Loading...
HomeMy WebLinkAboutMINUTES - 02231988 - 1.1 1 j BOARD OF SUPERVISORS FRC14: J: MICHAEL VVUIORD, PUBLIC WORKS DIRECTOR DATE: February 23, 1988 SUBJECT: Contract Award Recommendation: Jersey/Bethel Island Roads Culvert Replacement Project Project No. 0672-6U2541-87, Oakley/Bethel Island Area Specific Request(s) or R ations) & Background & Justification RECCHMENDED ACTION: AWARD the contract for furnishing labor and materials for the subject project to Coggin Schutte Company, the low bidder, in the amount of $42,954.00 and at the unit prices submitted; and REQUIRE the contractor to present surety bonds for Payment and Faithful Performance in the amounts of $21,477.00 and $42,954.00, respectively. DIRECT the Public Works Director to prepare the contract for the project. AUTHORIZE the Public Works Director to sign the contract on behalf of the Board subject to the Director having reviewed and found sufficient all required documents, including the contract signed by the contractor, the aforementioned surety bonds, and a certificate of insurance. DIRECT that, in accordance with the project specifications and/or upon the execution of the contract by the Public Works Director, any bid bonds posted by the bidders be exonerated and any checks or cash submitted for bid security be returned. FINANCIAL IMPACT' The project, including engineering and appropriate overhead charges, is funded b road maintenance funds. Continued on attachment: X yes Signature. Recommendation of County Administrator ti _.. Board 'ttee Approve Other: Signature(s) Action of Board on: FEB 2 3 1988 Approved as Recommended X other Vote of Supervisors I HEREBY CER rM THAT PIIS IS A TRUE AND CORRECT COPY OF AN ACTION 'TAKEN X Unanimous (Absent ) AND IIdffi2ED ON TM VaNUTFS OF THE Ayes: Noes: BOARD OF SUPERVISORS CSI DATE SHOWN. Absent: Abstain: Attested FEB 2 3 1988 Orig. Div.: Public Works-Construction Phil Batchelor cc: County Administration Clerk of the Board of Auditor-Controller Supervisors and County Design Administrator Accounting Contractor BJK/sa By C' DEPUTY bo:23.t2 IWASCW., FUR IU3034MENDATION/BACEGROLIND: The plans and specifications were approved and the project advertised for bids by the Board of Supervisors on January 26, 1988. The bids were received and opened at 255 Glacier Drive, Martinez, California, on Thursday, February 18, 1988. The construction bids received were as follows: 1. Coggin Schuette Company $ 42,954.00 2. Cimarron Construction $ 43,005.00 3. Wayne Fregien $ 58,980.00 4. Hardin-Eakle $ 59,453.57 5. Pfister Excavating $ 59,750.00 6. Joe M. Turner $ 61,925.00 7. Whiteside Construction $ 62,143.06 8. Dutra Construction Conpany $ 64,567.00 9. Edward J. Pestana $ 73,380.00 10. Antioch Paving Company $ 77,327.04 11. Manuel C. Jarrdim $105,521.90 The Engineer's estimated construction cost was $44,917.00. CONSEQUENCES OF NEGATIVE ACTION: TO: BOARD OF SUPERVISORS FROK: J. MICHAEL WAI.FiORD, PUBLIC WORKS DIRECTOR DATE: February 23, 1988 SUMIET: Agreement With the Southern Pacific Transportation Company for Performing Work and Cost Sharing in the Reconstruction of Various Railroad Crossings Project.No. 0672-61Z2017 Specific Request(s) or. (s) & Bacbgro and & Justification REQDID ACTIN: Approve and authorize Public Works to sign an agreement with the Southern Pacific Transportation Company for performing work and sharing costs for the reconstruction of fourteen rail crossings in the east county. FINANCIAL IRPACr' Southern Pacific will reimburse the County for the cost of the pavement and traffic control work performed for them. Any additional work done for the benefit of the County will be paid for by the road fund. REASONS FURON/BACBER ND• The County, for a long period of time, has been urging Southern Pacific to reconstruct a number of their badly deteriorated crossings. In response they are proposing to reconstruct all of their crossings between Alameda County and Solano Way. In order to expedite the project, the County has been asked to perform certain activities at Southern Pacific's.expense. At the same time our forces would do necessary routine maintenance on the approaches to the crossings. CIONSBOUENCES OF NEGATIVE ACTION: Without the crossing reconstructions the public will continue to be subjected to rough and possibly hazardous crossings. Continued on attac bment: yes Signature: Reoo�mmendati on of County Administrator Rena mmendation of Board Ccm mittee Approve Other: Signatures) Ac.-tion of Board cn: FEB 2 3 1998 Approved as Reoc X other 9 Vote of Supervisors I BEREBY cmru'Y THAT om IS A TRUE AND .COF&ZF7LT COPY OF AN AMOK TALI X Unanimous (Absent ) AND ENTERED ON THE MINUTES OF THE Ayes: Noes: BOARD OF SUP%WISCRS ON DATE SHOW. Absent: Abstain: Attester FEB 2 3 1988 Orig. Div.: Public Works (Maint.) Phil Batcbelor cc: County Administrator Clerk of the Board of Auditor-Controller Supervisors and Crnmty PW Construction Administrator PW Accounting County Counsel Southern Pacific pp JEC:pc DEPUrY bo:23.t2