Loading...
HomeMy WebLinkAboutMINUTES - 09291987 - 2.1 TO: BOARD OF SUPERVISORS FROM: Phil Batchelor, Contra lira County Administrator l DATE: September 24, 1987 Costa CO^ SUBJECT: CONSOLIDATED FIRE DISTRICT PERSONNEL AND FACILITIES SPECIFIC REQUEST(S) OR RECOMMENDATIONS) & BACKGROUND AND JUSTIFICATION RECOMMENDATION• Consistent with the Board' s concern for the protection of life and property and in recognition of the willingness of the City of Walnut Creek to appropriate their share of the funds, approve proceeding with the construction and staffing of a new station, Station 7 in the Walnut Avenue/Wiget Lane area of Walnut Creek, and relocation of Station 3 to the Tice Valley Boulevard/Rossmoor Parkway area of Walnut Creek, by taking the following specific actions: 1. Fix November 10, 1987 at 10: 30 a.m. for hearing on the adoption of a development fee ordinance. The hearing date is set in recognition of the November 3, 1987 advisory election on this issue. Direct District to prepare Fire Protection Facilities Fee Findings Report for submission to the Board prior to the hearing. 2 . Authorize purchase of apparatus ( fire engine) for Station 7 and approve appropriation adjustment to appropriate $187,291 from the District' s $300,000 reserve fund. 3 . Authorize the purchase of -apparatus equipment ( $47,781) and station furnishings and equipment for Station 7 ( $20,293) and Station 3 ( $7,500) from the District' s $300,000 reserve fund as shown on the equipment list (Attachment 1) . 4. Authorize General Services Department to proceed with all necessary actions in the usual manner to initiate the construction of the two stations. 5. Authorize Public Works Department and District to proceed with the acquisition of an alternate site for Station 3 . The District proposes to exchange the Station 3 relocation site owned by the District for a better site located closer to Rossmoor. 6: Authorize the addition of- three Fire Captain, three Senior Firefighter, and five firefighter positions to staff Station 7 and authorize the expenditure of $30,000 of the $530,000 reserved from the 1987-88 capital allocation for the salary costs of these new positions. CONTINUED ON ATTACHMENT: _X_ YES SIGNATURE: G�U� RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BO D COMMITTEE - APPROVE OTHER SIGNATURE(SI: ACTION OF BOARD ON September 29, 1987 APPROVED AS RECOMMENDED X OTHER X Also, REFERRED the issue of the carry-over of funds into Fiscal Year 1988-89 to the Finance Committee. VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE X UNANIMOUS (ABSENT ) AND CORRECT COPY OF AN ACTION TAKEN AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN. cc: County Administrator County Counsel ATTESTED _ � City of Walnut. Creek PHIL BATCHELOR, CLERK OF THE YBOARD OF Consolidated Fire District SUPERVISORS AND COUNTY ADMINISTRATOR M382/7-83 BY-- 'DEPUTY 7. Authorize the expenditure of $12,000 for the construction of Station 7 and $20,500 for the construction of Station 3 from the District' s $300,000 reserve fund. FINANCIAL IMPLICATIONS: The total cost and cost breakdowns by activity and funding source are shown below: Total County Walnut Creek SDAF Activity Cost Cost Cost Cost Station 7 Site Acquisition $ 0 $ 0 $ 0 $ 0 Construction 662,000 65,000(B) 585,000 12,000 Staffing (A) 655,000 0 0 655,000 Apparatus 187,291 0 0 187,291 Apparatus Equipment 47,781 0 0 47,781 Station Equipment & Furnishings 20,293 0 0 20,293 Station 3 Site Acquisition $ 0 $ 0 $ 0 $ 0 Construction 638,000 195,000(B) 422,500 20,500 Staffing 0 0 0 0 Equipment & Furnish. 7,500 0 0 7,500 Total $2,217,865 $ 260,000 $1,007,500 $950,365 One-Time $1,562,865 $ 260,000 $1,007,500 $295,365 Recurring $ 655,000 $ 0 $ 0 $655,000 A) Based on 11 positions at current annual costs. Actual cost in 1987-88 would be $30,000 (B) County development fees REASONS FOR RECOMMENDATION/BACKGROUND: The Board of Supervisors has been concerned for many years about the need for the recommended stations in Walnut Creek as well as fire facility and personnel needs in other areas of the County. Approximately two years ago, the Board directed the fire districts to develop financing plans to fund the cost of meeting fire service needs. The Board hired a fire service financing consultant to assist in implementing the financing plans. Additionally, Board members have attended workshops and city council meetings in an effort to help inform the citizens of the County about fire service needs. For a number of years, the Consolidated Fire District has requested funds to build and staff Station 7 in Walnut Creek and obtain sites for future fire stations. In May of 1985, the District submitted its Five-Year Plan for expansion to meet the fire protection and emergency medical care needs caused by ongoing building and population growth. The Plan includes the Walnut Creek stations. District staff has been reviewing the need for firefighters and stations, and evaluating the level of commitment from the various cities to improving fire and medical services in the District. Only one city, Walnut Creek, has taken action to allocate its share of funding in the Five-Year Plan. The city has committed to paying for its share of $1,007,500 to construct Station 7 and relocate Station 3 as evidenced in the attached letter from Mr. Thomas G. Dunne, Walnut Creek City Manager. (Attachment 2) In recognition of the fire service needs and the continuing escalation of construction costs, the Board reserved approximately $530,000 from the 1987-1988 fire district capital account and requested the County Administrator to recommend the use of those funds. Previously, the Board had reserved $300,000 of the capital amount allocated to the Consolidated Fire District during 1986-1987 . Since the reserve money is now available, it is recommended that the Board approve allocating funds for the one-time costs of station construction, apparatus acquisition, and equipment/furnishings as well as the ongoing cost of staffing and operating the new station. It is recommended that the $300,000 reserved in 1986-1987 be allocated for fire station construction, apparatus, equipment and furnishings as discussed above. It is further recommended that $30,000 of the $530,000 reserved from the 1987-1988 capital allocation be allocated for the salary, cost of the new positions and that the $500,000 balance be carried over into fiscal year 1988-1989 to help offset the full year salary costs of the new positions for Station 7 . It is proposed that the remainder of the cost of the new positions will be covered by a combination of District year end balance and an additional allocation of Special District Augmentation Funds. The construction of Station 7 is the highest priority need of the district because: ♦ The service area has experienced 41 major fires with significant fire loss in the last nine years. ♦ The service area has a population of about 15 ,000 residents and an average run time of four minutes. ♦ There are 500 yearly incidents, 640 of which are medical emergencies. The relocation of Station 3 is a very high priority because: ♦ The proposed service area has a population of about 11,000 residents and an average run time of 5.7 minutes. ♦ There are 450 yearly incidents, 860 of which are medical emergencies. ♦ The majority of the medical emergencies occur within Rossmoor. The costs of these stations continually escalate with the most recent increase of approximately $30,000 - $40,000 attributed to State-mandated seismic testing, construction and inspection. To offset these increases, costs have been reduced in the areas of landscaping, paving, fencing, lighting, and reducing the size of the generator. There exists a strong possibility of additional cost savings by using the same architect and basic station design at both locations. The cost estimates are as of September 1987 . Staffing costs are based on current salary and benefits data. The suggested implementation schedule for the two stations is attached. (Attachment 3) The above recommendations reserve funds for the County and SDAF shares for the designated purposes, and sets a date for hearing the proposed development fee for the unincorporated area within the District. x Attachment 1 " station 7 Annaratus, Equipment and Furnishings Costs ITEM COST 1 4x4 Fire Engine ( includes tax & delivery) $ 187 , 291 Station furnishings, appliances & equipment ' 20 , 293 4 30-minute SCBA breathing apparatus & bottles 7 , 564 1 Oxygen Resuscitator 805 1 Onan Generator 4, 500 1 Mobile Radio 2,500 1 Portable Radio, 6 Channel 1,700 1 Mobile Status Head 1, 200 1 Base Radio, 8 Channel 3 ,100 1 Station Printer, CAD 5, 000 Install 110 volt system on Engine 7 660 3000 ft. 22" hose 6 ,450 1500 ft. 12" hose 2,175 1600 ft. 12" Forestry hose 1, 840 800 ft. 1" Forestry hose 880 400 ft. 3/4" booster hose 700 2 16 ft. x 42" soft suction hoses 630 2 22" Akron fog nozzles 1, 848 4 12" Akron fog nozzles 1, 942 1 Lightweight wye 315 2 1" fog nozzles 780 6 Straight tips 350 1 12" 60 GPM foam nozzle 230 1 12 x 11" 60 GPM eductor 424 1 12" Pyrolite shutoff 188 ♦ ♦ . -2- 2 Smoke Ejectors 800 3 Salvage Covers 300 3 5-Gallon Foam 300 Miscellaneous Equipment 500 Trauma Kit 100 $ 255 , 365 Attachment 2 City tInut September 1, 1987 Board of Supervisors 651 Pine Street Martinez, CA It is the purpose of this communiciation to reaffirm the Walnut _ Creek City Council ' s earlier commitment to make available up to $1,007, 500 as the City' s share necessary to implement fire system improvements within the City of Walnut Creek provided for in the Contra Costa County Fire District' s Five Year Plan. It is our understanding that the Board of Supervisors' current consideration anticipates moving ahead with two projects at this time (Station 7 on Wiget Road and relocation of Station 3 to a new site in the vicinity of the entrance to Rossmoor) rather than scheduled over a period of several years. Since being notified of the Board's consideration of this matter, I have contacted all the members of our City Council for their comment on the new proposal. I- am pleased to report that Councilmembers are in support of the plan under consideration with the understanding that the County would also commit its full share of funding at this time. You will recall that the City' s commitment conditioned our sharing in the costs of the two projects to be developed over a period of three years as provided for in the Five Year Plan on actual construction cost-not-to-exceed basis (Station 7 - $585,000; Station 3 - $422,500) with City funds to be available upon The County awarding the contract for construction of planned improvements. The proposal to proceed with both projects at this time will require the City to advance all of its funds earlier than anticipated -- this is acceptable to us. Proceeding at this time with both projects is in the public interest. With reference to New Station #7 on Wiget, the City has encouraged proceeding with this improvement for as many years as I can remember. Development occuring in this area over past years more than justifies action being taken to provide the additional fire protection needed to adequately serve this now almost fully developed area. Regarding the relocation of existing Station #3 closer to the Rossmoor entrance, experience over the years with fire response calls to Rossmoor clearly justifies this project P.O. Box 8039, 1666 North Main Street, Walnut Creek, Colifornio 94596 (415)943-5800 Board of Supervisors September 1, 1987 Page 2 being accomplished at an earlier time than called for in the Five Year Plan. We are told that approximately 80% of the Rossmoor calls are non-fire related life-saving incidents. Given the age group in the Rossmoor Community, this is not a surprise, however, it is a most important matter and a quick response can mean life or death for the affected individual. In addition to the need, there is also the issue of availability of funds. I am concerned that County funds currently available for this use may not be at a later date . Likewise, the City of Walnut Creek, while currently in a position to finance its share, our ability to do so in the future cannot be absolutely guaranteed. In effect, there is a window of opportunity for the County and City working together to provide for a clearly defined need, all of this justifies our joint action to proceed in an expedicious manner. You have our full support and encouragement to proceed. Sinc r ly, i Thom s G. Dunne CIT MANAGER cc: City Council Chief William Maxfield Cecil Riley, Rossmoor Bernie Strojny %0 C1 ..1 m . N .A W N h+ 0o J m Ln .A. W N W (!� 7 O O b Q y Q rr n C Orr r• r( CrUr rt C n O rt r- rt O br t a a n rr rt w n :3 a a n a a rr ::r u► w rn :3 cn n a• (D a rn ►-• r• rr rt Dr r• r• r• rn w rt rt A+ r• n r• N cn :3 n o. cD a U N n :3. rt a rr 0 O n N b rt � n O °' n b a b fb w w rt O n rr P. n to a rt C n rr b C r( rt 'v :3 w N O G rt O to rt C r• to O C a rr 0 (n r• 'a a O rt :3 rt (D Li. H r• a O rt a n n I-,. y O Da n rt w (D > 0 : n rt A+ w n (D b a ,q n n w w o rr H m a C n w n y rt n rr C O rr n Ct7 �•c O r_ O rt n M uCi ((D rr O C r• r• rr C 0) z x r• 9 r• rt C PV A+ z cn b b O K to r• b b O W b w r (D FO w rt w r• n b N (D w r( _ (D N (D p A+ 0 (D n O :U Ch A) (D (rt rt D ►C � z rr " rs a a (D \ rt a n W (D H, H. rt w �_j 03 r• r- n r✓ o Z5 r• o oo. o C o La o n LQ C rn Cy C rr• ( C~' 0 vi O p, � F C n p, r• ~ n b `Q w n 'F-, ,0 b (D PU a rt a ((DD r- n O C r• o O n \ In co n m c Z C n H H r O O � ! i 1-3 J J J J ►-� f-+ lD W O N N N p A N O O C q 00 p d co 00 co Or Co 00 00 00 00 00 00 00 00 F3 lD �.D \D W 00 00 00 co J 00 00 00 .00 00 00 •.J J H H O z z n d H > H H 3 H b b7 r eA 4 rn rn W co N j O p O p O p i in n (n Ul cn n ::E: (n d (7 O rt n n D O O (D cD O (n i i i i i i i (D 4A 4101V 4b4 4 t tl% t4 C+ r• ON F.-. W N lD N Ul m W d1 00 00 J O Ul N U1 00 N Ln Ln J U, U" O Ln O O 0 0 0 N O 0 0 0 O __J O O O O 0 0 0 r A NTR R USE ONLY CONTRA COSTA COUNTY FINAL APPROVAL NEEDED 9Y: APPROPRIATION ADJUSTMENT BOARD of SUPERVISORS y T/C 2? COUNTY ADMINISTRATOR- ACCOUNT CODINC BUDGET UNIT: Contra Costa County Fire Protection District CANIIATION EXPENDITURE EXPENDITURE ACCOUNT DESCRIPTIONCDECREASE INCREASE SUB-ACCOUNT t00 100 7100 4951 Office Equipment & Furniture 1 27, 793 . ? 00 7100 4953 Autos & Trucks 1 187, 291.100 7100 4956 Tools & Sundry Equipment 1 47, 781. : 00 7100 4g8 2 Construction of Station 7 I 12, 000 . 100 7100 459.3 Construction of Station 3 I 20, 500. 100 7100 6301 Reserve for Contingencies 295 , 365100 I i I I 1 l I i 1 I ' I 1 1 ( I I I I i 1 1 1 I 1 I 1 i I ( i I I I I I I I I I i I 1 TOTALS I 1 295, 365L00 295, 365100 A ROVED EXPLANATION OF REQUEST DITOR-� 04Lfi OC1 1) 1987 As authorized by the Board Of Supervisors on 9-29-87, appropriate funds for the construction 7/_ Date of Station 7 , relocation of Station 3 and the acquisition of related equipment. LINTY D ISTRA R ARD OF SUPE VISORS s: %pw*ors Powers.Fames Schroder,Weak Toftm f�tu'I Batchelor, Cleft of the turd of SWrwisors and County Administrafw • ASO 10-19-87 SIGNIATURE TITLE DATE &?f—r4z� Date S' APPROPRIATION O s ADJ. JOURNAL NO. (M 129 Rev,2/OQ) SEE INSTRUCTIONS ON REVERSE SIDE AU NTR LI R USF ONLY FINAL APPROVAL NEEDED er: A. CONTRA COSTA COUNTY APPROPRIATION ADJUSTMENT T/C 2 7 eOARD OF SUPERVISORS COUNTY ADMINISTRATOR ACCOUNT CODING BUDGET UNIT: Contra Costa County Fire Protection District R12ATIOr EXPENDITURE 5XPENDITUEXPENDITURE ACCOUNT DESCRIPTION DECREASE INCREASE 100 100 100 4951 Office Equipment & Furniture 1 27, 793 . = 00 100 4953 Autos & Trucks 1 187, 291. 100 100 4956 Tools & Sundry Equipment 1 47, 781. : 00 100 4g52 Construction of Station 7 ' 12, 000 . 1 00 100 45g3 Construction of Station 3 20, 500 . 100 100 6301 Reserve for Contingencies 295, 365100 1 1 I t 1 - I ' , - I I I 1 I ' 1 ' I I 1 I i 1 I - 1 I 1 1 1 I I 1 i 1 1 I I I I I 1 1 I I TOTALS I 1 295 , 365L00 295 , 365100 APPROVED EXPLANATION OF REOUEST TOR-G(3NfiROLLEi OCT z 0 1987 As authorized by the Board Of Supervisors on 9-29-87 , appropriate funds for the construction Date of Station 7 , relocation of Station 3 and the VTY ADMINISTRATOR acquisition of related equipment. Date iD OF SUPERVISORS Supervlaors Pc*w&Mides,. Schroder,McPeak,Toftksen Phil Batcltelar, Clerk of the Beard of Saperviwrs vnd County Admirlistrater - ASO 10-19-87 SIGNATURE TITLE DATE v V '� -� Date / J 6 APPROPRIATION A POO 5�7� ADJ JOURNAL 10. M 129 Rev 2/ee) SEE TN!TRUCTIONS CN REVERSE SIDE