HomeMy WebLinkAboutMINUTES - 10201987 - 1.13 TO: BOARD OF SUPERVISORS , AS THE GOVERNING BODY OF THE
CONTRA COSTA COUNTY FLOOD CONTROL AND WATER
CONSERVATION DISTRICT
FROM: J . MICHAEL WALFORD , PUBLIC WORKS DIRECTOR
DATE : October 20, 1987
SUBJECT : Authorize Reimbursement to Pringle Construction for
Drainage Work in Excess of Drainage Fee Due on Minor
Subdivision 80-86. Project No . 7546-608565 - Oakley
Area .
Specific Request ( s ) or Recommendation ( s ) & Background &
Justification
I . RECOMMENDATION
Authorize the Chief Engineer to make an immediate reimbursement
of $11 , 100 to Pringle Construction for the construction of
approxi mately 500 1 f of 72 - i n c h storm d r a i n i n 1 i e of
constructing an equal length of 60 - inch storm drain , and
authorize the chair to execute a $19 ,890 reimbursement agreement
with Pringle Construction for drainage work done in excess of the
drainage fee due on Minor Subdivision 80-86 .
II . FINANCIAL IMPACT
Immediately reduces the Drainage Area 30B fund ( 2546 ) by $11 , 100
and obligates future drainage fees to the repayment of the
reimbursement agreement .
III . REASONS FOR RECOMMENDATION/BACKGROUND
At the time Minor Subdivision 80-86 was approved , the drainage
plan for Drainage Area 30B indicated Line C to be 60 inches in
diameter . The rezoning in the area resulted in a review of the
drainage plan . The review resulted in revising the 60- inch
diameter upward to 72- inch diameter .
7
Continued on attachment: X yes Signature: --
Recommendation of County Administrator
Recommendation of Board Committee
Approve Other:
Signature(s ) :
Action of Board on :
Approved as Recommended p,-' Other _-
Vote of Supervisors I HEREBY CERTIFY THAT THIS IS
A TRUE AND CORRECT COPY OF AN
Unanimous (Absent ) ACTION TAKEN AND ENTERED ON
Ayes : Noes : THE MINUTES OF THE BOARD OF
Absent: Abstain : SUPERVISORS ON DATE SHOWN.
Attested O / 9�
Orig . Div . : Public Works ( FC ) , PHIL BATCHELOR,
cc : CLERK OF THE BOARD
OF SUPERVISORS AND
COUNTY ADMINISTRATOR
RSC :sj
BO : Prin . t10
B y ,.,
DEPUTY CLE "b;;..
IV . CONSEQUENCES OF NEGATIVE ACTION
If the 60- inch was allowed to be constructed , the District would
have had to either supplement the 60- inch pipe with another pipe
or remove the 60- inch pipe and replace it with a 72- inch pipe .
Both of these alternates exceed the cost of having Pringle
Construction install an adequate system at this time .
a