HomeMy WebLinkAboutMINUTES - 12061988 - 1.7 17
TO: BOARD OF SUPEMSC RS, AS THE OMM31 M BODY OF THE COMM ClOGM
CXUI? Y FIDOD CXI? !JL AND WA= OOLSEMATIM DISTRICT
FRIM J. MICHAEL FAIFORD, CHIEF ENNM2MM
DAM: 17-- G 615
SUBJECT: CORPS OF ENGIlREERS' TAT ANTIOC H CREEK STUDY
Specific Request(s) or Reccmendation(s) & Bac)wAm nd &
Justification
I. RECOVDENDATION
Request the Corps of Engineers to continue their Preliminary
Feasibility Study until additional information can be provided by the
Flood Control District.
II. F INANCTAL IMPACT
None
III. RFASCNS FUR OTT/BAC JND
The Corps is finishing their Preliminary Feasibility Study of the
District's proposal for flood control improvements on West Antioch
Creek. The benefit/cost ratio for the project, as presently designed,
is low which could eliminate the project from further Corps'
considerations. The District desires to assemble information that
could modify the present project and result in a positive benefit/cost
ratio.
IV. (X7IEDDLJENCESS OF NEGATIVE ACTION
Inability to identify a viable project may result in the loss of
federal funds for needed flood control improvements on West Antioch
Creek.
Continued tinned on attachment: yes Signature:
Recot®endatic n of County Admi ni gator
Recommenr]ation of Board C7cmittee
Approve Other:
Signature(s) :
Action of Board on: DEC 6 1988
Approved as rtxxxmmrjdedC Other
Vote of Supervisors I MRMY CERTIFY THAT THIS IS A ME AND
Mid= COPY OF AN ACTIC N TMEN AND
X Uronimous (Absent ) ENTERED Chi THE MDR7 'ES OF THE BOARD
Ayes: Noes: OF SUPERVISORS CST DATE SHOWN.
Absent: Abstain: Attested D E C 6 1988
Orig. Div. : Public Works (FCE) PHIL BATCHUM,
cc: CTERK OF ME BOARD
OF MRIERVISCIRS AND
COUNTY
UK:pg
BO:WestAnt.t12
EEPU1Y CIERK