Loading...
HomeMy WebLinkAboutMINUTES - 01191988 - 1.11 TO : BOARD OF SUPERVISORS , AS THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J . MICHAEL WALFORD , CHIEF ENGINEER DATE: January 19 , 1988 SUBJECT: Consultant Services Agreement for Marsh Creek Reservoir Mapping , Brentwood Area , #7521- 6D8469 Specific Request (s ) or Recommendation (s ) & Background & Justification I . RECOMMENDATION APPROVE consulting service agreement with Aelyteck Inc . , for aerial surveys of the Marsh Creek Reservoir and AUTHORIZE the Chief Engineer to execute the agreement . II . FINANCIAL IMPACT The maximum cost to the Flood Control District which is not to be exceeded without written approval by the Chief Engineer is $9 , 250, which is available from Flood Control Zone 1 . III . REASONS FOR RECOMMENDATION/BACKGROUND The Marsh Creek Reservoir was constructed in 1963 . The aerial survey is `needed to determine how much siltation has accumulated in the reservoir . IV . CONSEQUENCES OF NEGATIVE ACTION Without. the aerial survey and mapping , we ' can not- determine the extent of sediment in the reservoir and the effect the sediment will have on the operation of the facility . Continued on attachment :_ yes Signature: Recommendation of County Administrator Recommendation of Board Committee Approve Other: Signature (s ) • Action of Board on: JAN 19 1988 Approved as Recommended X Other Vote of Supervisors I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN X Unanimous (Absent ) ACTION TAKEN AND ENTERED ON Ayes : Noes: THE MINUTES OF THE BOARD OF Absent: Abstain: SUPERVISORS ON DATE SHOWN . Attested JAN 19 1988 Orig. Div . : Public Works (Design ) PHIL BATCHELOR , cc: County Administrator CLERK OF THE BOARD Auditor-Controller OF SUPERVISORS AND PW Accounting COUNTY ADMINISTRATOR Flood Control Engineering Survey RR/ bb BO : 19 .t1 By DEPUTY CLERK