, ► �' .i r, You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included In the plans and specifications on this contract. NOTE:This change order Is not effective until approved by the Deputy Public Works Director,Operations and Flood Control,.__ r** NOTE TO TYPIST----AT LEAST 3 APPROVALS NEEDED FROM BACK SIDE,,-.BEFORE TYPING""" PE-C R 0-A 5 E eX7- ,4 weVR/d �►Mo c�n/T3:.:-;F° q vTtto / 2-r0 iA/ c �v�',eI4C7- Gffi9i+iG�' `oRD�/2,sam • ;;��.;, �, " t, x�,;.,,;.,�sor:,,c :..,. '} CCO V 7 z.412, i 1i• C a 7 to O'O .�L .r� 1 /---• .w L�^MIr�ANt 'S/',/►�fL/yM e d .,. �' "�/Fl� ;/y /O /S~ '',: '�}" lCe� ��:� co /tri cl�*�.. �iM'� 31 L74 - Z- �oc2r! 3 .7 S/ t I 2 -j37 G e -te- es vH of e `c aT✓a1/� f'i-tsNc Lr w;eh �m�e J L P� _ .__.•_ .......... .. 2 35':.(x. �.... . '"a .r : c:i�� �` n.?:r._,�..,:�:: i ' Z� �Ns1a � 4f"rarc. �o085'+D:;c'o ,, . : _ {JC , . k �l �a mow. t .,�i..`�.a. ! +.y. �u+Y.M'?� _ial✓ 1lwi.<r -, .«rJ,w :r..• iq J i 1Lisftliw �a4�r; 3-LZTwQ C4 M i _ ov+ a -Sc'.v CII So�51� _ A Rery 4 / IZ '� ' Se�...er 3814, / 7 4l( .M Itt 4- a,h I'D 2aZ2. ESTIMATED COST DECREASE $ INCREASE $ BY..--REASON OF THIS . CHANGE WORKING DAYS _EXTENSION OF TIME WILL BE ALLOWED } NOTES TO TYPIST: 1. is resident engineer 2. Type "Signature Not Required" in contractor .,..__....._. .. _.. __,______•.signature'spade-"'when-"the-'change-'order is - f sol,ely.. a .Balancing Change- Order . eI I 1. Labor, equipment and materials"approved by;the'Engineet'?atOnecessary,, will'.be;paid for in accordance with the provisions of the contract specifications relatin to extra work at force account. 2. Equipment approved by the Engineer-aa necessary will be'ipaid;at'r'the rental''rate'shown above, plus 158.°' 3. Consideration of any adjustments due in accordance with C:S.•..Sec. 4 will be deferred until such time as the final quantity has been determined for any of,the applicable: itema .listed above. ,(Noter Use only on major items of work where an adjustment is to be made. Ref.'C.S. -Sec. '4 ei'eV Y r 4. In. lieu of the"provia ions•:in" C.Si;,Sec.+-4,, no 1 adjustmenta-'shal_1,,be•-made in the-,contract unit prices, of-any of the items listed above. ((Note to Resident Engineers Use only on �major iteinn of work iihecit no adjustment is to be made" Ref. to C.S. Sec. 4)) S. A determination of any contract time extension~foi''th.e work herein specified shall be deferred until the completion of such work. -.._.».. -r. -•.,.:�...._ :_.,......_ ._ 6. The contractor agrees to accept $ as full compenletion for all of the work described above, and no additional compensation will bee owe ere or. ,31.t,jr < !t!"'! C-3 (Revised Nov. 1985) (••"'l+�2ZT CONTRA COSTA COUNTY C-3 REVISED(8-85)X-22 j Ui:<!,. l PUBLIC WORKS DEPARTMENT:1 SHEET OF c�. - ';��ti,`. "ri.i:..', _ •a rjh'ci'...a- ""t.'�_`� 4:` i71')iwf�T,.r.�„1; CONTRACT CHANGE ORDER YNO. _�REV.NO. A SUPPL NO. ROAD NAME W.O.NO. PROJECT NO. DATE r OV ,C*Co t✓• i . � rt')a.i:'' ?3'Cy xS?S V"�5ra:+;rl..;�.r'.i' •� + TO[ `T r”+'•` f CON A OR. :+ tis ere @Sled You are hereby directed to make the herein described changes from the plans and specifications or do the following described work rat included in the plans and specifications— ---- on this contract. NOTE:This change order Is not effective until approved by the Deputy Public Works Director,Operations and Flood Control.-._• ** NOTE TO TYPIST----AT LEAST 3 APPROVALS NEEDED FROM BACK SIDE". BEFORE TYPING-*'k'�* o a,„, 42. 14-T-.F 2-_C%0 4 - F17p ,, Wo , z6 - !r 4 f 75 - e. .� N e oM r/ 9 L e 1- p / Ca ✓t!sz* Car. - ,9b4&Idm t• Sec.✓e. Coft N et draIon• �P►tiav'e fe C)c al& X: [x� • � EX�CN� //H .G+P 4i/ �'.:,��r. .. l.l.w 4 4y.�.'. 6 b Te1, w -�a ..z .�� 8/10 8777 .. .. .. ,.: . ... . .. . .Y.•ti ►};•J�,. •+ -:�r Y+: a it a aa:' iRu ,.bh.:.:4Vi,,:.t.i;31:,N Hook v owe. 3 0".? 7 J. r a til` : ��� � �%9- M . ESTIMATED COST DECREASE $ INCREASE $ • BY .REASON ..OF THIS . CHANGE WORKING, DAYS. EXTENSION,.OF_.TIME WILL BE ALLOWED V NOTES TO TYPIST: 1. is resident engineer 2. Type "Signature Not Required" in contractor signature space when the change order is . .solely..a.,.Balancing .Change .Order . . . 1. Labor, equipment and materialsapp�oved bJ .'ttie`En'ineer...es:necessary j'wilf,be; aid for in accordance with the y g y p provisions of the contract specifications relating to-extra work at•.force-•account. 2. Equipment approved by the Engineer as necessary•will' be,paid"at"the rental rate shown above, plus 15l: 3. Consideration of any adjustments due in accordance with C.S, sec. 4 will be deferred until such time as the final quantity has been determined for any of the applicable"item a-listed above. (Notes use only on major items of work where an adjustment is to be made. Ref. C.S. SeC. 4)'"J' 4. In lieu of the provisions in C.S. .Sec. :4;• no'adjustments shall be made in the'contract unit prices of-any of the items listed above. ((Note to Resident Engineers Use only on major items of work where no adjustment is to be made. Ref. to C.S. Sec. 4)) S. A determination of any contract time extension for the work herein specified shall be deferred until the completion of such work. _............._......_._ 6. The contractor agrees to accept S as full compensation for all of the work described above, and no additional compensation will be allowed the or. : ij �;V� ' C-3 (Revised Nov. 1985) ^`' « • .{ CONTRA COSTA COUNTY G-3REVISED(8-85)X-22 PUBUC WORKS-DEPARTMENT, SHEET OF CONTRACT CHANGE ORDER NO. REV.NO. SUPPL NO. ..__... ROAD NAME W.O.NO. PROJEGT 4.. .. DATE T4: I CONTRACTOR. .r r r;Cfta e're nested b '�' You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE:This change order is not effective until approved by thei Deputy Public Works Director,Operations and Flood Control. ** NOTE TO TYPIST----AT LEAST 3 APPROVALS NEEDED FROM BACK SIDEBEFORE TYPING *'�* • n �jYh-- 4 r ftM°✓fG - hh.01 4't ..7+. : ,P O - / i iP 50 N 5 p GOh du••� CJ;fCEI'. Zo0 / q !O 4 + ` { r'yti:s.: .� �. -, t^;t• �'� r';l t': z.i`,,. '.f 1:1 f" i .�t0 / r 7li�z 6--a- T_ a Ce e /-q e C" 2 J4_+ Taj• j 7� .J��Vi '�.,.: M.f p• "�Yr .. .a{✓C�• tri• .... ..,._- .._ .. _. ..... L 7 4 " ,�"'� • 46 , 7l. .... _.. . .�7r.t,�._... _ vPws. .. i 1 t T Ad v -t S.e. a O V i .a ...w x ... W a Pry rte, ' t�. z . - t�� : Y ' .... .. . l ... ,. ,x,.. .f. 5'shJ e .3.., t,. :J r..3��t1=+a •:.t,1a�l�+��.a..�:7:Is.t; , lk i } ESTIMATED COST :. DECREASE $ • INCREASE BY«_REASON OF.-.THIS_-CHANGE ' ,WORKING_DAYS.,:EXTENSION -C}F..-T.IME...WILL BE ALLOWED t ' is resident engineer NOTES TO' TYP IST, 1. 2. Type "Signature Not Required" in contractor y. .._.. _..._«.:........_ signature spacw e when .the change _order is solely,..a Balancing .Change Order . _.w..... .._ 1. Labor, equipment and materials approved by the Engineer" as.'necessacy,'will be paid for in accordance with the provisions of,the contract•specificationa relating to extra work at, force,account, plus 15t4. 2. Equipment approved by the Engineer as necessary will' be'paid at'the cental~tate'shawn above, 3. Consideration of any adjustments due in accordance with C.S. Sec. 4 will be deferred until such time as the final quantity has been determined for any of the applicable;•items listed above. (Nater Use only on major items of work where an adjustment is to be made. Ref. C.S. Sec. 4) 4. ln•.;lieu of the provisions: in C.S. Sec.'.'4,,no adjustments:'shall;be'made in the contract unit prices of any.af the items listed above.. ((Note to Resident Engineers Use only on major items of work where no adjustment is to be made:' Ref. to C.S. Sec. 4)) 5. A determination of any contract time extension for the work herein specified shall be deferred until the completion of such work, 6. The contractor agrees to accept $ as full compensation for all of the work described above, and no additional compensation will be a owe ere C-3 (Revised Nov. 1985) + is •-zl 1 � 11EVISED(8-65)X-22 CONTRA COSTA COUNTY C-3 PUBLIC WORKS L)EPAATMENT 'SHEET OF CONTRACTC14ANGE ORDER NO. -t7n'tV.NO:""L- LSUPPLN6.- ROAD NAME W.O.NO. EcT O. DAIE J 7 v I.t.4 i,J;u -I.kju it L CONTRACTOR. Charve requested by You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not Included In(he plans and specificatlong an INs contract. 'y o NOTE:This change order Is not effective until approved by the Deputy Public Works Director,Operations and Flood Control. NOTE TO TYPIST----AT LEAST 3,..APPROVALS 'NEEDED.-FROM.-BACK SIDE BEFORE TYPING .***. E5A777 il/'OR14 A7- e- a 44 ;4 ' z koo.i 15e--9:iwtQ OX&S. if S em 9?f 7—re0e, too e /0 C le C)09 W 15 too ki CL (3 pite C) ro C q I e 19,ict 4 40 97 44 r.1 1A 4,r- 0/, g 7%r A-vi& Fe7-*,�-6ipl 60 got 49!2 40 If sk? i,T." 14 4kl`�2 l'!1VIC T1--1'y'--'1:, � 'E,It, Ir T �i4 A 1 �i�J44. -�"el/ *-',' -N a 2 's 3 - rc 11 1" CA rr o A L,0 r o 0 )0 e- 4 Le q .... ... OKI L ESTIMATED COST -:INCnA9E-$. e I RENR X6 E ifi6N 0 F TIME WILL 13E ALLOWED BY REASON OF THIS CHANGE WORKING DAYS: E ii6N NOTES TO TYPIST: ----is-resident engineer- V 2. Type ''Signature"'N-"'o"E--'R"e-'�q* 'uired""'-in-'contractor .... s ign.at Ur e—space,.when...the change -order.- is ...... solely a Balancing Change order . "J, I.' Labor, equipment and materials approved by the Engineer &a* necessa y, will be paid for'in accordance withtthe provisions of the contract specifications relating to extra work at force account. 2. Equipment approved by the Engineer sein at the rental rate shown above, plus 151. 3. Consideration of any adjustments due n accotdance-w th.-C.S. Sea'. 4 will be deferred until such Elme as the final quantity has been determined for any.of the, applicable Items.lieted,above. (Notat .Use only on major Items of work where an Is to be ads. Ref. C.S. sec. 4) 4. in the provisions in C.S. Sec. 40 no adjustments shall be made In the contract unit prices of any of the Items listed above. ((Note to Resident Engineers Use only on major Items of work where no adjustment is to be made. Ref. to C.S. See. 4)) ....- 5. ....5. A determination of any contract time extension for the work herein specified shall be deferred until the completion of such work. 6. The contractor age as"full; compe' neatio6"for all of the work described above, and no additional comp:e:attolonacceilill tbe atloweere or+,'-•.-•. _' CONTRA COSTA COUNTY ,, C-3nrwSED le-ss)x-22 ' '` PUBLIC WORKS DEPARTMENT i '"'` `SHEET 10 OF CONTRACT CNANt3E ORDER NO. 1. F),. e�iC`" '§UPOLI NU: ii 1,6.,-^ ROAD NA ME . . .. .. .. . ....._._.. ------- __._ ._._. _ _... ".. W.O. O. PROJECT No. ��. DAIE • _ :.j :t r-,, ;'•i f;`,':. ,.',� .. d t T xyt—aC"q i;r� 1 .. .(fir :,• _ •St' .`1 ftp .. "��� r f.i}. � C7 lig t./n t;'r)T)!'rrl Aril}'� t iii ., a:. ( ii`-.,itki> JLiu. .A,1J.l+"rL• LLi y.,::w, _ TO: CON m TOn. Cha nue requested by You are hereby d(recled to make the herein described chargee from the plans and specifcaibn:or do lite following described work rat Included In the plans and specifications on this contract. _._.....__..._._._..__..,..__ ...__.. _....._._. ✓✓77 f� NOTE:This change order Is not effective until approved by The Deputy Public Works Director,Operations and Flood Control. **** NOTE TO TYPIST-7--AT..LEAST 3,,,.APPROVALS•;NEEDED ..FROM-BACK SIDE BEFORE .TYPING.*** 1 1 _._..-..._._ C �o Jr V A _.._.._....._.._._. _.. C ell f& 1° �p cve.. . :a.: r .f� �� :��,f .n, .rte no oy 141" H I� 0 In Y7, �r► ! , . YoH tor! or � (. own/` oI"Q9 ✓!' _ e hot ' ../e h:.._ �/o f �.... e-i4L �4 ----- pl- �r7 I's s�i .:�•1 A't. > I,i' x f . 'r J./17t'T r :. Z. Colo s't. I 4� O 41 64. tQ 02 dl e 44 60 10 o 4000,,0 t ESTIMATED COST s�DECREASE"$'""tet INCREASE $ BY REASON OF THIS CHANGE WORKING DAYS EXTENSION OF TIME WILL BE ALLOWED NOTES TO' TYPIST: _...1. _ ,...._ .__._.,.-..._.._..,�._.._.__....._._._... is resident engineer f i 2. Type "Signature Not Required" in contractor signature space -when the change order is solely a Balancing Change order . 1. 'Labor, equipment and materials approved by the Engineer as necessary, will be'pald for In accordance with the provisions of the contract specification: relating to extra work at force account. 2. equippmmant approved by the Engineer as necessary:will be paid at the rental rate shown above, plus 151. 3. Consideration of any adjustments due in sococdance'-wLth C.S. Bee. 4 will be deferred until such time as the final ;gquantity hes been determined'for any of the,applicable, ltema,listed above;,(Note, Use only on major items of work where an adjustment Is to be made. Ref. C.B. 'so. 41 ' 4. 1n lieu of the provisions In C.S. Seo. 4, no 'adjustments shall be made in the contract unit prices of any of the Items listed above. ((Note to Resident Engineers Use only on major items of work where no adjustment Is to be made. Ref. to C.S. Sec. 4)) __..___.__. .. _.. ._..__._......_.. 5. A determination of any contract time extension for the work herein specified shall be deferred until the completion of . such work. r.;' _a,'t ;.,:: t - :,- :�•;: ;.,,:;, 6. The contractor agrees to accept $ As`tull` 6mpsnsatloh for all of the work described above, and no additional compensation will be a owe ere or.. I' CONTRA COSTA COUNTY Jc•an�v�seoie-es►x-s2 PUBLIC WORKS DEPARTMENT' '' `'' SHEET- --OF CONTRACT CHANGE ORDER NO. �iEV.NO. '-'' !tuPPLNo.' ROAD NAME _ ._ .... ...�.__.. W.O.No. PROJECT NO. DAIE , Ta CONTRACTOR Change requested by You are hereby directed to make the herein described changes from the plane and specifications or do the following described work not Included In the plans end specifications on this contract. I NOTE:This change order Is not effective until approved by the Deputy Public Works Director,Operations and Flood Control. **** NOTE TO TYPIST----AT LEAST 3 APPROVALB_iNEEDED..FROM"BACK SIDE BEFORE TYPING *** rL, �- _ r r Irl / of O ~._.,. .. ��► QY� "7 • �X L jkU :J.47 , : .r _. iiV` ,r.' f 41.: yp � .F•� ren T':f�,'._. � ', .1 .,:? `, t,, 1,iii ti?;l t..r _ :,Jit+;�.r;rd '•i {iq Y . CY •b H0, ;J 1 r.. 't.'•) V.:C'..�.. �.. Y. 1!i. S:�fj• �•� ti,.: y , li h��lFlf y..� lfl.J r. .h&'1'i• -ESTIMATED 'COST ! DECREASE'.$` ' "� -� "`'INCREASE`$ BY REASON OF THIS CHANGE WWORKING DAY3 EXTENSION OF TIME WILL BE ALLOWED NOTES TO TYPIST: 1. is- resident engineer 2. Type "Signature Not Required" 'in " contractor signature space..when .the change .order is solely a Balancing Change Order . i...41 f; 1. `Labor, equipment and materials approved by the ' will be paid for in accordance with the provisions of the contract specifications relating to extra work at force account. 2. Equiprsent approved by the Engineer as necessary will be paid at the rental rate shown above, plus 151. 3. Con@ deration of any adjustments due in aceordance.wlth C.S. Sec. 4 will be deferred until such time as the final quantity has been determined for :any of the applicable iteme.liated above. .JNoter Use.only on major items of work where an adjustment is to be made. Ref. C.a. sec. '41 4. In lieu of the provisions in c.s. sec. 4, no adjustments @hall be made in the contract unit prices of any of the items listed above. ((Note to Resident Engineer) Use only on major items of work where no adjustment in to be made. Ref. to C.a. sec. 411 S. A determination of any contract time extension for the work herein specified shall be deferred until the completion of such work. S. The contractor agrees to acoept $ 'a s'fu11'compensation for all of the work described above, and no additional compensation will a aLlowed the—f—aror:. f-I V CONTRA COSTA COUNTY c•3nelpsEv1e-051x•22 PUBLIC WORKS DEPARTMENT " SHEET SOF CONTRACT CHANGE ORDER NO. � '" FiEV.NO:::! '":' :SUPPL NO.' ROAD NAME ......___. W.O. O. C O. DATE < ,a • ::. � .. .�,a ,,����I!( f i. 'ems....».. ' iir F' �%''F-' „ � _ t.aJi� f '�;, ;1• - +, `.�;�' n`" Y:• •s�t�r� elrr.,h�x� ...Fl .... F � t�: +1;.• 7.:.:t_ .,. s'4' !, .., v'.v/..:l i'l' �'41r,.i! .'a.t.l,7:. f .�.:�,+ •3c•.,.f.tir'il�� ..r ' :� . t TO: CONTRA n. Charys requested by You are hereby directed to make Ills herein described charges from the plans and speclficallons or do IIx+following described work not Incksded In the plans and specllk:e!Ions on this contract. ._...- _.._ _. ........__ _.. ._.. ved by the De NOTE:This change order Is not effective until approputy Public Works Director,Operations and Flood Control. **** NOTE TO TYPIST----AT LEAST 3 APPROVALS?NEEDED FROM BACK SIDE BEFORE TYPING Lsf OOF rte= _ .�._.I^C S 7� / R 34 sign: R7. sign 1. ea..:@ 150.00 150.00 R11:-sign 1 ea.:@ 150.00 150.00 RI sign 2 ea:' @ ,150.00 300.00 R28L sin _.,,......,....,.._........:. _::.:;._. : ; ,._.,...... c g 1`-ea.. @ 180.00 180.00 , Thermoplastic 12" White Solid .295 l.f. @ 1040 = 413.00 Thermoplastic'811 white"Solid 400 `1.f. @ 1.05 _ -420.00 : Thermoplastic double yellow 980 l.f. @ 1.15 = 1,127.00 Thermoplastic 4" white solid 1195 1:f. @ 0.58 _ 693.10 + No pavement marking, thermo. 1. ea. @ .92.00....;:..,.. "left" pavement marking" thermo 1 ea. `@ 92.00 92.00 j "turn" . vement marki • pa ng.".. .thermo.l:ea. @_92.00 92.00 " ,�z estop" pavement marking thermo 2 ea... @ 92.00 _ 184.00 i _... . . Straight arrow. vement-mk . pa g . 6 yea.-,@•80.00.::.::.;:_:..�,���.�__--.....,.; ... .480.00 .... .._ Turning arrow pavement mkg. 5 ea. @.140.00 - 700.00. 24 concrete bumpers -. -�a� : �60' ea. @.r-23:00"' -' "�� " -----------__ = 380.00 M6fi enf--with--AC- patches 5 ,ea. @ ;140.00 700.00 Type,G pavement''lltarke>" ":. .__. x 90"e'a'-,!@ 3``25: ,. ��, 292.50 Type D pavement marker 20 ea. @.3.25 _ 65.00 • SPe � � a , ,5��,�to�lz �h,cr�e � _. , ._.. ..4 _....._` C.C_ .._.__.... ...__..........._._,__ _. COST..,.!`"-DECREASE...$_.: �. u , .;. .: .._. .INC ASE BY REASON OF THIS CHANGE WORKING 'DA.YS''EXTENSION OF TIME WILL BE ALLOWED 3 i NOTES TO TYPIST: 1. _._...._...,._.._ is resident engineer 2. Type" "Signature Not- Required" -in contractor _ ....signature_ space _when . the•.,change order is solely a Balancing Chan a Order . r 7 1: Labor:% equipment and materiels approved=by `the•Engineec-'ee'''heeessaiy, Nlll be paid fot'in accordance with the provisions of tpphee contract specifications relating to extra work'at force account. 7. considerationroEeanyyadjustmenteeduesinea:cordo ce,.wlth.C.S. Sec. 4 willaberdeferrednuntilesuchutime/as the final quantity has been determined for any-of the applicable lteme.11sted above. (Notes Use only on major Items of work where an adjustment Is to be'made. Ref: C.8. Sec:,4),• .' "•`' 1. In Ile. of the provisions in c.s. see. /, no adjustments shell be made In the contract unit prices of any of the items listed above. ((Note to Resident Engineers Use only on major items of work where no adjustment is to be made. Ref. to C.s. Sec. 4)) 5: A determinatlon of any contract time extension for the work herein specified shall be deferred until the completion of such work. 6. The contractor agrees to accept 8 tae "Lull compeneation' 'for all of the work described above, and no additional compensation will be'e I I owe t here L or. J . P_7 Inw.rl eeA nn.r lasal S. A determination of any contract ilme extension for the work herein specified shell be deferred until the completion of such work, S. The contractor agrees to accept $ '" as full'aompensation for all of the work described above, and no additional compensation will a allowe thereLOr. C-3 (Revised Nov. 19951