TO: BOARD OF SUPERVISORS
FROM: Transportation Committee Contra
Supervisors Torlakson and Schroder Costa
DATE'. February 2 , 1988 Coi
SUBJECT: TRANSPLAN Regional Transportation Project List � �`�
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION
RECOMMENDATION:
The Transportation Committee recommends that the Board of Supervisors
accept this report, which will be submitted to TRANSPLAN for its
consideration.
FINANCIAL IMPACT:
None.
REASONS FOR RECOMMENDATIONS/BACKGROUND:
TRANSPLAN is the transportation planning committee for eastern Contra
Costa County and is part of the Contra Costa Transportation
Partnership Commission ( CCTPC) . The nine-member TRANSPLAN committee
includes representatives from the cities of Antioch, Brentwood, and
Pittsburg, and the County. In July, the Board of Supervisors
appointed Supervisors Torlakson and McPeak, and Planning Commissioner
Ronald Nunn, as the County representatives on TRANSPLAN.
The CCTPC has charged TRANSPLAN with the responsibility of developing
a transportation plan for eastern Contra Costa County. This plan is
to be submitted to the CCTPC after it is considered by each
jurisdiction represented on TRANSPLAN. On January 13 , 1988,
TRANSPLAN approved a list of regional transportation projects
containing project descriptions and priorities. This list was
approved on a 5 to 3 vote. The list is now being distributed to the
cities of Antioch, Brentwood, and Pittsburg, and the Board of
Supervisors for their consideration and formal approval. TRANSPLAN
will consider the actions of the cities and the County at its
February 10 meeting.
Orig.Dept. - CDD/TPD
dpll:boTPlist.rev
XX
CONTINUED ON ATTACHMENT: _ YES SIGNATURE:
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S): �75",4 km
ACTION OF BOARD ON February 2, 1988 APPROVED AS RECOMMENDED X OTHER
VOTE OF SUPERVISORS
_ I HEREBY CERTIFY THAT THIS IS A TRUE
X UNANIMOUS (ABSENT AND CORRECT COPY OF AN ACTION TAKEN
AYES; NOES: AND ENTERED ON THE MINUTES OF THE BOARD
ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN.
cc: Community Development Dept. ATTESTED �% /V /
Vice Mayor, City of Brentwood PHIL BATCH EL . C
O LERK OF THE BOARD OF
County Administrator SUPERVISORS AND COUNTY ADMINISTRATOR
M382/7-83 BY.. ,DEPUTY
The Transportation Committee of the Board of Supervisors has reviewed
the project list ( see Exhibit A) . Their comments are indicated by
strikeouts for deletions, and italicized type for additions. The
Transportation Committee is particulary interested in TRANSPLAN' s
consideration of TSM programs, regional planning, and street
maintenance/enhancement needs.
The Transportation Committee would like the Board to be aware of
these comments, which will be submitted to TRANSPLAN for
consideration at the February 10, 1988 TRANSPLAN meeting. The
project list will be brought back to the Board for consideration and
approval after February 10.
CONSEQUENCES OF NEGATIVE ACTION:
Failure to accept this report may delay submittal of the TRANSPLAN
project list to the CCTPC.
SLG:dsp( rev. 1. 27 . 88 )
dpll :boTPlist.rev
r EXHIBIT "A"
TRANSPLAN LIST OF REGIONAL TRANSPORTATION PRaTFaGT3
(1988 Dollars, Thousands)
Date: 9174E-1f99 01/26/88
Pri- Cost Amount Funding Amount
No. Project Description ority ($999) Funded Source Unfunded
1. SR 4: Willow Pass Rd (Concord) to Bailey, 4 lanes to 6 1 51000 3508 F m m C-,e v exrsnertt 45000
with climbing lanes, and lower grade. 4000 Gas Tax (H.R. 2)
2000 BART
2. Delta Expressway: SR 4 (east of Hillcrest) to SR 4 at 2 53000 12300 B'wood Facility Fee 33820
Marsh Creek Road, 0 to 2 lanes. .5000 Oakley Area of Benefit
1880 D Bay Area of Benefit
3. SR 4: Bailey to Hillcrest, 4 lanes to 6, add EB onramp 3 168000 168000
and WB offramp at L St, and remove G St ramps. Cost
estimate includes right-of-way for 8 lanes plus median
space for transit.
4. TRANSIT: Rail extension from North Concord/Martinez 4 464699 151000 to
Park & Ride lot to t Ave(heavy-mil•-eptien) 151000 to 464000
eastern Contra Costa County. Cast estimate does not 464000
include right-of-way cost, but covers light rail or
heavy rail alternatives.
5. 5R 84/Vasco Rd Corridor: I-580 in Livermore to SR 4, 5 180000 180000
construct a 4-lane freeway.
6. SR 239/Byron Hwy Corridor: I-580 near Tracy to SR 4, 6 80000 80000
construct a 4-lane freeway.
7. SR 4: SR 160 to county line, relocate to Delta 7 70000 70000
Expressway and upgrade to 4-lane freeway.
8. SR 4: Railroad to SR 242, HOV lanes (7th & 8th 8 55700 55700
lanes).
9. Transportation System Management: Provide funds to
local agencies to promote carpcoois/vanFools and transit.
Fluids available for operating and capital casts.
10. Regional Planning: Provide planning funds to local
agencies to maximize effectiveness of transportation
improvements.
11. Local Entitlements: Provide funds to the County and
and cities for road maintenanc/enhancoment projects.
CONTINGENCY. PROTECTS flee-mete)
If all or part of the Delta FScpzessway is not constructed
then all or part of the following contingency projects
would be substituted.
12. SR 4: SR 160 to Sunset, 2 to 4 lanes. 13888 10750 Oakley Area of Benefit 3138
13. SR 4: Sunset to Sellers, 2 lanes to 4. 2000 2000
14. SR 4: Sellers to county line, 2 lanes to 4. 6000 1610 D Bay Area of Benefit 4390
N(�E �- �iie-prejee s- ----
are emtiMest art-€anilure-" eenst -al+ter-part-&f-the-Bei-Btpres9way.