Loading...
HomeMy WebLinkAboutMINUTES - 12061988 - 1.7 17 TO: BOARD OF SUPEMSC RS, AS THE OMM31 M BODY OF THE COMM ClOGM CXUI? Y FIDOD CXI? !JL AND WA= OOLSEMATIM DISTRICT FRIM J. MICHAEL FAIFORD, CHIEF ENNM2MM DAM: 17-- G 615 SUBJECT: CORPS OF ENGIlREERS' TAT ANTIOC H CREEK STUDY Specific Request(s) or Reccmendation(s) & Bac)wAm nd & Justification I. RECOVDENDATION Request the Corps of Engineers to continue their Preliminary Feasibility Study until additional information can be provided by the Flood Control District. II. F INANCTAL IMPACT None III. RFASCNS FUR OTT/BAC JND The Corps is finishing their Preliminary Feasibility Study of the District's proposal for flood control improvements on West Antioch Creek. The benefit/cost ratio for the project, as presently designed, is low which could eliminate the project from further Corps' considerations. The District desires to assemble information that could modify the present project and result in a positive benefit/cost ratio. IV. (X7IEDDLJENCESS OF NEGATIVE ACTION Inability to identify a viable project may result in the loss of federal funds for needed flood control improvements on West Antioch Creek. Continued tinned on attachment: yes Signature: Recot®endatic n of County Admi ni gator Recommenr]ation of Board C7cmittee Approve Other: Signature(s) : Action of Board on: DEC 6 1988 Approved as rtxxxmmrjdedC Other Vote of Supervisors I MRMY CERTIFY THAT THIS IS A ME AND Mid= COPY OF AN ACTIC N TMEN AND X Uronimous (Absent ) ENTERED Chi THE MDR7 'ES OF THE BOARD Ayes: Noes: OF SUPERVISORS CST DATE SHOWN. Absent: Abstain: Attested D E C 6 1988 Orig. Div. : Public Works (FCE) PHIL BATCHUM, cc: CTERK OF ME BOARD OF MRIERVISCIRS AND COUNTY UK:pg BO:WestAnt.t12 EEPU1Y CIERK