Loading...
HomeMy WebLinkAboutBOARD STANDING COMMITTEES - 10102022 - TWIC Agenda PktTRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE October 10, 2022 9:00 A.M. To slow the spread of COVID-19, in lieu of a public gathering, the meeting will be accessible via Zoom to all members of the public as permitted by Government Code section 54953(e). Supervisor Diane Burgis, Chair Supervisor Candace Andersen, Vice Chair Agenda Items:Items may be taken out of order based on the business of the day and preference of the Committee. When: Oct 10, 2022 09:00 AM Pacific Time (US and Canada) Topic: TWIC Please click the link below to join: https://cccounty-us.zoom.us/j/82442518129 Meeting ID: 824 4251 8129 Or by telephone, dial: USA 214 765 0478 US Toll USA 888 278 0254 US Toll-free Conference code: 198675 1.Introductions 2.Public comment on any item under the jurisdiction of the Committee and not on this agenda (speakers may be limited to three minutes). 3.REVIEW Record of Meeting for May 9, 2022, Transportation, Water and Infrastructure Meeting. This record was prepared pursuant to the Better Government Ordinance 95-6, Article 25-205 (d) of the Contra Costa County Ordinance Code. Any handouts or printed copies of testimony distributed at the meeting will be attached to this meeting record. (John Cunningham, Department of Conservation and Development) (Page 4) 4.ACCEPT the Capital Road Improvement and Preservation Program (CRIPP) for fiscal year 2022/2023 to 2028/2029 and RECOMMEND the Board of Supervisors fix a public hearing for approval of the CRIPP. (Larry Leong, Department of Public Works) (Page 7) 5.CONSIDER report on Local, State, Regional, and Federal Transportation Related Legislative Issues and take ACTION as appropriate. (John Cunningham, Department of Conservation and Development) (Page 262) 6.DISCUSS and REVISE the County's 2022-23 State and Federal Legislative Platforms (TWIC Referrals Only) and DIRECT staff as appropriate. (John Cunningham, Department of Conservation and Development) (Page 266) 7.RECEIVE Communication, News, Miscellaneous Items of Interest to the Committee and DIRECT staff as appropriate. (John Cunningham, Department of Conservation and Development) (Page 315) 8.The next meeting is currently scheduled for November 14, 2022. 9.Adjourn 10-10-12 TWIC Meeting - Agenda Packet, Page 1 of 330 The Transportation, Water & Infrastructure Committee (TWIC) will provide reasonable accommodations for persons with disabilities planning to attend TWIC meetings. Contact the staff person listed below at least 72 hours before the meeting. Any disclosable public records related to an open session item on a regular meeting agenda and distributed by the County to a majority of members of the TWIC less than 96 hours prior to that meeting are available for public inspection at the County Department of Conservation and Development, 30 Muir Road, Martinez during normal business hours. Public comment may be submitted via electronic mail on agenda items at least one full work day prior to the published meeting time. For Additional Information Contact: John Cunningham, Committee Staff Phone (925) 655-2915, Fax (925) 655-2750 john.cunningham@dcd.cccounty.us 10-10-12 TWIC Meeting - Agenda Packet, Page 2 of 330 Glossary of Acronyms, Abbreviations, and other Terms (in alphabetical order): Contra Costa County has a policy of making limited use of acronyms, abbreviations, and industry-specific language in meetings of its Board of Supervisors and Committees. Following is a list of commonly used abbreviations that may appear in presentations and written materials at meetings of the Transportation, Water and Infrastructure Committee: AB Assembly Bill ABAG Association of Bay Area Governments ACA Assembly Constitutional Amendment ADA Americans with Disabilities Act of 1990 ALUC Airport Land Use Commission AOB Area of Benefit BAAQMD Bay Area Air Quality Management District BART Bay Area Rapid Transit District BATA Bay Area Toll Authority BCDC Bay Conservation & Development Commission BDCP Bay-Delta Conservation Plan BGO Better Government Ordinance (Contra Costa County) BOS Board of Supervisors CALTRANS California Department of Transportation CalWIN California Works Information Network CalWORKS California Work Opportunity and Responsibility to Kids CAER Community Awareness Emergency Response CAO County Administrative Officer or Office CCTA Contra Costa Transportation Authority CCWD Contra Costa Water District CDBG Community Development Block Grant CEQA California Environmental Quality Act CFS Cubic Feet per Second (of water) CPI Consumer Price Index CSA County Service Area CSAC California State Association of Counties CTC California Transportation Commission DCC Delta Counties Coalition DCD Contra Costa County Dept. of Conservation & Development DPC Delta Protection Commission DSC Delta Stewardship Council DWR California Department of Water Resources EBMUD East Bay Municipal Utility District EIR Environmental Impact Report (a state requirement) EIS Environmental Impact Statement (a federal requirement) EPA Environmental Protection Agency FAA Federal Aviation Administration FEMA Federal Emergency Management Agency FTE Full Time Equivalent FY Fiscal Year GHAD Geologic Hazard Abatement District GIS Geographic Information System HBRR Highway Bridge Replacement and Rehabilitation HOT High-Occupancy/Toll HOV High-Occupancy-Vehicle HSD Contra Costa County Health Services Department HUD United States Department of Housing and Urban Development IPM Integrated Pest Management ISO Industrial Safety Ordinance JPA/JEPA Joint (Exercise of) Powers Authority or Agreement Lamorinda Lafayette-Moraga-Orinda Area LAFCo Local Agency Formation Commission LCC League of California Cities LTMS Long-Term Management Strategy MAC Municipal Advisory Council MAF Million Acre Feet (of water) MBE Minority Business Enterprise MOA Memorandum of Agreement MOE Maintenance of Effort MOU Memorandum of Understanding MTC Metropolitan Transportation Commission NACo National Association of Counties NEPA National Environmental Protection Act OES-EOC Office of Emergency Services-Emergency Operations Center PDA Priority Development Area PWD Contra Costa County Public Works Department RCRC Regional Council of Rural Counties RDA Redevelopment Agency or Area RFI Request For Information RFP Request For Proposals RFQ Request For Qualifications SB Senate Bill SBE Small Business Enterprise SR2S Safe Routes to Schools STIP State Transportation Improvement Program SWAT Southwest Area Transportation Committee TRANSPAC Transportation Partnership & Cooperation (Central) TRANSPLAN Transportation Planning Committee (East County) TWIC Transportation, Water and Infrastructure Committee USACE United States Army Corps of Engineers WBE Women-Owned Business Enterprise WCCTAC West Contra Costa Transportation Advisory Committee WETA Water Emergency Transportation Authority WRDA Water Resources Development Act 10-10-12 TWIC Meeting - Agenda Packet, Page 3 of 330 TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE 3. Meeting Date:10/10/2022   Subject:REVIEW Record of Meeting for May 9, 2022, Transportation, Water and Infrastructure Meeting. Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE,  Department:Conservation & Development Referral No.: N/A   Referral Name: N/A  Presenter: John Cunningham, DCD Contact: John Cunningham (925)655-2915 Referral History: County Ordinance (Better Government Ordinance 95-6, Article 25-205, [d]) requires that each County Body keep a record of its meetings. Though the record need not be verbatim, it must accurately reflect the agenda and the decisions made in the meeting. Referral Update: Any handouts or printed copies of testimony distributed at the meeting will be attached to this meeting record. Links to the agenda and minutes will be available at the TWI Committee web page:  http://www.cccounty.us/4327/Transportation-Water-Infrastructure Recommendation(s)/Next Step(s): Staff recommends approval of the attached Record of Action for the May 9, 2022, Committee Meeting with any necessary corrections. Fiscal Impact (if any): N/A Attachments 05-09-22 TWIC Minutes 10-10-12 TWIC Meeting - Agenda Packet, Page 4 of 330 TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE RECORD OF ACTION FOR May 9, 2022 Supervisor Diane Burgis, Chair Supervisor Candace Andersen, Vice Chair  Present: Diane Burgis, Chair    Candace Andersen, Vice Chair    Staff Present:John Cunningham, DCD; Jody London, DCD; Craig Standafer, PWD; Nancy Wein, PWD; Jerry Fahy, PWD; Jeff Valeros, PWD; Maureen Tom, DCD; Alicia Nuchols, BOS - D3  1.Introductions 2.Public comment on any item under the jurisdiction of the Committee and not on this agenda (speakers may be limited to three minutes). No public comment. 3.Staff recommends approval of the attached Record of Action for the March 14, 2022, Committee Meeting with any necessary corrections. The Committee unanimously APPROVED the meeting record. 4.RECEIVE staff report and RECOMMEND that the Board of Supervisors authorize the Public Works Director, or designee, to submit grant applications to the State Department of Transportation and the Metropolitan Transportation Commission under the Active Transportation Program. The Committee unanimously APPROVED the staff recommendation and DIRECTED staff to bring the item to the full Board of Supervisors. 5.REVIEW the recommended list of Road Maintenance and Rehabilitation Account (RMRA)(SB1) funded road projects, RECEIVE public comment and DIRECT staff to perform any changes or revisions to the recommended project list. RECOMMEND the Board of Supervisors approve project list, and direct staff to proceed with submitting the Fiscal Year 2022/2023 list of projects to the California Transportation Commission prior to the July 1, 2022 submittal deadline for approval. The Committee unanimously APPROVED the staff recommendations and DIRECTED that the project list be forwarded to the Board of Supervisors. 6.CONSIDER report on Local, Regional, State, and Federal Transportation Related Legislative Issues and take ACTION as appropriate. The Committee RECEIVED the report.10-10-12 TWIC Meeting - Agenda Packet, Page 5 of 330  The Committee RECEIVED the report.   7.REVIEW Status Report and DIRECT staff to forward the report to the Board of Supervisors with revisions as appropriate.       The Committee APROVED the report and DIRECTED staff to send it to the full Board of Supervisors.   8.RECEIVE information and DIRECT staff as appropriate.      The Committee RECEIVED communication, news, miscellaneous items of interest.   9.The next meeting is currently scheduled for June 13, 2022.   10.Adjourn      For Additional Information Contact:  John Cunningham, Committee Staff Phone (925) 674-7833, Fax (925) 674-7250 john.cunningham@dcd.cccounty.us 10-10-12 TWIC Meeting - Agenda Packet, Page 6 of 330 TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE 4. Meeting Date:10/10/2022   Subject:Capital Road Improvement and Preservation Program (CRIPP) for Fiscal Year 2022/23 to 2028/29 Submitted For: Brian M. Balbas, Public Works Director/Chief Engineer  Department:Public Works Referral No.: 1   Referral Name: Review legislative matters on transportation.  Presenter: Larry Leong, Department of Public Works Contact: Larry Leong (925)313-2026 Referral History: The Capital Road Improvement and Preservation Program (CRIPP) is a programming document for the funding of capital road improvement and preservation projects within Contra Costa County. It includes estimated project costs, funding source information, and scheduling information for known potential projects within the next seven fiscal years. It also includes revenue projections and a summary of estimated project-related expenditures for each funding source. The CRIPP was established by Resolution 89/306 under the County Road Improvement Policy (Policy). The Policy was authorized by Government Code Section 66002 and is required under the Growth Management Element of the Contra Costa Transportation and Growth Management Program Ordinance approved by the voters in November 1988 (Measure C-88) and reaffirmed in 2004 with passage of Measure J. Measure J requires that each participating local agency develop a five-year CRIPP. In 1991, the CRIPP was expanded to cover seven years to conform to the Congestion Management Plan, and in 1992 the CRIPP update was changed to a biennial schedule. Approval of the CRIPP by the Board of Supervisors does not automatically approve each individual project listed in the CRIPP. Each project in the CRIPP is subject to a separate public review, engineering feasibility analysis, and environmental assessment before the Board of Supervisors will consider final approval of the project. As this is a planning level document, adoption of the CRIPP will not preclude development and construction of projects that have not been identified. As more information is gathered about a project, the Public Works Department may determine that the project will cost more than originally estimated for reasons not known at this time. In such a case, the Public Works Department will study various alternatives to find a solution to the funding shortfall. The Public Works Department will adjust subsequent CRIPPs to reflect any changes in project scope or cost. Adopting a CRIPP to guide our capital improvements will do several things for the County:  Increase public awareness of how and where funds will be spent on our road system. Enhance public trust and increase funding transparency by demonstrating that funds are programmed and expended in accordance with an approved program. Encourage more public involvement in the programming and expenditure of our capital funds. Provide accurate “accountability” of whether our transportation system will meet an acceptable level of service to satisfy our growth management policies. Provide a basis for projecting staffing needs over the next seven years. 10-10-12 TWIC Meeting - Agenda Packet, Page 7 of 330 Provide a budget tool to track expenditures of each type of funding utilized for capital improvements. Referral Update: [Note from TWIC Staff: Please see public comment on the CRIPP (re: Pinehurst Rd) forwarded from District 2 staff under agenda item 7, "RECEIVE Communication, News..."] The County Road Program has experienced a variety of issues which have affected the construction of new infrastructure and maintenance of existing infrastructure. Gas Tax is the primary funding source for capital projects and the maintenance program. There are many competing priorities for the fixed amount of gas tax the County annually receives from the State. For many years, the County has had to defer maintenance on its roadways, which means repairs to infrastructure and related assets get delayed and backlogged due to budget limitations and funding constraints. The goal over the next 7 years is to increase the amount of available funding for pavement surface treatments and the budget for routine maintenance of over 660 miles of roadways and related infrastructure like culverts, catch basins, guard rail and bridges to try and address this need. This goal must be balanced with need for new transportation projects while considering the issues below.  COVID has resulted in a decrease in expected gas tax revenue of millions of dollars and the roll out of some grant programs, which also has affected available funding for projects over the last two years. The County experienced almost $19 million of unexpected damage to the roadway system caused by storm events in 2017 and 2019. About half of this cost was covered by state and federal funds but the balance was funded with local funds. These unforeseen projects to restore the roadways after the storm events greatly impacted the schedule and available revenue for other projects through 2022, as the last of these projects are just now being completed. The costs of construction materials and labor has increased almost 20% the last two years, and this is expected to continue in the future. This has made currently programmed projects more expensive to build. There will be many new opportunities for grants within the next 12 months, but they will all require some local match, which could be in the millions of dollars in gas tax. The road program is financially constrained, which means there is only so much money to go around. Currently there is limited capacity to provide this local match and decisions will have to be made on the best projects to construct while balancing the need to address maintenance needs on the County’s existing roadway infrastructure. In 2021, Congress approved a new federal transportation bill titled "Infrastructure Investment and Jobs Act" (IIJA). This bill creates many competitive funding programs, including categories for transportation in the millions of dollars. In addition, there will be safety grants, programs to fund bicycle and pedestrian projects, and other funding opportunities for projects. Through the CRIPP and the Road Program, the County will continue to improve roadway safety through adoption of a Vision Zero Program and the Active Transportation Plan. Vision Zero is a change in how we think about and approach fatalities and major injuries on our roadways. Instead of accepting collisions that result in fatalities and serious injuries as inevitable, Vision Zero requires us to instead think of these collisions as preventable through a Safe System Approach. A Safe System approach addresses the five elements of a safe transportation system through a shared responsibility and redundancy: safe road users, safe vehicles, safe speeds, safe roads, and post-crash care. The objective of the Active Transportation Plan is to support a mode shift from the single-occupant vehicle to other more active and environmentally friendly modes of transportation like walking, biking, rolling, and using transit. Our goal is to also create a sustainable transportation network to try and address the impacts of the road system on the environment. Future projects may include, cool pavements, porous pavements, complete streets, multi-modal ways to travel, recycled materials, and drought tolerant landscaping where feasible. The County is also required to install green stormwater infrastructure on many projects to treat stormwater to remove sediments and pollutants before the stormwater goes into the storm drain system. A sustainable transportation network will also positively affect climate change, greenhouse gas emissions, and water supply. The issues of environmental justice will need to be addressed in the development of transportation projects, which is a great concern for residents and stakeholders. Environmental justice is the fair treatment and meaningful involvement of all people regardless of race, color, national origin, or income, with respect to the development, implementation, and enforcement of environmental laws, regulations, and policies. 10-10-12 TWIC Meeting - Agenda Packet, Page 8 of 330 Recommendation(s)/Next Step(s): ACCEPT the Capital Road Improvement and Preservation Program (CRIPP) for fiscal year 2022/2023 to 2028/2029 and RECOMMEND the Board of Supervisors fix a public hearing for approval of the CRIPP. Fiscal Impact (if any): No Fiscal Impact. Approval and adoption of the CRIPP will provide a programming document that programs funds for capital road improvement and preservation projects within the County. Preparation of the CRIPP is a requirement of the Growth Management Program and Measure J Funding. Attachments CRIPP FY 2022/23 - 2028/29 10-10-12 TWIC Meeting - Agenda Packet, Page 9 of 330 THIS PROJECT FUNDED BY GAS TAXES CAPITAL ROAD IMPROVEMENT AND PRESERVATION PROGRAM Planning for the future Contra Costa County Public Works Department 10-10-12 TWIC Meeting - Agenda Packet, Page 10 of 330 10-10-12 TWIC Meeting - Agenda Packet, Page 11 of 330 ROAD PROGRAM AT WORK INTRODUCTION The Contra Costa County Capital Road Improvement and Preservation Program (CRIPP) aims to maintain and improve the County’s infrastructure within the public road right of way. This includes roadways, bridges, storm drains, WUD໥F OLJKWV ELNH ODQHV VLGHZDONV FXUE UDPSV and roadway landscaping. The CRIPP is an expenditure plan that lays out the funded transportation projects in the County for the next seven years and is approved by the Board of Supervisors. It is central to the County’s 5RDG3URJUDPZKLFKLVWRSURYLGHDVDIHH໥FLHQW and reliable transportation system that balances social, environmental and economic needs of the County. This capital budget presented in the CRIPP emphasizes: Ê Leveraging federal and state grants with local funds to maximize available funding for new infrastructure. Ê Responsibly managing funds to maintain and improve our existing infrastructure Ê Planning for future demands on the transportation system Ê (໤HFWLYHO\PDQDJLQJ¿VFDOUHVRXUFHVDQG VHHNLQJIXQGLQJRSSRUWXQLWLHV 3XEOLF :RUNV 0LVVLRQ6WDWHPHQW 3XEOLF :RUNV HPSOR\HHV GHOLYHU FRVW H໤HFWLYH VDIH UHOLDEOH and sustainable projects, programs and quality services with a focus on our communities and provide support services that are competitive, DWWHQWLYHUHVSRQVLYHH໥FLHQWDQGVDIHWRHQDEOH County Departments to provide high quality services to the public. TABLE OF CONTENTS INTRODUCTION – Page 1 WHAT IS A CAPITAL PROJECT – Page 3 WHAT DID WE ACCOMPLISH SINCE THE LAST CRIPP? – Page 4 ACTIVE TRANSPORTATION PLAN – Page 5 VISION ZERO PROGRAM – Page 6 HOW MUCH CAPITAL WORK IS BEING DONE? – Page 7 NEAR-TERM PROJECT OUTLOOK – Page 8 COUNTYWIDE ROADWAY INVENTORY – Page 10 COUNTYWIDE INFRASTRUCTURE NEEDS AND CHALLENGES – Page 11 PAVEMENT CONDITION – Page 11 PEDESTRIAN AND BICYCLE INFRASTRUCTURE – Page 13 COUNTY BRIDGE PROGRAM – Page 15 GREEN STORMWATER INFRASTRUCTURE – Page 15 CLIMATE CHANGE – Page 17 LIMITED RESOURCES, INCREASING COSTS AND CHANGING SOCIAL PRIORITIES – Page 18 WHERE DOES ALL THE MONEY COME FROM FOR OUR PROJECTS? –Page 20 110-10-12 TWIC Meeting - Agenda Packet, Page 12 of 330 ROAD PROGRAM AT WORK Ê The CRIPP is a planning document. When the Board of Supervisors approves the CRIPP, it does not automatically approve each individual project listed in the CRIPP. Each project in the CRIPP is subject to a separate public environmental review, engineering feasibility analysis, and environmental assessment. Ê As information is gathered about each SURMHFW WKH 3XEOLF :RUNV'HSDUWPHQW may determine that the project will cost more than originally estimated for UHDVRQVQRWNQRZQDWWKHWLPHWKH&5,33 is published. In such cases, the Public :RUNV 'HSDUWPHQW ZLOO VWXG\ YDULRXV DOWHUQDWLYHVWR¿QGDVROXWLRQWRDGGUHVV the funding shortfall or by identifying RWKHUIXQGLQJVRXUFHV7KH3XEOLF:RUNV Department will then adjust subsequent &5,33VWRUHÀHFWDQ\FKDQJHVLQSURMHFW scope or cost. TABLE OF CONTENTS (cont.) HOW DO WE ALLOCATE FUNDING TO OUR PROJECTS? – Page 23 BUDGETS ARE COMMUNICATION TOOLS – Page 25 CRIPP OUTLOOK – Page 25 ACTIVE AND COMPLETED PROJECT INTRODUCTION – Page 27 COUNTYWIDE PROJECTS – Page 29 PROJECTS BY SUPERVISOR DISTRICTS: • District I – Page 3 • District II – Page 5 • District III – Page 7 • District IV – Page 9 • District V –Page 11 APPENDICES: $ $FURQ\P'H¿QLWLRQV B. County Road Improvement Program C. Gas Tax Guidelines D. RMRA Information E. Complete Streets Policy F. Vision Zero Policy G. Active Transportation Program H. CRIPP Resolution & Board Order , $UHDRI%HQH¿W6HFWLRQ J. Unfunded Projects TRANSPORTATION ENGINEERING 210-10-12 TWIC Meeting - Agenda Packet, Page 13 of 330 ROAD PROGRAM AT WORK WHAT IS A CAPITAL PROJECT? 7KH 3XEOLF :RUNV 'HSDUWPHQW EXLOGV FDSLWDO SURMHFWV WR enhance or improve transportation infrastructure in the public right of way. These projects are usually more than $100,000 and are unique with a complete funding plan. They can range from bicycle and pedestrian improvements, roadway shoulder widening, pavement surface treatments to major bridge replacement projects. 3URMHFWVRIWHQLQYROYHVLJQL¿FDQWSXEOLFRXWUHDFKDQGGHVLJQ ZRUN DQG VRPH LQFOXGH UHJXODWRU\ SHUPLWWLQJ DQG XWLOLW\ coordination or relocation before construction can begin. A NH\GLVWLQFWLRQEHWZHHQDFDSLWDOSURMHFWDQGRQHWKDWLVLQWKH operating budget is that capital projects are distinct, usually multi-year projects that are independently funded by one or many sources that add or modify some facility or feature within the road right-of-way. In contrast, projects in the operating EXGJHWFKLHÀ\IRFXVRQPDLQWDLQLQJWKHIDFLOLWLHVZHDOUHDG\ have. WHAT ABOUT MARSH DRIVE BRIDGE? This is a major bridge replacement project over the :DOQXW &UHHN &KDQQHO 7KH existing 1938 bridge will be replaced with a new one that meets current standards and allows for safe public access with bicycle and pedestrian facilities. This $17 million project will be completed in 2022. WHAT ABOUT DANVILLE BOULEVARD ROUNDABOUT? 7KLV ZLOO EH WKH ¿UVW &RXQW\ maintained roundabout and ZLOOLPSURYHVDIHW\DQGWUD໥F circulation in downtown Alamo This project is leveraging $2.7 million in federal funds from the Highway Safety Improvement Program. Construction of this project is scheduled for 2023 with a total estimated cost of $6.3 million as of November 2021. 0DUVK'ULYH%ULGJH8QGHU&RQVWUXFWLRQ Danville Boulevard/Orchard Court Roundabout Conceptual Drawing 310-10-12 TWIC Meeting - Agenda Packet, Page 14 of 330 ROAD PROGRAM AT WORK WHAT DID WE ACCOMPLISH SINCE THE LAST CRIPP? Some of the highlights from the past two years include: Ê About 92 miles of the 661 miles of roadway maintained by the County were surface treated as part of the pavement preservation program Ê Bailey Road/SR4 Interchange Project revamped WKH&DOWUDQVR໤UDPSWRLPSURYHSHGHVWULDQDQGELF\FOH VDIHW\DQGPRELOLW\DW6WDWH5RXWHKLJKZD\RQR໤ ramps Ê Completed 4.5 miles of centerline rumble strips on San Pablo Dam Road to reduce crossover collisions Ê 5 storm damage sites were repaired on Alhambra 9DOOH\5RDG%HDU&UHHN5RDG+DSS\9DOOH\5RDGDQG Pinehurst Road Ê Approximately 0.5 miles of overhead utilities were placed underground within Bailey Road and Willow Pass Road in Bay Point Ê Added approximately 1870 feet of bikeway on Oak Road by Pleasant Hill Bart Ê Completed 2640 feet of Complete Street Improvements DORQJ)UHG-DFNVRQ:D\ Ê &RXQW\ZLGH*XDUGUDLO 3URMHFW DQG .LUNHU 3DVV 5RDG Safety Projects installed 8.5 miles of improved guardrail along 30 miles of County roadway Ê  VHWV RI SHGHVWULDQDFWXDWHG ÀDVKHUVwere LQVWDOOHGLQWKH:DOQXW&UHHN5RGHRDQG%D\3RLQW areas Ê Started the replacement of Marsh Drive Bridge RYHU ORZHU :DOQXW &UHHN ZLWK D QHZ EULGJH WKDW LV wider plus structurally, seismically, and hydraulically improved Ê Constructed about 6000 feet of truck climbing laneRQQRUWKERXQG.LUNHU3DVV5RDGWRLPSURYHWUD໥F ÀRZRQWKHVWHHSJUDGH IS THE CONTRA COSTA COUNTY PUBLIC WORKS THE BEST IN THE BAY AREA? ƒIn 2001 the County was WKH ¿UVW 3XEOLF :RUNV Department to be accredited in California. It was reaccredited by the $PHULFDQ 3XEOLF :RUNV Association in 2020. ƒPioneer in Vision Zero to actively improve safety on County roads. ƒLeader in the Active Transportation Program to improve safety and mobility for pedestrians, bicyclists, and transit users. 410-10-12 TWIC Meeting - Agenda Packet, Page 15 of 330 ROAD PROGRAM AT WORK ACTIVE TRANSPORTATION PLAN Contra Costa County is creating an Active Transportation 3ODQ7KH3ODQZLOOIRFXVRQLPSURYLQJZDONLQJELNLQJ and rolling (i.e., wheeled mobility devices used by SHRSOHZLWKGLVDELOLWLHVVWUROOHUVVFRRWHUVVNDWHERDUGV etc.) in the unincorporated areas of the County. Input from community members has helped us develop this Plan. We appreciate everyone who shared experiences, FKDOOHQJHVDQGYLVLRQVRIZDONLQJELNLQJDQGUROOLQJ with us. At the end of the project, the Plan will have a list of prioritized project recommendations that will: Ê ,PSURYHURDGZD\LQIUDVWUXFWXUHFRQGLWLRQVDQGFUHDWHQHZURXWHVIRUSHRSOHWRZDONELNH and roll. Ê 0DNHZDONLQJELNLQJDQGUROOLQJWRSDUNVVFKRROVVWRUHVDQGRWKHUFRPPXQLW\GHVWLQDWLRQV safer and more comfortable. Ê 3ULRULWL]HFRPPXQLW\HQJDJHPHQWH໤RUWVDQGSURMHFWUHFRPPHQGDWLRQVLQGLVDGYDQWDJHG communities. Ê Develop a list of implementable projects to help the County improve safety and comfort for SHRSOHZDONLQJELNLQJDQGUROOLQJ 7KH3ODQ8SGDWHSURFHVVZDVFRPSOHWHGLQ$SULO3OHDVHYLVLWhttps://activecontracosta.org/ for more information. 510-10-12 TWIC Meeting - Agenda Packet, Page 16 of 330 ROAD PROGRAM AT WORK VISION ZERO PROGRAM 9LVLRQ=HURLVDFKDQJHLQKRZZHWKLQNDERXWDQGDSSURDFK fatalities and major injuries on our roadways. Instead of accepting collisions that result in fatalities and serious injuries DVLQHYLWDEOH9LVLRQ=HURUHTXLUHVXVWRLQVWHDGWKLQNRIWKHVH collisions as preventable through a Safe System Approach. A 6DIH6\VWHPDSSURDFKDGGUHVVHVWKH¿YHHOHPHQWVRIDVDIH transportation system through a shared responsibility and redundancy: safe road users, safe vehicles, safe speeds, safe roads, and post-crash care. 2Q0DUFKWKH&RXQW\DGRSWHGWKH$FWLRQ3ODQIURPWKH 9LVLRQ=HUR)LQDO5HSRUWWKDWZDVFUDIWHGE\WKH3XEOLF:RUNV Department, the Department of Conservation and Development, and the Department of Health Services. Outside agencies and groups, such as the California Highway Patrol, the Contra Costa Transportation Authority (CCTA), 511 Contra Costa, and bicycle advocates, provided important DVVLVWDQFHWRWKH&RXQW\LQWKLVH໤RUW )RUWRRORQJIDWDOLWLHVDQGVHYHUHLQMXULHVIURPWUD໥FFROOLVLRQVKDYHEHHQYLHZHGDVLQHYLWDEOHVLGH H໤HFWVRIPRGHUQOLIH(DFK\HDUPRUHWKDQSHRSOHQDWLRQZLGH²WKHSRSXODWLRQRIDVPDOO FLW\²DUHQHHGOHVVO\NLOOHGLQWUD໥FFROOLVLRQVRQ$PHULFDQVWUHHWVDQGWKRXVDQGVPRUHDUHLQMXUHG :KLOHRIWHQUHIHUUHGWRDV³DFFLGHQWV´WKHUHDOLW\LVWKDWWKHVHWUDJHGLHVFDQEHSUHYHQWHGE\WDNLQJ DPRUHSURDFWLYHSUHYHQWDWLYHDSSURDFKWKDWSULRULWL]HVWUD໥FVDIHW\DVDSXEOLFKHDOWKLVVXH Vision Zero includes capital improvements, but it is more than that. Contra Costa’s commitment to Vision Zero brought together a multi-disciplinary group, including our transportation engineering FRQVXOWDQW )HKU  3HHUV WKH 3XEOLF :RUNV 'HSDUWPHQW &RXQW\ +HDOWK 6HUYLFHV WKH &RXQW\ Department of Conservation and Development, the California Highway Patrol, 511 Contra Costa, DQG%LNH(DVW%D\7KDWJURXSZLOOFRQWLQXHWRDGGUHVVNH\9LVLRQ=HURIRFXVDUHDVIRUWKH&RXQW\ using elements of the Safe System. For more information, please visit the County’s website at: https://www.contracosta.ca.gov/VisionZero 610-10-12 TWIC Meeting - Agenda Packet, Page 17 of 330 ROAD PROGRAM AT WORK HOW MUCH CAPITAL WORK IS BEING DONE? 3XEOLF:RUNVVWD໤KDVEHHQEXVLHUWKDQHYHUWKHODVWWZR\HDUVWe have been successful at obtaining grants from federal, state and local funding programs to construct a variety of projects. For example, in 2021, $20.8 million of grant funding was secured for 8 projects. The total budget for the upcoming program, including projects constructed within the past two years, is about $282.5 million for 49 projects, including the surface treatment projects and chip seal program. 7KHFKDUWVKRZVDUDWLRRISURMHFWGHYHORSPHQWFRVWV EOXH WRFRQVWUXFWLRQFRVWV RUDQJH SHU¿VFDO year. The average annual construction cost from FY14/15 to FY26/27 is about $22 million. The VSLNHVLQWKHRUDQJHLQGLFDWHWKDWPDMRUSURMHFWVRULPSURYHPHQWVZKLFKFRLQFLGHZLWKJUDQWF\FOHV have been or are proposed to be constructed in those years. 6RPHSURMHFWVDUHUHODWLYHO\VPDOOLQVFRSHDQGWDNHMXVWD\HDURUWZRWRGHVLJQDQGFRQVWUXFW Others have multiple phases including planning, design, environmental documentation, right-of-way acquisition, utility relocation, and the actual construction that may span several years and have multiple phases. 0 10,000,000 20,000,000 30,000,000 40,000,000 50,000,000 60,000,000 FY 14-15FY 15-16FY 16-17FY 17-18FY 18-19FY 19-20FY 20-21FY 21-22FY 22-23FY 23-24FY 24-25FY 25-26FY 26-27Budget Trends of the Past and for the Future Project development Construction Past Years Future Years 710-10-12 TWIC Meeting - Agenda Packet, Page 18 of 330 ROAD PROGRAM AT WORK NEAR-TERM PROJECT OUTLOOK 7KLVOLVWRISURMHFWVVKRZVDVQDSVKRWRIWKH³5RDG3URJUDPDW:RUN´DQGDVDPSOHRIZRUNLQWKH QH[W\HDUV7KHVHPXOWLSKDVHSURMHFWVZLOOWDNHDORWRIH໤RUWUHVRXUFHVDQGIRFXVRQWKHSDUW RIWKH3XEOLF:RUNV'HSDUWPHQWWRGHOLYHUVXFFHVVIXOO\ Ê Mobility Projects are Americans with Disabilities Act (ADA) upgrades, pedestrian and ELF\FOHLPSURYHPHQWVDQGSHGHVWULDQÀDVKHUV&RPSOHWH6WUHHWVSURMHFWVDUHOLVWHGKHUH ƒWestminster and Kenyon Avenue Accessibility Project ƒIron Horse Trail Crossing Enhancements ƒBixler Road and Regatta Drive Intersection Improvements ƒWalnut Boulevard Shoulder Widening ƒ0D\KHZ:D\DQG&KHUU\/DQH7UDLO&URVVLQJ(QKDQFHPHQW ƒAlves Lane Trail Crossing ƒNorth Bailey Road Active Transportation Corridor ƒTreat Boulevard Corridor Improvement ƒCurb Ramp Projects Ê Safety Projects are based on reducing vehicular collisions. Pedestrian enhancements and RWKHUQRQYHKLFXODUVDIHW\SURMHFWVZLOOEHOLVWHGXQGHU0RELOLW\3URMHFW ƒByron Highway and Byer Road Intersection Improvements ƒDanville Boulevard/Orchard Court Roundabout: 7KLV LV WKH ¿UVW URXQGDERXW RQ D &RXQW\ maintained roadway. ƒ%ULRQHVDQG&URFNHWW*XDUGUDLO8SJUDGHV ƒ.LUNHU 3DVV 5RDG 6RXWKERXQG 7UXFN &OLPELQJ Lane ƒSan Pablo Dam Road and Bailey Road Signal +DUGZDUH8SJUDGHV ƒNorris Canyon Safety Improvements ƒVasco Road Safety – Phase 2 ƒ)UDQNOLQ&DQ\RQ5RDG6DIHW\,PSURYHPHQWV 810-10-12 TWIC Meeting - Agenda Packet, Page 19 of 330 ROAD PROGRAM AT WORK Ê Reliability Projects are projects to improve or sustain a rating index which is a tool to assess how well something is performing. This will include the pavement condition index (PCI) which is a method to evaluate how well the existing pavement surface on a roadway LVSHUIRUPLQJ,WDOVRLQFOXGHVWKH%ULGJH6X໥FLHQF\UDWLQJDQG%ULGJH+HDOWK,QGH[WR evaluate the status of a bridge. Projects will typically include pavement and bridge projects. ƒ0DUVK'ULYH%ULGJH5HSODFHPHQW ƒPleasant Hill Road Bridge Rehabilitation ƒByron Highway Bridge Replacement ƒ0DUVK&UHHN5RDG%ULGJH5HSODFHPHQW ƒSecond Avenue Bridge Replacement ƒAnnual Pavement Surface Treatment Projects ƒ%ULGJH 3UHYHQWDWLYH 0DLQWHQDQFH 3URMHFWV  %303 EULGJHV Ê (໥FLHQF\ 3URMHFWV are projects generated from studies that analyze roadway capacity. These projects tend to be more costly to design and construct since these involve more systematic improvements than typical localized improvement projects. ƒCamino Tassajara and Tassajara Road Realignment Project 910-10-12 TWIC Meeting - Agenda Packet, Page 20 of 330 ROAD PROGRAM AT WORK COUNTYWIDE ROADWAY INVENTORY In order to provide a sense of scale, below is a snap shot of Contra Costa County roadway inventory. 661 miles of publicly maintained roadway (as of 2021) 80 miles of Bikeway (Class 1 Trails, Class 2 Bike Lanes, & Class 3 Bike Routes) Intersections: Miscellaneous Items: 91 Vehicular Bridges 11 Bridges with less than 20 foot span 9 Pedestrian Bridges 439.5 miles of Sidewalk 100 Traffic Signalized Intersections 107 Four- Way Stop- Controlled Intersections 1,234 Two-Way Stop- Controlled Intersections 1,075 Crosswalks 1010-10-12 TWIC Meeting - Agenda Packet, Page 21 of 330 ROAD PROGRAM AT WORK COUNTYWIDE INFRASTRUCTURE NEEDS AND CHALLENGES :LWKVRPXFKJHRJUDSKLFDUHDZLWKLQ&RQWUD&RVWD&RXQW\VRPDQ\GL໤HUHQWW\SHVDQGFRQGLWLRQV RIURDGZD\IDFLOLWLHVDQGVXFKDGLYHUVHUDQJHRIFRPPXQLWLHVWKH3XEOLF:RUNV'HSDUWPHQWQHHGV to consider many competing factors in order to identify needs and to generate solutions and capital projects that would meet those needs. PAVEMENT CONDITION 7KH &RQWUD &RVWD &RXQW\ 3DYHPHQW 0DQDJHPHQW 6\VWHP DLPV WR PRQLWRUWKHURDGZD\SDYHPHQWFRQGLWLRQHYHU\WZR\HDUVDQGNHHS its pavement condition index (PCI) in the good range of 70 or greater, UHGXFHWKHPLOOLRQEDFNORJLQVWUHHWPDLQWHQDQFHDQGHQFRXUDJH WUDQVLWXVHELF\FOLQJZDONLQJDQGFDUSRROLQJ7KH3&,LVDVWDQGDUG rating system that all public agencies use to rate their facilities. This budget includes a maintenance program of more than $8 million per year for the pavement surface treatment program, with the goal to increase this amount to $10 million annually over the next 7 years The County’s current PCI is 71. As shown in the chart on the next page, if the County does not fully fund the surface treatment program as planned, the PCI that is projected over the next several years will drop. The budget manager must weigh all of these factors to balance the capital budget with the pavement rehabilitation budget. Recently, the pavement management goal is to schedule areas for paving based on geographic areas to focus in on entire communities to minimize future construction impacts and to minimize WUDQVSRUWDWLRQFRVWVE\WKHFRQWUDFWRU7KLVZLOOLQFUHDVHWKHH໥FLHQF\DQGFRVWH໤HFWLYHQHVVRIWKH program. $QDQQXDOSDYLQJSURJUDPKDVPXOWLSOHEHQH¿WVIRUDOOVWUHHWXVHUV0DLQWDLQHGURDGZD\VDUH safer, with fewer potholes, updated striping, and often provide an opportunity for pedestrians and ELF\FOLVWVLPSURYHPHQWVDVH[HPSOL¿HGE\QHZFXUEUDPSLQVWDOODWLRQDQGSDYHPHQWVWULSLQJIRU QHZELNHZD\V(YHU\WLPHDURDGZD\UHFHLYHVDQHZVXUIDFHVWD໤HYDOXDWHVRSSRUWXQLWLHVWRLQVWDOO ELF\FOHODQHVRULGHQWLI\DVWUHHWDVDELNHURXWH,QDGGLWLRQSUHYHQWDWLYHPDLQWHQDQFHRIVWUHHWV LVVLPLODUWRUHJXODURLOFKDQJHVIRUDYHKLFOH6WXGLHVVKRZWKDWWDNHQRYHUWKHOLIHF\FOHRIWKH pavement, it is over twice as expensive to completely rebuild a street than to properly maintain them with a surface treatment program. 1110-10-12 TWIC Meeting - Agenda Packet, Page 22 of 330 ROAD PROGRAM AT WORK Chart Showing Forecasted Pavement Condition (*) 7KLVFKDUWLVXVHIXOLQGHWHUPLQLQJKRZWKHSDYHPHQWEXGJHWIRUHFDVWHGDW0LOOLRQDQQXDOO\DQGDW 0LOOLRQDQQXDOO\RYHUWKHQH[WFRXSOHRI\HDUVD໤HFWV&RXQW\¶VRYHUDOOSDYHPHQWFRQGLWLRQLQGH[6RXUFH 3DYHPHQW0DQDJHPHQW%XGJHW2SWLRQV5HSRUWGDWHG0DUFK 68 69 70 71 72 73 74 2021 2022 2023 2024 2025 Forecasted Pavement Condition Index 2021-2025 Projected PCI if County spends $10M Annually Projected PCI if County's proposed spending plan of $8M Annually 1210-10-12 TWIC Meeting - Agenda Packet, Page 23 of 330 ROAD PROGRAM AT WORK PEDESTRIAN AND BICYCLE INFRASTRUCTURE 0RVW URDGV LQ &RQWUD &RVWD &RXQW\ ZHUH FRQVWUXFWHG ZKHQ WKH FDU ZDV WKH SULPDU\ PRGH RIWUDQVSRUWDWLRQ7RGD\DVZHZRUNWRXSJUDGHRXUIDFLOLWLHVZHPXVWJLYHPRUHWKRXJKWWR accommodating pedestrians, especially the disabled, and to building better connections for bicycles. The Active Transportation Plan and the Vision Zero Plan discussed above play a big role in determining ZKLFKJDSVLQWKHSHGHVWULDQDQGELF\FOHSURMHFWVVKRXOGEH¿OOHGZLWKDSURMHFW Sidewalks and Curb Ramps XUUHQWO\ UHTXHVWV IRU VLGHZDON DQG FXUE UDPS installations for ADA access are received by Transportation Engineering and incorporated into a SULRULW\OLVW0LVVLQJFXUEUDPSVDUHDOVRLQVWDOOHG prior to a street’s pavement rehabilitation as directed by State law that requires that when major construction such as a roadway replacement project occurs, pedestrian facilities must be upgraded for compliance with ADA. 7KH3XEOLF:RUNV'HSDUWPHQW¶VVLGHZDONSULRULW\OLVWFRQWDLQVRYHUIHHWRIVLGHZDONJDSV WKURXJKRXWWKH&RXQW\&RQWUD&RVWD&RXQW\URDGVYDU\IURPXUEDQVHWWLQJVOLNH.HQVLQJWRQ%D\ 3RLQWDQGWKHGRZQWRZQDUHDRI$ODPRWRUXUDOURDGVLQHDVW&RXQW\OLNH0DUVK&UHHN5RDG5RDGV ZLWKRXWVLGHZDONVDUHFRPPRQLQWKHUXUDOSRUWLRQVRIWKH&RXQW\KRZHYHUWKH\DUHDQHFHVVLW\IRU the safe mobility of residents within urban settings. The curb ramp priority list contains about 51 curb ramps requested from the public with a high number in Kensington, Bay Point, and Alamo. These will be installed as funding allows. Also, new curb ramps are typically installed or existing ramps upgraded when a major pavement rehabilitation SURMHFWWKDWUHTXLUHVUHPRYDODQGUHSODFHPHQWRIWKHSDYHPHQWVXUIDFHWDNHVSODFH7KLVLVWRPDNH the curb returns compliant with ADA requirements. ,QDGGLWLRQWRRXUFDSLWDOSURMHFWH໤RUWVWRFORVHJDSVLQWKHV\VWHPODQGGHYHORSHUVDUHUHTXLUHG WRLQVWDOOVLGHZDONVZLWKLQWKHLUGHYHORSPHQWV2IWHQWKH\DUHUHTXLUHGWRFRQVWUXFWVLGHZDONVDQG ELNHODQHVR໤VLWHIURPWKHLUGHYHORSPHQWGHSHQGLQJRQWKHLULPSDFWVWRWKHH[LVWLQJWUDQVSRUWDWLRQ system. 1310-10-12 TWIC Meeting - Agenda Packet, Page 24 of 330 ROAD PROGRAM AT WORK 7UD໥F6LJQDOV 7KH7UD໥F6HFWLRQPDLQWDLQVDWUD໥FVLJQDOSULRULW\OLVWZKLFKFRPSLOHV those unsignalized intersections that have been found to meet Signal :DUUDQWV$7UD໥F6LJQDO:DUUDQWEDVLFDOO\SUHTXDOL¿HVDQLQWHUVHFWLRQ IRUDGGLQJDWUD໥FVLJQDOEDVHGRQFULWHULDOLNHWUD໥FYROXPHVDQGFROOLVLRQ KLVWRU\7KH3XEOLF:RUNV'HSDUWPHQWDOVRKDVDQ$UHDRI%HQH¿W $2%  SURJUDPWKDWFROOHFWVIHHVIURPGHYHORSHUVWRR໤VHWWKHLUWUDQVSRUWDWLRQ LPSDFWVDQGIXQGFHUWDLQSURMHFWVOLNHVLJQDOL]DWLRQWKDWPD\RUPD\QRW have had a warrant analysis done. 7KHODVWWZRPDMRULQWHUVHFWLRQVWKDWUHFHLYHGVLJQDOPRGL¿FDWLRQVZHUH the Byron Highway and Camino Diablo intersections and the State Route 4 and Bailey Road interchange intersections. It has been several years VLQFHWKH&RXQW\LQVWDOOHGDQHZWUD໥FVLJQDODWDQH[LVWLQJLQWHUVHFWLRQ 7KH VLJQDO SULRULW\ OLVW FRQWDLQV HLJKW SRVVLEOH LQWHUVHFWLRQVWKDW DUH ZDUUDQWHG $ QHZ WUD໥F signal installation that is on the signal priority list will be constructed with the Bailey Road Active Transportation Corridor project. Bicycle Connectivity 7KH&RQWUD&RVWD7UDQVSRUWDWLRQ$XWKRULW\LQFRRUGLQDWLRQZLWKWKH&RXQW\KDVD%LF\FOH1HWZRUN 3ODQWKDWLVRQHWRROZKHQHYDOXDWLQJIXWXUHELF\FOHSURMHFWV7KHUHDUHIRXUPDLQFODVVHVRIELNH IDFLOLW\UDQJLQJIURPGHGLFDWHGSDWKV &ODVV, WRWUDGLWLRQDOELNHODQHVLQWKHURDGVKRXOGHUV &ODVV ,, WRELNHURXWHVZKHUHELF\FOLVWVDUHDOORZHGWKHIXOOXVH of a vehicle lane (Class III) to special bicycle lanes that DUHVHSDUDWHGIURPYHKLFXODUWUD໥F &ODVV,9  One project that the County currently has in the planning phase that was recently funded by a grant is the Bailey Road Active Transportation Corridor Project. In this SURMHFWD&ODVV,9ELNHODQHZLOOEHFRQVWUXFWHGDORQJ Bailey Road between State Route 4 and Willow Pass 5RDGLQFOXGLQJWUD໥FVLJQDOXSJUDGHVDQGLQWHUVHFWLRQ improvements. The public eagerly anticipates this project that will connect the commercial strip on Willow Pass Road to the Pittsburg/Bay Point Bay Area Rapid Transit (BART) station located south of Highway 4. This project is expected to be constructed in 2025. 1410-10-12 TWIC Meeting - Agenda Packet, Page 25 of 330 ROAD PROGRAM AT WORK COUNTY BRIDGE PROGRAM $VQRWHGDERYHWKH&RXQW\KDVEULGJHVDQGWKH\DUHDOOLQYDULRXVVWDWHVRIUHSDLU0RVWRIWKH EULGJHVFURVVWKHYDULRXVFUHHNVDQGZDWHUZD\VZLWKLQWKH&RXQW\ZKHUHDVVRPHFURVVURDGZD\V DQGUDLOURDGWUDFNV0RVWEULGJHVZHUHFRQVWUXFWHGRYHU\HDUVDJRDQGUHTXLUHPDLQWHQDQFHLQ order to extend the life of the bridge or are due to be replaced with a new structure. ,QWKHSDVWIRXU\HDUVWKH&RXQW\KDVUHSODFHGRQHEULGJHRQ0DUVK&UHHN5RDGRYHU0DUVK &UHHNDQGVWDUWHGRQHIRRWORQJEULGJHRQ0DUVK'ULYHFURVVLQJWKH:DOQXW&UHHNÀRRGFRQWURO channel. In FY 2017-2018, County replaced a failed culvert with a new bridge on Alhambra Valley 5RDGRYHU$OKDPEUD&UHHNZKHUHWKHH[LVWLQJFXOYHUWIDLOHGGXULQJWKHUDLQVWRUPVRI,Q addition, the County has scheduled to repair or replace 10 bridges in the next 7 years. Bridges are inspected biannually by the State of California and the County determines what treatment the bridges require. Some bridges are VWUXFWXUDOO\GH¿FLHQWPHDQLQJWKH\PD\QRWEHDEOH to carry the same weight they could when they were constructed. Other bridges are geometrically constrained, meaning they are often narrow and do not meet current road standards or have sharp curves approaching the bridges. The federal government has funding available for bridge rehabilitation and replacement called the Highway Bridge Program (HBP). These funds are vitally important to maintenance of the bridges ZLWKLQWKH&RXQW\7KLVIXQGLQJPHFKDQLVPLVUDWKHUFRPSOH[DQGFDQWDNHDORQJWLPHWRUHDOL]H oftentimes longer than ten years. A local match is usually required for the funding, which is typically RIWKHWRWDOFRVWRIWKHZRUN GREEN STORMWATER INFRASTRUCTURE Green Stormwater Infrastructure (GSI) is a relatively new initiative and requirement for the County on many of our projects, which is a requirement of the %D\ $UHD 0XQLFLSDO 5HJLRQDO 6WRUP :DWHU 1DWLRQDO 3ROOXWLRQ'LVFKDUJH(OLPLQDWLRQ6\VWHP3HUPLW 053  issued by the California Regional Water Quality Control Board, Section C.3. Green Stormwater Infrastructure for roadways and new subdivisions typically includes the treatment of stormwater to remove sediments and pollutants before the water goes into the storm drain 1510-10-12 TWIC Meeting - Agenda Packet, Page 26 of 330 ROAD PROGRAM AT WORK V\VWHP)DFLOLWLHVOLNHELRUHWHQWLRQEDVLQVRUVZDOHVFROOHFWVWRUPZDWHUIURPWKHURDGZD\VXUIDFH DQGDOORZLWWREH¿OWHUHGWKURXJKDVSHFLDOVRLOPL[EHIRUHHLWKHUEHLQJLQ¿OWUDWHGLQWRWKHJURXQGRU GUDLQHGLQWRWKHVWRUPGUDLQV\VWHPDQGLQWRDFUHHN :KLOHQRWQHFHVVDULO\DFDSLWDOSURMHFWWKH3XEOLF:RUNV'HSDUWPHQWKDVEHHQUHTXLUHGWRKDYH*6, SODFHGLQWKHULJKWRIZD\VLQFHWKH$ODPR&UHHN6XEGLYLVLRQZDVFRQVWUXFWHGLQ5HFHQWO\LQ WKH3XEOLF:RUNV'HSDUWPHQWFRQVWUXFWHGWKH5RGHR'RZQWRZQ,QIUDVWUXFWXUHSURMHFWZKHUH DQRWKHU*6,IDFLOLW\ZDVLQVWDOOHG7KHVHIDFLOLWLHVORRNOLNHODQGVFDSLQJDQGPRVWPHPEHUVRIWKH public may not even recognize its environmental importance. 5HFHQWO\ WKH 3XEOLF :RUNV 'HSDUWPHQW FRQVWUXFWHG ELRUHWHQWLRQ EDVLQV LQ WKHLU WZRDFUH SDUNLQJ ORW in order to demonstrate what these facilities are DQG KRZ WKH\ ZRUN WR SHRSOH ZKR PD\ YLVLW WKH Department. Another project that was completed LQLVWKH.LUNHU3DVV5RDG1RUWKERXQG7UXFN &OLPELQJ/DQH3URMHFWZKHUHWZRELR¿OWUDWLRQEDVLQV were constructed. Another element of GSI and storm water treatment VSHFL¿FDOO\ LV WUDVK FDSWXUH  ,Q  WKH 3XEOLF :RUNV'HSDUWPHQWEHJDQWRLQYHQWRU\WKHDPRXQW of trash present in the County road right-of-way, in accordance with Section C.10, Trash Load 5HGXFWLRQRIWKH053$VSDUWRIWKHWUDVKUHGXFWLRQ UHTXLUHPHQWVHDFK\HDUWKH3XEOLF:RUNV'HSDUWPHQW installs devices that collect trash in many of the drainage LQOHWVWRUHGXFHRUHOLPLQDWHWKHWUDVKWKDWÀRZVZLWKLQ VWRUPZDWHUIURPEHLQJGLVFKDUJHGGLUHFWO\WRFUHHNVDQG waterways. Not only is installation of these devices a QHZFDSLWDOH[SHQVHIRUWKH3XEOLF:RUNV'HSDUWPHQW these devices require enhanced annual maintenance to clean out the trash, which is a new funding challenge for WKH3XEOLF:RUNV'HSDUWPHQW 7KHRXWORRNIRU*6,LVWRFRQWLQXHWRGHYHORSQHZPHWKRGV to implement GSI in roadway projects that comply with WKH053DQG¿WZLWKLQWKHSURMHFWVFRSHDQGEXGJHW,QVLGHRIDGUDLQDJHLQOHWUHWUR¿WWHGZLWKD trash capture device. 1610-10-12 TWIC Meeting - Agenda Packet, Page 27 of 330 ROAD PROGRAM AT WORK CLIMATE CHANGE In 2015 the County has adopted the Climate Action Plan (CAP), which outlines the actions the &RXQW\ZLOOWDNHWRDGGUHVVRXUFKDQJLQJFOLPDWH,QDQH໤RUWWRPHHW&$3JRDOVWKH3XEOLF:RUNV 'HSDUWPHQWORRNVIRUZD\VWRLQFRUSRUDWHVWKHIROORZLQJFRQFHSWVDQGLGHDVZKHQGHYHORSLQJD transportation project and in the administration of existing programs: 1.([SDQGRSSRUWXQLWLHVIRUELNLQJDQGZDONLQJWRUHGXFHJUHHQKRXVHJDVHPLVVLRQV 2.&RQVLGHU9HKLFOHV0LOHV7UDYHOOHG 907 LQRXUUHYLHZRI'HYHORSHU,PSURYHPHQW3ODQVDVD new way of viewing impacts of development required by the State. 3.0DLQWDLQWKHH[LVWLQJURDGZD\ODQGVFDSLQJWRFDSWXUHDQGVHTXHVWHUFDUERQJDVHPLVVLRQV that cause global warming. 4.Consider sea level rise as a factor in the development of future projects that could be impacted by rising waters. 5.Support watershed programs for drainage inlet trash capture devices and street sweeping programs. 6.(QFRXUDJHSHGHVWULDQDQGELF\FOHPRGHVRIWUDYHOWKURXJKVDIHW\LPSURYHPHQWVDQGELNH QHWZRUNVH[SDQVLRQLQWKHQH[WVHYHQ\HDUV ƒ7KHIRUHFDVWLVWRDGGDERXWIHHWRIELNHZD\V DORQJFHQWHUOLQHRI&RXQW\5RDGZD\  through 2029. ƒ9DULRXVFXUEUDPSSURMHFWVDQGFURVVZDONWUDLOFURVVLQJSURMHFWVZLOOEHLQVWDOOHGZLWK several of the grants that we are applying for and prior to pavement surface treatment projects. 7.6HHNRSSRUWXQLWLHVWRXVHSRURXVFRQFUHWHWRLQFUHDVHORFDOJURXQGZDWHULQ¿OWUDWLRQ 8.Advocate for new concrete mix designs that aim to reduce greenhouse emissions. 9.Construct green infrastructure to help to improve water quality and recharge local water tables. Some examples of projects we are doing today include: ƒThe North Bailey Road Active Transportation Corridor project will add about 2,400 feet of GHGLFDWHGWZRZD\F\FOHWUDFNWRWKHKHDYLO\WUDYHOHG%DLOH\5RDGEHWZHHQ6WDWH5RXWH 4 and Willow Pass Road. ƒTreat Boulevard Corridor Improvement Project aims to improve the safety of bicyclists EHWZHHQ0DLQ6WUHHWDQG-RQHV5RDGIRUDERXWIHHW7KLVSURMHFWLVLQFORVHSUR[LPLW\ to the busy I-680 ramps, Iron Horse Trail, and Pleasant Hill BART station. ƒ&DPLQR7DVVDMDUD5HDOLJQPHQW3URMHFWSURSRVHVWRDGGDELNHZD\DQG&ODVV,WUDLOWR FRQQHFWZLWK'XEOLQ¶VWUDLOV\VWHPDORQJ&DPLQR7DVVDMDUDIURP:LQGHPHUH3DUNZD\WR the County Line for about 2500 feet in the County. 1710-10-12 TWIC Meeting - Agenda Packet, Page 28 of 330 ROAD PROGRAM AT WORK LIMITED RESOURCES, INCREASING COSTS AND CHANGING SOCIAL PRIORITIES 7KH&RXQW\5RDG3URJUDPKDVH[SHULHQFHGDYDULHW\RILVVXHVZKLFKKDVD໤HFWHGWKHFRQVWUXFWLRQ of new infrastructure and maintenance of existing infrastructure. Gas Tax is the primary funding source for capital projects and the maintenance program. There DUHPDQ\FRPSHWLQJSULRULWLHVIRUWKH¿[HGDPRXQWRIJDVWD[WKH&RXQW\DQQXDOO\UHFHLYHVIURP the state. The goal over the next seven years is to increase the amount of available funding for pavement surface treatments and the budget for routine maintenance of over 661 miles of roadways DQGUHODWHGLQIUDVWUXFWXUHOLNHFXOYHUWVFDWFKEDVLQVJXDUGUDLODQGEULGJHV How best to balance this goal with the need for new transportation projects while considering the issues below? Ê COVID has resulted in a decrease in expected gas tax revenue of millions of dollars and the UROORXWRIVRPHJUDQWSURJUDPVZKLFKDOVRKDVD໤HFWHGDYDLODEOHIXQGLQJIRUSURMHFWVRYHU the last two years. Ê The County experienced almost $19 million of unexpected damage to the roadway system caused by storm events in 2017. About half of this cost was covered by state and federal funds but the balance was funded with local funds. These unforeseen projects to restore the roadways after the storm events greatly impacted the schedule and available revenue for other projects through 2022. Ê The costs of construction materials and labor has increased, almost 20% the past 2 years DQGLVH[SHFWHGWRFRQWLQXHLQWKHIXWXUH7KLVPDNHVRXUSURMHFWVPRUHH[SHQVLYHWREXLOG Ê There will be many new opportunities for grants within the next twelve months, but they will all require some local match, which could be in the millions of dollars in gas tax. The road SURJUDPLV¿QDQFLDOO\FRQVWUDLQHGZKLFKPHDQVWKHUHLVOLPLWHGIXQGLQJDYDLODEOH&XUUHQWO\ there is limited capacity to provide this local match and decisions will have to be made on the best projects to submit for grant funding. In 2021, Congress approved a new federal transportation bill titled “Infrastructure Investment and Jobs Act” (IIJA). This bill creates many competitive funding programs, including categories for transportation in the millions of dollars. In addition, there will be safety grants, programs to fund bicycle and pedestrian projects, and other funding opportunities for projects. The requirement for a local match will need to be balanced with the available funds for the maintenance program. 1810-10-12 TWIC Meeting - Agenda Packet, Page 29 of 330 ROAD PROGRAM AT WORK 6RFLHW\LVFKDQJLQJDQGVRLVKRZZHGHYHORSDQGWKLQNDERXWWUDQVSRUWDWLRQSURMHFWV Ê 2XUJRDOLVWRFUHDWHDVXVWDLQDEOHWUDQVSRUWDWLRQQHWZRUNWRWU\DQGDGGUHVVWKHLPSDFWV of the road system on the environment. Future projects may include green infrastructure, cool pavements, porous pavements, complete streets, multi-modal ways to travel, recycled materials, and drought tolerant landscaping where feasible. A sustainable transportation QHWZRUNZLOODOVRpositivelyD໤HFWFOLPDWHFKDQJHJUHHQKRXVHJDVHPLVVLRQVDQGZDWHU supply. Ê We need to address issues of environmental justice in the development of our projects, ZKLFKLVDJUHDWFRQFHUQIRURXUUHVLGHQWVDQGVWDNHKROGHUV(QYLURQPHQWDOMXVWLFHLVWKH fair treatment and meaningful involvement of all people regardless of race, color, national origin, or income, with respect to the development, implementation, and enforcement of environmental laws, regulations, and policies. Ê Another goal is to support a mode shift from the single-occupant vehicle to other more DFWLYHDQGHQYLURQPHQWDOO\IULHQGO\PRGHVRIWUDQVSRUWDWLRQOLNHZDONLQJELNLQJUROOLQJDQG using transit. AD INCREASING CONSTRUCTION COST MEET PAVEMENT CONDITION GOALS IMPLEMENT COMPLETE STREETS, VISION ZERO, AND GREEN INFRASTRUCTURE PROGRAMS 1910-10-12 TWIC Meeting - Agenda Packet, Page 30 of 330 ROAD PROGRAM AT WORK Ê Gas Tax Funds,are revenues paid by the State to cities and counties from the per-gallon motor vehicle fuel tax and is the primary funding source for the road program. The County uses the majority of the Gas Tax funds for road operation and maintenance, but the next most VLJQL¿FDQWSRUWLRQLVXVHGIRUFDSLWDOSURMHFWV:LWKRXW it the County would miss an opportunity to obtain additional outside funding to help construct much needed safety, maintenance, and multi-modal transportation LPSURYHPHQWV*DVWD[HVDOVRIXQGVWD໤WLPHWRSUHSDUH the actual grant application. Last year for every $1 dollar VSHQWRQVWD໤WLPHWRSUHSDUHJUDQWDSSOLFDWLRQVWKH County was able to get about $15 dollars in return. Appendix B of this CRIPP shows the County-adopted guidelines for the expenditure of Gas Tax revenues following passage of Proposition 111 in 1990. Local Funding: Ê Measure J (formerly Measure C): Contra Costa County voters approved the Contra Costa Transportation ,PSURYHPHQW DQG *URZWK 0DQDJHPHQW 3URJUDP 2UGLQDQFH 0HDVXUH& LQ1RYHPEHU0HDVXUH& provide for a ½-cent sales tax for transportation projects ZLWKLQ&RQWUD&RVWD&RXQW\0HDVXUH&KDGDWZHQW\ year life and expired in 2009. In November 2004, voters approved the continuation of the County’s ½ - cent sales WD[E\SDVVLQJ0HDVXUH-DQGH[WHQGHGWKHWUDQVSRUWDWLRQ funding for 25 more years. ½౯ WHERE DOES ALL THE MONEY COME FROM FOR OUR PROJECTS? An important step in developing a capital budget is to determine available funds, which requires revenue and expense projections. This section contains a detailed summary of the various funding sources used for projects in the CRIPP. 2010-10-12 TWIC Meeting - Agenda Packet, Page 31 of 330 ROAD PROGRAM AT WORK Ê $UHDRI%HQH¿W $2%  The County has a total of 14 AOB programs within unincorporated Contra Costa &RXQW\$Q$2%LVDGHYHORSPHQWWUD໥FPLWLJDWLRQIHH program designed to improve the capacity and safety of WKH&RXQW\¶VURDGQHWZRUNZLWKLQDGH¿QHGERXQGDU\DV land development occurs. AOB funds are only applied to projects within the AOB boundary and that are on the AOB project list. These funds only supplement a portion RIWKHSURMHFWWKHUHIRUHSURMHFWVWHQGWRZDLWXQWLORWKHU funding becomes available by applying for grants. For more detailed information on each AOB and the AOB program in general, please see Appendix E about AOBs. Ê 7UXVW 7UD໥F 0LWLJDWLRQ  )XQGVWhen a large GHYHORSPHQWPDNHVDVLJQL¿FDQWLPSDFWRQWKHURDGZD\ system, the developer may be required to contribute to a road improvement fund to mitigate the impacts of the development. The County has three trust funds WREHXVHGIRUVSHFL¿FSURMHFWV1DY\0LWLJDWLRQ)XQGV in the Bay Point Area provided $5 million to help fund new transportation improvements and waterfront access WRR໤VHWWKHORVVRI3RUW&KLFDJR+LJKZD\WKURXJKWKH Concord Naval Weapons Station. Other developer fees LQFOXGHWKH'LVFRYHU\%D\:HVW7UD໥F0LWLJDWLRQ)XQGV DQGWKH.HOOHU&DQ\RQ0LWLJDWLRQ)XQGV(DFKRIWKHVH funds is held in trust by the County and is listed as separate funding sources in this CRIPP. Ê Other Local Funds: These funds include monies from other partner agencies that are participating in construction of a project due to a shared responsibility of the facility. In addition, funds also come from several Regional Fee programs throughout the County where the fee program is adopted by several participating jurisdictions and is administered jointly through a separate authority. As these Regional Fee programs are not under the authority of the County, the revenue and expenditures for these programs are not included in the CRIPP. The Regional Fee programs include the East Contra Costa Regional Fee and Financing Authority (ECCRFFA), the Southern Contra Costa (SCC) Fees, West Contra Costa Transportation Advisory Committee Fee (WCCTAC), and the Tri Valley Transportation Development (TVTD) Fee. 2110-10-12 TWIC Meeting - Agenda Packet, Page 32 of 330 ROAD PROGRAM AT WORK State Local Match Ê 6WDWH /RFDO 0DWFK IXQGV DUH UHYHQXHV SDLG E\ WKH State to Counties from the State Highway Account. The funds are to be used for transportation purposes to match federally funded transportation projects. The &RXQW\ UHFHLYHV D ¿[HG DQQXDO DPRXQW HYHU\ \HDU Competitive Grant Funding Sources: ATP, HBP, HSIP, OBAG, and TDA Ê ATP – The Active Transportation (Grant) Program consolidates various federal and state transportation JUDQW SURJUDPV WKDW DUH R໤HUHG HYHU\ WZR WR WKUHH years. The goals of the ATP include, but are not limited to, increasing the proportion of trips accomplished by ZDONLQJDQGELNLQJLQFUHDVLQJVDIHW\DQGPRELOLW\RIQRQ PRWRUL]HGXVHUVDGYDQFLQJH໤RUWVRIUHJLRQDODJHQFLHV to achieve greenhouse gas reduction goals, enhancing public health, and providing a broad spectrum of projects WREHQH¿WPDQ\W\SHVRIXVHUVLQFOXGLQJGLVDGYDQWDJHG communities. Ê HBP – The Highway Bridge Program is to replace or rehabilitate public bridges when the State and Federal Highway Administration determine that a bridge is VLJQL¿FDQWO\ LPSRUWDQW DQG TXDOL¿HV XQGHU WKH +%3 program guidelines. Funding is typically ongoing, but the amount of money available compared with the number of bridges needing repair or replacement within the State is small, which means that bridge repair/replacement can remain unfunded for a long period of time. Ê HSIP – The Highway Safety Improvement Program is a IHGHUDODLGSURJUDPWKDWLVR໤HUHGHYHU\WZRWRWKUHH \HDUV ZLWK WKH JRDO WR UHGXFH WKH QXPEHU RI WUD໥F fatalities and serious injuries on all public roads. 2210-10-12 TWIC Meeting - Agenda Packet, Page 33 of 330 ROAD PROGRAM AT WORK HOW DO WE ALLOCATE FUNDING TO OUR PROJECTS? 7KH¿JXUHEHORZVKRZVWKHUHODWLYHSURSRUWLRQVRIWKHYDULRXVUHYHQXHVRXUFHVWKDWDUHDSSOLHGWR capital projects in the County. 2QFHWKHIXQGLQJVRXUFHVDUHNQRZQLWLVWKHQSRVVLEOHWRSURMHFWRXWWKHH[SHQGLWXUHVIRUWKHYDULRXV projects within the CRIPP. The budgets for each project are updated at least once a year and at major project milestones such as completing the environmental document, developing construction plans, and awarding a construction contract. Ê OBAG – The One Bay Area Grant programLVD0HWURSROLWDQ 7UDQVSRUWDWLRQ&RPPLVVLRQ 07& IXQGLQJDSSURDFKWKDW targets project investments in Priority Development Areas that is available every two to four years. These regional capital projects focus on the following: local street and road maintenance, streetscape enhancements, bicycle and pedestrian improvements, transportation planning, and Safe Routes to School projects. Ê TDA – The Transportation Development Act is an annual competitive, regional, state-funded grant intended for projects to improve pedestrians and bicyclist safety and accessibility. 2310-10-12 TWIC Meeting - Agenda Packet, Page 34 of 330 ROAD PROGRAM AT WORK The tables on this page summarize the revenues and expenditures over the next 7 years. Note that the revenues and expenditures shown in the tables do not always match exactly because revenues PD\EHUHFHLYHGLQD¿VFDO\HDUEHIRUHRUDIWHUWKHDFWXDOH[SHQGLWXUHRFFXUV Projected Annual Revenue (values in thousands of dollars) Funding Source FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Total Gas Tax Funds $ 7,935 $ 12,894 $ 17,423 $ 18,506 $ 19,465 $ 12,225 $ 11,500 $ 11,300 $ 111,247 0HDVXUH-$ 2,425 $ 978 $ 0 $ 434 $ 0 $ 0 $ 0 $ 0 $ 3,842 Areas of %HQH¿W $2%  Funds $ 1,482 $ 1,482 $ 1,482 $ 1,482 $ 1,482 $ 1,482 $ 1,482 $ 1,482 $ 11,856 County Trust Funds $ 47 $ 47 $ 47 $ 47 $ 47 $ 47 $ 47 $ 47 $ 376 Other Local Funds $ 1,300 $ 764 $ 745 $ 2,905 $ 782 $ 0 $ 3,750 $ 0 $ 10,245 6WDWH0DWFK Funds $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 800 Competitive Grants $ 17,861 $ 11,879 $ 18,418 $ 26,551 $ 11,043 $ 5,700 $ 0 $ 0 $ 91,453 Total $ 31,150 $ 28,144 $ 38,215 $ 50,025 $ 32,919 $ 19,554 $ 16,879 $ 12,929 $ 229,819 Projected Annual Expenditures (values in thousands of dollars) Funding Source FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Total Gas Tax Funds $ 7,935 $ 12,894 $ 17,423 $ 18,506 $ 19,465 $ 12,225 $ 11,500 $ 11,300 $ 111,247 0HDVXUH-$ 2,425 $ 978 $ 0 $ 434 $ 0 $ 0 $ 0 $ 0 $ 3,842 Areas of %HQH¿W $2%  Funds $ 466 $ 452 $ 323 $ 0 $ 0 $ 0 $ 0 $ 0 $ 1,241 County Trust Funds $ 759 $ 567 $ 0 $ 329 $ 0 $ 0 $ 0 $ 0 $ 1,655 Other Local Funds $ 1,300 $ 764 $ 745 $ 2,905 $ 782 $ 0 $ 3,750 $ 0 $ 10,245 6WDWH0DWFK Funds $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Competitive Grants $ 17,861 $ 11,879 $ 18,418 $ 26,551 $ 11,043 $ 5,700 $ 0 $ 0 $ 91,453 Total $ 30,745 $ 27,535 $ 36,909 $ 48,725 $ 31,290 $ 17,925 $ 15,250 $ 11,300 $ 219,683 2410-10-12 TWIC Meeting - Agenda Packet, Page 35 of 330 ROAD PROGRAM AT WORK BUDGETS ARE COMMUNICATION TOOLS. This CRIPP attempts to communicate the challenges, opportunities, and choices presented in maintaining and improving Contra Costa County’s public roadway infrastructure. This document and its projects have been reviewed and input obtained by many people throughout WKH&RXQW\7KLVZDVGRQHWKURXJKSXEOLFZRUNVKRSVDQGFRPPXQLW\PHHWLQJVVXFKDVWKHDUHD 0XQLFLSDO$GYLVRU\&RXQFLOV,QSXWKDVDOVREHHQUHFHLYHGIURPPHPEHUVRIWKH%RDUGRI6XSHUYLVRUV DQGVWD໤IURPWKH3XEOLF:RUNV'HSDUWPHQWDQGWKH'HSDUWPHQWRI&RQVHUYDWLRQDQG'HYHORSPHQW CRIPP OUTLOOK: 7KH&5,33SURYLGHVDJHQHUDOO\SRVLWLYHRXWORRNRYHUWKHQH[W\HDUSHULRG+RZHYHUWKHUHDUH PDQ\FRPSHWLQJSULRULWLHVIRUWKH¿[HGDPRXQWRIORFDOIXQGLQJ *DVWD[DQG0HDVXUH- WKH&RXQW\ annually receives. Gas tax is the primary funding source for the road program, with the majority going towards maintenance and the capital projects presented in the CRIPP. The goal over the next 7 years is to increase the amount of available funding for the pavement surface treatment program and routine maintenance of over 660 miles of County roadway while balancing that with the need for new, updated infrastructure. The past several years have seen also seen many external forces D໤HFWLQJWKHDPRXQWRI*DVWD[WKH&RXQW\KDVDYDLODEOH7KHVHLQFOXGH&29,'URDGZD\UHSDLU caused by 2017 storm events, and the increased costs of construction materials and labor of almost 20% in just the past two years. What does the future hold for the type of projects we deliver? One important goal to create DVXVWDLQDEOHWUDQVSRUWDWLRQQHWZRUNWRWU\DQGDGGUHVVWKHLPSDFWVRIWKHURDGV\VWHPRQWKH environment. We also need to address issues of environmental justice in the development of our SURMHFWVZKLFKLVDJUHDWFRQFHUQIRURXUUHVLGHQWVDQGVWDNHKROGHUV 7KH&5,33LVDG\QDPLFGRFXPHQWHYHUFKDQJLQJDQGUHDFWLQJWR¿QDQFLDODQGVRFLDOFKDQJHV legislated requirements, and community desires. This document and its updates are available at: https://www.contracosta.ca.gov/383/Capital-Road-Improvement-Preservation-Pr. 2510-10-12 TWIC Meeting - Agenda Packet, Page 36 of 330 2610-10-12 TWIC Meeting - Agenda Packet, Page 37 of 330 ROAD PROGRAM AT WORK SECTION II Capital Road Projects Countywide and Supervisor Districts 2710-10-12 TWIC Meeting - Agenda Packet, Page 38 of 330 ROAD PROGRAM AT WORK CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM – Active and Completed Project List The following pages contain the list of proposed projects for the next 2022 CRIPP publication. The Active and Completed CRIPP project list is sorted by Board of Supervisor Districts and Countywide projects. There are 5listed active or completed projects; however, some projects span across two Districts and are listed more than once. Projects are considered active when funding has been secured for the project. Projects that have been completed between the publication of the 2020 CRIPP and this one are also included to ensure the list is a comprehensive representation of the County’s Road Program. The projects are sorted geographically by Countywide projects and then by County Board of Supervisor Districts (District). Each tabbed section generally contains the following information: County-Wide Projects are introduced before District I. These projects are on-going programs that vary geographically on a yearly basis. For example, a County-Wide Curb Ramp project may focus on one area of the County, and another area in the following year. Board of Supervisor District-wide project overview map provides a quick reference to locate active projects. Active project list within the District (excluding countywide projects as discussed above) with project descriptions allow the reader to view the active projects. Active project data sheets include a project description, funding schedule, and vicinity map. In support of Road Program's four areas of focus, these projects are categorized as follows: Project Category Description Safety Safety projects are scoped primarily to reduce vehicle, pedestrian, and bicycle collisions. Almost all projects have a safety aspect; however to be categorized as a safety project, it must have been originally scoped to have a safety component rather than specifically for a reliability, efficiency, or accessibility component. Reliability Reliability projects are scoped to improve or sustain a rating index such as pavement condition index (PCI), Bridge Sufficiency rating, Brid ge Health Index, and Culvert Condition Index (under development). Pavement and bridge projects are typically categorized “Reliability.” Efficiency Efficiency projects are usually generated from Level Of Service (LOS) studies, from roadway capacity issues, or from traffic signal warrants. LOS studies are often found in Area of Benefit studies. Efficiency projects tend to be more costly to design and construct since these are more systemic improvement than localized improvements. Mobility Accessibility project include ADA upgrades, pedestrian and bicycle improvements, and pedestrian flashers. Complete street projects are usually placed in this category. 2810-10-12 TWIC Meeting - Agenda Packet, Page 39 of 330 ROAD PROGRAM AT WORK Countywide Projects 2910-10-12 TWIC Meeting - Agenda Packet, Page 40 of 330 ROAD PROGRAM AT WORK COUNTYWIDE: ACTIVE CRIPP PROJECTS C-1. 2022 Countywide Curb Ramp Project – This project is to retrofit existing curb ramps and install new ones throughout Contra Costa County to meet ADA standards. This is part of an annual program to upgrade or install ramps in advance of a pavement surface treatment project in the same area. This project is funded by: Gas Tax. Preliminary work areas appear to be in Pacheco, Bay Point, Rodeo and Contra Costa Center/Walden. C-2. 2022 Countywide Surface Treatment – This is part of the annual pavement surface treatment program and is a project rescheduled from 2022 to 2023. This project is funded by Gas Tax. Preliminary work areas appear to be in Pacheco, Bay Point, and Contra Costa Center. C-3. Tara Hills Full Trash Capture Project (2022 Trash Capture Device Installation) – This project installs prefabricated Trash Treatment Control Devices (TTCD) at three locations in the Tara Hills area. This project is funded by: Gas Tax and CCCFCD-SUA funds C-4. Bridge Preventative Maintenance Project (HBP) - This project is to perform maintenance such as surface treatments to various bridges in the County based on the periodic bridge inspections of County bridges. Construction is planned for 2022. This project is funded by: HBP, Gas Tax. C-5. Countywide Curb Ramp Program (Maintenance Division) - This program is to retrofit existing curb ramps and install new ones throughout Contra Costa County to meet ADA standards. This is a set-aside budget item to support the annual program. This project is funded by: Gas Tax. C-6. Pavement Surface Treatments (Maintenance Division) - This is an annual program to fund surface treatments throughout the County. Surface treatments will be performed over various years in the following areas: (Areas Subject to Change) x Group 1 – East Richmond Heights, Rodeo, Kensington, Crockett/Walnut Creek, San Pablo Dam Road x Group 2 – Crockett, Discovery Bay, Marsh Creek Area, Tassajara Valley x Group 3 – Tara Hills, Saranap, Martinez, Alamo, South Walnut Creek x Group 4 – Montalvin, Bay View, Bay Point, East Danville & Blackhawk Road These groups are planned for in upcoming years. This program is funded by: Gas Tax. 3010-10-12 TWIC Meeting - Agenda Packet, Page 41 of 330 ROAD PROGRAM AT WORK COUNTYWIDE: COMPLETED CRIPP PROJECTS C-7. 2021 Countywide Surface Treatment – This project will rehabilitate roadway pavement, extend the life of the road, and reduce the long-term maintenance costs. C-8. 2021 Curb Ramp Project (Maintenance Division) - This project upgraded existing curb ramps that were not ADA compliant and were within the project limits of a planned pavement treatment project. Construction was finalized in 2022. This project was funded by: Gas Tax. x Areas included North Richmond Area, Clyde Area, North Concord Area, Castle Hill Area, and Alamo Area C-9. Guardrail Upgrade Project (HSIP) - This project upgraded existing guardrail end treatments to the current Caltrans standard. Approximately 167 guardrail ends were upgraded with HSIP Cycle 8 Funds. Construction was completed in 2020. This project was funded by: HSIP, East County Regional AOB. 3110-10-12 TWIC Meeting - Agenda Packet, Page 42 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED CountywLdH mobility Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination 55 Preliminary Engineering 140 140 Environmental 45 45 Design Engineering +Right-of-Way 30 30 + Construction 2,780 470 2,310 Total 3,000 690 2,310 + Gas Tax (c) 3,000 690 2,310 Purpose is to improve multi-modal access along public roadways. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT 2022 Countywide Curb Ramp Project The curb ramp projects are to improve curb ramps and install new ones per State law where a pavement reconstruction project was performed. Areas for this project may include Contra Costa Center:DOGHQ, Bay Point, 3DFKHFRand 5RGHR areas. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 3210-10-12 TWIC Meeting - Agenda Packet, Page 43 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED CountywLdH reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 200 100 100 Environmental 10 10 Design Engineering +Right-of-Way + Construction 4,790 50 4,740 Total 5,000 100 160 4,740 + Gas Tax (c) 5,000 100 160 4,740 2022 Countywide Surface Treatment Project Surface treatment projects will rehabilitate the existing roadway pavement, extend the life of the road, and reduce the long-term maintenance costs. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Surface Treatment will be at various locations throughout the County. Here is a list of possible treatment areas: Contra Costa Center, Bay Point, and Pacheco PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 3310-10-12 TWIC Meeting - Agenda Packet, Page 44 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED CountywLdH reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering Environmental 2 2 Design Engineering 20 5 15 +Right-of-Way + Construction 70 70 Total 92 7 85 CCCFCD-SUA 61 61 Gas Tax 31 7 24 7DUD+LOOV)XOOTrash Capture 3URMHFW 7UDVK&DSWXUH'HYLFH,QVWDOODWLRQ This is to improve water quality as part of the Municipal Regional Permit. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project installs prefabricated Trash Treatment Control Devices (TTCD) at three locations in the Tara Hills area. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 3410-10-12 TWIC Meeting - Agenda Packet, Page 45 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED CountyZidH reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 11 Environmental 141 39 103 Design Engineering 350 221 128 +Right-of-Way 25 25 + Construction 728 15 713 Total 1,245 261 271 713 + Gas Tax (c)533 127 98 307 HBP 712 134 172 406 Bridge Preventative Maintenance Project Ensure the maintenance and safety of the existing bridges throughout the County. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to perform maintenance such as surface treatments to various bridges in the County based on the periodic bridge inspections of County bridges. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 3510-10-12 TWIC Meeting - Agenda Packet, Page 46 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED mobility Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 + ADMIN 11,600 1,200 1,300 1,300 1,300 1,300 1,300 1,300 1,300 Planning/ Coordination Preliminary Engineering Environmental Design Engineering +Right-of-Way + Construction Operations Total 11,600 1,200 1,300 1,300 1,300 1,300 1,300 1,300 1,300 Gas Tax 11,600 1,200 1,300 1,300 1,300 1,300 1,300 1,300 1,300 Measure J RTS Amounts shown in thousands of dollars Countywide Curb Ramp Project This program is to retrofit existing curb ramps and install new ones throughout Contra Costa County to meet ADA standards. This is part of an annual program to upgrade or install ramps in advance of a pavement surface treatment project in the same area. The purpose is to improve multi-modal mobility and to provide equal access to all users within the public road right-of-way SUPERVISOR DISTRICT PROJECT CATEGORY Anticipated Project Expenditures Countywide CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 3610-10-12 TWIC Meeting - Agenda Packet, Page 47 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering Environmental Design Engineering +Right-of-Way + Construction 5,500 5,500 Operations 70,000 10,000 10,000 10,000 10,000 10,000 10,000 Total 75,500 5,500 10,000 10,000 10,000 10,000 10,000 10,000 Gas Tax 71,900 1,900 10,000 10,000 10,000 10,000 10,000 10,000 Measure J RTS 3,400 3,400 Amounts shown in thousands of dollars Pavement Surface Treatments This is an annual program to fund surface treatments throughout the County. Surface treatments will be performed over various years in the following areas: (Areas Subject to Change) East Richmond Heights, Rodeo, Kensington, Crockett/Walnut Creek, San Pablo Dam Road Crockett, Discovery Bay, Marsh Creek Area, Tassajara Valley Tara Hills, Saranap, Martinez, Alamo, South Walnut Creek Montalvin, Bay View, Bay Point, East Danville & Blackhawk Road Surface treatment projects will rehabilitate the existing roadway pavement, extend the life of the road, and reduce the long-term maintenance costs. SUPERVISOR DISTRICT PROJECT CATEGORY Anticipated Project Expenditures Countywide CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 3710-10-12 TWIC Meeting - Agenda Packet, Page 48 of 330 3810-10-12 TWIC Meeting - Agenda Packet, Page 49 of 330 ROAD PROGRAM AT WORK Board of Supervisors District I 3910-10-12 TWIC Meeting - Agenda Packet, Page 50 of 330 RodeoCrockettEl SobranteNorth RichmondKensingtonTara HillsEl SobranteAlhambra ValleyBayviewEast Richmond HeightsMontalvin ManorPort CostaRollingwoodRichmondPinoleHerculesOrindaEl CerritoLafayetteSan PabloMartinezI-9I-8I-7I-10I-6I-5I-4I-3I-2I-1IVIISan Pablo AveSan Pablo Dam RdBear Creek RdRichmond PkwyCarlson BlvdCutting BlvdAppian W a yCummings Skwy23Rd StHilltop DrCastro StMcewen RdMacdonald AveFrankli n C a ny o n R d Pinole Valley RdCastro Ranch RdGarrard BlvdParker Ave CRIPP Active Project MapUnincorporated PlacesCitiesActive ProjectsCompleted ProjectsNote: Projects are identified with Supervisor District number and project number for its District.Supervisor District I01.530.75Miles¹4010-10-12 TWIC Meeting - Agenda Packet, Page 51 of 330 ROAD PROGRAM AT WORK SUPERVISOR DISTRICT 1: ACTIVE CRIPP PROJECTS I-1. I-2. I-3. I-4. I-5. I-6. Appian Way Utility Undergrounding Project (PG&E Rule 20A) - This project will underground existing overhead power lines as part of a PG&E program from the City of Pinole to Argyle Road. Construction is planned for 2028. This project is funded by: PG&E Rule 20A (Work Credits spent by PG&E), Gas Tax. Briones Area Guardrail Upgrades (HSIP) - This project will remove approximately 43 guardrails and replace them with new guardrails DQGHQGWUHDWPHQWVthat meet the current Caltrans standard on Bear Creek Road and Alhambra Valley Road in the unincorporated Briones area. Construction is planned for 2023. This project spans three Supervisor Districts (I, II, and V). This project is funded by: HSIP, Gas Tax. Del Monte Drive Bridge Painting and Polyester Concrete Overlay (Bridge No. 28C0207) (HBP) - This project is to repaint and overlay the Del Monte Drive Bridge over Burlington Northern Santa Fe railroad. Construction is planned for 2024. This project is funded by: HBP, Gas Tax. San Pablo Dam Road and Bailey Road Signal Hardware Upgrades (HSIP) - This project will upgrade traffic signal hardware, install Advanced Dilemma Detection Zone systems, and improve pedestrian crossing signal hardware at eleven intersections on San Pablo Dam Road and Bailey Road. Construction is planned for 2024. This project spans District I and V. This project is funded by: HSIP, Gas Tax. Tara Hills Curb Ramps on Shawn Drive (TDA Grant) - This project will install twelve ADA curb ramps at various intersections on Shawn Drive in the Tara Hills area of unincorporated San Pablo. Construction is planned for 2023. This project is funded by: TDA, Gas Tax. Westminster and Kenyon Avenue Accessibility Project (TDA Grant) - The project consists of installing fourteen curb ramps at selected intersections along Westminster Avenue and Kenyon Avenue in Kensington. Construction is planned for 2023. This project is funded by: TDA, Gas Tax 4110-10-12 TWIC Meeting - Agenda Packet, Page 52 of 330 ROAD PROGRAM AT WORK SUPERVISOR DISTRICT 1: COMPLETED CRIPP PROJECTS I-7. Alhambra Valley Embankment Repair Site 1 - West of Castro Ranch Road (Maintenance Division) - This project repaired the roadway embankment and restored the roadway shoulder. Project was substantially constructed in 2021 and expected to be completed in 2022. This project was funded by: Measure J Return to Source, Gas Tax. I-8. Alhambra Valley Road Embankment Repair (Maintenance Division) - This project realigned Alhambra Valley Road and rebuilt the roadway away from the embankment slide and the creek. Construction was completed in 2021. This project is funded by: Measure J Return to Source, Gas Tax. I-9. Bear Creek Road - Road Embankment Repair (Maintenance Division) - This project repaired the roadway embankment along Bear Creek Road. Project was substantially constructed in 2021 and expected to be completed in 2022. This project spans District I and V. This project was funded by: Measure J Return to Source, Gas Tax. I-10. Fred Jackson Way, First Mile/Last Mile Connection (ATP) - This project constructed complete street improvements along Fred Jackson Way from Brookside Drive to Grove Avenue. This project was formerly named Fred Jackson Way Improvements – Grove Avenue to Brookside Drive. Project constructed in 2022. This project was funded by: ATP, State Coastal Conservancy Prop 1, North Richmond AOB, Measure J Transportation for Livable Communities. 4210-10-12 TWIC Meeting - Agenda Packet, Page 53 of 330 ROAD PROGRAM AT WORK 4310-10-12 TWIC Meeting - Agenda Packet, Page 54 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1 safety Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination 225 50 25 25 25 25 25 50 Preliminary Engineering Environmental Design Engineering + Right-of-Way 300 300 + Construction 3,900 3,900 Total 4,425 50 25 325 25 25 25 3,950 + Gas Tax (c)675 50 25 325 25 25 25 200 Rule 20A 3,750 3,750 Appian Way Utility Undergrounding Project Utilities will be placed underground to improve the aesthetics by removing roadside obstacles along the gateway to the El Sobrante community. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project will underground existing overhead power lines as part of a PG&E program from the City of Pinole to Argyle Road. Construction is planned for 2028. This project is funded by: PG&E Rule 20A (Work Credits spent by PG&E), Gas Tax. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 4410-10-12 TWIC Meeting - Agenda Packet, Page 55 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME I-1 Source: County GIS Appian Way Utility Undergrounding Project PROJECT NUMBER ROAD PROGRAM AT WORK 4510-10-12 TWIC Meeting - Agenda Packet, Page 56 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1 safety Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 15 7 8 Environmental 75 1 74 Design Engineering 150 150 +Right-of-Way 5 5 + Construction 1,437 120 1,317 Total 1,682 8 237 120 1,317 + Gas Tax (c)690 8 237 8 437 HSIP 992 113 880 Briones Area Guardrail Upgrades The County needs to upgrade deficient guardrails to reduce the potential and severity of injuries when vehicles collide with them. The HSIP grant allows the County to leverage its funds and upgrade more guardrails in a more timely manner, providing a safer environment for drivers in the event of a collision. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project will remove approximately 43 guardrails and end treatments and replace them with new guardrails and end treatments that meet the current Caltrans standard on Bear Creek Road and Alhambra Valley Road in the unincorporated Briones area. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 4610-10-12 TWIC Meeting - Agenda Packet, Page 57 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME I-2 Source: County GIS Briones Area Guardrail Upgrades PROJECT NUMBER ROAD PROGRAM AT WORK 4710-10-12 TWIC Meeting - Agenda Packet, Page 58 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1 reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering Environmental Design Engineering 355 150 150 55 +Right-of-Way 51 51 + Construction 761 100 661 Total 1,167 150 301 716 + Gas Tax (c)374 93 135 146 HBP 793 57 166 570 Del Monte Drive Bridge Painting and Poly Overlay (Bridge No. 28C0207) The existing bridge requires repair. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to repaint and overlay the Del Monte Drive Bridge. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 4810-10-12 TWIC Meeting - Agenda Packet, Page 59 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME I-3 Source: County GIS Del Monte Drive Bridge Painting and Poly Overlay (Bridge No. 28C0207) PROJECT NUMBER ROAD PROGRAM AT WORK 4910-10-12 TWIC Meeting - Agenda Packet, Page 60 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1 safety Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination 25 7 18 Preliminary Engineering 30 30 Environmental 38 1 32 5 Design Engineering 141 75 66 +Right-of-Way + Construction 1,012 120 892 Total 1,245 8 155 191 892 Gas Tax 145 8 28 14 95 HSIP - State 1,100 127 177 797 San Pablo Dam Road and Bailey Road Signal Hardware Upgrades This project improves the safety of eleven intersections along San Pablo Dam Road and Bailey Road by upgrading traffic signal hardware, installing Advanced Dilemma Detection video systems, and upgrading pedestrian signal hardware. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project will upgrade traffic signal hardware, install Advanced Dilemma Detection Zone systems, and improve pedestrian crossing signal hardware at eleven intersections on San Pablo Dam Road and Bailey Road PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 5010-10-12 TWIC Meeting - Agenda Packet, Page 61 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME I-4 Source: County GIS San Pablo Dam Road and Bailey Road Signal Hardware Upgrades PROJECT NUMBER ROAD PROGRAM AT WORK 5110-10-12 TWIC Meeting - Agenda Packet, Page 62 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1 mobility Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 10 5 5 Environmental 5 5 Design Engineering 55 20 35 +Right-of-Way + Construction 263 6 257 Total 333 31 302 + Gas Tax (c)253 253 TDA 80 31 49 Tara Hills Curb Ramps on Shawn Drive Previously there was a project that installed ADA curb ramps along Dolan Way to create a walkable path leading up to Tara Hills Elementary School. This school also has a south side entrance on Shawn Drive. This project will create a walkable path to the south side entrance of the school. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project will install 12 ADA curb ramps on various intersections on Shawn Drive in the Tara Hills area of unincorporated San Pablo. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 5210-10-12 TWIC Meeting - Agenda Packet, Page 63 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME I-5 Source: County GIS Tara Hills Curb Ramps on Shawn Drive PROJECT NUMBER ROAD PROGRAM AT WORK 5310-10-12 TWIC Meeting - Agenda Packet, Page 64 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1 mobility Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination 19 19 Preliminary Engineering 11 2 2 7 Environmental 2 2 Design Engineering 145 60 50 35 +Right-of-Way 10 8 2 + Construction 403 403 Total 590 19 70 54 447 + Gas Tax (c)547 9 38 54 447 TDA 43 10 32 Westminster and Kenyon Avenue Accessibility Project The purpose of this project is to improve the pedestrian infrastructure by providing ADA- compliant curb ramps along portions of Westminster Avenue and Kenyon Avenue in the Kensington area. This project is necessary to improve the safety of pedestrians and to provide ADA access to Kensington Elementary School, Kensington Park, Kensington Community Center, Kensington Library, and public transit for everyone of all capabilities. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT The project consists of installing fourteen curb ramps at selected intersections along Westminster Avenue and Kenyon Avenue in Kensington. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 5410-10-12 TWIC Meeting - Agenda Packet, Page 65 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME I-6 Source: County GIS Westminster and Kenyon Avenue Accessibility Project PROJECT NUMBER ROAD PROGRAM AT WORK 5510-10-12 TWIC Meeting - Agenda Packet, Page 66 of 330 5610-10-12 TWIC Meeting - Agenda Packet, Page 67 of 330 ROAD PROGRAM AT WORK Board of Supervisors District II 5710-10-12 TWIC Meeting - Agenda Packet, Page 68 of 330 AlamoBlackhawkNorris CanyonDiabloReliez ValleySaranapAlhambra ValleyEl SobranteSan MiguelKensingtonCastle HillCamino TassajaraNorth GateEl SobranteShell RidgeContra Costa CentreAcalanes RidgePachecoAcalanes RidgeEast Richmond HeightsConcordAntiochDanvilleOrindaLafayetteSan RamonWalnut CreekMoragaClaytonRichmondPleasant HillMartinezBrentwoodEl CerritoOakleyPittsburgII-9II-8II-10II-1II-7II-6II-5II-4II-3II-2IIIVIIIIVVMarsh Creek RdMorgan Territory Rd N Gate RdClayton AveCamino TassajaraYgnacio Valley RdBollinger Canyon RdMoraga RdAlcost a Blv d Concord BlvdHighland RdTaylor BlvdSan Ram o n V all e y Bl v dLone Tree WayDiablo RdPinehrust RdBailey RdDougherty Rd Blackhawk RdWalnut BlvdMyrtle DrGlorietta BlvdGolf Course RdDougherty Rd CRIPP Active Project MapUnincorporated PlacesCitiesActive ProjectsCompleted ProjectsNote: Projects are identified with Supervisor District number and project number for its District.Supervisor District II02.551.25Miles¹5810-10-12 TWIC Meeting - Agenda Packet, Page 69 of 330 ROAD PROGRAM AT WORK SUPERVISOR DISTRICT 2: ACTIVE CRIPP PROJECTS II-1. Briones Area Guardrail Upgrades (HSIP) - This project will remove approximately 43 guardrails and end treatments and replace them with new guardrails and end treatments that meet the current Caltrans standard on Bear Creek Road and Alhambra Valley Road in the unincorporated Briones area. Construction is planned for 2023. This project spans three Supervisor Districts (I, II, and V). This project is funded by: HSIP, Gas Tax. II-2. Camino Tassajara/Tassajara Road Realignment Project - This project is to realign and widen Camino Tassajara within Contra Costa County and Tassajara Road within the City of Dublin to improve safety for motorists and increase accessibility for bicyclists and pedestrians. Construction is tentatively scheduled for 2025 subject to funding availability. This project is currently funded by: SCC Sub-Regional, Tassajara JEPA, City of Dublin Funds. II-3. Danville Blvd/Orchard Ct Complete Streets Improvements (HSIP) - This project is to construct a roundabout at the Danville Boulevard/Orchard Court intersection and install complete street improvements along Danville Boulevard between Jackson Way and Stone Valley Road in Downtown Alamo. Construction is planned for 2022. This project is funded by: HSIP, Measure J Regional, Trust 8192, Gas Tax. II-4. Freeman Road and Briones Valley Road Bridge Maintenance Project (HBP) – This project spans two Supervisor Districts. In District II, Freeman Road Bridge Maintenance Project over Las Trampas Creek is to clean and repaint all structural steel members, replace joint seals at the abutments, backfill any eroded embankment slope paving with concrete, and seal the concrete curbs and roadway deck. In District III, Briones Valley Road Bridge Preventative Maintenance project, over Briones Creek, includes repainting the bridge superstructure and replacing or tightening all bolted connections between the deck and steel plates. Construction is planned for 2026. This project is funded by: HBP, Gas Tax. II-5. Iron Horse Trail Crossing Enhancements - Alamo (TDA) - This project will install new rectangular rapid flash beacons (RRFBs) with passive activation systems at the Hillgrade Avenue and Las Trampas Road crossings of the Iron Horse Regional Trail and will add passive activation systems to the existing flasher systems at Stone Valley Road West and Hemme Avenue crossings. Construction is planned for 2022. This project is funded by: TDA, Gas Tax. 5910-10-12 TWIC Meeting - Agenda Packet, Page 70 of 330 ROAD PROGRAM AT WORK II-6. Norris Canyon Road Safety Improvements (Measure J) - The project will improve safety on Norris Canyon Road by widening and realigning an approximately 1,000-foot segment of Norris Canyon Road located west of Ashbourne Drive and installing a safety rail/guard rail on the south side of the roadway. Construction is planned for 2025. This project is funded by: Measure J, Gas Tax. II-7. Pleasant Hill Road Bridge Rehabilitation (Bridge No. 28C0154) (HBP) - This project is to extend the service life of the Pleasant Hill Road Bridge over Taylor Boulevard. This project spans Districts II and IV. Construction is planned for 2023. This project is funded by: HBP, Gas Tax. SUPERVISOR DISTRICT 2: COMPLETED CRIPP PROJECTS II-8. Happy Valley Road - Embankment Repair (Maintenance Division) - This project repaired an existing slide along Happy Valley Road and restored the roadway to its original pavement width. Project was constructed in 2021. This project is funded by: Caltrans Emergency Fund, Measure J Return to Source, Gas Tax. II-9. Pinehurst Road - Sinkhole and Culvert Repair (Maintenance Division) - This project repaired the roadway and culvert underneath at Pinehurst Road, 2.5 miles north of Canyon Road. Construction was coPSOHWHG in 2021. This project was funded by: Caltrans Emergency Fund, Measure J Return to Source, Gas Tax. II-10. Walnut Creek Crosswalk Improvements (TDA Grant) - This project improved pedestrian safety at two crosswalk locations near unincorporated Walnut Creek. One of the two crossings was located in District II at the intersection of Olympic Boulevard and Bridgefield Road. The other project site was located in District IV at Walden Road and Westcliffe Lane. Construction was completed in 2020. This project was funded by: HSIP, TDA, Gas Tax. 6010-10-12 TWIC Meeting - Agenda Packet, Page 71 of 330 6110-10-12 TWIC Meeting - Agenda Packet, Page 72 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1 safety Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 15 7 8 Environmental 75 1 74 Design Engineering 150 150 +Right-of-Way 5 5 + Construction 1,437 120 1,317 Total 1,682 8 237 120 1,317 + Gas Tax (c)690 8 237 8 437 HSIP 992 113 880 Briones Area Guardrail Upgrades The County needs to upgrade deficient guardrails to reduce the potential and severity of injuries when vehicles collide with them. The HSIP grant allows the County to leverage its funds and upgrade more guardrails in a more timely manner, providing a safer environment for drivers in the event of a collision. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project will remove approximately 43 guardrails and end treatments and replace them with new guardrails and end treatments that meet the current Caltrans standard on Bear Creek Road and Alhambra Valley Road in the unincorporated Briones area. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 6210-10-12 TWIC Meeting - Agenda Packet, Page 73 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME II-1 Source: County GIS Briones Area Guardrail Upgrades PROJECT NUMBER ROAD PROGRAM AT WORK 6310-10-12 TWIC Meeting - Agenda Packet, Page 74 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2 mobility Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination 12 12 Preliminary Engineering 73 48 10 5 5 5 Environmental 476 23 50 25 100 279 Design Engineering 2,393 149 200 200 300 1,544 + Right-of-Way 450 450 + Construction 65 65 Total 3,469 219 260 230 405 2,355 City of Dublin funds 1,271 110 130 115 203 714 SCC Sub-Regional 1,869 110 130 115 203 1,311 Tassajara JEPA 329 329 Camino Tassajara/Tassajara Road Realignment Project The purpose of this project is to realign and widen Camino Tassajara within Contra Costa County (County) and Tassajara Road within the City of Dublin (City) from Windemere Parkway to Kylemore Circle/Palisades Drive. Realignment of the roadway will improve safety for motorists and accessibility for bicyclists and pedestrians along Camino Tassajara. The project will improve sight distance by removing the S-curve. Widening of the roadway from two-lanes to four lanes will also increase capacity to accommodate projected future traffic volumes, consistent with the County General Plan. The additional pavement width will provide Class II bicycle lanes in accordance with the 2018 Contra Costa Countywide Bicycle and Pedestrian Plan. An additional separated shared use path will bridge the City of Dublin's trail network to the County’s existing bicycle, sidewalk, and trails along Windemere Parkway and Camino Tassajara. Anticipated Project Expenditures Amounts shown in thousands of dollars SUPERVISOR DISTRICT This project is to realign and widen Camino Tassajara within Contra Costa Conty and Tassajara Road within the City of Dublin to improve safety for motorists and increase accessibility for bicyclists and pedestrians. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 2QO\WKH'HVLJQSKDVHLVIXQGHG52:DQG&RQVWUXFWLRQ$FWLYLWLHVZLOOSURFHHGZKHQIXQGLQJLVLGHQWLILHGDQGVHFXUHG 6410-10-12 TWIC Meeting - Agenda Packet, Page 75 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME II-2 Source: County GIS Camino Tassajara/Tassajara Road Realignment Project PROJECT NUMBER ROAD PROGRAM AT WORK 6510-10-12 TWIC Meeting - Agenda Packet, Page 76 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2 safety Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination 99 Preliminary Engineering 91 77 14 Environmental 152 106 46 Design Engineering 1,245 1,013 232 + Right-of-Way 1,371 1,171 200 + Construction 3,441 30 3,411 Total 7,309 2,367 522 4,420 + Gas Tax (c) 3,163 1,319 114 1,730 HSIP 2,718 399 86 2,233 Measure J Regional 1,370 591 322 457 Trust 8192 57 57 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Danville BRXlHvDUd/Orchard CRXUt Complete Streets Improvements This project is to construct a roundabout at the Danville Boulevard/Orchard Court intersection and install complete street improvements along Danville Boulevard between Jackson Way and Stone Valley Road in Downtown Alamo. Construction is scheduleG for the summer of 2022. This project is funded by Highway Safety Improvement Program (HSIP), Measure J, and Developer Fees. The Danville Boulevard/Orchard Court intersection is ranked within the top five locations in the County with the highest number of bicycle and/or pedestrian collisions at an intersection. The increased amount of motorized and non-motorized users is due to this corridor being part of Downtown Alamo, with the Alamo Plaza shopping center on one side and another shopping center across the street. Mature trees in the sidewalk have damaged the existing sidewalks and made them uneven. The project aims to improve safety through the corridor for all users by improving sidewalks to meet ADA requirements and reducing conflicts at this intersection. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 6610-10-12 TWIC Meeting - Agenda Packet, Page 77 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME II-3 Source: County GIS Danville Boulevard/Orchard Court Complete Streets Improvements PROJECT NUMBER ROAD PROGRAM AT WORK 6710-10-12 TWIC Meeting - Agenda Packet, Page 78 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2 reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering Environmental Design Engineering 200 100 100 +Right-of-Way 40 40 + Construction 700 100 600 Total 940 100 240 600 Gas Tax 217 47 80 90 HBP 723 53 160 510 Freeman Road and Briones Valley Road Bridge Maintenance Project This is a bridge maintenance project to perform repairs and to paint the bridges for long-term upkeep. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT In District II, Freeman Road Bridge Maintenance Project over Las Trampas Creek is to clean and repaint all structural steel members, replace joint seals at the abutments, backfill any eroded embankment slope paving with concrete, and seal the concrete curbs and roadway deck. In District III, Briones Valley Road Bridge Preventative Maintenance project, over Briones Creek, includes repainting the bridge superstructure and replacing or tightening all bolted connections between the deck and steel plates. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 6810-10-12 TWIC Meeting - Agenda Packet, Page 79 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME II-4 Source: County GIS Freeman Road and Briones Valley Road Bridge Maintenance Project PROJECT NUMBER ROAD PROGRAM AT WORK Note: See District III for Briones bridge location 6910-10-12 TWIC Meeting - Agenda Packet, Page 80 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2 mobility Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 55 Environmental Design Engineering 5 5 +Right-of-Way + Construction 89 89 Total 99 10 89 + Gas Tax (c)10 10 TDA 89 89 Iron Horse Trail Crossing Enhancements - Alamo The purpose of this project is to improve safety of trail users at street crossings of the Iron Horse Regional Trail in Alamo. Crossings at Hillgrade Avenue and at Las Trampas Road currently have in-ground flashers to alert motorists to pedestrian and bicyclists crossing the street. The existing in-ground flashers are difficult to see by drivers during daylight hours when the trail is most heavily used, and trail users cannot tell from the trail whether the flashers have been activated. Installing rectangular rapid flashing beacons (RRFBs) will improve bicycle and pedestrian safety at these trail crossings. These crossings, along with two crossings at Stone Valley Road West and Hemme Avenue with existing flasher systems, will be modified to include passive detection to activate the flashers for pedestrians, runners, and bicyclists without requiring them to stop. The passive detection will be in addition to the existing push button actuation. This will encourage more use of the trail by active transportation users. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project will install new flashing beacons with passive activation systems at the Hillgrade Avenue and Las Trampas Road crossings of the Iron Horse Regional Trail and will add passive activation systems to the existing flasher systems at Stone Valley Road West and Hemme Avenue crossings. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 7010-10-12 TWIC Meeting - Agenda Packet, Page 81 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME II-5 Source: County GIS Iron Horse Trail Crossing Enhancements PROJECT NUMBER ROAD PROGRAM AT WORK 7110-10-12 TWIC Meeting - Agenda Packet, Page 82 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2 safety Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination 144 65 45 18 4 4 8 Preliminary Engineering 253 253 Environmental 216 3 100 113 Design Engineering 410 200 210 + Right-of-Way 251 1 70 180 + Construction 3,858 1,200 2,658 Total 5,132 322 415 521 4 1,204 2,666 + Gas Tax (c) 3,702 266 770 2,666 Measure J Regional 1,430 56 415 521 4 434 Norris Canyon Road Safety Improvements The purpose of this project is to improve safety along Norris Canyon Road by widening and realigning a narrow segment of Norris Canyon Road located west of Ashbourne Drive and installing a guard rail on the south side of the roadway where there has been a history of serious collisions. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT The project will improve safety on Norris Canyon Road by widening and realigning an approximately 1,000-foot segment of Norris Canyon Road located west of Ashbourne Drive and installing a safety rail/guard rail on the south side of the roadway. Construction is planned for 2025. This project is funded by: Measure J, Gas Tax. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 7210-10-12 TWIC Meeting - Agenda Packet, Page 83 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME II-6 Source: County GIS Norris Canyon Road Safety Improvements PROJECT NUMBER ROAD PROGRAM AT WORK 7310-10-12 TWIC Meeting - Agenda Packet, Page 84 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2 reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 140 140 Environmental 10 10 Design Engineering 203 203 +Right-of-Way 19 19 + Construction 1,856 1,700 156 Total 2,228 372 1,700 156 + Gas Tax (c)396 94 242 60 HBP 1,832 278 1,458 96 Pleasant Hill Road Bridge Rehabilitation (Bridge No. 28C0154) This project is needed in order to extend the service life of the bridge. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to extend the service life of the Pleasant Hill Road Bridge over Taylor Boulevard. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 7410-10-12 TWIC Meeting - Agenda Packet, Page 85 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME I,- Source: County GIS Pleasant Hill Road Bridge Rehabilitation (Bridge No. 28C0154) PROJECT NUMBER ROAD PROGRAM AT WORK 7510-10-12 TWIC Meeting - Agenda Packet, Page 86 of 330 7610-10-12 TWIC Meeting - Agenda Packet, Page 87 of 330 ROAD PROGRAM AT WORK Board of Supervisors District III 7710-10-12 TWIC Meeting - Agenda Packet, Page 88 of 330 AlamoByronKnightsenBay PointBlackhawkDiscovery BayBethel IslandDiabloNorris CanyonSan MiguelCamino TassajaraNorth GateClydeContra Costa CentreAntiochConcordOakleyDanvillePittsburgBrentwoodSan RamonClaytonPleasant HillIII-4III-7III-6III-5III-3III-2IIIIIVIVVasco RdBalfour RdMarsh Creek RdByron HwyMorgan Territory RdMain StBailey RdDelta RdBixler RdN Gate RdClayton AveLone Tree WayDanville BlvdConcord BlvdHighland RdE18Th StBuchanan RdCrow Canyon RdKirker Pass RdWillow Pass RdBethel Island RdDougherty Rd Myrtle DrWalnut AveN Parkside DrLivorna RdA StByron HwyCRIPP Active Project MapUnincorporated PlacesCitiesActive ProjectsCompleted ProjectsNote: Projects are identified with Supervisor District number and project number for its District.Supervisor District III0361.5Miles¹III-7810-10-12 TWIC Meeting - Agenda Packet, Page 89 of 330 ROAD PROGRAM AT WORK SUPERVISOR DISTRICT 3: ACTIVE CRIPP PROJECTS III-1. Bixler Road and Regatta Drive Intersection Improvements (TDA Grant) - This project is to install rapid rectangular flashing beacons at existing crosswalk, reconstruct an existing path, and construct a median refuge island with advanced warning road signs and pavement striping. Construction is planned for 2023. This project is funded by: TDA, Gas Tax. III-2. Byron Highway Bridge Replacement over California Aqueduct (Bridge No. 28C0121) (HBP) - This project is to replace the Byron Highway Bridge, approximately 1.4 miles northwest of the Alameda County Line. Construction is planned for 2024. This project is funded by: HBP, funds from Department of Water Resources (DWR), Gas Tax. III-3. Byron Highway/Byer Road Intersection Improvements (HSIP) - This project is to install safety improvements along the frontage of Excelsior Middle School. These improvements include the construction of a left turn pocket from southbound Byron Highway to eastbound Byer Road, a two-way left turn lane on Byron Highway, and a widening of the roadway shoulders. Construction is planned for 2022. This project is funded by: HSIP, Discovery Bay West Mitigation Fund, Discovery Bay AOB, East County Regional AOB, Gas Tax. III-4. Freeman Road and Briones Valley Road Bridge Maintenance Project (HBP) - This project spans two Supervisor Districts. In District II, Freeman Road Bridge Maintenance Project over Las Trampas Creek is to clean and repaint all structural steel members, replace joint seals at the abutments, backfill any eroded embankment slope paving with concrete, and seal the concrete curbs and roadway deck. In District III, Briones Valley Road Bridge Preventative Maintenance project, over Briones Creek, includes repainting the bridge superstructure and replacing or tightening all bolted connections between the deck and steel plates. Construction is planned for 2026. This project is funded by: HBP, Gas Tax. III-5. Marsh Creek Road Bridge Replacement (Bridge No. 28C143 & 28C145) (HBP) - This project is to replace two bridges on Marsh Creek Road, located approximately 3.0 miles east of Deer Valley Road and 7.3 miles east of Morgan Territory Road. Construction is planned for 2024. This project is funded by: HBP, East County Regional AOB, Gas Tax. 7910-10-12 TWIC Meeting - Agenda Packet, Page 90 of 330 ROAD PROGRAM AT WORK III-6. Vasco Road Safety - Phase 2 (Safety Project) - This project proposes to widen Vasco Road and construct a median barrier for about 1.5 miles of Vasco Road, approximately 3.0 miles to 5.5 miles north of the Alameda/Contra Costa County Line. Construction is planned for 2024; however, the schedule may change based on funding availability. This project is funded by: Prop 1B, RM3, Measure J Regional, Measure J Return to Source, Gas Tax. III-7. Walnut Boulevard Shoulder Widening (TDA Grant) - This project is to construct bicycle roadway improvements along Walnut Boulevard (East County) from Marsh Creek Road to Vasco Road. Construction is planned for 202. This project is funded by: TDA, Gas Tax. 8010-10-12 TWIC Meeting - Agenda Packet, Page 91 of 330 8110-10-12 TWIC Meeting - Agenda Packet, Page 92 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 3 mobility Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 31 15 16 Environmental 5 5 Design Engineering 33 10 23 +Right-of-Way + Construction 161 5 156 Total 230 30 200 + Gas Tax (c)130 130 TDA 100 30 70 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Bixler RRDd and Regatta DrLYH Intersection Improvements This project includes installing a number of infrastructure improvements. Rapid rectangular flashing beacons (RRFBs) will placed at existing crossing. Construction of center median island along with advanced warning road signs and yield lines. Project also includes the reconstruction of pedestrian path and hatched striping. The purpose of this project is to improve pedestrian safety at the intersection of Bixler Road and Regatta Drive in Discovery Bay. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 8210-10-12 TWIC Meeting - Agenda Packet, Page 93 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME III-1 Source: County GIS Bixler Road and Regatta Drive Intersection Improvements PROJECT NUMBER ROAD PROGRAM AT WORK 8310-10-12 TWIC Meeting - Agenda Packet, Page 94 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 3 reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 30 30 Environmental 494 494 Design Engineering 2,138 1,132 300 320 310 76 + Right-of-Way 3,858 38 100 1,500 1,995 225 + Construction 16,715 760 8,000 7,955 Total 23,236 1,695 400 1,820 3,065 8,301 7,955 DWR 2,335 138 118 240 340 717 782 + Gas Tax (c) 1,457 730 32 90 90 263 252 HBP 19,444 827 250 1,490 2,635 7,321 6,921 Byron Highway Bridge Replacement over California Aqueduct (Bridge No. 28C0121) The existing bridge is approaching the end of its service life. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to replace the Byron Highway Bridge, approximately 1.4 miles northwest of the Alameda County Line. Construction is scheduled for 2024. This project is funded by Highway Bridge Program (HBP) and Gas Tax Funds, and is co-sponsored with the Department of Water Resources. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 8410-10-12 TWIC Meeting - Agenda Packet, Page 95 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME III-2 Source: County GIS Byron Highway Bridge Replacement over California Aqueduct (Bridge No. 28C0121) PROJECT NUMBER ROAD PROGRAM AT WORK 8510-10-12 TWIC Meeting - Agenda Packet, Page 96 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 3 safety Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination 51 43 8 Preliminary Engineering 75 68 7 Environmental 125 116 9 Design Engineering 722 707 15 + Right-of-Way 305 295 10 + Construction 1,385 318 1,067 Total 2,663 1,229 359 1,076 Disco Bay AOB 165 165 Disco Bay West 1,465 538 359 567 East County Regional AOB 417 417 HSIP 617 109 508 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Byron Highway/Byer RRDd Intersection Improvements This project is to install safety improvements along the frontage of Excelsior Middle School. These improvements include the construction of a left turn pocket from southbound Byron Highway to eastbound Byer Road, a two-way left turn lane on Byron Highway, and a widening of the roadway shoulders. The purpose of this project is to improve traffic circulation along the frontage of the Excelsior Middle School and at the uncontrolled intersection of Byron Highway and Byer Road. The Byron Union School District has requested the County’s assistance in addressing a series of collisions that occurred along the frontage of the school. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 8610-10-12 TWIC Meeting - Agenda Packet, Page 97 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME III-3 Source: County GIS Byron Highway/Byer Road Intersection Improvements PROJECT NUMBER ROAD PROGRAM AT WORK 8710-10-12 TWIC Meeting - Agenda Packet, Page 98 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2 reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering Environmental Design Engineering 200 100 100 +Right-of-Way 40 40 + Construction 700 100 600 Total 940 100 240 600 Gas Tax 217 47 80 90 HBP 723 53 160 510 Freeman Road and Briones Valley Road Bridge Maintenance Project This is a bridge maintenance project to perform repairs and to paint the bridges for long-term upkeep. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT In District II, Freeman Road Bridge Maintenance Project over Las Trampas Creek is to clean and repaint all structural steel members, replace joint seals at the abutments, backfill any eroded embankment slope paving with concrete, and seal the concrete curbs and roadway deck. In District III, Briones Valley Road Bridge Preventative Maintenance project, over Briones Creek, includes repainting the bridge superstructure and replacing or tightening all bolted connections between the deck and steel plates. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 8810-10-12 TWIC Meeting - Agenda Packet, Page 99 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME III-4 Source: County GIS Note: See District II for Briones bridge location Freeman Road and Briones Valley Road Bridge Maintenance Project PROJECT NUMBER ROAD PROGRAM AT WORK 8910-10-12 TWIC Meeting - Agenda Packet, Page 100 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 3 reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 55 Environmental 750 740 10 Design Engineering 2,036 1,392 420 92 123 + Right-of-Way 774 436 200 68 70 + Construction 15,210 1,090 12,520 1,600 Total 18,775 2,573 630 1,250 12,713 1,600 East County Regional AOB 270 270 + Gas Tax (c) 4,193 861 363 370 2,270 320 HBP 14,313 1,713 267 880 10,173 1,280 Marsh Creek Road Bridge Replacement (Bridge No. 28C143 & 28C145) The existing bridges are approaching the end of their service life. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is replace two bridges on Marsh Creek Road, located approximately 3.0 miles east of Deer Valley Road and 7.3 miles east of Morgan Territory Road. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 9010-10-12 TWIC Meeting - Agenda Packet, Page 101 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME III-5 Source: County GIS Marsh Creek Road Bridge Replacement (Bridge No. 28C143 & 28C145) PROJECT NUMBER ROAD PROGRAM AT WORK 9110-10-12 TWIC Meeting - Agenda Packet, Page 102 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 3 safety Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination 104 100 2 2 Preliminary Engineering 17 17 Environmental 763 204 10 29 520 Design Engineering 1,555 1,335 50 70 100 + Right-of-Way 272 247 15 10 + Construction 20,438 2,044 16,350 2,044 Total 23,161 1,916 62 116 2,674 16,350 2,044 + Gas Tax (c) 6,554 309 62 116 630 3,394 2,044 Measure C 327 327 Measure J RTS 80 80 Prop 1B 1,200 1,200 Regional Measure 3 15,000 2,044 12,956 Vasco Road Safety - Phase 2 Vasco Road is a major rural arterial that is heavily traveled by commuters and has a history of severe collisions. The project will improve safety on Vasco Road by reducing cross median crashes. These long term upgrades and improvements will provide substantial safety improvements to the roadway. Anticipated Project Expenditures Amounts shown in thousands of dollars SUPERVISOR DISTRICT This project proposes to widen the roadway and construct a median barrier for about 1.5 miles of Vasco Road, approximately 3.0 miles to 5.5 miles north of the Alameda/Contra Costa County Line. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM &RQVWUXFWLRQVFKHGXOHLVVXEMHFWWRIXQGLQJDYDLODELOLW\ 9210-10-12 TWIC Meeting - Agenda Packet, Page 103 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME III-6 Source: County GIS Vasco Road Safety - Phase 2 PROJECT NUMBER ROAD PROGRAM AT WORK 9310-10-12 TWIC Meeting - Agenda Packet, Page 104 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 3 mobility Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination 29 26 4 Preliminary Engineering 11 9 2 Environmental 6 4 2 Design Engineering 361 111 50 100 100 +Right-of-Way + Construction 550 550 Total 957 149 54 104 650 + Gas Tax (c)882 74 54 104 650 TDA 75 75 Walnut Boulevard Shoulder Widening Improve bicyclist safety along Walnut Boulevard between Marsh Creek Road and Vasco Road in unincorporated Brentwood. Walnut Boulevard is included in the Contra Costa Countywide Bicycle and Pedestrian Plan as a future Class II bike lane, and constructing this project would continue the progress towards creating this bike facility. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to construct bicycle roadway improvements along Walnut Boulevard (East County) from Marsh Creek Road to Vasco Road. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 9410-10-12 TWIC Meeting - Agenda Packet, Page 105 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME III-7 Source: County GIS Walnut Boulevard Shoulder Widening PROJECT NUMBER ROAD PROGRAM AT WORK 9510-10-12 TWIC Meeting - Agenda Packet, Page 106 of 330 9610-10-12 TWIC Meeting - Agenda Packet, Page 107 of 330 ROAD PROGRAM AT WORK Board of Supervisors District IV 9710-10-12 TWIC Meeting - Agenda Packet, Page 108 of 330 AlamoBay PointDiabloVine HillSaranapReliez ValleyAlhambra ValleyBlackhawkSan MiguelPachecoCastle HillNorth GateShell RidgeContra Costa CentreClydeMountain ViewAcalanes RidgeAcalanes RidgeConcordAntiochPittsburgLafayetteWalnut CreekMartinezMoragaDanvilleClaytonPleasant HillOrindaBrentwoodBrentwoodIV-8IV-7IV-6IV-4IV-5IV-3IV-1VIIIVIIIIMarsh Creek RdBailey RdDeer Valley Rd N Gate RdClayton AveTreat BlvdDanvill e Bl v d Moraga RdAlham br a Av eConcord BlvdWillow Pass RdTaylor BlvdPacheco BlvdBuchanan RdE18Th StPleasant Hill RdCenter AveRheem BlvdHillcrest AveSt Marys RdCowell Rd Reliez Valley RdRailroad AveMt Diablo BlvdWalnut BlvdStone Valley RdSomersville RdMyrtle DrContra Costa Blv d Waterfront RdCastle Rock R dEmpire Mine RdMarina VistaConcord AveN Parkside DrSan Miguel DrSummit RdA StTice Valley BlvdNortonvill e R d Solano WayCanyon RdMitchell Canyon RdMeado w LnSouth Gate RdPaso NogalGlenside DrWillow Pass RdCRIPP Active Project MapUnincorporated PlacesCitiesActive ProjectsCompleted ProjectsNote: Projects are identified with Supervisor District number and project number for its District.Supervisor District IV01.530.75Miles¹IV-9810-10-12 TWIC Meeting - Agenda Packet, Page 109 of 330 ROAD PROGRAM AT WORK SUPERVISOR DISTRICT 4: ACTIVE CRIPP PROJECTS IV-1. Marsh Drive Bridge Replacement Over Walnut Creek (HBP) - This project is to remove and replace the existing Marsh Drive Bridge in cooperation with the City of Concord. Construction started in 2021. This project spans District IV and V. This project is funded by: HBP, East Bay Regional Parks District, Pacific Gas & Electric, Contra Costa Water District, Gas Tax. IV-2. Mayhew Way and Cherry Lane Trail Crossing Enhancement (TDA Grant) - This project is to improve trail user safety at the intersection of the Iron Horse Trail and Mayhew Way and at the intersection of Contra Costa Canal Trail and Cherry Lane in the Pleasant Hill area. Construction is planned for 2023. This project is funded by: TDA, Gas Tax. IV-3. Morgan Territory Road Bridges 5.0 & 5.2 Replacement (Maintenance) - This project will replace the Morgan Territory Road Bridges at the 5.0 and 5.2 mile mark. Construction is planned for 2024. This project is funded by: Gas Tax. IV-4. Pleasant Hill Road Bridge Rehabilitation (Bridge No. 28C0154) (HBP) - This project is to extend the service life of the Pleasant Hill Road Bridge over Taylor Boulevard. This project spans Districts II and IV. Construction is planned for 2023. This project is funded by: HBP, Gas Tax. IV-5. Treat Boulevard Corridor Improvements (I-680/Treat Blvd Bicycle & Pedestrian Plan) - This project is to improve safety and connectivity for pedestrians and bicyclists along Treat Boulevard between North Main Street and Jones Road. Construction is planned for 2025. This project is funded by: STIP, Former Redevelopment Agency, Gas Tax. 9910-10-12 TWIC Meeting - Agenda Packet, Page 110 of 330 ROAD PROGRAM AT WORK SUPERVISOR DISTRICT 4: COMPLETED CRIPP PROJECTS IV-6. Kirker Pass Road Northbound Truck Lanes (STIP and OBAG) - This project widened Kirker Pass Road and added a northbound truck-climbing lane. In addition, this project included pavement rehabilitation on Kirker Pass Road from the City of Concord/County boundary to approximately 4,200 feet east of the northern Hess Road intersection. Construction was completed in 2021. This project spans District IV and V. This project was funded by: STIP, OBAG, Measure J, State Match, Gas Tax. IV-7. Oak Road Bikeway Project (TDA) - This project improved bicyclist safety by providing Class II bicycle lanes and related improvements on Oak Road between Treat Boulevard and Buskirk Avenue in unincorporated Walnut Creek. Construction was completed in 2021. This project was funded by: TDA, Gas Tax. IV-8. Walnut Creek Crosswalk Improvements (TDA Grant) - This project improved pedestrian safety at two crosswalk locations near unincorporated Walnut Creek. One of the two crossings was located in District II at the intersection of Olympic Boulevard and Bridgefield Road. The other project site was located in District IV at Walden Road and Westcliffe Lane. Project was completed in 2020. This project is funded by: HSIP, TDA, Gas Tax. 10010-10-12 TWIC Meeting - Agenda Packet, Page 111 of 330 10110-10-12 TWIC Meeting - Agenda Packet, Page 112 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 4 reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 36 7 29 Environmental 349 319 30 Design Engineering 1,631 1,583 48 + Right-of-Way 2,038 405 960 120 553 + Construction 12,535 340 8,088 4,107 Total 16,590 2,655 9,155 4,227 553 CCWD 29 29 EBRPD 25 25 + Gas Tax (c) 2,156 704 1,008 444 HBP 13,286 1,611 7,339 3,783 553 Marsh Drive Bridge Replacement Over Walnut Creek The existing bridge is approaching the end of its service life. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to remove and replace the existing Marsh Drive Bridge in cooperation with the City of Concord. This project is scheduled for construction in 2021. This project is funded by Highway Bridge Program (HBP) and Gas Tax Funds. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 10210-10-12 TWIC Meeting - Agenda Packet, Page 113 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME IV-1 Source: County GIS Marsh Drive Bridge Replacement Over Walnut Creek PROJECT NUMBER ROAD PROGRAM AT WORK 10310-10-12 TWIC Meeting - Agenda Packet, Page 114 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 4 mobility Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination 19 13 6 Preliminary Engineering 11 6 5 Environmental Design Engineering 110 1 60 49 +Right-of-Way 30 10 20 + Construction 231 231 Total 401 13 76 312 + Gas Tax (c)352 3 37 312 TDA 50 10 39 Mayhew Way and Cherry Lane Trail Crossing Enhancement The purpose of this project is to improve trail user safety at the intersection of the Iron Horse Regional Trail and Mayhew Way and at the intersection of the Contra Costa Canal Trail and Cherry Lane in the Pleasant Hill area. Mayhew Way crossing is in the top five Iron Trail Crossing with the highest traffic volume. This is the last one to receive a traffic control device. Cherry Lane's trail crossing has existing in-ground flashers that are no longer effective; RRFBs will upgrade and improve the safety of this trail crossing. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to improve trail user safety at the intersection of the Iron Horse Trail and Mayhew Way and at the intersection of Contra Costa Canal Trail and Cherry Lane in the Pleasant Hill area. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 10410-10-12 TWIC Meeting - Agenda Packet, Page 115 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME IV-2 Source: County GIS Mayhew Way and Cherry Lane Trail Crossing Enhancement PROJECT NUMBER ROAD PROGRAM AT WORK 10510-10-12 TWIC Meeting - Agenda Packet, Page 116 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 4 reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 251 1 250 Environmental 252 32 100 100 20 Design Engineering 472 222 250 + Right-of-Way 100 50 50 + Construction 2,400 600 1,800 Total 3,475 255 350 400 650 1,820 + Gas Tax (c) 3,475 255 350 400 650 1,820 Morgan Territory Road Bridges 5.0 & 5.2 Replacement The bridges are near the end of their service life and need to be replaced. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project will replace the Morgan Territory Road Bridges at the 5.0 and 5.2 mile mark. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 10610-10-12 TWIC Meeting - Agenda Packet, Page 117 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME IV-3 Source: County GIS Note: See District II for Briones bridge location Morgan Territory Road Bridges 5.0 & 5.2 Replacement PROJECT NUMBER ROAD PROGRAM AT WORK 10710-10-12 TWIC Meeting - Agenda Packet, Page 118 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2 reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 140 140 Environmental 10 10 Design Engineering 203 203 +Right-of-Way 19 19 + Construction 1,856 1,700 156 Total 2,228 372 1,700 156 + Gas Tax (c)396 94 242 60 HBP 1,832 278 1,458 96 Pleasant Hill Road Bridge Rehabilitation (Bridge No. 28C0154) This project is needed in order to extend the service life of the bridge. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to extend the service life of the Pleasant Hill Road Bridge over Taylor Boulevard. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 10810-10-12 TWIC Meeting - Agenda Packet, Page 119 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME IV-4 Source: County GIS Pleasant Hill Road Bridge Rehabilitation (Bridge No. 28C0154) PROJECT NUMBER ROAD PROGRAM AT WORK 10910-10-12 TWIC Meeting - Agenda Packet, Page 120 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 4 mobility Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination 95 71 24 Preliminary Engineering Environmental 70 40 30 Design Engineering 314 50 264 +Right-of-Way + Construction 2,012 28 1,984 Total 2,491 71 114 294 28 1,984 Former RDA 641 71 114 294 162 + Gas Tax (c)254 254 STIP 1,596 28 1,568 Treat Boulevard Corridor Improvements The purpose of this project is to improve safety and connectivity for pedestrians and bicyclists along Treat Blvd. Treat Blvd currently creates challenges for the users of transit as the wide roadways (up to nine lanes) and intersections become barriers for pedestrians to cross. Without bicycle infrastructure, the first/last mile for transit users becomes even more constrained. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to improve safety and connectivity for pedestrian and bicyclist along Treat Boulevard between North Main Street and Jones Road. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 11010-10-12 TWIC Meeting - Agenda Packet, Page 121 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME IV-5 Source: County GIS Treat Boulevard Corridor Improvements PROJECT NUMBER ROAD PROGRAM AT WORK 11110-10-12 TWIC Meeting - Agenda Packet, Page 122 of 330 11210-10-12 TWIC Meeting - Agenda Packet, Page 123 of 330 ROAD PROGRAM AT WORK Board of Supervisors District V 11310-10-12 TWIC Meeting - Agenda Packet, Page 124 of 330 AlamoBay PointRodeoDiabloReliez ValleyEl SobranteVine HillSaranapAlhambra ValleyCrockettBlackhawkNorth RichmondSan MiguelKensingtonPachecoCastle HillTara HillsNorth GateEl SobranteBayviewShell RidgeContra Costa CentreEast Richmond HeightsClydeMontalvin ManorMountain ViewAcalanes RidgePort CostaRollingwoodAcalanes RidgeRichmondAntiochConcordHerculesPittsburgOrindaPinoleLafayetteMartinezMoragaDanvilleWalnut CreekPleasant HillClaytonEl CerritoSan PabloBrentwoodOakleyV-14V-17V-16V-15V-13V-19V-V-9129 V-V-V-IVIIIVIIIMarsh Creek RdBailey RdN Gate RdClayton AveSan Pablo Dam RdMoraga RdConcord BlvdWillow Pass RdMorello AveE18Th StBuchanan RdRichmond PkwyHillcrest Ave Cowell RdWaterfront RdCummings SkwyPort Chicago HwyMyrtle DrMarina VistaWalnut AvePinole Valley RdA StCRIPP Active Project MapUnincorporated PlacesCitiesActive ProjectsCompleted ProjectsNote: Projects are identified with Supervisor District number and project number for its District.Supervisor District V02.551.25Miles¹V-1V-V-11410-10-12 TWIC Meeting - Agenda Packet, Page 125 of 330 ROAD PROGRAM AT WORK SUPERVISOR DISTRICT 5: ACTIVE CRIPP PROJECTS V-1. Alves Lane Trail Crossing (TDA Grant) - This project will install a raised crosswalk at the Delta De Anza trail crossing which will slow down traffic and improve safety for pedestrians and bicyclists crossing Alves Lane. The project will also install Rectangular Rapid Flashing Beacons (RRFBs) on both sides of the crosswalk. Construction is planned for 2022. This project is funded by: TDA, Gas Tax. V-2. Briones Area Guardrail Upgrades (HSIP) - This project will remove approximately 43 guardrails and replace them with new guardrails and end treatments that meet the current Caltrans standard on Bear Creek Road and Alhambra Valley Road in the unincorporated Briones area. Construction is planned for 2023. This project spans three Supervisor Districts (I, II, and V). This project is funded by: HSIP, Gas Tax. V-3. Crockett Area Guardrail Upgrade (HSIP) - This project is to remove existing guardrails and end treatments and to replace them with current Caltrans standard guardrails and end treatments on arterials and major collector roadways in the unincorporated Crockett area. Construction was recently completed in 2022. This project is funded by: HSIP, Gas Tax. V-4. Franklin Canyon Road Safety Improvements (HSIP) - This project is to install 12" centerline rumble strips along the unincorporated segment of Franklin Canyon Road between Cummings Skyway and Dutra Road. Construction is planned for 2024. This project is funded by: HSIP, Gas Tax. V-5. Marsh Drive Bridge Replacement Over Walnut Creek (HBP) - This project is to remove and replace the existing Marsh Drive Bridge in cooperation with the City of Concord. Construction started in 2021. This project spans District IV and V. This project is funded by: HBP, East Bay Regional Parks District, Pacific Gas & Electric, Contra Costa Water District, Gas Tax. V-6. North Bailey Road Active Transportation Corridor (ATP Grant) - This project will construct bicycle and pedestrian improvements along Bailey Road between SR4 and Willow Pass Road. The intersection of Bailey Road with Mary Ann Lane/Placer Drive will be signalized. Construction is planned for 2025. This project is funded by: ATP, Gas Tax, Bay Point AOB. 11510-10-12 TWIC Meeting - Agenda Packet, Page 126 of 330 ROAD PROGRAM AT WORK V-7. San Pablo Dam Road and Bailey Road Signal Hardware Upgrades (HSIP) - This project will upgrade traffic signal hardware, install Advanced Dilemma Detection Zone systems, and improve pedestrian crossing signal hardware at eleven intersections on San Pablo Dam Road and Bailey Road. Construction is planned for 2024. This project spans District I and V. This project is funded by: HSIP, Gas Tax. V-8. Second Avenue Bridge Replacement (Bridge No. 28C0383) (HBP) - This project is to remove and replace the existing Second Avenue Bridge over Grayson Creek. Construction is planned for 2026. This project is funded by: HBP, Gas Tax. SUPERVISOR DISTRICT 5: COMPLETED CRIPP PROJECTS V-9. Alhambra Valley Road - Ferndale Site (Maintenance Division) - This project is to repair storm damage to Alhambra Valley Road east of Ferndale Road. Construction was substantially constructed in 2021 and expected to be completed in 2022. This project is funded by: Measure J, Gas Tax. V-10. Bay Point Utility Undergrounding Project (PG&E Rule 20A) - This project relocated overhead utilities into a trench along Bailey Road and Willow Pass Road. Construction started in 2019. This project is funded by: PG&E Rule 20A work credits (paid for by PG&E directly), Navy Mitigation, Gas Tax. V-11. Bailey Road/SR 4 Interchange Improvements (ATP) - This project improved safety and circulation of pedestrians and bicyclists along Bailey Road through the SR4 interchange. Construction was completed in 2021. This project is funded by: ATP, Bay Point AOB, Measure J, Navy Mitigation Funds, Keller Canyon fees, Gas Tax. V-12. Bear Creek Road - Road Embankment Repair (Maintenance Division) - This project repaired the roadway embankment along Bear Creek Road. Construction was substantially completed in 2022 and expected to be completed in 2022. This project spans District I and V. This project was funded by: Measure J, Gas Tax. V-13. Bel Air Trail Crossing Project (TDA Grant) - This project constructed safety improvements at the Bel Air Trail Crossing on Madison Avenue which is behind the Bel Air Elementary School in Bay Point. Sidewalk (gap closure) improvements took place along Madison Avenue where there was once only a dirt shoulder. Construction was completed in 2021. This project is funded by: TDA, Gas Tax. 11610-10-12 TWIC Meeting - Agenda Packet, Page 127 of 330 ROAD PROGRAM AT WORK V-14. Kirker Pass Road Northbound Truck Lanes (STIP and OBAG) - This project widened Kirker Pass Road to add a northbound truck-climbing lane. In addition, this project included pavement rehabilitation on Kirker Pass Road from the City of Concord/County boundary to approximately 4,200 feet of the northern Hess Road intersection. Construction was completed in 2021. This project spans District IV and V. This project was funded by: STIP, OBAG – LSR, Measure J, State Match, Gas Tax. V-15. Kirker Pass Road Safety Project (HSIP) - This project aimed to improve driver safety and awareness and reduce the severity of collisions along 3.1-mile segment of Kirker Pass Road between the city borders of Concord and Pittsburg. Improvements included guardrail installation, streetlights at the two Hess Road intersections, and median reflectors. Construction was completed in 2022. This project is funded by: HSIP, Gas Tax. V-16. Rodeo Downtown Infrastructure (Former Redevelopment Agency) - This project constructed sidewalks and curb ramps along Pacific Avenue and a section along Parker Avenue near 7th Street. This project improved pedestrian access to Rodeo Creek Trail on Investment Street and to fill in sidewalk gap segments. Construction was completed in 2020. This project was funded by: Former Redevelopment Act, Measure J TDA, Gas Tax. V-17. Rodeo Pedestrian Enhancement Project (TDA Grant) - This project installed two ADA curb ramps on Parker Avenue at 6th Street and one set of RRFBs. Along 7th Street, pedestrian crossing enhancements were constructed in front of Saint Patrick School. Construction was completed in 2021. This project was funded by: TDA, Gas Tax. 11710-10-12 TWIC Meeting - Agenda Packet, Page 128 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 mobility Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 10 8 2 Environmental Design Engineering 50 50 +Right-of-Way + Construction 187 187 Total 247 8 239 + Gas Tax (c)198 198 TDA 50 8 41 Alves Lane Trail Crossing Motorists used Alves Lane as an alternative commute route, increasing speeds and ADT on this street. Installing a raised crosswalk and RRFBs will decrease the speeds and discourage cut-through traffic on this street as well as increase safety to trail users. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project will install a raised crosswalk at the Delta De Anza trail crossing which will slow down traffic and improve safety for pedestrians and bicyclists crossing Alves Lane. The project will also install Rectangular Rapid Flashing Beacons (RRFBs) on both sides of the crosswalk PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 11810-10-12 TWIC Meeting - Agenda Packet, Page 129 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME V-1 Source: County GIS Alves Lane Trail Crossing PROJECT NUMBER ROAD PROGRAM AT WORK 11910-10-12 TWIC Meeting - Agenda Packet, Page 130 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1 safety Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 15 7 8 Environmental 75 1 74 Design Engineering 150 150 +Right-of-Way 5 5 + Construction 1,437 120 1,317 Total 1,682 8 237 120 1,317 + Gas Tax (c)690 8 237 8 437 HSIP 992 113 880 Briones Area Guardrail Upgrades The County needs to upgrade deficient guardrails to reduce the potential and severity of injuries when vehicles collide with them. The HSIP grant allows the County to leverage its funds and upgrade more guardrails in a more timely manner, providing a safer environment for drivers in the event of a collision. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project will remove approximately 43 guardrails and end treatments and replace them with new guardrails and end treatments that meet the current Caltrans standard on Bear Creek Road and Alhambra Valley Road in the unincorporated Briones area. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 12010-10-12 TWIC Meeting - Agenda Packet, Page 131 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME V-2 Source: County GIS Briones Area Guardrail Upgrades PROJECT NUMBER ROAD PROGRAM AT WORK 12110-10-12 TWIC Meeting - Agenda Packet, Page 132 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 safety Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 26 23 3 Environmental 28 25 3 Design Engineering 297 257 40 +Right-of-Way 3 1 2 + Construction 1,587 1,587 Total 1,940 305 1,634 + Gas Tax (c)940 305 634 HSIP 1,000 1,000 Crocket Area Guardrail Upgrade The County needs to upgrade deficient guardrails to reduce the potential and severity of injuries when vehicles collide with them. The HSIP grant allows the County to leverage its funds and upgrade more guardrails in a more timely manner, providing a safer environment for drivers in the event of a collision. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to remove existing guardrails and end treatments and replace them with current Caltrans standard guardrails and end treatments on arterials and major collector roadways in the unincorporated Crockett area. Construction is scheduled for 2022. Gas Taxes and the Highway Safety Improvement Program (HSIP) fund this project. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 12210-10-12 TWIC Meeting - Agenda Packet, Page 133 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME V-3 Source: County GIS Crocket Area Guardrail Upgrade PROJECT NUMBER ROAD PROGRAM AT WORK 12310-10-12 TWIC Meeting - Agenda Packet, Page 134 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 safety Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 15 2 8 3 2 Environmental 15 15 Design Engineering 120 80 40 +Right-of-Way + Construction 462 15 447 Total 612 2 103 58 449 +Gas Tax (c)50 2 43 3 2 HSIP 562 60 55 447 Franklin Canyon Road Safety Improvements The purpose is to improve roadway safety on this two-lane, rural, major collector with winding curves, narrow lanes, and narrow shoulders. In over 4 years,15 collisions have been reported on the unincorporated Contra Costa County segment of Franklin Canyon Road. Among these collisions are 1 fatality, 8 severe injuries, 3 other-visible injuries, 2 complaint-of- pain injuries, and 1 property-damage-only collisions. Approximately 66% of collisions are due to lane departures passing the centerline. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to install 12" centerline rumble strips along the unincorporated segment of Franklin Canyon Road between Cummings Skyway and Dutra Road. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 12410-10-12 TWIC Meeting - Agenda Packet, Page 135 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME V-4 Source: County GIS Franklin Canyon Road Safety Improvements PROJECT NUMBER ROAD PROGRAM AT WORK 12510-10-12 TWIC Meeting - Agenda Packet, Page 136 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 4 reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering 36 7 29 Environmental 349 319 30 Design Engineering 1,631 1,583 48 + Right-of-Way 2,038 405 960 120 553 + Construction 12,535 340 8,088 4,107 Total 16,590 2,655 9,155 4,227 553 CCWD 29 29 EBRPD 25 25 + Gas Tax (c) 2,156 704 1,008 444 HBP 13,286 1,611 7,339 3,783 553 Marsh Drive Bridge Replacement Over Walnut Creek The existing bridge is approaching the end of its service life. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to remove and replace the existing Marsh Drive Bridge in cooperation with the City of Concord. This project is scheduled for construction in 2021. This project is funded by Highway Bridge Program (HBP) and Gas Tax Funds. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 12610-10-12 TWIC Meeting - Agenda Packet, Page 137 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME V-5 Source: County GIS Marsh Drive Bridge Replacement Over Walnut Creek PROJECT NUMBER ROAD PROGRAM AT WORK 12710-10-12 TWIC Meeting - Agenda Packet, Page 138 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 mobility Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/Coordinati on 83 26 45 4 4 4 Preliminary Engineering 150 75 75 Environmental 150 75 75 Design Engineering 860 129 576 155 +Right-of-Way 25 25 + Construction 8,738 1,838 6,900 Total 10,006 26 324 755 159 1,842 6,900 Bay Point AOB 584 79 452 53 + Gas Tax (c) 3,263 26 45 4 106 4 3,078 North Bailey Road Active Transportation Corridor The goal of this project is to improve the pedestrian and bicycle environment along Bailey Road in Bay Point in accordance with the 2010 Bailey Road Pedestrian and Bicycle Improvement Plan. The Plan provides concepts that fulfill the community's desire for Bailey Road to be safer and more wakable, bieable, and transit-oriented. This project fulfills a significant portion of the plan. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project constructs bicycle and pedestrian improvements along Bailey Road. These improvements include construction of a two-way cycle track, new landscape areas adjacent to the cycle track and in the roadway median, and intersection improvements. The intersection of Bailey Road with Mary Ann Lane/Placer Drive will be signalized. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 12810-10-12 TWIC Meeting - Agenda Packet, Page 139 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME V-6 Source: County GIS North Bailey Road Active Transportation Corridor PROJECT NUMBER ROAD PROGRAM AT WORK 12910-10-12 TWIC Meeting - Agenda Packet, Page 140 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1 safety Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination 25 7 18 Preliminary Engineering 30 30 Environmental 38 1 32 5 Design Engineering 141 75 66 +Right-of-Way + Construction 1,012 120 892 Total 1,245 8 155 191 892 Gas Tax 145 8 28 14 95 HSIP - State 1,100 127 177 797 San Pablo Dam Road and Bailey Road Signal Hardware Upgrades This project improves the safety of eleven intersections along San Pablo Dam Road and Bailey Road by upgrading traffic signal hardware, installing Advanced Dilemma Detection video systems, and upgrading pedestrian signal hardware. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project will upgrade traffic signal hardware, install Advanced Dilemma Detection Zone systems, and improve pedestrian crossing signal hardware at eleven intersections on San Pablo Dam Road and Bailey Road PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 13010-10-12 TWIC Meeting - Agenda Packet, Page 141 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME V-7 Source: County GIS San Pablo Dam Road and Bailey Road Signal Hardware Upgrades PROJECT NUMBER ROAD PROGRAM AT WORK Pittburg District V 13110-10-12 TWIC Meeting - Agenda Packet, Page 142 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 reliability Phase/Funding Source Cost Cost to Date FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Planning/ Coordination Preliminary Engineering Environmental Design Engineering 1,200 200 500 500 + Right-of-Way 170 50 120 + Construction 7,000 400 6,600 Total 8,370 200 550 620 400 6,600 + Gas Tax (c) 1,262 40 110 112 100 900 HBP 7,108 160 440 508 300 5,700 Bridge is near the end of its useful life and needs to be replaced. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Second Avenue Bridge Replacement (Bridge No. 28C0383) This project is to remove and replace the existing Second Avenue Bridge over Grayson Creek. This project is scheduled for construction in 2026. This project is seeking funding approval from the Highway Bridge Program (HBP) and willEH supplemented with Gas Tax Funds. PROJECT CATEGORY CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM 13210-10-12 TWIC Meeting - Agenda Packet, Page 143 of 330 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME V-8 Source: County GIS Second Avenue Bridge Replacement (Bridge No. 28C0383) PROJECT NUMBER ROAD PROGRAM AT WORK 13310-10-12 TWIC Meeting - Agenda Packet, Page 144 of 330 13410-10-12 TWIC Meeting - Agenda Packet, Page 145 of 330 ROAD PROGRAM AT WORK Appendix A: Acronyms & Definitions A-110-10-12 TWIC Meeting - Agenda Packet, Page 146 of 330 ROAD PROGRAM AT WORK Acronym Description Funding Type ADA Americans with Disabilities Act N/A AOB Area of Benefit N/A Alamo AOB Alamo Area of Benefit – Traffic Mitigation Fees Local ATP Active Transportation Program -Funds for projects/programs that encourage increased use of active modes of transportation to reduce greenhouse gas emissions and to promote healthier communities Federal Bay Point AOB Bay Point Area of Benefit – Traffic Mitigation Fees Local Bethel Island AOB Bethel Island Area of Benefit – Traffic Mitigation Fees Local Briones AOB Briones Area of Benefit – Traffic Mitigation Fees Local CCC Contra Costa County N/A CCCFCD Contra Costa County Flood Control District also know as Contra Costa County Flood Control Water Conservation District. This acronym was used in the Countywide Trash Capture project N/A CCTA Contra Costa Transportation Authority N/A CCWD Contra Costa Water District -Funds contributed by the Contra Costa Water District Local CDBG Community Development Block Grant - Funds set aside for frontage improvements in economically depressed areas.Federal Cent County AOB Central County Area of Benefit – Traffic Mitigation Fees Local CTPL Comprehensive Transportation Priority List maintained by CCTA N/A Disco Bay AOB Discovery Bay Area of Benefit – Traffic Mitigation Fees Local Disco Bay West Discovery Bay West Mitigation Funds – Traffic Mitigation Fees Local DWR Department of Water Resources – Co-sponsor for Bridge Improvement on Byron Highway Local EBRPD East Bay Regional Park District N/A A-210-10-12 TWIC Meeting - Agenda Packet, Page 147 of 330 ROAD PROGRAM AT WORK Acronym Description Funding Type ECCRFFA/RTDIM East Contra Costa Regional Fee & Financing Authority/Regional Transportation Development Impact Mitigation Local East County Regional AOB or ECRAOB East County (Regional) Area of Benefit – Traffic Mitigation Fees Local Former RDA Former Redevelopment Agency -Bond funds designated for former redevelopment areas Local Gas Tax Gas Tax Funds -Sales tax on gasoline used to enhance road operation and maintenance.Local GSI Green Stormwater Infrastructure – Formerly GI or Green Infrastructure N/A HBP Highway Bridge Program - Funds for bridges in need of replacement, and for seismic retrofit program.Federal Herc/Rodeo/Crock AOB Hercules/Rodeo/Crockett Area of Benefit –Traffic Mitigation Fees Local HR3 High Risk Rural Road Program - Funds for safety improvements to rural roads defined as high risk.Federal HSIP Highway Safety Improvement Program - Funds for infrastructure-related highway safety improvements that lead to a significant reduction in traffic fatalities and serious injuries on all public roads. Federal JEPA Joint Exercise Powers Agreement - Term used to identify a joint agreement between the County and another agency, Cities, etc. on a particular capital project N/A Keller Canyon Mit Fund Keller Canyon Landfill Mitigation Funds -Mitigation funds from Keller Canyon Landfill. Funds are for pavement maintenance between SR4 and Keller Canyon Landfill Entrance. City of Pittsburg has a fair-share portion of these funds. Local Lifeline Grant Lifeline Grant are funds intended to improve mobility for low- income residents.Federal LOS Level of Service refers to the operational status of an intersection or segment of roadway N/A A-310-10-12 TWIC Meeting - Agenda Packet, Page 148 of 330 ROAD PROGRAM AT WORK Acronym Description Funding Type Martinez AOB Martinez Area of Benefit – Traffic Mitigation Fees Local Measure J Measure J -An umbrella name for various CCTA administered local funding source Local Measure J PBTF Measure J Pedestrian, Bicycle and Trail Facilities Program - Funds for pedestrian, bicycle, and trail facilities.Local Measure J Regional Measure J: Regional Funds - Portion of sales tax measure designated for projects of regional significance.Local Measure J RTS Measure J: Return to Source Funds - Portion of sales tax measure returned to local jurisdictions to be used for transportation projects within Contra Costa County. Local Measure J TLC Measure J Transportation for Livable Communities Program - Funds for projects/programs for plans and facilities that encourage more walking, bicycling and transit use. Local N Richmond AOB North Richmond Area of Benefit – Traffic Mitigation Fees Local Navy Mit Navy Mitigation Funds - Mitigation funds from closure of Port Chicago Highway.Local OBAG One Bay Area Grant Program –Grant program that focuses on transportation investments in priority development areas (PDA's). Federal OBAG-LSR One Bay Area Grant (for) Local Streets and Roads -A specific OBAG funding source to support local streets and roads Federal OBAG-FAS One Bay Area Grant (for) Federal Aid Source - A specific OBAG funding source for certain types of capital projects Federal Pacheco AOB Pacheco (West Concord) Area of Benefit –Traffic mitigation fees.Local Phillips 66 funds Conoco Phillips 66 -Conoco Phillips grant program to support the community.Local Prop 1B Proposition 1B - These state funds makes safety improvements and repairs to local streets and roads and improves seismic safety of local bridges by providing for a bond issue. State A-410-10-12 TWIC Meeting - Agenda Packet, Page 149 of 330 ROAD PROGRAM AT WORK Acronym Description Funding Type RDA Redevelopment Agency N/A Rich/El Sobr AOB Richmond/El Sobrante Area of Benefit – Traffic mitigation fees.Local RM3 Regional Measure 3 - A supplemental local funding source from the State of California Local RRFB Rectangular Rapid Flash Beacons - A pedestrian actuated feature at crosswalk to notify drivers that a pedestrian is in the vicinity of the crosswalk N/A RSS Abatement Fund Richmond Sanitary Service Abatement Funds -Funds appropriated for the purchase of historic markers on San Pablo Dam Road. Local SCC South Contra Costa N/A So County AOB South County Area of Benefit – Traffic Mitigation Fees Local So Walnut Cr AOB South Walnut Creek Area of Benefit –Traffic Mitigation Fees. This AOB has been incorporated into the Central County AOB Local SR State Route N/A SR2S Safe Routes to School (State) -Funds emphasize construction of infrastructure to aid in safety near schools.Federal State Match State Match Funds - Funds to match federally funded transportation projects.State STIP State Transportation Improvement Program - Funds transportation projects on and off the State Highway System.Federal SUA Stormwater Utility Assessment – This is a Flood Control District funding source. Local TDA Transportation Development Act - Funds for construction of bicycle and pedestrian facilities.State TVTC Fee Tri-Valley Transportation Development Fee -Regional traffic mitigation fees.Local West County AOB West County Area of Benefit – Traffic Mitigation Fees Local A-510-10-12 TWIC Meeting - Agenda Packet, Page 150 of 330 ROAD PROGRAM AT WORK A-610-10-12 TWIC Meeting - Agenda Packet, Page 151 of 330 ROAD PROGRAM AT WORK Appendix B: County Road Improvement Policy B-110-10-12 TWIC Meeting - Agenda Packet, Page 152 of 330 ROAD PROGRAM AT WORK B-210-10-12 TWIC Meeting - Agenda Packet, Page 153 of 330 ROAD PROGRAM AT WORK B-310-10-12 TWIC Meeting - Agenda Packet, Page 154 of 330 ROAD PROGRAM AT WORK B-410-10-12 TWIC Meeting - Agenda Packet, Page 155 of 330 ROAD PROGRAM AT WORK B-510-10-12 TWIC Meeting - Agenda Packet, Page 156 of 330 ROAD PROGRAM AT WORK B-610-10-12 TWIC Meeting - Agenda Packet, Page 157 of 330 ROAD PROGRAM AT WORK B-710-10-12 TWIC Meeting - Agenda Packet, Page 158 of 330 B-810-10-12 TWIC Meeting - Agenda Packet, Page 159 of 330 ROAD PROGRAM AT WORK Appendix C: Guidelines for Expenditure of Gas Tax Revenue (Proposition 111 Funds) C-110-10-12 TWIC Meeting - Agenda Packet, Page 160 of 330 ROAD PROGRAM AT WORK C-210-10-12 TWIC Meeting - Agenda Packet, Page 161 of 330 ROAD PROGRAM AT WORK C-310-10-12 TWIC Meeting - Agenda Packet, Page 162 of 330 ROAD PROGRAM AT WORK C-410-10-12 TWIC Meeting - Agenda Packet, Page 163 of 330 ROAD PROGRAM AT WORK C-510-10-12 TWIC Meeting - Agenda Packet, Page 164 of 330 ROAD PROGRAM AT WORK C-610-10-12 TWIC Meeting - Agenda Packet, Page 165 of 330 ROAD PROGRAM AT WORK C-710-10-12 TWIC Meeting - Agenda Packet, Page 166 of 330 C-810-10-12 TWIC Meeting - Agenda Packet, Page 167 of 330 ROAD PROGRAM AT WORK Appendix D: Road Maintenance and Rehabilitation Account Information D-110-10-12 TWIC Meeting - Agenda Packet, Page 168 of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¶VVLJQLILFDQWIXQGLQJVKRUWIDOOWRPDLQWDLQWKHVWDWH¶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eeting - Agenda Packet, Page 169 of 330 UHYHQXHV6%DOVRLQFOXGHVLQIODWLRQDU\DGMXVWPHQWVLQWKHUHYHQXHWRORFDODJHQFLHVVRWKDW WKHSXUFKDVLQJSRZHURIWKHIXQGVGRHVQRWGHFUHDVHDVLWKDVLQWKHSDVW6%SULRULWL]HV IXQGLQJWRZDUGVPDLQWHQDQFHUHKDELOLWDWLRQDQGVDIHW\LPSURYHPHQWVRQVWDWHKLJKZD\V ORFDOVWUHHWVDQGURDGVDQGEULGJHVDQGWRLPSURYHWKHVWDWH¶VWUDGHFRUULGRUVWUDQVLWDQG DFWLYHWUDQVSRUWDWLRQIDFLOLWLHV 6%)XQGVZHUHDYDLODEOHWRFLWLHVDQGFRXQWLHVVWDUWLQJLQ)<DQGDUHFRPSULVHG RIWZRSDUWVDQLQFUHDVHLQWKHDQQXDOJDVWD[UHYHQXHWKDWORFDODJHQFLHVKDYHKLVWRULFDOO\ EHHQUHFHLYLQJDQGDQHZIXQGLQJVRXUFHFDOOHG5RDG0DLQWHQDQFHDQG5HKDELOLWDWLRQ $FFRXQW 505$ SURJUDPIXQGV7KH&DOLIRUQLD6WDWH$VVRFLDWLRQRI&RXQWLHV &6$& DQQXDOO\SURYLGHVDQHVWLPDWHRIWKHWRWDOJDVWD[UHYHQXHVWKH&RXQW\FDQH[SHFWWRVHH IURPWUDQVSRUWDWLRQELOOLQFOXGLQJWKHWRWDOHVWLPDWHGUHYHQXHIURP505$SURJUDPIXQGV &6$&HVWLPDWHVWKH&RXQW\ZLOOUHFHLYHDERXWPLOOLRQLQWRWDOWUDQVSRUWDWLRQIXQGLQJ IRU)<IURP6%DSSUR[LPDWHO\GRXEOHZKDWWKH&RXQW\UHFHLYHGMXVWDIHZ\HDUV DJR$ERXWPLOOLRQRIWKDWDPRXQWLVIURPWKH505$SURJUDP7KLVDPRXQWZLOO FRQWLQXHWRJURZLQIXWXUH\HDUVZLWKWKHEXLOWLQLQIODWLRQDU\LQGH[ 6%HPSKDVL]HVWKHLPSRUWDQFHRIDFFRXQWDELOLW\DQGWUDQVSDUHQF\LQWKHGHOLYHU\RI &DOLIRUQLD¶VWUDQVSRUWDWLRQSURJUDPV7KHUHIRUHLQRUGHUWREHHOLJLEOHIRU505$IXQGLQJ D-310-10-12 TWIC Meeting - Agenda Packet, Page 170 of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¶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eeting - Agenda Packet, Page 171 of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eeting - Agenda Packet, Page 172 of 330 ([SLULQJJUDQWVZKHUHORFDOIXQGVDUHQHFHVVDU\WRFRPSOHWHWKHIXQGLQJSDFNDJH *HRJUDSKLFHTXLW\ 3URMHFWVZKHUHH[SHQGLWXUHVKDGDOUHDG\RFFXUUHGIRUGHVLJQRIWKHSURMHFWDQGKDG EHHQVKHOYHGGXHWRGHFOLQLQJJDVWD[UHYHQXHV 0XOWLPRGDOEHQHILWVLQDFFRUGDQFHZLWKWKH%RDUGRI6XSHUYLVRU¶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eeting - Agenda Packet, Page 173 of 330 7KHPDMRULW\RIWKH505$IXQGVDUHGHVLJQDWHGIRUPDLQWHQDQFHDFWLYLWLHVEXWWKHUDQJHRI SURSRVHGSURMHFWVLQIXWXUH\HDUVLVH[SHFWHGWREURDGHQDVWKHDPRXQWRI505$IXQGV LQFUHDVHV,WVKRXOGEHQRWHGWKDWSURMHFWOLVWEHORZLVDVPDOOVXEVHWRISURMHFWVLQRYHUDOO URDGSURJUDPDQGRQO\IRFXVHVRQKRZWKH505$IXQGVZLOOEHH[SHQGHGDVUHTXLUHGE\ WKH&RPPLVVLRQ D-710-10-12 TWIC Meeting - Agenda Packet, Page 174 of 330 %$&.*5281' &217 ' 352326('352-(&76 7RWDO505$ PLOOLRQ 3URSRVHG3URMHFW1R5RDG'UDLQDJH0DLQWHQDQFH 505$ PLOOLRQ  &RXQW\ZLGH 'LWFK&OHDQLQJ±7KLVURXWLQHPDLQWHQDQFHLWHPLVWRSHUIRUPGUDLQDJHGLWFK FOHDQLQJWRUHPRYHGHEULVDQGYHJHWDWLRQZKLFKPD\REVWUXFWWKHSDVVDJHRI VWRUPZDWHUDQGFDXVHORFDOIORRGLQJ 505$  &RXQW\3URMHFW1R 8 &OHDQ&DWFK%DVLQ±7KLVURXWLQHPDLQWHQDQFHLWHPLVWRSHUIRUPFOHDQLQJRI VHGLPHQWDQGSUHYHQWREVWUXFWLRQVRIFDWFKEDVLQV GUDLQDJHLQOHWV DQGUHODWHGSLSH V\VWHPV7KH&RXQW\KDVRYHUWZHQW\WKRXVDQGFDWFKEDVLQVWKURXJKRXWWKH XQLQFRUSRUDWHGSRUWLRQVRIWKH&RXQW\ 505$  &RXQW\3URMHFW1R 8 ,QVSHFW&DWFK%DVLQ±7KLVURXWLQHPDLQWHQDQFHLWHPLVWRSHUIRUPLQVSHFWLRQVRI FDWFKEDVLQVDQGDVVRFLDWHGV\VWHPV7KLVLQFOXGHVDYLVXDOLQVSHFWLRQRIWKH GUDLQDJHLQOHWDQGDQ\FOHDQZDWHULQVHUWV)ROORZXSYLGHRLQVSHFWLRQVPD\EH UHTXLUHGIRUGHHSHULQOHWVDQGRUVXVSHFWHGVWUXFWXUDOLVVXHFRQFHUQLQJWKHLQOHWV 505$  &RXQW\3URMHFW1R8 3URSRVHG3URMHFW1R7UDIILF6DIHW\'HYLFHV0DLQWHQDQFH 505$   &RXQW\ZLGH 7UDIILF6LJQLQJ ±7KLVURXWLQHPDLQWHQDQFHLWHPLVWRSHUIRUPVLJQUHSDLU UHSODFHPHQWDQGLQVWDOODWLRQDORQJWKHXQLQFRUSRUDWHG&RXQW\URDGZD\V 505$  &RXQW\3URMHFW1R8 7UDIILF6WULSLQJ±7KLVURXWLQHPDLQWHQDQFHLWHPLVWRSHUIRUPQHZSDLQWLQJ URXWLQHSDLQWLQJDQGUHSODFHPHQWRISDYHPHQWVWULSLQJDORQJWKHXQLQFRUSRUDWHG &RXQW\URDGZD\VWRHQKDQFHSXEOLFVDIHW\ 505$  &RXQW\3URMHFW 1R8 3URSRVHG3URMHFW1R3DYHPHQW5HSDLUVDQG3UHSDUDWLRQ 505$ PLOOLRQ  &RXQW\ZLGH 3RW+ROH3DWFKLQJ±7KLVURXWLQHPDLQWHQDQFHLWHPLVWRSHUIRUPVSRWSDYHPHQW UHSDLUVRISRWKROHVDORQJWKHXQLQFRUSRUDWHG&RXQW\URDGZD\VWRHOLPLQDWHVXUIDFH KD]DUGV 505$  &RXQW\3URMHFW1R8 3DYHPHQW)DEULF3DWFKLQJ±7KLVURXWLQHPDLQWHQDQFHLWHPLVWRSHUIRUP SDYHPHQWIDEULFSDWFKLQJDORQJWKHXQLQFRUSRUDWHG&RXQW\URDGZD\VWRFRUUHFW PLQRUSDYHPHQWGHIHFWVDQGSUHYHQWIXUWKHUFUDFNLQJ$QDUHDRIH[LVWLQJGDPDJHG D-810-10-12 TWIC Meeting - Agenda Packet, Page 175 of 330 DVSKDOWZLOOEHUHPRYHGDQGH[FDYDWHGWRDOORZDIDEULFSDWFKWREHSODFHG7KH URDGZD\EDVHZLOOEHFRPSDFWHGDQGOHYHOHGWRVXSSRUWWKHQHZIDEULFOD\HUDQG DVSKDOWOD\HU 505$  &RXQW\3URMHFW1R8 3DYHPHQW)DLOXUH5HSDLU%DFNKRH±7KLVURXWLQHPDLQWHQDQFHLWHPLVWRFRQGXFW SDYHPHQWIDLOXUHUHSDLUDORQJWKHXQLQFRUSRUDWHG&RXQW\URDGZD\V7KLVWDVN UHTXLUHVWKHUHPRYDORIDODUJHUDUHDRIFUDFNHGRUGDPDJHGSDYHPHQWZLWKD EDFNKRH7KHURDGZD\EDVHZLOOEHFRPSDFWHGDQGRYHUODLGZLWKQHZDVSKDOW 505$  &RXQW\3URMHFW1R8 3XOO%R[3DYLQJ ±7KLVLVDURDGZD\SDYLQJRSHUDWLRQWRSODFHDVSKDOWRQORFDOL]HG URDGZD\GHSUHVVLRQVWRSURYLGHDVPRRWKULGLQJVXUIDFHIRUWKHPRWRUL]HGSXEOLF DORQJWKHXQLQFRUSRUDWHG&RXQW\URDGZD\V 505$  &RXQW\3URMHFW 1R8 +DQG3DWFKLQJ±7KLVLVVLPLODUWRSRWKROHSDWFKLQJWRFRQGXFWVSRWSDYHPHQW UHSDLUVDORQJXQLQFRUSRUDWHG&RXQW\URDGZD\EXWRQDVPDOOHUVFDOH 505$  &RXQW\3URMHFW1R8 &UDFN6HDOLQJ±7KLVSDYHPHQWSUHVHUYDWLRQWDVNLVWRVHDOFUDFNVLQWKHURDGZD\ &UDFNVDUHW\SLFDOO\ILOOHGLQWRVHDOWKHURDGZD\VWUXFWXUDOVHFWLRQIURPZDWHU SHQHWUDWLRQ7KHJRDOLVWRSURORQJWKHVHUYLFHOLIHRIWKHSDYHPHQWDQGRUSUHSDUH WKHURDGZD\VXUIDFHIRUDQRYHUOD\ 505$  &RXQW\3URMHFW1R 8 /HYHOLQJ±7KLVWDVNLVDVVRFLDWHGZLWKOHYHOLQJRIODUJHVHWWOHPHQWVGHSUHVVLRQV VXUIDFHLUUHJXODULWLHVDQGUHFHQWODUJHSDYHPHQWUHSDLUV7KLVLVWRSURYLGHDVPRRWK ULGLQJVXUIDFHIRUWKHPRWRUL]HGSXEOLFDORQJXQLQFRUSRUDWHG&RXQW\URDGZD\V 505$  &RXQW\3URMHFW1R8 3DYHPHQW)DLOXUH5HSDLU±*ULQGHU±7KLVWDVNLVWRUHPRYHEDGO\FUDFNHGRU EURNHQSDYHPHQW7KHURDGZD\LVWKHQUHSODFHGZLWKQHZDVSKDOWDQGURDGZD\EDVH URFN7KLVWDVNVXSSRUWVSDYHPHQWSUHVHUYDWLRQRSHUDWLRQVDQGDOVRH[WHQGVWKH VHUYLFHOLIHRIWKHURDGZD\SDYHPHQW 505$  &RXQW\3URMHFW1R 8 3URSRVHG3URMHFW1R&RXQW\:LGH6XUIDFH7UHDWPHQWV 505$ PLOOLRQ &RXQW\ZLGH 'RXEOH&KLS6HDO3URMHFW  ±7KLVSURMHFWZLOODSSO\DGRXEOHFKLSVHDOWR YDULRXVURDGVDVDSDYHPHQWSUHVHUYDWLRQSURMHFWLQWKHXQLQFRUSRUDWHG&RQWUD&RVWD &RXQW\/RFDWLRQVZLOOLQFOXGH2ULQGD %HDU&UHHN5RDG )UDQNOLQ&DQ\RQ .QLJKWVHQ%UHQWZRRG%U\RQDQG6DQ5DPRQDUHDV:RUNZLOODOVRLQFOXGHVXUIDFH SUHSDUDWLRQDQGSDYHPHQWVWULSLQJDQGPDUNLQJV 505$  &RXQW\ 3URMHFW1R8 D-910-10-12 TWIC Meeting - Agenda Packet, Page 176 of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¶VPLVVLRQDQGLPSURYH WKHSURJUDP¶VNH\SHUIRUPDQFHPHWULFVIRUVDIHW\HIILFLHQF\UHOLDELOLW\DQGDFFHVVLELOLW\ &216(48(1&(2)1(*$7,9($&7,21 ,IDSURMHFWOLVWLVQRWDSSURYHGE\WKH%RDUGRI6XSHUYLVRUVDQGVXEPLWWHGWRWKH&7&E\ WKH0D\GHDGOLQHWKH&RXQW\ZLOOQRWEHHOLJLEOHWRUHFHLYHLWVSRUWLRQRI505$ IXQGVDQGWKHSURMHFWVOLVWHGDERYHZLOOQRWEHFRQVWUXFWHG $77$&+0(176 5HVROXWLRQ1R D-1010-10-12 TWIC Meeting - Agenda Packet, Page 177 of 330 D-1110-10-12 TWIC Meeting - Agenda Packet, Page 178 of 330 D-1210-10-12 TWIC Meeting - Agenda Packet, Page 179 of 330 D-1310-10-12 TWIC Meeting - Agenda Packet, Page 180 of 330 D-1410-10-12 TWIC Meeting - Agenda Packet, Page 181 of 330 Appendix E: Complete Street Policy E-110-10-12 TWIC Meeting - Agenda Packet, Page 182 of 330 This Complete Streets Policy was adopted by Resolution No. 2016/374 by the Board of Supervisors of Contra Costa County on July 12, 2016. COMPLETE STREETS POLICY OF CONTRA COSTA COUNTY A. Complete Streets Principles 1.Complete Streets Serving All Users. Contra Costa County expresses its commitment to creating and maintaining Complete Streets that provide safe, comfortable, and convenient travel along and across rights-of-way (including streets, roads, highways, bridges, paths, and other portions of the transportation system) through a comprehensive, integrated transportation network that serves all categories of users, including pedestrians, bicyclists, persons with disabilities, motorists, movers of commercial goods, users and operators of public transportation, seniors, children, youth, students and families. 2.Context Sensitivity. In planning and implementing street projects, departments and agencies of Contra Costa County shall maintain sensitivity to local conditions in both residential and business districts as well as urban, suburban, and rural areas, and shall work with residents, merchants, school representatives, and other stakeholders to ensure that a strong sense of place ensues. Improvements that will be considered include sidewalks, shared use paths, separated bikeways/cycle tracks, bicycle lanes, bicycle routes, paved shoulders, street trees and landscaping, planting strips, accessible curb ramps, crosswalks, refuge islands, pedestrian signals, signs, street furniture, bicycle parking facilities, public transportation stops and facilities, transit priority signalization, traffic calming circles, transit bulb outs, road diets and other features assisting in the provision of safe travel for all users and those features and concepts identified in the Contra Costa County Complete Streets General Plan Amendment of April 2008. 3.Complete Streets Routinely Addressed by All Departments. All departments and agencies of Contra Costa County shall work towards making Complete Streets practices a routine part of everyday operations, approach every relevant project, program, and practice as an opportunity to improve streets and the transportation network for all categories of users/modes, and work in coordination with other departments, agencies, and jurisdictions to maximize opportunities for Complete Streets, connectivity, and cooperation. Example activities include, but are not necessarily limited to the following: pavement resurfacing, restriping, accessing above and underground utilities, signalization operations or modifications, maintenance of landscaping/related features, and shall exclude minor (catch basin cleaning, sign replacement, pothole repair, etc.) maintenance and emergency repairs. 4.All Projects and Phases. Complete Streets infrastructure sufficient to enable reasonably safe travel along and across the right of way for each category of users shall be incorporated into all planning, funding, design, approval, and implementation processes for any construction, reconstruction, retrofit, maintenance, operations, alteration, or repair of streets (including streets, roads, highways, bridges, and other portions of the transportation system), except that specific infrastructure for a given category of users may be excluded if an exemption is approved via the process set forth in section C.1 of this policy. B. Implementation 1. Plan Consultation and Consistency. Maintenance, planning, and design of projects affecting the transportation system shall be consistent with the Contra Costa County General Plan, as well as other applicable bicycle, pedestrian, transit, multimodal, best practices, and other relevant documents. Where such consistency cannot be achieved without negative consequences, consistency shall not be required if the head of the relevant departments, or designees, provides written approval explaining the basis of such deviation. 2. Street Network/Connectivity. As feasible, and as opportunities arise, Contra Costa County shall incorporate Complete Streets infrastructure into existing streets to improve the safety and convenience of users, with the particular goal of creating a connected network of facilities accommodating each category of users, increasing connectivity across jurisdictional boundaries, and for accommodating existing and anticipated future areas of travel origination or destination. A well connected network should include non-motorized connectivity to schools, parks, Exhibit A E-210-10-12 TWIC Meeting - Agenda Packet, Page 183 of 330 commercial areas, civic destinations and regional non-motorized networks on both publically owned roads/land and private developments (or redevelopment areas). 3.Countywide Bicycle Advisory Committee (CBAC) Consultation. The CBAC may review the design principles used by staff to accommodate motor vehicle, bicycle, pedestrian, and transit modes of travel when reviewing projects. The CBAC will be engaged early in the planning and design stage to provide an opportunity for comments and recommendations regarding Complete Street features of major public transportation projects. 4.Evaluation. The County will establish a means to collect data and evaluate the implementation of complete streets policies. For example tracking the number of miles of paths, bike lanes and sidewalks, numbers of street crossings, signage etc. C. Exceptions 1.Required Findings and Leadership Approval for Exemptions. Plans or projects that seek exemptions from incorporating Complete Streets design principles must provide a written explanation of why accommodations for all modes were not included in the project. An exemption may be granted by the Director of Public Works or Director of Conservation and Development upon finding that inclusion of Complete Streets design principles are not possible or appropriate under one or more of the following circumstances: 1) bicycles or pedestrians are not permitted on the subject transportation facility pursuant to state or local laws; 2) inclusion of Complete Streets design principles would result in a disproportionate cost to the project; 3) there is a documented absence of current and future need and demand for Complete Streets design elements on the subject roadway; and, 4) one or more significant adverse effects would outweigh the positive effects of implementing Complete Streets design elements. Plans or projects that are granted exceptions must be made available for public review. E-310-10-12 TWIC Meeting - Agenda Packet, Page 184 of 330 E-410-10-12 TWIC Meeting - Agenda Packet, Page 185 of 330 E-510-10-12 TWIC Meeting - Agenda Packet, Page 186 of 330 E-610-10-12 TWIC Meeting - Agenda Packet, Page 187 of 330 ROAD PROGRAM AT WORK Appendix F: Vision Zero Street Policy F-110-10-12 TWIC Meeting - Agenda Packet, Page 188 of 330 5(&200(1'$7,21 6  &216,'(5DFFHSWLQJWKH&RQWUD&RVWD&RXQW\9LVLRQ=HUR)LQDO5HSRUWGDWHG)HEUXDU\DVUHFRPPHQGHGE\ WKH7UDQVSRUWDWLRQ:DWHUDQG,QIUDVWUXFWXUH&RPPLWWHHDQG$'237WKH9LVLRQ=HUR$FWLRQ3ODQDVUHFRPPHQGHG E\WKH3XEOLF:RUNV'LUHFWRU ),6&$/,03$&7 1RILVFDOLPSDFW %$&.*5281' 7KH9LVLRQ=HUR$FWLRQ3ODQGHPRQVWUDWHV&RQWUD&RVWD&RXQW\ VFRPPLWPHQWWR9LVLRQ=HURWKHHOLPLQDWLRQRI VHYHUHLQMXULHVDQGIDWDOLWLHVUHVXOWLQJIURPWUDIILFFROOLVLRQVRQ&RXQW\URDGZD\V7KHSXUSRVHRI&RQWUD&RVWD &RXQW\¶V9LVLRQ=HUR$FWLRQ3ODQLVWRLGHQWLI\RSSRUWXQLWLHVIRUVDIHW\IRUDOOPRGHVWKURXJKLPSOHPHQWDWLRQRID 6DIH6\VWHPDSSURDFK7KLVEXLOGVXSRQWKHHQJLQHHULQJIRFXVHG6\VWHPLF6DIHW\$QDO\VLV5HSRUW 66$5 WRSURYLGH DFRPSUHKHQVLYHPXOWLGLVFLSOLQDU\DQGKROLVWLFDSSURDFKWRVDIHW\7KH9LVLRQ=HUR)LQDO5HSRUWVXPPDUL]HVDQG GRFXPHQWVWKH&RXQW\¶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eeting - Agenda Packet, Page 189 of 330 7KH)LQDO5HSRUWDOVRLGHQWLILHVD+LJK,QMXU\1HWZRUN +,1 IRUWKH&RXQW\HVWDEOLVKLQJDIUDPHZRUNIRUWKH GHYHORSPHQWRIFROOLVLRQSURILOHVDQGSURMHFWORFDWLRQV7KHUHVXOWLQJWHQSULRULW\SURMHFWVZHUHVHOHFWHGIURP WKHSURMHFWORFDWLRQVOLVWE\VWXG\LQJWKHFROOLVLRQGDWDFROOLVLRQIDFWRUVDQGLQFRUSRUDWLQJIHHGEDFNIURPWKH FRPPXQLW\ YLDDQLQWHUDFWLYHZHEPDS  F-310-10-12 TWIC Meeting - Agenda Packet, Page 190 of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¶V9LVLRQ=HUR $FWLRQ3ODQIRFXVHVRQXQLQFRUSRUDWHGURDGZD\V$GRSWLRQRIWKH9LVLRQ=HUR)LQDO5HSRUWDQG$FWLRQ3ODQZLOO DOVRTXDOLI\DVWKH&RXQW\¶VUHTXLUHPHQWIRUWKH/RFDO5RDG6DIHW\3URJUDP /563 WKDWDOOPXQLFLSDOLWLHVLQ &DOLIRUQLDDUHUHTXLUHGWRIXOILOOLQRUGHUWRUHFHLYH2QH%D\$UHD*UDQW 2%$* DQG+LJKZD\6DIHW\ ,PSURYHPHQW3URJUDP +6,3 JUDQWIXQGLQJ 7KH&RXQW\¶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³HQJLQHHULQJIRFXVHG´GRFXPHQWDQGZKLOHWKH 9LVLRQ=HUR)LQDO5HSRUWFRQWDLQVVRPHRIWKHVDPHWHFKQLFDOLQIRUPDWLRQDVWKH66$5LWLVPRUHH[SDQVLYHLQ QDWXUH,WEXLOGVXSRQWKHWKH66$5WRLQFOXGHDPRUHKROLVWLFDSSURDFKWRURDGZD\VDIHW\IRUQRQHQJLQHHULQJ SDUWQHUVVXFKDV&RXQW\3XEOLF+HDOWK/DZ(QIRUFHPHQWDGYRFDF\JURXSVDQG&RXQW\3ODQQLQJ 7KH&RQWUD&RVWD&RXQW\¶V9LVLRQ=HUR$FWLRQ3ODQDQG)LQDO5HSRUWLVWKHFXOPLQDWLRQRIIRXU\HDUV¶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eeting - Agenda Packet, Page 191 of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¶VUHTXLUHPHQWWKDWHDFK MXULVGLFWLRQDGRSWD/RFDO5RDGZD\6DIHW\3ODQ /563 RUHTXLYDOHQWVXFKDVD9LVLRQ=HUR3ODQ &/(5. 6$''(1'80 F-510-10-12 TWIC Meeting - Agenda Packet, Page 192 of 330 6SHDNHUV1RQDPHJLYHQ&DOOHU+XDQ:HVW&RXQW\UHVLGHQW3HWHU $77$&+0(176 )LQDO9LVLRQ=HUR5HSRUWGDWHG 9LVLRQ=HUR3RZHU3RLQW F-610-10-12 TWIC Meeting - Agenda Packet, Page 193 of 330 Vision Zero Projects Tier Zero: (Projects currently underway.) 1. Camino Diablo from Vasco Road to Byron Highway 2. Franklin Canyon Road from just west of McHarry Ranch Road to Wolcott Lane 3. Kirker Pass Road from Clayton Avenue to Buchanan Road 4. San Pablo Dam Road from Kennedy Grove Entrance to Bear Creek Road 5. Treat Boulevard from Buskirk Avenue to Sheppard Road Tier One: (Projects that have been scoped and prepared for grant submittals.) 6. Appian Way/Valley View Road/Sobrante Avenue intersection 7. Byron Highway from Clifton Court Road to the California Aqueduct crossing 8. Camino Diablo/Vasco Road intersection 9. Canal Road/Bailey Road intersection and the De Anza Trail crossing 10. Concord Avenue from I-680 to the Walnut Creek channel 11. Danville Boulevard from Jackson Way to La Serena Avenue 12. Marsh Creek Road from west of Deer Valley Road to Clayton city limits 13. San Pablo Avenue from California Street to Merchant Street 14. San Pablo Dam Road from May Road to Kennedy Grove entrance 15. Willow Pass Road from Port Chicago Highway to North Broadway Avenue Tier Two: (Other potential projects that promote safety.) 16. Alves Lane/Medanos Avenue/Hill Street intersection 17. Appian Way/Manor Road intersection 18. Bailey Road from Concord city limits to Willow Avenue 19. Bear Creek Road from Camino Pablo to Alhambra Valley Road 20. Camino Tassajara from Finley Road to just south of Windmere Parkway 21. Canal Road from Bailey Road to Loftus Road 22. Deer Valley Road from Marsh Creek Road to Balfour Road 23. Highland Road from Carneal Road to Manning Road 24. Market Avenue from Jade Street to UP tracks 25. Marsh Creek Road from Bixler Road to Byron Highway 26. Marsh Creek Road from Deer Valley Road to Camino Diablo 27. Olympic Boulevard from Windtree Court to I-680 28. Pacheco Boulevard/Center Avenue intersection 29. Pacheco Boulevard from Wygal Drive to Arthur Road 30. Port Chicago Highway from Driftwood Drive to Pacifica Avenue 31. San Pablo Avenue from Richmond Parkway to Golden Gate Park 32. San Pablo Dam Road from El Portal Drive to May Road 33. Sunset Road/Byron Highway intersection 34. Walnut Boulevard/Vasco Road intersection 35. Willow Pass Road/Evora Road/SR-4 interchange F-710-10-12 TWIC Meeting - Agenda Packet, Page 194 of 330 F-810-10-12 TWIC Meeting - Agenda Packet, Page 195 of 330 ROAD PROGRAM AT WORK Appendix G: Active Transportation Plan G-110-10-12 TWIC Meeting - Agenda Packet, Page 196 of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eeting - Agenda Packet, Page 197 of 330 %$&.*5281' 7KH$FWLYH7UDQVSRUWDWLRQ3ODQ $73 GHPRQVWUDWHVWKDW&RQWUD&RVWD&RXQW\LVFRPPLWWHGWRHQKDQFLQJDFWLYH WUDQVSRUWDWLRQE\SURPRWLQJDFFHVVDQGFRQQHFWLYLW\IRUDOOPRGHVRIWUDYHOEHVLGHVDXWRPRELOHWUDYHO%\ GHILQLWLRQDFWLYHWUDQVSRUWDWLRQFRPSULVHVDQ\VHOISURSHOOHGKXPDQSRZHUHGWUDYHOVXFKDVZDONLQJDQG ELF\FOLQJ7KHSXUSRVHRI&RQWUD&RVWD&RXQW\¶V$73LVWRVHUYHDVDURDGPDSWRHQKDQFHDFWLYHWUDQVSRUWDWLRQ VDIHW\DQGPRGHVKDUHIRUXQLQFRUSRUDWHGDUHDVLQ&RQWUD&RVWD&RXQW\E\SURYLGLQJDFRPSUHKHQVLYHORRNDWWKH &RXQW\¶VDFWLYHWUDQVSRUWDWLRQQHHGVDQGRSSRUWXQLWLHV7KHSODQRXWOLQHVLQYHVWPHQWVLQQHZELF\FOHIDFLOLWLHV XSJUDGHGFURVVLQJVHQKDQFHGWUDLOFRQQHFWLRQVDQGLPSURYHGZDONZD\V7KHVHLQYHVWPHQWVSULRULWL]H LPSURYHPHQWVZLWKLQKLVWRULFDOO\XQGHUVHUYHGDQGLPSDFWHGFRPPXQLWLHV7KH$73)LQDO5HSRUWLVWKH FXOPLQDWLRQRIWKUHH\HDUVRIHIIRUWE\&RXQW\VWDIIDQGWKHLUFRQVXOWDQWV 7KHSURFHVVRIGHYHORSLQJWKLV$73EHJDQZLWKGRFXPHQWLQJFRPPXQLW\QHHGVDQGLQSXWDQGEXLOGVRIIWKH &RXQW\¶VHIIRUWVLQWKHUHFHQWO\DGRSWHG9LVLRQ=HUR$FWLRQ3ODQ7KH9LVLRQ=HUR$FWLRQ3ODQLQFOXGHVD V\VWHPLFORRNDWVDIHW\DQGFROOLVLRQKLVWRU\ZLWKLQWKH&RXQW\LQFOXGLQJLPSURYHPHQWVIRUELF\FOLVWVDQG SHGHVWULDQV7KLV$73LVLQWHQGHGWRVHUYHDVDQLPSOHPHQWLQJDFWLRQRIWKH9LVLRQ=HUR$FWLRQ3ODQDVZHOODV JXLGHIXWXUHJUDQWDSSOLFDWLRQVDQGIXQGLQJIRUDFWLYHWUDQVSRUWDWLRQSURMHFWVWKDWVXSSRUWPRGHVKLIWWRZDONLQJ DQGELF\FOLQJ$GGLWLRQDOO\WKLV$73LVFRQVLVWHQWZLWKRWKHUGRFXPHQWVVXFKDVWKH&RXQW\¶V*HQHUDO3ODQWKH &RXQW\¶V&RPSOHWH6WUHHWV3ROLF\3ODQ%D\$UHD&RQWUD&RVWD7UDQVSRUWDWLRQ$XWKRULW\¶V &&7$ &RXQW\ZLGH%LF\FOHDQG3HGHVWULDQ3ODQDQGWKH&RXQW\¶V&OLPDWH$FWLRQ3ODQ 7KH$73¶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¶V3HGHVWULDQ3ULRULW\$UHDVSURMHFWVDORQJ&&7$¶V %LF\FOH%DFNERQH1HWZRUNUHFRPPHQGDWLRQVIURPSUHYLRXVUHJLRQDOHIIRUWVIHHGEDFNIURPNH\VWDNHKROGHUV DQGWKHFRPPXQLW\SUR[LPLW\WRNH\GHVWLQDWLRQV HJVFKRROVKRVSLWDOVDIIRUGDEOHKRXVLQJWUDQVLWVWRSV SDUNV SURMHFWVZLWKLQLPSDFWHGDUHDVDVGHILQHGE\PXOWLSOHUHVRXUFHV LH0HWURSROLWDQ7UDQVSRUWDWLRQ &RPPLVVLRQ¶V(TXLW\3ULRULW\$UHDV+HDOWK\3ODFHV,QGH[&DO(QYLUR6FUHHQ$PHULFDQ&RPPXQLW\6XUYH\GDWD &RPPXQLW\$LU5LVN(YDOXDWLRQ3URJUDPDQGWKH&DOLIRUQLD'HSDUWPHQWRI(GXFDWLRQ DQGHDVHRI FRQVWUXFWDELOLW\ *LYHQWKHVFRSHRISURMHFWVZLWKLQWKLV$73LPSOHPHQWDWLRQZLOOWDNHPDQ\\HDUVWRFRPSOHWH,PSOHPHQWDWLRQRI HDFKSURMHFWLVGHSHQGHQWXSRQWKHDYDLODELOLW\DQGDFTXLVLWLRQRIIXQGLQJ7KH&RXQW\ZLOOSHULRGLFDOO\XSGDWH WKLVSODQLGHDOO\RQDILYH\HDUWLPHOLQHWRUHIOHFWHYROYLQJQHHGVDQGSURJUHVVWRZDUGFRPSOHWLRQ G-310-10-12 TWIC Meeting - Agenda Packet, Page 198 of 330 2Q0DUFKWKH7UDQVSRUWDWLRQ:DWHUDQG,QIUDVWUXFWXUH&RPPLWWHH 7:,& DFFHSWHGWKHGUDIWRIWKH $FWLYH7UDQVSRUWDWLRQ3ODQ5HSRUWGDWHG0DUFKDQGGLUHFWHG3XEOLF:RUNVVWDIIWRLQFRUSRUDWHFRPPHQWV DQGSUHVHQWWRWKHIXOO%RDUGRI6XSHUYLVRUVIRUDGRSWLRQ6LQFHWKHQWKLVUHSRUWKDVEHHQXSGDWHGDQGWKH)LQDO 5HSRUWLVGDWHG$SULO &216(48(1&(2)1(*$7,9($&7,21 )DLOXUHWRDGRSWWKH$FWLYH7UDQVSRUWDWLRQ3ODQ)LQDO5HSRUWZLOOLPSDFWWKHFRPSHWLWLYHQHVVRIWKH&RXQW\LQ VHFXULQJJUDQWLQJIXQGLQJIURPPXOWLSOHJUDQWSURJUDPVVXFKDVWKH$FWLYH7UDQVSRUWDWLRQ3URJUDPDQG2QH%D\ $UHD*UDQW3URJUDP &/(5. 6$''(1'80 6SHDNHUV&DOOHU $77$&+0(176 $735HSRUW 3RZHU3RLQW3UHVHQWDWLRQ G-410-10-12 TWIC Meeting - Agenda Packet, Page 199 of 330 Roadway Name FromTo MilesNeighborhood/Area of BenefitProject TypeBikeway TypeProject DescriptionCost EstimatePrioritySupervisor District156Contra Costa County Active Transportation Plan$FWLYH7UDQVSRUWDWLRQ3ODQ3URMHFWVG-510-10-12 TWIC Meeting - Agenda Packet, Page 200 of 330 Roadway Name FromTo MilesNeighborhood/Area of BenefitProject TypeBikeway TypeProject DescriptionCost EstimatePrioritySupervisor District157Contra Costa County Active Transportation Plan$FWLYH7UDQVSRUWDWLRQ3ODQ3URMHFWVG-610-10-12 TWIC Meeting - Agenda Packet, Page 201 of 330 Roadway Name FromTo MilesNeighborhood/Area of BenefitProject TypeBikeway TypeProject DescriptionCost EstimatePrioritySupervisor District158Contra Costa County Active Transportation Plan$FWLYH7UDQVSRUWDWLRQ3ODQ3URMHFWVG-710-10-12 TWIC Meeting - Agenda Packet, Page 202 of 330 Roadway Name FromTo MilesNeighborhood/Area of BenefitProject TypeBikeway TypeProject DescriptionCost EstimatePrioritySupervisor District159Contra Costa County Active Transportation Plan$FWLYH7UDQVSRUWDWLRQ3ODQ3URMHFWVG-810-10-12 TWIC Meeting - Agenda Packet, Page 203 of 330 Roadway Name FromTo MilesNeighborhood/Area of BenefitProject TypeBikeway TypeProject DescriptionCost EstimatePrioritySupervisor District160Contra Costa County Active Transportation Plan$FWLYH7UDQVSRUWDWLRQ3ODQ3URMHFWVG-910-10-12 TWIC Meeting - Agenda Packet, Page 204 of 330 Roadway Name FromTo MilesNeighborhood/Area of BenefitProject TypeBikeway TypeProject DescriptionCost EstimatePrioritySupervisor District161Contra Costa County Active Transportation Plan$FWLYH7UDQVSRUWDWLRQ3ODQ3URMHFWVG-1010-10-12 TWIC Meeting - Agenda Packet, Page 205 of 330 ROAD PROGRAM AT WORK Appendix H: Board Order Approving the 2022 Capital Road Improvement and Preservation Program and the 2022 TWIC Report H-110-10-12 TWIC Meeting - Agenda Packet, Page 206 of 330 H-210-10-12 TWIC Meeting - Agenda Packet, Page 207 of 330 ROAD PROGRAM AT WORK Information to be provided after BOS review and approval of the CRIPP H-310-10-12 TWIC Meeting - Agenda Packet, Page 208 of 330 H-410-10-12 TWIC Meeting - Agenda Packet, Page 209 of 330 ROAD PROGRAM AT WORK Appendix I: Areas of Benefit Project Lists, Maps, and Revenue Forecast I-110-10-12 TWIC Meeting - Agenda Packet, Page 210 of 330 ROAD PROGRAM AT WORK AREA OF BENEFIT PROGRAM The unincorporated areas of Contra Costa County are divided into several Areas of Benefit (AOBs) for road improvements focused on mitigating impacts of new development on the transportation network. This appendix shows the following information for each AOB: current ordinance number, project list, boundary map, and forecast of revenues and expenditures. If the AOB is funding an active project, the project is listed with the funding amount and the fiscal year in which the expenditures will occur. Within each AOB, road improvement projects to alleviate known traffic congestion or traffic safety problems have been identified and prioritized. An AOB fee is charged to all developments that create additional traffic in the area to pay for these projects. The fee amount varies depending on which AOB the property is located in, the amount of traffic generated by the development, and the cost of the projects identified on that AOBs project list. HOW DOES THE AOB PROGRAM FIT INTO THE CRIPP? As explained in the CRIPP Introduction, the CRIPP is a planning document for IXQGHG projects in the next 7 years that the Department has VFKHGXOHG at the time of this publication. The AOB is one funding source for County road projects. Road improvement projects funded by AOB revenues must be identified on an AOB Nexus study that is adopted by the County Board of Supervisors. Projects on the AOB project lists appear in either the active project list in the main body of this CRIPP or in the unfunded list contained in Appendix J. Some of the projects on the AOB project lists fall outside of the seven-year, active-project, planning window but are included in the unfunded CRIPP project lists. Each AOB project list was approved with each respective AOB ordinance. In order to update an AOB project list, a separate update process will need to occur. Projects within each AOB program may be removed or added when each AOB ordinance is updated and adopted by the Board of Supervisors. The update of a CRIPP is not the process in which the County updates an AOB. For reference, the following information for each adopted AOB is included: x Ordinance number x Approved/Proposed Project List x Boundary Map for the AOB x Approximate Project Location on the AOB Boundary Map The AOB program consists of 14 separate areasWKDWFRYHUWKHHQWLUH&RXQW\. At any given time, several of these areas may be in the process of a program update. These updates may include revisions to the AOB project list; thus, a draft of a pending project list may be included in this section of the CRIPP but are yet to be approved by the Board of Supervisors. I-210-10-12 TWIC Meeting - Agenda Packet, Page 211 of 330 ROAD PROGRAM AT WORK The following AOBs have active capital projects within the next seven-year outlook. x East County (Regional) AOB x North Richmond AOB In the past CRIPP, AOB administrative expenditures were shown but are no longer considered as a capital improvement project. As a result, the following AOBs have no active projects, but will be shown for the potential revenue forecast and their respective balance: x Alamo AOB x Bay Point AOB x Bethel Island AOB x Briones AOB x Central County AOB x Discovery Bay AOB x Hercules/Crockett/Rodeo AOB x Martinez AOB x Pacheco (West) AOB x Richmond/El Sobrante AOB x South County AOB x West County AOB For more information about the Areas of Benefit Program, contact the AOB manager at (925) 313-2000 or visit the AOB website, http://www.cccounty.us/AOB. AOB Overview Map I-310-10-12 TWIC Meeting - Agenda Packet, Page 212 of 330 ROAD PROGRAM AT WORK Alamo Area of Benefit Current Ordinance 2016-25 PROJECT LIST SCHEDULE Item Location Description Project Status 1 Danville Boulevard/Orchard Court Complete Streets Improvements Construct roundabout and complete streets features In Design 2 Alamo Schools Construct pedestrian safety improvements at Stone Valley Middle School, Alamo Elementary School, and Rancho Romero Schools. 1)Hemme Avenue Sidewalk (between Rancho Romero Elem. and La Sonoma Way) 2)Miranda Avenue Natural Pathway (betw. Stone Valley Middle and Stone Valley Road) 3) Livorna Road Sidewalk Improvements – (Completed) Pending 3 Danville Boulevard at Hemme Avenue Intersection safety improvements.Pending I-410-10-12 TWIC Meeting - Agenda Packet, Page 213 of 330 ROAD PROGRAM AT WORK Alamo AOB Revenue Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 1,139 $ 1,239 $ 1,339 $ 1,439 $ 1,539 $ 1,639 $ 1,739 $ 1,839 $ 1,939 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 800 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 I-510-10-12 TWIC Meeting - Agenda Packet, Page 214 of 330 ROAD PROGRAM AT WORK Bay Point Area of Benefit Current Ordinance 2016-18 PROJECT LIST SCHEDULE Item Location (Nexus Id)Description Project Status 1 Willow Pass Road (1.1)Signalize EB and WB off-ramps at west interchange of SR4 Pending 2 Willow Pass Road (1.2)Intersection improvements at Willow Pass Road and Evora Road to facilitate traffic flow to WB SR 4.Pending 3 Willow Pass Road (2.1)Restriping from Bailey Road to Pittsburg City Limits to improve capacity.Pending 4 Willow Pass Road (2.2)Bailey Road intersection improvements.Pending 5 Port Chicago Highway (3.1) Widen to accommodate bicycle and pedestrian improvements from Driftwood Drive to west of McAvoy Road. Pending Willow Pass Rdass R Bailey RdEvora Rd Port Chicago Hwy Pacifica Ave cagg Driftwood Drllow P AlvesLnLoftus RdCanal Rd PITTSBURG CONCORD McAvoy Rd1 2 12 11 11 3 410965 8 PITTSBURG I-610-10-12 TWIC Meeting - Agenda Packet, Page 215 of 330 ROAD PROGRAM AT WORK 6 Port Chicago Highway (3.2)Realign from west of McAvoy Road to Pacifica Avenue.Pending 7 Port Chicago Highway & Willow Pass Rd Intersection (4) Construct multi-modal safety improvements through intersection from Lynbrook Drive to Weldon Street.Complete 8 Driftwood Drive (5)Construct pedestrian and bicycle safety improvements from Port Chicago Highway to Pacifica Avenue.Pending 9 Pacifica Avenue (6)Extend roadway from Port Chicago Highway to Alves Lane extension.Pending 10 Alves Lane (7)Extend roadway from Willow Pass Road to Pacifica Avenue extension.Pending 11 Loftus Road (8)Construct bicycle and pedestrian safety improvements from Canal Road to Willow Pass Road.Pending 12 Bailey Road (9) Bicycle and pedestrian improvements from Willow Pass Road to Canal Road.In Design Phase 13 Bailey Road (10)Bicycle and pedestrian improvements from Canal Road to BART.Complete Bay Point AOB Revenue & Expenditure Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 1,993 $ 2,014 $ 1,662 $ 1,709 $ 1,809 $ 1,909 $ 2,009 $ 2,109 $ 2,209 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 800 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Total of All Projects $ 584 $ 79 $ 452 $ 53 $ 0 $ 0 $ 0 $ 0 $ 0 North Bailey Road Active Transportation Corridor $ 584 $ 79 $ 452 $ 53 $ 0 $ 0 $ 0 $ 0 $ 0 I-710-10-12 TWIC Meeting - Agenda Packet, Page 216 of 330 ROAD PROGRAM AT WORK Bethel Island Area of Benefit Current Ordinance 2016-12 PROJECT LIST SCHEDULE Item Location Description Project Status 1 Bethel Island Road Add bicycle and pedestrian improvements from Taylor Road to Sandmound Boulevard Pending 2 Sandmound Boulevard Add bicycle and pedestrian improvements from Oakley City Limits to Mariner Road Pending 3 Sandmound Boulevard Add bicycle and pedestrian improvements from Mariner Road to Cypress Road.Pending 4 Gateway Road Add bicycle and pedestrian improvements from Bethel Island Road to Piper Road Pending 5 Piper Road Add bicycle and pedestrian improvements from Gateway Road to Willow Road Pending I-810-10-12 TWIC Meeting - Agenda Packet, Page 217 of 330 ROAD PROGRAM AT WORK Bethel Island AOB Revenue Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 304 $ 314 $ 324 $ 334 $ 344 $ 354 $ 364 $ 374 $ 384 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 80 $ 10 $ 10 $ 10 $ 10 $ 10 $ 10 $ 10 $ 10 I-910-10-12 TWIC Meeting - Agenda Packet, Page 218 of 330 ROAD PROGRAM AT WORK Briones Area of Benefit HERCULES PINOLE RICHMOND MARTINEZ Current Ordinance 88-27 PROJECT LIST SCHEDULE Item Location Description Project Status 1 Alhambra Valley Road Realign curves at Ferndale Road (mile post 5.6), Main Road (mile post 6.2), and 4000 feet northwest of Bear Creek road (mile post 2.9) Pending I-1010-10-12 TWIC Meeting - Agenda Packet, Page 219 of 330 ROAD PROGRAM AT WORK Briones AOB Revenue Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 541 $ 542 $ 543 $ 544 $ 545 $ 546 $ 547 $ 548 $ 549 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 8 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 I-1110-10-12 TWIC Meeting - Agenda Packet, Page 220 of 330 ROAD PROGRAM AT WORK Central County Area of Benefit Current Ordinance 2021-37 PROJECT LIST SCHEUDLE Item Location/Roadway (Nexus ID)Description Project Status 1 Pleasant Hill Road (WPH2)Bicycle improvements from Geary Road to Taylor Boulevard Pending 2 Reliez Valley Road (WPH3) Bicycle improvements from North of Grayson Road to Withers Avenue Pending 3 Taylor Boulevard (WPH4)Safety improvements at the Intersection at Gloria Terrace Pending 4 Fish Ranch Road (NL1)Safety improvements from SR-24 to Grizzly Peak Road Pending 5 San Pablo Dam Road (NL2/3)Roadway safety improvements, West of Camino Pablo Pending 6 Bear Creek Road (NL5)Intersection improvements at the Intersection at Happy Valley Road Pending 7 Pinehurst Road (SL1)Bicycle improvements, West of Canyon Road Pending 8 Ayers Road (EC2)Intersection improvements at the Intersection at Concord Avenue Pending I-1210-10-12 TWIC Meeting - Agenda Packet, Page 221 of 330 ROAD PROGRAM AT WORK 9 Ayers Road (EC3)Intersection improvements at the Intersection at Laurel Avenue Pending 10 Bailey Road (EC4/6)Intersection Improvements at the Intersection and segment at Myrtle Drive to include adding shoulder Pending 11 Las Juntas Road (CCC1)Intersection improvements at the Intersection at Coggins Drive Pending 12 Buskirk Avenue (CCC2)Roadway improvements, North of Treat Boulevard Pending 13 Treat Boulevard (CCC3/5)Complete Street Improvements From I-680 Overpass to Jones Road In- Progress 14 Treat Boulevard (CCC4)Complete Street Improvements From Jones Road to Walnut Creek Bridge Pending 15 Treat Boulevard (CCC6)Intersection improvements at the Intersection at Jones Road In- Progress 16 Mayhew Way (CCC8)Pedestrian improvements, West of Bancroft Avenue Pending 17 Olympic Boulevard (SWC2) Intersection improvements at the Intersection at Boulevard Way/Tice Valley Boulevard Pending 18 Olympic Boulevard (SWC7) Intersection improvements at the Intersection at Bridgefield Road Pending 19 Olympic Boulevard (SWC9)Bicycle and pedestrian improvements from Windtree Court to I-680 Pending 20 Dewing Lane (SWC3)Connection of South Walnut Creek to Iron Horse Trail Between Dewing Lane and So Villa Way Pending 21 Tice Valley Boulevard (SWC4) Complete Street Improvements from Tice Valley Lane to 200' east of Tice Hollow Court Pending 22 Springbrook Road (SWC6) Complete Street Improvements from 170 ft east of Gilmore Street to 460 ft east of Regency Court Pending 23 Boulevard Way (SWC8)Sidewalk project from Warren Road to Olympic Boulevard Pending 24 Rudgear Rd (SM1)Intersection safety improvements at the Intersection at San Miguel Dr Pending 25 Walnut Blvd (SM2)Pedestrian improvements from View Lane to 250’ northwest of Walnut Ct Pending 26 Mountain View Blvd (SM3)Pedestrian improvements from Blackwood Dr to Walnut Blvd Pending 27 San Miguel Dr (SM4)Pedestrian improvements from Rudgear Rd to Blackwood Dr Pending Central County AOB Revenue Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 5,288 $ 5,388 $ 5,488 $ 5,588 $ 5,688 $ 5,788 $ 5,888 $ 5,988 $ 6,088 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 800 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 I-1310-10-12 TWIC Meeting - Agenda Packet, Page 222 of 330 ROAD PROGRAM AT WORK Discovery Bay Area of Benefit Current Ordinance 2018-16 PROJECT LIST SCHEDULE Item Location Description Project Status 1 Discovery Bay Boulevard Construct intersection improvements at Clipper Drive Pending 2.1 State Route 4 Widen and provide pedestrian and bicycle improvements between Bixler Road and Discovery Bay Boulevard Pending 2.2 Rebuild bridge to accommodate four lanes between Bixler Road and Discovery Bay Blvd Pending 2.3 Construct intersection improvements at Newport Drive Pending 2.4 Widen roadway between Byron Highway and Bixler Road Pending 3 Byron Highway Construct school safety improvements at the intersection with Byer Road Pending 4 Clipper Drive Construct traffic calming measures between Newport Drive and Discovery Bay Boulevard Pending 5 Bixler Road Construct complete street improvements between SR-4 and Byer Road Pending 6 Byer Road Construct complete street improvements between Bixler Road and Byron Highway Pending 4 2.1 2.3 2.2 6 2.4 3 1 Byron HwyBixler RdMarsh Creek Rd Byron Elementary SchoolDiscoveryBay BlvdBRENTWOOD B Bixler Rd5Byer Rd I-1410-10-12 TWIC Meeting - Agenda Packet, Page 223 of 330 ROAD PROGRAM AT WORK Discovery Bay AOB Revenue Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 92 $ 142 $ 192 $ 242 $ 292 $ 342 $ 392 $ 412 $ 432 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 340 $ 50 $ 50 $ 50 $ 50 $ 50 $ 50 $ 20 $ 20 I-1510-10-12 TWIC Meeting - Agenda Packet, Page 224 of 330 East County Regional Area of Benefit Boundary East County (Regional) Area of Benefit End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 4,397 $ 4,618 $ 5,218 $ 5,548 $ 6,148 $ 6,748 $ 7,348 $ 7,948 $ 8,548 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 4,800 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Total of All Projects $ 649 $ 379 $ 0 $ 270 $ 0 $ 0 $ 0 $ 0 $ 0 Countywide Guardrail Upgrades $ 379 $ 379 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Marsh Creek Road Bridge Replacement (Bridge No. 28C143 & 28C145) $ 270 $ 0 $ 0 $ 270 $ 0 $ 0 $ 0 $ 0 $ 0 PITTSBURG ANTIOCH BRENTWOOD OAKLEY DISCOVERY BAY DDD Note: Please refer to project descriptions to determine project’s location and/or limits. I-1610-10-12 TWIC Meeting - Agenda Packet, Page 225 of 330 ROAD PROGRAM AT WORK 8 Byron Highway Construct two way left turn lane at Byron Elementary School Pending 9 SR 4/Byron Highway intersection Widen southern intersection of Byron Highway with SR 4 (Phase 2)Pending 10 Knightsen Avenue Widen roadway from East Cypress Rd to Delta Rd Pending 11 Delta Road Widen roadway from Sellers Ave to Byron Highway Pending 12 Sellers Avenue Widen roadway from Delta Rd to Chestnut St Pending 13 Sellers Avenue Widen roadway from Main canal to Marsh Creek Rd Pending 14 Byron Highway Widen roadway from Delta Rd to Chestnut St Pending 15 Byron Highway Widen roadway from Chestnut St to SR 4 Pending 16 Byron Highway Widen roadway from SR 4 to Camino Diablo Pending 17 Camino Diablo Widen roadway from Vasco Rd to Byron Highway Pending 18 Knightsen Ave/Delta Rd intersection Construct intersection improvements Pending 19 Byron Highway/Camino Diablo intersection Construct intersection improvements Pending 20 Byron Highway/SR 4 /Point of Timber intersection Construct intersection improvements Pending 21 Sellers Ave/Marsh Creek Rd intersection Construct intersection improvements Pending 22 Balfour Rd/Byron Highway intersection Construct intersection improvements Pending 23 Sellers Ave/Sunset Rd intersection Construct intersection improvements Pending 24 Sellers Ave/Chestnut St intersection Construct intersection improvements Pending 25 Sellers Ave/Balfour Rd intersection Construct intersection improvements Pending East County Regional AOB Revenue & Expenditure Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 4,397 $ 4,618 $ 5,218 $ 5,548 $ 6,148 $ 6,748 $ 7,348 $ 7,948 $ 8,548 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 4,800 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Total of All Projects $ 649 $ 379 $ 0 $ 270 $ 0 $ 0 $ 0 $ 0 $ 0 Countywide Guardrail Upgrades $ 379 $ 379 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Marsh Creek Road Bridge Replacement (Bridge No. 28C143 & 28C145) $ 270 $ 0 $ 0 $ 270 $ 0 $ 0 $ 0 $ 0 $ 0 I-1710-10-12 TWIC Meeting - Agenda Packet, Page 226 of 330 ROAD PROGRAM AT WORK Hercules/Rodeo/Crockett AOB Revenue Forecast Current Ordinance 88-27 PROJECT LIST SCHEDULE Item Location Description Project Status 1 Pomona Street Widen to provide shoulder from Crockett Boulevard to 2nd street Complete 2 Pomona St / Winslow Ave / Carquinez Scenic Alignment study Pending 3 Crockett Boulevard Widen to three lane arterial to provide for truck climbing lane from Pomona Street to Cummings Skyway Complete 4 San Pablo Ave Modify signal at Union Oil entrance Complete 5 Pomona St Modify signal at 2nd Ave Complete 6 Parker Ave / San Pablo Avenue / Willow Intersection Modify intersection and install signal Complete 7 Parker / Fourth Modify intersection and install signal Complete 8 Willow / Hawthorne Modify intersection and install signal Complete HERCULES CROCKETT RODEO PORT COSTA Pomona St Winslow St I-1810-10-12 TWIC Meeting - Agenda Packet, Page 227 of 330 ROAD PROGRAM AT WORK Hercules/Rodeo/Crockett AOB Revenue Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 21 $ 22 $ 23 $ 24 $ 25 $ 26 $ 27 $ 28 $ 29 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 8 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 I-1910-10-12 TWIC Meeting - Agenda Packet, Page 228 of 330 ROAD PROGRAM AT WORK Martinez Area of Benefit Current Ordinance 95-38 PROJECT LIST SCHEDULE Item Location Description Project Status 1 Alhambra Valley Road Safety and capacity improvements from Martinez city limit to Ferndale Road Pending 2 Alhambra Valley Road Realign curves at Ferndale Road Complete 3 Pacheco Boulevard Realign grade crossing with AT&SF Pending 4 Pacheco Boulevard Widen to arterial standard Pending 1 3 Alhambra Valley Rd 4 MARTINEZHERCULES PINOLE RICHMOND LAFAYETTE WALNUT CREEK PLEASANT HILL CONCORD I-2010-10-12 TWIC Meeting - Agenda Packet, Page 229 of 330 ROAD PROGRAM AT WORK Martinez AOB Revenue Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 2,592 $ 2,692 $ 2,792 $ 2,892 $ 2,992 $ 3,092 $ 3,192 $ 3,292 $ 3,392 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 800 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 I-2110-10-12 TWIC Meeting - Agenda Packet, Page 230 of 330 ROAD PROGRAM AT WORK North Richmond Area of Benefit Current Ordinance 2017-22 Project List Schedule Item Location Description Project Status 1 Pittsburg Avenue at Richmond Parkway Intersection Improve intersection operations which may include modification to traffic signal, additional turn lanes, or other safety improvements Pending 2 Market Avenue Complete Streets Project Improvements to include pedestrian infrastructure and traffic/truck calming measures Pending 3 Fred Jackson Way Improvements to include pedestrian and bicycle infrastructure and traffic/truck calming measures between Chesley Avenue and Parr Boulevard. Pending 4 Parr Boulevard Improvements to include pedestrian and bicycle infrastructure between Richmond Parkway and BNSF railroad tracks.Pending 5 Brookside Drive Improvements to include pedestrian and bicycle infrastructure between Central Street and AT&SF railroad tracks.Pending Parr Blvd Richmond PkwyRICHMOND 4 Brookside Dr 5 Pittsburg Ave1 Market Ave ve Fred Jackson Way2 Chesley Ave 3 burg ACentral StVerde Ave 8 9 Goodrick Ave10 11 SAN PABLO I-2210-10-12 TWIC Meeting - Agenda Packet, Page 231 of 330 ROAD PROGRAM AT WORK 6 Truck route between Verde Avenue and Parr Boulevard Determine a bypass route for trucks to minimize truck traffic through the residential area.Pending 7 Circulation and safety improvements for Verde Elementary School Improve circulation and safety to Verde Elementary School including a potential secondary access.Pending 8 Safety improvements on Central Street, between Brookside Drive and Pittsburgh Avenue Provide safety improvements to provide a roadway that meets County standards and provides for bicycle and pedestrian safety. Pending 9 Pittsburgh Avenue Complete Streets Project Improvements to include pedestrian and bicycle infrastructure between Richmond Parkway and Fred Jackson Way.Pending 10 Safety improvements on Goodrick Avenue, between Parr Boulevard and AOB Boundary (550’ South of Richmond Parkway) Provide safety improvements to provide a roadway that meets County standards and provides for bicycle and pedestrian safety. Pending 11 Chesley Avenue Install traffic calming measures on Chesley Avenue to create a pedestrian friendly environment.Pending North Richmond AOB Revenue& Expenditure Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 4,168 $ 4,360 $ 4,560 $ 4,760 $ 4,960 $ 5,160 $ 5,360 $ 5,560 $ 5,760 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 1,600 $ 200 $ 200 $ 200 $ 200 $ 200 $ 200 $ 200 $ 200 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Total of All Projects $ 8 $ 8 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Fred Jackson Way,First Mile/Last Mile Connection $ 8 $ 8 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 I-2310-10-12 TWIC Meeting - Agenda Packet, Page 232 of 330 ROAD PROGRAM AT WORK Pacheco Area of Benefit Current Ordinance 2021-12 Project List Schedule Item Location Description Project Status 1 Pacheco Boulevard and Muir Road Construct 2nd right turn lane and reconstruct/relocate bike pedestrian and traffic signal improvements Pending 2 Pacheco Boulevard and Center Avenue Improve traffic circulation improvements at the intersection of Pacheco Boulevard and Center Avenue Pending 3 Pacheco Boulevard from Arnold Drive to Muir Road Construct bike lanes from Arnold Drive to Muir Road Pending 4 Pacheco Boulevard and Carolos Drive/N. Buchanan Circle Construct traffic signal at intersection of Pacheco Boulevard and Carolos Drive/N. Buchanan Circle Pending 5 Center Avenue from Pacheco Boulevard to Marsh Drive Construct continuous multi-modal infrastructure improvements on Center Avenue from Pacheco Boulevard to Marsh Drive Pending 3 2 1 4 5 6 CONCORD MARTINEZ PLEASANT HILL 7 4 I-2410-10-12 TWIC Meeting - Agenda Packet, Page 233 of 330 ROAD PROGRAM AT WORK 6 Marsh Drive from Center Avenue to the bridge near the Iron Horse Regional Trail Construct shoulders and bike lanes along Marsh Drive from Center Avenue to Iron Horse Trail Pending 7 Concord Avenue from Contra Costa Boulevard to the Iron Horse Regional Trail Construct a shared-use path along Concord Avenue starting near Contra Costa Boulevard to the Iron Horse Regional Trail Pending Pacheco AOB Revenue Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 416 $ 421 $ 426 $ 431 $ 436 $ 441 $ 446 $ 451 $ 456 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 40 $ 5 $ 5 $ 5 $ 5 $ 5 $ 5 $ 5 $ 5 I-2510-10-12 TWIC Meeting - Agenda Packet, Page 234 of 330 ROAD PROGRAM AT WORK Richmond / El Sobrante Area of Benefit (Current Ordinance 91-27 – not shown) DRAFT Project List Schedule dated 2021 below Item Location Description Project Status 1 El Portal Drive (RES2) Provide Uniform Roadway Adjoining City of Richmond between i- 80 and San Pablo Dam Road Pending 2 Appian Way (RES3)Complete Streets Improvements from Allview Ave to San Pablo Dam Road Pending 3 Appian Way (RES3.1)Intersection Improvements at the intersection with Valley View Road Pending 4 Appian Way (RES1)Intersection Improvements at the intersection with Pebble Drive Pending 5 Appian Way (RES5)Intersection Improvements at the intersection with Manor Road Pending 6 Appian Way (RES6)Intersection Improvements at the intersection with Argyle Road Pending 7 Appian Way (RES7)Intersection Improvements at the intersection with Santa Rita Road Pending 4 8 1 12 6 2 3 PINOLE HERCULES RICHMOND RICHMOND SAN PABLO 5 7 9 11 10 13 14 15 16 17 I-2610-10-12 TWIC Meeting - Agenda Packet, Page 235 of 330 ROAD PROGRAM AT WORK 8 Castro Ranch Road (RES8) Complete Streets and Safety Improvements between San Pablo Dam Road and Hillside Drive Pending 9 La Paloma Road (RES9)Complete Streets Improvements from Hilltop Drive to Appian Way Pending 10 Hillcrest Road (RES11) Complete Streets Improvements between Morrow Drive to Alpine Road Pending 11 Hillcrest Road (RES12)Build New Connecting Roadway between Hillcrest Road and Pitt Way Pending 12 San Pablo Dam Road (RES10) Complete Streets and Safety Improvements from east of Appian Way to AOB limits Pending 13 San Pablo Dam Road (RES13) Complete Street Improvements between El Portal Drive, Hill Crest Road and Appian Way Pending 14 San Pablo Dam Rd (RES14) Shared Use Path across San Pablo Creek From the Richmond city limits (east of El Portal Drive) to Appian Way Pending 15 Santa Rita Road (RES15) Complete Streets and Safety Improvements between Appian Way and Richmond city limits Pending 16 Manor Road (RES 16)Complete Streets and Safety Improvements between Hilltop Drive and Appian Way Pending 17 Hilltop Drive (RES17)Complete Streets and Safety Improvements between La Paloma Road and Manor Road Pending Richmond/El Sorbrante AOB Revenue Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 373 $ 398 $ 423 $ 448 $ 473 $ 498 $ 523 $ 548 $ 573 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 200 $ 25 $ 25 $ 25 $ 25 $ 25 $ 25 $ 25 $ 25 I-2710-10-12 TWIC Meeting - Agenda Packet, Page 236 of 330 ROAD PROGRAM AT WORK South County Area of Benefit Current Ordinance 96-27 Project List Schedule Item Location Description Project Status 1 Camino Tassajara Improve County portion to two lane rural highway standard Pending 2 Crow Canyon Road Various safety and capacity improvements, including a truck climbing lane (* Crow Canyon Road Incorporated into the City of San Ramon) N/A* DANVILLE SAN RAMON WALNUT CREEK LAFAYETTE MORAGA 1 I-2810-10-12 TWIC Meeting - Agenda Packet, Page 237 of 330 ROAD PROGRAM AT WORK South County AOB Revenue Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 2,681 $ 2,831 $ 2,981 $ 3,131 $ 3,281 $ 3,431 $ 3,581 $ 3,731 $ 3,881 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 1,200 $ 150 $ 150 $ 150 $ 150 $ 150 $ 150 $ 150 $ 150 I-2910-10-12 TWIC Meeting - Agenda Packet, Page 238 of 330 ROAD PROGRAM AT WORK West County Area of Benefit Pending West County AOB update expected in 2023 Proposed Project List Schedule Item Location Description Project Status 1 Arlington Avenue, Intersection with Rincon Road and Kensington Road Intersection Safety Improvements Pending 2 Arlington Avenue, Intersection with Westminster Avenue Intersection Safety Improvements Pending 3 Arlington Avenue, Intersection with Sunset Drive Intersection Safety Improvements Pending 4 Arlington Avenue, Intersection with Coventry Road Intersection Safety Improvements Pending 5 Arlington Avenue, Intersection with Amherst Avenue Intersection Safety Improvements Pending 6 Arlington Boulevard, Intersection with Vine Avenue and Highland Avenue Intersection Safety Improvements Pending 10 9 12 1 HERCULES PINOLE RICHMOND SAN PABLO EL CERRITO ORINDA 234 5 6 11 8 7 I-3010-10-12 TWIC Meeting - Agenda Packet, Page 239 of 330 ROAD PROGRAM AT WORK 7 Pinole Valley Road, Between Pinole City Limits and AOB boundary Safety Improvements Pending 8 Tara Hills Drive, Between San Pablo Avenue and Pinole City Limits Pedestrian Safety Improvements and Traffic Calming Pending 9 San Pablo Avenue, Between Kay Road and Pinole City Limits Bicycle Improvements Pending 10 San Pablo Avenue, Between Eire Drive and the Pinole City Limits Striped Pedestrian Crossing with Beacons Pending 11 Tara Hills Elementary School, Shannon Elementary School, Pinole Middle School Striped Pedestrian Crossing with Beacons Pending 12 San Pablo Dam Road, Between the top of the San Pablo Dam Reservoir and the AOB Boundary Safety Improvements Pending West County AOB Revenue Forecast End of Year Cash Balance (in 1,000's of Dollars) End of FY 20/21 Balance FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 End of Year Balance $ 128 $ 138 $ 148 $ 158 $ 168 $ 178 $ 188 $ 198 $ 208 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 Projected Revenue $ 70 $ 10 $ 10 $ 10 $ 10 $ 10 $ 10 $ 10 $ 10 I-3110-10-12 TWIC Meeting - Agenda Packet, Page 240 of 330 I-3210-10-12 TWIC Meeting - Agenda Packet, Page 241 of 330 ROAD PROGRAM AT WORK Appendix J: Unfunded Project List J-110-10-12 TWIC Meeting - Agenda Packet, Page 242 of 330 ROAD PROGRAM AT WORK UNFUNDED PROJECT LIST The following is a list of projects that have varying levels of project scoping and either have an incomplete funding plan or do not have funding identified. Many projects have not been evaluated for consistency with County Planning documents, policies, or goals. The unfunded project list varies widely in the range of scoping. For example, some preliminary engineering has been performed on projects that are in the County Area of Benefit program, which include Nexus Studies. Other projects are more of a “wish list” where little to no scoping has occurred. In all of the cases, funding sources have not been identified, with the exception of Area of Benefit funding that only partially funds the given projects. However, the list remains a ready source for potential projects when grant opportunities come up from time to time. In total, the unfunded project list is a list of project “ideas” from various sources, presented “for informational purposes only.” The unfunded project list has been compiled from many sources, including the County Area of Benefit Program, Transportation Studies, and internal County sources (County Board of Supervisors, Department of Conservation and Development, and the various divisions and work groups within the Public Works Department). These unfunded projects are within the purview of the Transportation Engineering Division to support improving and preserving the County’s network of roadways, sidewalks, bicycle lanes, and other modes of travel. There are 242 unfunded projects listed. This list will act as a reminder of project concepts to be further evaluated when funding opportunities become available and the project becomes a Public Works Department priority. J-210-10-12 TWIC Meeting - Agenda Packet, Page 243 of 330 ROAD PROGRAM AT WORK List of Unfunded Projects (in alphabetical order): 1. 6th Street Rodeo Sidewalk Project - Parker Avenue to Garretson (Traffic Section) - This project proposes to provide sidewalk along one side of 6th Street between Parker Avenue and Garretson Avenue. Supervisor District: 5 2. 7th Street Sidewalk Project - Parker Avenue to Garretson (Traffic Section) - This project proposes to provide sidewalk along one side of 7th Street between Parker Avenue and Garretson Avenue. Supervisor District: 5 3. Alamo Area Pedestrian and Bicycle Improvements (PWD) - This project proposes to construct pedestrian and bicycle improvements in the Alamo area. Supervisor District: 2 4. Alhambra Valley Road Realignment near Wanda Way and Millthwait Drive (Martinez/Briones AOB Update) - This project proposes to realign the reversing curves of Alhambra Valley Road to improve drivers' safety and sight distance. Supervisor District: 5 5. Alhambra Valley Road Safety Improvements (Various Locations) (PWD) - This project proposes to construct safety improvements along Alhambra Valley Road. Supervisor District: 1, 5 6. Alves Lane Extension - Willow Pass Road to Pacifica Avenue (Bay Point AOB) - This project is to construct a new roadway extension and modify the existing traffic signal at Alves Lane and Willow Pass Road. Supervisor District: 5 7. Appian Way & Argyle Drive Intersection Improvements (Richmond/El Sobrante AOB) - This project proposes to construct signal improvements to improve the safety at the intersection of Appian Way and Argyle Drive. Supervisor District: 1 8. Appian Way & Manor Road Intersection Improvements (Richmond/El Sobrante AOB) - This project proposes to construct intersection improvements at the intersection of Appian Way and Manor Road. Supervisor District: 1 9. Appian Way and Pebble Drive Intersection Improvements (Richmond/El Sobrante AOB) - This project proposes to construct signal improvements to improve safety at the intersection of Appian Way and Pebble Drive. Supervisor District: 1 10. Appian Way and Santa Rita Road Intersection Improvements (Richmond/El Sobrante AOB) - This project proposes to construct signal improvements to improve the safety at the intersection of Appian Way and Santa Rita Road. Supervisor District: 1 11. Appian Way at Valley View Intersection Project (Appian Way Corridor Study) - This project proposes to construct complete street safety improvements at the intersection. Supervisor District: 1 12. Appian Way Complete Streets Project - San Pablo Dam Road to Valley View Road (Richmond/El Sobrante AOB) - This ‘Complete Streets Project’ proposes to improve pedestrian and bicycle safety along Appian Way from San Pablo Dam Road to Valley View Road. Supervisor District: 1 J-310-10-12 TWIC Meeting - Agenda Packet, Page 244 of 330 ROAD PROGRAM AT WORK 13. Appian Way Complete Streets Project - Valley View Road to Pinole City Limits (Richmond/El Sobrante AOB) - This ‘Complete Streets Project’ proposes to improve pedestrian and bicycle safety along Appian Way from Valley View Road to the Pinole city limit. Supervisor District: 1 14. Arlington Avenue & Amherst Avenue Intersection Safety Improvements (West County AOB) - This project proposes to construct safety improvements at the intersection. Supervisor District: 1 15. Arlington Avenue & Coventry Road Intersection Safety Improvements (West County AOB) - This project proposes to construct safety improvements at the intersection. Supervisor District: 1 16. Arlington Avenue & Rincon Road/Kensington Park Road Intersection Safety Improvements (Proposed West County AOB) - This project proposes to construct safety improvements at the intersection. Supervisor District: 1 17. Arlington Avenue & Sunset Drive Intersection Safety Improvements (West County AOB) - This project proposes to construct safety improvements at the intersection. Supervisor District: 1 18. Arlington Boulevard & Vine Avenue/Highland Avenue Intersection Safety Improvements (Proposed West County AOB) - This project proposes to construct safety improvements at the intersection. Supervisor District: 1 19. Ayers Road & Concord Boulevard Intersection Improvements (Central County AOB) - This project proposes to add a southbound right-turn lane and sidewalk at the intersection of Ayers Road and Concord Boulevard. Supervisor District: 4 20. Ayers Road & Laurel Avenue Intersection Improvements (Central County AOB) - This project proposes to widen the approaches to the intersection at Ayers Road and Laurel Drive and to install new curb, gutter, sidewalk, and traffic signal. Improvements require coordination with the City of Concord. Supervisor District: 4 21. Bailey Road & Myrtle Drive Intersection Improvements (Central County AOB) - This project is to improve safety at the intersection at Bailey Road and Myrtle Drive by widening Bailey Road for a new through-lane and westbound left turn pocket. Supervisor District: 4 22. Bailey Road Bicycle and Pedestrian Improvements - Canal Road to BART (PWD) - This project is to construct bicycle and pedestrian improvements along the Bailey corridor to service the Bay Point BART station. Supervisor District: 5 23. Bailey Road Overlay Project - SR4 to Keller Canyon Landfill Entrance (Developer Fee) - This project is to overlay Bailey Road. Supervisor District: 5 24. Bailey Road Shoulder Improvements (Central County AOB) - This project is to provide bicycle improvements. Supervisor District: 4, 5 25. Balfour Road & Byron Highway Intersection Improvements (East County Regional AOB) - This project proposes to install a traffic signal and exclusive left-turn lanes at the intersection of Balfour Road and Byron Highway. Left turn lanes will be installed with Balfour Road Shoulder widening (see also Balfour Road Shoulder Widening - Sellers Avenue to Bixler Road). Supervisor District: 3 26. Balfour Road Shoulder Widening - Deer Valley Road to Brentwood City Limits (ECCRFFA) - This project proposes to widen about 1.2 miles of Balfour Road between Deer Valley Road and Brentwood City Limits. Supervisor District: 3 J-410-10-12 TWIC Meeting - Agenda Packet, Page 245 of 330 ROAD PROGRAM AT WORK 27. Bay Point Bicycle and Pedestrian Improvements (CTPL) - This project proposes to improve bicycle and pedestrian safety in Bay Point area. Supervisor District: 5 28. Bay Trail Gap Closure (Various Locations) (Study) - This project proposes to assist and close gaps in the Bay Trail. Supervisor District: 5 29. Bear Creek Road & Happy Valley Road Intersection Improvements (Central County AOB) - This project proposes to install an all-way stop at the T-intersection of Happy Valley Road and Bear Creek Road. Supervisor District: 1, 2 30. Bear Creek Road Safety Improvements (CTPL) - This project proposes to construct safety improvements along Bear Creek Road between Alhambra Valley Road and the City of Orinda. Supervisor District: 1, 5 31. Bella Vista Infrastructure Improvements (Study) - This project is to construct capital improvements in accordance with the Bella Vista Infrastructure Study. Supervisor District: 5 32. Bethel Island Road Bicycle and Pedestrian Improvements - Taylor Road to Sandmound Boulevard (Bethel Island AOB) - This project proposes to add bicycle and pedestrian improvements along Bethel Island Road between Sandmound Boulevard and Taylor Road. Supervisor District: 3 33. Bixler Road Widening and Bicycle Improvements, between SR4 and Byer Road (Discovery Bay AOB) - This project proposes to widen Bixler Road to include shoulders and bike lane from SR4 south to Byer Road. Supervisor District: 3 34. Boulevard Way Bicycle and Pedestrian Project (PWD) - This project is to construct bicycle and pedestrian improvements along Boulevard Way. Supervisor District: 2 35. Boulevard Way Bridge Repair at Las Trampas Creek (CTPL) – This project is to repair degraded creek invert and armor the banks. Supervisor District: 2 36. Boulevard Way Sidewalk Project (Central County AOB) - This project is to construct pedestrian improvements along Boulevard Way. Supervisor District: 2 37. Brookside Drive Complete Streets Project - Central Street to BNSF Railroad (North Richmond AOB) - This project proposes to widen Brookside Drive from Central Street to the Union Pacific Railroad and provide complete street improvements. Supervisor District: 1 38. Bryon Highway Extension: Delta Road to north of Rock Slough (CTPL) - Extend Byron Highway northward, from its current northern terminus at Delta Road, to the City of Oakley boundary at the north end of Rock Slough. Project requires construction of a bridge over Rock Slough. Supervisor District: 3 39. Bryon Highway Safety Improvements (ECCRFFA) - This project proposes to improve safety to Byron Highway by improving intersections and by adding shoulder to the road. Supervisor District: 3 40. Buskirk Avenue Improvements - Treat Boulevard to Pleasant Hill City Limits (Central County AOB) - This project proposes to widen the roadway along Buskirk Avenue from Treat Boulevard to the Pleasant Hill City limit. Supervisor District: 4 J-510-10-12 TWIC Meeting - Agenda Packet, Page 246 of 330 ROAD PROGRAM AT WORK 41. Byer Road Widening and Bicycle Improvements (Discovery Bay AOB) - This project proposes to widen Byer Road to include shoulder and bike lane from Byron Highway east to Bixler Road. Supervisor District: 3 42. Byron Highway & Point of Timber Intersection Improvements (East County Regional AOB) - This project is to improve the intersection. Supervisor District: 3 43. Byron Highway Safety Improvements (Various Locations) (CTPL) - This project proposes to construct safety improvements at various locations along Byron Highway to include shoulder widening, drainage improvements, and intersection improvements. Supervisor District: 3 44. Byron Highway Widening - Camino Diablo to the Alameda County Line (East County Regional AOB) - This project proposes to widen 5 miles of roadway shoulders on Byron Highway from Camino Diablo to the Alameda County Line. Supervisor District: 3 45. Byron Highway Widening - Chestnut Street to SR4 (East County Regional AOB) - This project proposes to widen shoulders for 1.6 miles of Byron Highway from Chestnut Street to SR4. Supervisor District: 3 46. Byron Highway Widening - Delta Road to Chestnut Street (East County Regional AOB) - This project proposes to widen shoulders for 2.5 miles of Byron Highway from Delta Road to Chestnut Street. Supervisor District: 3 47. Byron Highway Widening - SR4 to Camino Diablo (East County Regional AOB) - This project proposes to widen shoulders along Byron Highway from SR4 south to Camino Diablo. Supervisor District: 3 48. Camino Diablo Widening - Vasco Road to Byron Highway (East County Regional AOB) - This project proposes to widen shoulders on Camino Diablo from Vasco Road east to Byron Highway. Supervisor District: 3 49. Camino Tassajara Safety Improvements (Various Locations) (CTPL) - This project proposes to construct various roadway and intersection improvements along Camino Tassajara to include shoulder widening and drainage improvements. Supervisor District: 2 50. Canal Road Sidewalk Project (CTPL) - This project proposes to construct sidewalk along a segment of Canal Road between Chadwick Lane and 420 feet south of Winterbrook drive. Supervisor District: 5 51. Castro Ranch Road Pedestrian Safety Improvements - San Pablo Dam Road to Hillside Drive (Richmond - El Sobrante AOB) - This project proposes to install complete streets improvements and safety improvements. Supervisor District: 1 52. Center Avenue Complete Streets Improvements (Pacheco AOB) - This project is to construct bike lanes, widen the roadway by reducing the existing sidewalk, and construct new sidewalk to provide a continuous path of travel along Center Avenue. Supervisor District: 5 53. Center Avenue Widening (Pacheco AOB) - This project is to construction intersection modifications at Pacheco Boulevard and Center Avenue and westerly along Center Avenue. Supervisor District: 5 J-610-10-12 TWIC Meeting - Agenda Packet, Page 247 of 330 ROAD PROGRAM AT WORK 54. Central Street Complete Street - Brookside Drive and Pittsburg Avenue (North Richmond AOB) - This project is to construct complete streets improvements along Central Avenue between Brookside Drive and Pittsburg Avenue. Supervisor District: 1 55. Chestnut Street Widening - Sellers Avenue to Byron Highway (East County AOB) - This project proposes to widen shoulders along Chestnut Street from Sellers Avenue east to Byron Highway. Supervisor District: 3 56. Clifton Court Road Bridge Repair (Bridge No. 28C0403) (Bridge Inspection) - This project proposes to repair and maintain the bridge on Clifton Court Road. Supervisor District: 3 57. Clipper Drive Traffic Calming Measures (Discovery Bay AOB) - This project proposes to construct traffic-calming measures along Clipper Drive from Newport Drive east to Discovery Bay Boulevard. Supervisor District: 3 58. Clyde Extensions - Essex Street and Middlesex Street to Port Chicago Highway (CTPL) - This project proposes to extend both Essex Street and Middlesex Street one block westward to Port Chicago Highway. Supervisor District: 5 59. Colusa Avenue Complete Streets Project (CTPL) - This ‘Complete Streets Project’ proposes to improve pedestrian and bicycle safety along a 0.5 mile stretch of Colusa Avenue. Supervisor District: 1 60. Concord Avenue Bicycle Improvements - I-680 off-ramp to Iron Horse Trail (Pacheco AOB) - This project is to construct a 10’ wide Class 1 shared use path on the south side of Concord Avenue from Contra Costa Boulevard to the Iron Horse Trail. Supervisor District: 4 61. Concord Avenue Improvements Project (Pacheco AOB) - This project is to construct safety roadway improvement to support Complete Streets along Concord Avenue. Supervisor District: 4 62. Countywide Safe Routes to Schools Program (County) (CTPL) - This is a program to study Safe Routes to Schools in the County. Supervisor District: Countywide 63. Countywide Surface Treatments (PWD) - This is a program to maintain streets with a surface treatment throughout the County. Supervisor District: Countywide 64. Countywide Traffic Betterment - New Sign and Striping Program (CTPL) - This is a program to maintain signing and striping. Supervisor District: Countywide 65. Countywide Traffic Calming (PWD) - This program is to install traffic-calming elements. Supervisor District: Countywide 66. Countywide Traffic Program (CTPL) - This program provides for safety and efficient movement of vehicular and pedestrian traffic while preserving neighborhood character and minimizing disruption to the residents. This includes Safety Investigation, Traffic Operation, Traffic Data & Records, and Traffic Signal & Traffic Management. Supervisor District: Countywide 67. Crockett Downtown Upgrade Project (PWD) - This project will upgrade the pedestrian facilities in the Downtown Crockett Area. Supervisor District: 5 J-710-10-12 TWIC Meeting - Agenda Packet, Page 248 of 330 ROAD PROGRAM AT WORK 68. Cummings Skyway - Widen Interchange at I-80 (CTPL) - This project is to improve the Cummings Skyway interchange at I-80 to provide bicycle lanes and turn pockets. Supervisor District: Countywide 69. Cummings Skyway Truck Lane Extension (CTPL) - This project is to extend the existing eastbound truck-climbing lane on Cummings Skyway. Supervisor District: 5 70. Danville Boulevard & Hemme Avenue Intersection Improvements (Alamo AOB) - This project is to extend the existing northbound left turn lane on Danville Boulevard at the intersection of Danville Boulevard and Hemme Avenue. This is also located near Rancho Romero Elementary School. Supervisor District: 2 71. Danville Boulevard at Hemme Avenue Intersection Safety Improvements (Alamo AOB) - This project is to construct safety improvements at the intersection. Supervisor District: 2 72. Danville Boulevard Improvements (Alamo AOB) - Construct bicycle and pedestrian improvements along Danville Boulevard. Supervisor District: 2 73. Deer Valley Road Safety Improvements (Various Locations) (ECCRFFA) - This project proposes to construct safety improvements along Deer Valley Road at various locations. Supervisor District: 3 74. Deer Valley Road Widening Project (ECCRFFA) - This project proposes to widen the road from northern Antioch City limit to Empire Mine Road. Supervisor District: 3 75. Del Monte Drive Bridge Replacement (Bridge No. 28C0207) (PWD) - This project is to replace the bridge. Supervisor District: 1 76. Delta De Anza Trail Crossing Project (PWD) - This project improves the remaining intersection crossings of the Delta De Anza Trail between Port Chicago Highway and Bailey Road. Supervisor District: 5 77. Delta De Anza Trail Gap Closure (Various Locations) (PWD) - This project is to provide gap closures to the Delta De Anza Trail. Supervisor District: 5 78. Delta Road Widening - Byron Highway to Holland Tract Road (East County Regional AOB) - This project proposes to widen shoulders for about 1.7 miles of Delta Road from Byron Highway to Holland Tract Road. Supervisor District: 3 79. Delta Road Widening - Sellers Avenue to Byron Highway (East County Regional AOB) - This project proposes to widen shoulders for about 2.0 miles of Delta Road from Sellers Avenue to Byron Highway. Supervisor District: 3 80. Dewing Lane Pedestrian Bridge over Las Trampas Creek (Central County AOB) - This project is to construct a pedestrian bridge over Las Trampas Creek in the vicinity of Dewing Lane (unincorporated Walnut Creek). Supervisor District: 2 81. Diablo Road Widening - Avenida Nueva to Blackhawk Road (Proposed South County AOB) - Widen approximately 925 feet of Diablo Road to two-lane rural road standard. Supervisor District: 2 82. Discovery Bay Boulevard & Clipper Drive Intersection Improvements (Discovery Bay AOB) - This project proposes to modify intersection traffic control to improve level of service at the intersection of Discovery Bay Boulevard and Clipper Drive. Supervisor District: 3 J-810-10-12 TWIC Meeting - Agenda Packet, Page 249 of 330 ROAD PROGRAM AT WORK 83. Driftwood Drive Pedestrian and Bicycle Safety Improvements - Port Chicago Highway to Pacifica Avenue (Bay Point AOB) - This project proposes to construct six-foot shoulders and six-and-a-half- foot wide sidewalks on both sides of Driftwood Drive. Supervisor District: 5 84. Eden Plains Road Widening - Sunset Road to Marshall Court (CTPL) - This project proposes to widen Eden Plains Road to two-lane arterial standard design, with two 12-foot lanes and paved shoulders on both sides of the street. Supervisor District: 3 85. El Portal Drive Improvements - I-80 to San Pablo Dam Road (Richmond-El Sobrante AOB) - This project proposes to provide uniformity between the existing roadway and the segment of City of Richmond. Supervisor District: 1 86. Evora Road Extension - Current western terminus of Evora Road to Port Chicago Highway (Evora Road Extension Traffic Study) - This project proposes to extend Evora Road westward to Port Chicago Highway in Concord. Supervisor District: 5 87. Evora Road Widening - Willow Pass Road (Bay Point) to Willow Pass Road (Concord) (ECCRFFA) - This project proposes widening of Evora Road to four lanes. Supervisor District: 5 88. Fish Ranch Road Safety Improvements - SR 24 to Grizzly Peak Road (Central County AOB) - This project is to enhance vehicle and bicycle safety by widening Fish Ranch Road to provide roadway shoulders between Grizzly Peak Road to SR24. Supervisor District: 2 89. Franklin Canyon Undercrossing -- Sobrante Ridge to Carquinez Strait Trail (CTPL) - This project proposes to construct a Franklin Canyon undercrossing to facilitate regional trail access. Supervisor District: 5 90. Fred Jackson Way/Goodrick Avenue Realignment (CTPL) - This project proposes to realign these streets to form one intersection instead of two offset intersections. Supervisor District: 1 91. Fred Jackson Way Complete Streets Project - Intersection with Chesley Avenue (North Richmond AOB) - This project proposes to install traffic calming improvements at the intersection of Fred Jackson Way and Chesley Avenue. This project is intended to meet the County's Complete Street Policy. Supervisor District: 1 92. Fred Jackson Way Complete Streets Project - Between Chesley Avenue and Parr Boulevard (North Richmond AOB) - This project is to install pedestrian and bicycle improvements along Fred Jackson Way between Chesley Avenue and Parr Boulevard. This project is to meet the County’s Complete Street Policy. Supervisor District: 1 93. Fred Jackson Way Improvements (North Richmond AOB) - This project is to install pedestrian and bicycle improvements along Fred Jackson Way between Chesley Avenue and Parr Boulevard. This project is to meet the County’s Complete Street Policy. Supervisor District: 1 94. Gateway Road Bicycle and Pedestrian Improvements - Bethel Island Road to Piper Road (Bethel Island AOB) - Project work includes widening Gateway Road to County standards and provide bicycle and pedestrian improvements. Travel lanes will be widened from 10 feet to 12 feet, and 8- foot shoulders will be constructed along both sides of the roadway. Supervisor District: 3 95. Gateway Road Widening - Piper Road to Stone Road (CTPL) - This project proposes to widen travel lanes and provide walkable shoulders along Gateway Road. Supervisor District: 3 J-910-10-12 TWIC Meeting - Agenda Packet, Page 250 of 330 ROAD PROGRAM AT WORK 96. Gloria Terrace Sidewalk Project -- Taylor Boulevard to Reliez Valley Road (CTPL) - This project proposes to provide a sidewalk or walkable shoulders on Gloria Terrace. Supervisor District: 2 97. Goodrick Avenue Safety Improvements - Parr Boulevard to AOB Boundary (550' South of Richmond Parkway) (North Richmond AOB) - This project would enhance vehicle, bicycle, and pedestrian safety by providing bike lanes and sidewalks along Goodrick Avenue. Supervisor District: 1 98. Hemme Avenue Sidewalk Improvements (Alamo AOB) - This project proposes to extend the existing sidewalk on the north side of Hemme Avenue from Barbee Lane to La Sonoma Way, just west of Rancho Romero Elementary School. Supervisor District: 2 99. Highland Road Improvements - Camino Tassajara to Alameda County Line (CTPL) - This project proposes to construct safety improvements along Highland Road from Camino Tassajara to the Alameda County Line. Supervisor District: 2 100. Hillcrest Road Safety Improvements - Morrow Drive to Alpine Road (Richmond-El Sobrante AOB) - This complete street projects proposes to improve safety. Supervisor District: 1 101. Hilltop Drive Complete Streets Intersection Improvements - La Paloma Road to Manor Road (Richmond-El Sobrante AOB) - This project proposes to implement complete street and intersection improvements. Supervisor District: 1 102. Holway Drive Safety Improvements - Main Street to Camino Diablo Road (CPTL) - This project proposes to connect sidewalks, curb ramps, and crosswalks along Holway Drive. Supervisor District: 3 103. Iron Horse Trail Flashers and Signage (CTPL) - This project proposes to install flashers and signage at select locations along the full length of the Iron Horse Trail. Supervisor District: 2 104. Jones Road Bikeway (CTPL) - This project proposes to provide a Class III bike route along Jones Road. Supervisor District: 4 105. Kirker Pass Road Bikeway (CTPL) - This project is to construct a bikeway between the City of Concord and the City of Pittsburg. Supervisor District: 5 106. Kirker Pass Road Northbound Runaway Truck Ramp (BOS) - This project is to construct a northbound trunk runaway truck ramp along Kirker Pass Road prior to the City of Pittsburg. Supervisor District: 5 107. Kirker Pass Road Safety Improvements (PWD) - This project is to construct safety improvements at various locations. Supervisor District: 5 108. Kirker Pass Road Southbound Truck Lanes (ECCRFFA) - This project is to construct a southbound truck-climbing lane along Kirker Pass Road. Supervisor District: 5 109. Knightsen Avenue & Delta Road Intersection Improvements (East County Regional AOB) - This project proposes to install a new traffic signal and exclusive left turn lanes at the intersection of Knightsen Avenue and Delta Road. Supervisor District: 3 110. Knightsen Avenue and Eden Plains Road Widening - Delta Road to Chestnut Street (East County Regional AOB) - This project is to widen Knightsen Avenue and Eden Plains Road. Supervisor District: 3 J-1010-10-12 TWIC Meeting - Agenda Packet, Page 251 of 330 ROAD PROGRAM AT WORK 111. Knightsen Avenue Widening - East Cypress Road to Delta Road (East County Regional AOB) - This project proposes to widen shoulders on Knightsen Avenue for about 1.6 miles from East Cypress Road to Delta Road. Supervisor District: 3 112. La Paloma Road Pedestrian and Roadway Improvements (Richmond/El Sobrante AOB) - This project proposes to install traffic safety and pedestrian improvements along La Paloma Road. Supervisor District: 1 113. Las Juntas Way & Coggins Drive Intersection Improvements (Central County AOB) - This project is to improve the intersection level of service through intersection modifications at Las Juntas Way and Coggins Drive near the Pleasant Hill Bart Station. Supervisor District: 4 114. Livorna Road Bikeway (PWD) - Widen Road to create space for Bike Lanes on Livorna Road from Douglas Court to Acacia Lane. Supervisor District: 2 115. Loftus Road Bicycle and Pedestrian Improvements - Willow Pass Road to Canal Road (Bay Point AOB) - This project is to provide pedestrian and bicycle facilities close to the Willow Cove Elementary School. Supervisor District: 5 116. Lone Tree Way (Anderson Lane) Bike Lane Gap Closure - Anderson Lane to Virginia Drive (CTPL) - This project is to provide bike lanes for the last County-maintained portion of Lone Tree Way for a quarter-of-a-mile stretch of roadway. Coordination with the City of Brentwood may be required. Supervisor District: 3 117. Manor Road Pedestrian Safety Improvements - Hilltop Drive to Appian Way (Richmond/El Sobrante AOB) - This project will construct pedestrian safety improvements on Manor Road from Hilltop Drive to Appian Way. Supervisor District: 1 118. Market Avenue Complete Streets - Fred Jackson Way to AOB Boundary (North Richmond AOB) - This project proposes to install pedestrian improvements and traffic calming improvements along Market Avenue between Fred Jackson and 7th Street. Supervisor District: 1 119. Marshall Drive Sidewalk -- Indian Valley Elementary School/City of Walnut Creek line to El Verano Drive (CTPL) - This project proposes to construct sidewalk on both sides of Marshall Drive. This is about a one-mile segment of roadway. Supervisor District: 4 120. Marsh Creek Road & Camino Diablo Intersection Improvements (CTPL) - This project proposes to construct safety improvements at the intersection of Marsh Creek Road and Camino Diablo. Supervisor District: 3 121. Marsh Creek Road & Deer Valley Road Intersection Improvements (PWD) - This project proposes to widen the roadway and construct turn pockets at the intersection of Marsh Creek Road and Deer Valley Road. Supervisor District: 3 122. Marsh Creek Road and Morgan Territory Road Intersection Improvements (CTPL) - This project is to improve the intersection. Supervisor District: 3 123. Marsh Creek Road Improvements - Clayton City Limits to Brentwood City Limits (East County Regional AOB) - This project is to construct various roadway and intersection improvements along Marsh Creek Road that includes shoulder widening to enhance bicycle use and drainage improvements. Supervisor District: 3, 4 J-1110-10-12 TWIC Meeting - Agenda Packet, Page 252 of 330 ROAD PROGRAM AT WORK 124. Marsh Creek Road Safety Enhancements (ECCRFFA) - This project proposes to construct safety improvements along Marsh Creek Road. Supervisor District: 3, 4 125. Marsh Creek Trail (DCD) - Marsh Creek Trail – This project is to close the 15-mile bike and pedestrian gap along Marsh Creek Road between Clayton and Brentwood. This project is to construct a bicycle and pedestrian facility from the City of Clayton to East Bay Regional Park District’s Round Hill Park. The existing trail in Brentwood is to be extended by others to Round Hill Park. The overall intent is to provide a commuter bicycle trail, which connects Central County to East County. Supervisor District: 3, 4 126. Marsh Drive Bicycle and Safety Improvements - Center Avenue to Walnut Creek Channel Bridge (Pacheco AOB) - This project is to provide bicycle and pedestrian improvements. Supervisor District: 4 127. Mayhew Way Pedestrian Improvements - West of Bancroft Road (Central County AOB) - This project will construct pedestrian safety improvements along Mayhew Way. Supervisor District: 4 128. Miranda Avenue Natural Pathway (Alamo AOB) - This project proposes to construct a path along Miranda Avenue from Stone Valley Middle School to Stone Valley Road and install bike lanes. Supervisor District: 2 129. Mitchell Canyon Road Bike Lanes (PWD) - This project is to improve safety along Mitchell Canyon Road near the Mitchell Canyon Visitor Center. Supervisor District: 4 130. Monterey Street Safety Improvements - Veale Avenue to Palm Avenue (CTPL) - This project proposes to pipe an existing ditch, conduct drainage improvements and provide walkable shoulders. Supervisor District: 5 131. Morgan Territory Road Safety Improvements (CTPL) - This project proposes to construct safety improvements at various locations along Morgan Territory Road. Supervisor District: 3 132. Mountain View Boulevard Complete Streets Improvements - San Miguel Drive to Walnut Boulevard (Central County AOB) - This project proposes to construct pedestrian and bicycle facilities along Mountain View Boulevard from San Miguel Drive to Walnut Boulevard. Supervisor District: 4 133. Norris Canyon Road Safety Improvements (PWD) - This project will construct safety improvements along the roadway at various locations. Supervisor District: 2 134. Northern Waterfront Goods Movement Infrastructure (CCTA) – This project is to construct and improve intermodal and arterial connections between economic development centers along the Northern Waterfront area of Contra Costa County. Supervisor District: 4 135. North Richmond Area Infrastructure Improvements (PWD) – This project is to construct various Infrastructure Improvements for motorists and bike/pedestrian throughout North Richmond. Supervisor District: 1 136. North Richmond Circulation and Safety Improvements for Verde Elementary School (North Richmond AOB) - Construct Pedestrian improvements for the Verde Elementary School. Supervisor District: 1 J-1210-10-12 TWIC Meeting - Agenda Packet, Page 253 of 330 ROAD PROGRAM AT WORK 137. North Richmond Improvements - Pittsburg Avenue Extension 3rd Street to the proposed 7th Street extension (CTPL) - This project proposes to extend Pittsburg Avenue from Fred Jackson Way to the projection of 7th Street. Supervisor District: 1 138. North Richmond Sidewalk Replacement (PWD) - This project is to construct sidewalk/curb improvements in North Richmond. Supervisor District: 1 139. North Richmond Truck Route - Parr Boulevard to Market Avenue (North Richmond AOB) - This project proposes to reduce truck traffic in the residential area of North Richmond by upgrading existing roadways or constructing new roads to accommodate truck traffic from Parr Boulevard to Market Avenue. Supervisor District: 1 140. Olinda Road Pedestrian Improvements - Valley View Road to 850 ft. south of Valley View Road (CTPL) - The project proposes to close a gap of sidewalk along Olinda Road in order to provide pedestrian facilities to De Anza High School and Olinda Elementary School. Supervisor District: 1 141. Olympic Boulevard & Boulevard Way/Tice Valley Boulevard Intersection Improvements (Central County AOB) - This project is to improve the intersection. Supervisor District: 2 142. Olympic Boulevard and Boulevard Way/Tice Valley Boulevard Intersection Improvements (Central County AOB) - This project is to provide a traffic signal at the intersection. Supervisor District: 2 143. Olympic Corridor Pedestrian and Bicycle Improvements - Long Term (Central County AOB) - This project is to construct long-term pedestrian and bicycle improvements along the Olympic Boulevard Corridor to connect South Walnut Creek to the Iron Horse Trail. Supervisor District: 2 144. Olympic Corridor Pedestrian and Bicycle Improvements - Short Term (Central County AOB) - This project is to construct pedestrian and bicycle improvements along the Olympic Boulevard Corridor to connect South Walnut Creek to the Iron Horse Trail. Supervisor District: 2 145. Pacheco Boulevard & Center Avenue Intersection Improvements (Pacheco AOB) - This project is to construct modifications to the intersection of Pacheco Boulevard and Center Avenue. Supervisor District: 5 146. Pacheco Boulevard & Muir Road Intersection Improvements (Pacheco AOB) - This project is to construct an intersection modification at Pacheco Boulevard and Muir Road. Supervisor District: 5 147. Pacheco Boulevard & North Buchanan Circle Intersection Improvements (Pacheco AOB) - This project is to signalize the intersection at Pacheco Boulevard and Carlos Drive/North Buchanan Circle. Supervisor District: 5 148. Pacheco Boulevard Grade Crossing Improvements at BNSF Railroad (CTPL) - This project is to realign Pacheco Boulevard and reconstruct the railroad overcrossing, Supervisor District: 5 149. Pacheco Boulevard Improvements - Arnold Drive to Muir Road (Pacheco AOB) - This project is to construct complete streets improvements in accordance with the Pacheco Planning Study and Pacheco AOB. Supervisor District: 5 150. Pacheco Boulevard Improvements - Arthur Road to BNSF Railroad (Pacheco AOB) - This project is to construct complete streets improvements in accordance with the planning study. Supervisor District: 5 J-1310-10-12 TWIC Meeting - Agenda Packet, Page 254 of 330 ROAD PROGRAM AT WORK 151. Pacheco Boulevard Improvements - BNSF Railroad to Arnold Drive (Pacheco AOB) - This project is to construct complete streets improvements in accordance with the Pacheco Planning Study and in coordination with the City of Martinez. Supervisor District: 5 152. Pacheco Boulevard Improvements - Morello Avenue to Arthur Road (Pacheco AOB) - This project is to construct complete street improvements and roadway widening according to the Pacheco Planning Study. Supervisor District: 5 153. Pacifica Avenue Extension - Port Chicago Highway to Alves Lane (Bay Point AOB) - This project proposes to construct a new roadway and to modify the existing traffic signal at Pacifica Avenue and Port Chicago Highway. Supervisor District: 5 154. Pacific Avenue Bridge Replacement (Bridge No. 28C0379) (PWD) - This project is to replace the Pacific Avenue Bridge over the Union Pacific Railroad (UPRR) right-of-way. Supervisor District: 1 155. Parr Boulevard Complete Streets Project -- Richmond Parkway to BNSF Railroad (North Richmond AOB) - This project proposes to widen Parr Boulevard from Richmond Parkway to the UPRR crossing and to provide complete street improvements. Supervisor District: 1 156. Peach Street Closure Project (CTPL) - This project proposes to barricade Peach Street to prevent traffic from cutting through from Shell Avenue to Pacheco Boulevard. Supervisor District: 5 157. Pedestrian and Bicycle Improvements on Livorna Road, Stone Valley Road, and Danville Boulevard (Alamo AOB) - This project is to construct pedestrian and bicycle improvements along Livorna Road, Stone Valley Road, and Danville Boulevard. Supervisor District: 2 158. Pedestrian Improvements near Rodeo Hills Elementary School (PWD) - This project is to construct pedestrian improvements near the Rodeo Hill Elementary School in Rodeo. Supervisor District: 1 159. Pinehurst Road Bicycle Improvements (Central County AOB) - This project is to construct bicycle turnouts/rest stops every half-mile along Pinehurst Road and Canyon Road. Supervisor District: 2 160. Pinehurst Road Roadway Stabilization Project (BOS)– This project is to rehabilitate Pinehurst Road in Canyon. Supervisor District: 2 161. Pinole Valley Road Safety Improvements - Pinole City Limits to AOB boundary (West County AOB) - This project proposes safety improvements on Pinole Valley Road between the Pinole City Limits and the AOB Boundary. Supervisor District: 1 162. Piper Road Improvements - Gateway Road to Willow Road (Bethel Island AOB) - This project proposes to widen the travel lanes from 10 feet to 12 feet and to construct 5-foot shoulders and 2-foot shoulder backing along Piper Road. Supervisor District: 3 163. Pittsburg Avenue at Richmond Parkway Intersection Improvements (North Richmond AOB) - This project aims to construct intersection improvements at the Pittsburg Avenue and Richmond Parkway intersections. Supervisor District: 1 164. Pittsburg Avenue Complete Streets Project - Richmond Parkway to Fred Jackson Way (North Richmond AOB) - This project proposes to construct complete street improvements on Pittsburg Avenue from Richmond Parkway to Fred Jackson Way. Supervisor District: 1 J-1410-10-12 TWIC Meeting - Agenda Packet, Page 255 of 330 ROAD PROGRAM AT WORK 165. Pitt Way Roadway Improvements (Richmond/El Sobrante AOB) - This project proposes to construct a new collector roadway along Pitt Way from San Pablo Dam Road to Hillcrest Road in the future town square area of El Sobrante. Supervisor District: 1 166. Pleasant Hill Road Pedestrian and Bicycle Improvements (Central County AOB) - This project proposes to construct curb, gutter and sidewalk and prohibit curbside parking to create bicycle lanes along Pleasant Hill Road. Supervisor District: 4 167. Pleasant Hill Road Sidewalk Project - 1700 Block to Diablo View Road west side (CTPL) - This project proposes to construct a sidewalk on the west side of Pleasant Hill Road. Supervisor District: 4 168. Pomona Street/Winslow Avenue/Carquinez Scenic Drive Safety Alignment Study (Hercules/Rodeo/Crockett AOB) - This project is to conduct a safety alignment study along Pomona Street, Winslow Avenue, and Carquinez Scenic Drive. Supervisor District: 5 169. Pomona Street Sidewalk Project - 3rd Avenue to Rolph Park Drive (south side of road) (CTPL) - This project is to construct sidewalk on the south side of Pomona Street. Supervisor District: 5 170. Port Chicago Highway Bicycle and Pedestrian Improvements - Driftwood Drive to McAvoy Road (Bay Point AOB) - This project proposes to construct a bike lane/shoulder along both sides of Port Chicago Highway, and a sidewalk along the south side. Supervisor District: 5 171. Port Chicago Highway Improvements (PWD) - This project proposes to construct safety, pedestrian and bicycle improvements along Port Chicago Highway. Supervisor District: 5 172. Port Chicago Highway Realignment Project - McAvoy Road to Pacifica Avenue (Bay Point AOB) - This project will realign the sharp horizontal curve on Port Chicago Highway, add an eastbound left turn pocket at McAvoy Road, and add sidewalks along both sides of Port Chicago Highway. Supervisor District: 5 173. Reliez Valley Road Bicycle Improvements. (Central County AOB) - This project proposes to construct bicycle lanes by widening the shoulders along Reliez Valley Road. There are drainage modifications and parking considerations to be resolved. Supervisor District: 5 174. Reliez Valley Road Complete Streets - Alhambra Valley Road to Grayson Road (Martinez AOB) - This project will widen the roadway to two lanes and add left turn pockets/lanes to Reliez Valley Road from Alhambra Valley Road to Grayson Road. Supervisor District: 5 175. Reliez Valley Road Improvements and Multi-Use Path - Alhambra Valley Road to 0.25 Miles North of Carter Acres Lane (Martinez/Briones AOB Update) - This project is to widen Reliez Valley Road to construct a pedestrian/bicycle path and a left turn pocket/lane to match the County's precise alignment plan. Supervisor District: 5 176. Rincon Road Widening and Pedestrian Improvements Project - Arlington Avenue to Arlington Avenue (CTPL) - This project proposes to widen Rincon Road and construct pedestrian improvements between the two Arlington Avenue intersections. Supervisor District: 1 177. Rudgear Road & San Miguel Drive Intersection Improvements (Central County AOB) - This project would install a mini-roundabout at the intersection of Rudgear Road and San Miguel Drive. Supervisor District: 4 J-1510-10-12 TWIC Meeting - Agenda Packet, Page 256 of 330 ROAD PROGRAM AT WORK 178. Rudgear Road/San Miguel/Walnut Boulevard/Mountain View Boulevard Safety Improvements (CTPL) - This project will construct safety improvements on the listed roads. Supervisor District: 4 179. Sandmound Boulevard Bicycle and Pedestrian Improvements -- Mariner Road to Cypress Road (Bethel Island AOB) - This project proposes to install bicycle and pedestrian improvements along 1.1 miles of Sandmound Boulevard from Mariner Road to Cypress Road. Supervisor District: 3 180. Sandmound Boulevard Bicycle and Pedestrian Improvements - Oakley City Limits to Mariner Road (Bethel Island AOB) - This project proposes to widen travel lanes and improve shoulders for about 0.3 miles of Sandmound Boulevard from the Oakley City Limits to Mariner Road. Supervisor District: 3 181. San Miguel Drive Bicycle and Pedestrian Improvements (Central County AOB) - This project is to construct a pedestrian path along the west side of San Miguel Drive from Blackwood Drive to Rudgear Road. Supervisor District: 4 182. San Pablo Avenue/Parker Avenue Sidewalk (Board of Supervisors) – This project adds 800 feet of sidewalk at the border between the City of Hercules and Rodeo. Supervisor District: 5 183. San Pablo Avenue Bicycle Improvements - Kay Road to City of Pinole (West County AOB) - Construct Bicycle improvements on San Pablo Avenue from Kay Road to City of Pinole. Supervisor District: 1 184. San Pablo Avenue Complete Streets Project - Rodeo to Crockett (Study) - This project is to construct improvement in accordance with the San Pablo Avenue Complete Streets Feasibility Report from Rodeo to Crockett. Supervisor District: 5 185. San Pablo Avenue Pedestrian Safety Improvements - Eire Drive to Pinole City Limits (West County AOB) – This project is to construct pedestrian improvements on San Pablo Avenue from Eire Drive to City of Pinole. Supervisor District: 1 186. San Pablo Avenue Transit Corridor Improvements - Various Locations (WCCTAC) - This project will improve various sections of the San Pablo Avenue corridor. This project includes costs in the cities. Supervisor District: 1, 5 187. San Pablo Creek Trail - Richmond City Limit (East of El Portal) to Appian Way (Richmond- El Sobrante AOB) - This project proposes the construction of a shared use path. Supervisor District: 2 188. San Pablo Dam Road & Greenridge Drive Signal Improvements (Signal Priority List) - This project proposes to install a new traffic signal at the intersection of San Pablo Dam Road and Greenridge Drive. Supervisor District: 1 189. San Pablo Dam Road Bicycle and Pedestrian Improvements - Tri Lane to Appian Way (CTPL) - This project proposes to install pedestrian and bicycle improvements along San Pablo Dam Road from Tri Lane to Appian Way. This project will be built with other San Pablo Dam Road projects. Supervisor District: 1 190. San Pablo Dam Road Bicycle Improvements -- Orinda City Limit to Northerly AOB Boundary (Central County AOB) - This project proposes bicycle improvements along San Pablo Dam Road. Supervisor District: 1 J-1610-10-12 TWIC Meeting - Agenda Packet, Page 257 of 330 ROAD PROGRAM AT WORK 191. San Pablo Dam Road Downtown Improvements -- El Portal Drive to Castro Ranch Road (WCCTAC) - This project proposes complete street improvements on San Pablo Dam Road. Supervisor District: 1 192. San Pablo Dam Road Improvements (Various Locations) (PWD) - This project proposes to construct safety improvements and bicycle improvements along San Pablo Dam Road. Supervisor District: 1 193. San Pablo Dam Road Intersection Improvements (Various Locations) (CTPL) - This project proposes to construct intersection improvements along San Pablo Dam Road. Supervisor District: 1 194. San Pablo Dam Road Multimodal and Safety Improvements - Appian Way to AOB Boundary (Richmond - El Sobrante AOB) - This project proposes to construct safety improvements and bicycle improvements along San Pablo Dam Road and within the West County AOB limit. Supervisor District: 1 195. San Pablo Dam Road Pedestrian Crossing Safety Improvements -- El Portal Drive to Hillcrest Road/Appian Way (Richmond-El Sobrante AOB) - This project proposes complete streets improvements by providing additional pedestrian crossing. Supervisor District: 1 196. San Pablo Dam Road Roadway Safety Improvements -- City of Orinda Limit to Northerly AOB Boundary (Central County AOB) - This project proposes Roadway improvements along San Pablo Dam Road. Supervisor District: 1 197. San Pablo Dam Road Safety Improvements - San Pablo Reservoir to AOB Boundary (West County AOB) - This project proposes to install safety improvements along San Pablo Dam Road from the San Pablo Reservoir to the AOB Boundary. Supervisor District: 1 198. Santa Rita Road Pedestrian Safety Improvements - Appian Way to Richmond City Limit (Richmond- El Sobrante AOB) - This project proposes to implement complete streets principles and improve pedestrian safety. Supervisor District: 1 199. Sellers Ave & Balfour Road Intersection Improvements (East County Regional AOB) - This project proposes to install a new traffic signal and exclusive left-turn lanes at the intersection of Sellers Avenue and Balfour Road. Supervisor District: 3 200. Sellers Avenue & Chestnut Avenue Intersection Improvements (East County Regional AOB) - This project proposes to install a new traffic signal and exclusive left-turn lane at the intersection of Sellers Avenue and Chestnut Avenue. Supervisor District: 3 201. Sellers Avenue & Marsh Creek Road Intersection Improvements (East County Regional AOB) - This project proposes to install a new traffic signal at the intersection of Sellers Avenue and Marsh Creek Road in cooperation with Caltrans. Supervisor District: 3 202. Sellers Avenue & Sunset Road Intersection Improvements (East County Regional AOB) - This project proposes to install a new traffic signal and exclusive left-turn lanes at the intersection of Sellers Avenue and Sunset Road. Supervisor District: 3 203. Sellers Avenue Intersection Improvements (Various Locations) (PWD) - This project is to improve various intersections. Supervisor District: 3 204. Sellers Avenue Widening - Main Canal to Marsh Creek Road (East County Regional AOB) - This project is to widen Sellers Avenue. Supervisor District: 3 J-1710-10-12 TWIC Meeting - Agenda Packet, Page 258 of 330 ROAD PROGRAM AT WORK 205. Sellers Avenue Widening - Brentwood City Limits to Marsh Creek Road (East County Regional AOB) - This project proposes to widen shoulders for about 1.5 miles of Sellers Avenue from the East Contra Costa Irrigation District (ECCID) canal south to Marsh Creek Road. Supervisor District: 3 206. Sellers Avenue Widening - Delta Road to Chestnut Street (East County Regional AOB) - This project proposes to widen about 2.5 miles of Sellers Avenue from Delta Road to Chestnut Street. Supervisor District: 3 207. Springbrook Road Bicycle and Pedestrian Improvements (Central County AOB) - This project is to construct sidewalk improvements and stripe shoulder along Springbrook Road starting near Gilmore Court to about Regency Court. Supervisor District: 2, 4 208. SR239 - Preconstruction Activities (ECCRFFA) - Preconstruction activities includes full environmental approval, design and ROW protection. No construction costs are in this phase. This project also excludes all activities associated with the Vasco Road-Byron Highway Connector segment. Supervisor District: 3 209. SR239: Vasco Road – Byron Highway Connector Segment (ECCRFFA) - New 2-lane roadway between Vasco Road and Byron Highway and associated local improvements. Supervisor District: 3 210. SR4 & Byron Highway Intersection Improvements South (East County Regional AOB) - This project is to improve the intersection. Supervisor District: 3 211. SR4 & Discovery Bay Boulevard Intersection Improvements (CTPL) - This project is to improve the intersection. Supervisor District: 3 212. SR4 & Newport Drive Intersection Improvements (Discovery Bay AOB) - This project proposes to signalize the intersection of SR4 and Newport Drive to address a future LOS deficiency. Supervisor District: 3 213. SR4 Bicycle Facilities Improvements - Newport Drive to Discovery Bay Boulevard (Discovery Bay AOB) - This project is to study and construct bicycle facilities along SR4 in the Discovery Bay area. Supervisor District: 3 214. SR4 Bridge Widening at Bixler Road and Discovery Bay Boulevard (Discovery Bay AOB) - This project is to widen the bridges on SR4. Supervisor District: 3 215. SR4 West Bikeway (CTPL) - The project will construct a bicycle path parallel to SR4 West. Supervisor District: 5 216. SR4 Widening - Byron Highway and Regatta Drive (Discovery Bay AOB) - Project will widen SR4 to provide four 12-foot travel lanes between Byron Highway and Regatta Drive. Supervisor District: 3 217. SR4 Widening - Bixler Road to Discovery Bay Boulevard (Discovery Bay AOB) - This project proposes to widen about 1.2 miles of R 4 from Bixler Road to Discovery Bay Boulevard in cooperation with Caltrans. Supervisor District: 3 218. SR4 Widening Project - Marsh Creek Road to San Joaquin County (CTPL) - This project will widen SR4 from a 2-lane roadway to a 4-lane arterial from Marsh Creek Road to the San Joaquin County line. Supervisor District: 3 J-1810-10-12 TWIC Meeting - Agenda Packet, Page 259 of 330 ROAD PROGRAM AT WORK 219. Stone Valley Road & Roundhill Road Intersection Improvements (CTPL) - This project proposes to construct crosswalk improvements at the Roundhill Road intersection. Supervisor District: 2 220. Stone Valley Road & Smith Road Intersection Improvements (CTPL) - This project proposes to install a left turn lane at Smith Road. Supervisor District: 2 221. Sunset Road Widening - Sellers Avenue to Byron Highway (East County Regional AOB) - This project proposes to widen shoulders for about 2.0 miles of Sunset Road from Sellers Avenue to Byron Highway. Supervisor District: 3 222. Tara Hills Drive Pedestrian Safety Improvements and Traffic Calming - San Pablo Avenue to City of Pinole (West County AOB) - This project proposes to install vehicle and pedestrian improvements along Tara Hills Drive in the Tara Hills area. Supervisor District: 1 223. Tice Valley Boulevard Bicycle and Pedestrian Improvements (Central County AOB) - This project is to construct complete streets improvements along Tice Valley Boulevard. Supervisor District: 2 224. Treat Boulevard & Jones Road Intersection Improvements (Central County AOB) - This project modifies the intersection of Treat Boulevard and Jones Road to improve its level of service. The project will construct an additional left turn bay to the southbound approach of Jones Road, as well as a new right turn lane to northbound Jones Road. Supervisor District: 4 225. Treat Boulevard Bicycle Improvements - Jones Road to Walnut Creek City Limits (Central County AOB) - This project is to improve bicycle accessibility and safety along Treat Boulevard east of Jones Road. Supervisor District: 4 226. Valley View Road Improvements - Appian Way to City of Richmond (CTPL) - This project proposes to improve Valley View Road from Appian Way to the City of Richmond. Supervisor District: 1 227. Valley View Road Improvements - City of Richmond to San Pablo Dam Road (CTPL) - This project proposes to widen Valley View Road from City of Richmond to San Pablo Dam Road. Supervisor District: 1 228. Vasco Road/Camino Diablo Intersection Improvements (PWD) - This project will construct additional features to improve the safety of the Vasco Road/Camino Diablo intersection. Supervisor District: 3 229. Vasco Road Safety Improvements (Phase 2) (PWD) - This project proposes to widen the roadway and to construct a median barrier for about 1.5 miles of Vasco Road. Work also includes widening a single span bridge, constructing wildlife crossings, and constructing mechanically stabilized earth (MSE) retaining walls. Supervisor District: 3 230. Vasco Road Safety Improvements (Various Locations) (PWD) - This project will construct multiple safety improvements along Vasco Road. Supervisor District: 3 231. Vasco Road Widening (ECCRFFA) - This project widens Vasco Road to four lanes from Marsh Creek Road to the County line. Supervisor District: 3 232. Via Verde - San Pablo Creek Bridge to downtown San Pablo Dam Road (Richmond/El Sobrante AOB) - This project is to construct a pedestrian bridge over San Pablo Creek between Via Verde and Appian Way. Supervisor District: 1 J-1910-10-12 TWIC Meeting - Agenda Packet, Page 260 of 330 ROAD PROGRAM AT WORK 233. Walnut Boulevard Bicycle and Pedestrian Improvements (ECCRFFA) - This project is to provide bicycle and pedestrian improvements to Walnut Boulevard. Supervisor District: 4 234. Walnut Boulevard Road Widening Project - City of Brentwood to Marsh Creek Road (CTPL) - This project is to widen Walnut Boulevard between Marsh Creek Road and the City of Brentwood line to four lanes. Supervisor District: 3 235. Walnut Boulevard Pedestrian Improvements (Central County AOB) - This project is to install sidewalks on both sides of Walnut Boulevard from View Lane to 250 feet northwest of Walnut Court. Supervisor District: 4 236. Waterfront Road Grade Change Project (PWD) - This project is to raise the roadway in anticipation of global sea level rise. McNabney Marsh and other wetlands that occasionally spill onto the roadway border a portion of the roadway. Supervisor District: 5 237. West County Striped Intersection with Beacons - Various Schools (West County AOB) - This project is improve pedestrian crossing at two schools in the Tara Hills area. Supervisor District: 1 238. Whyte Park Avenue Sidewalk Project - Boulevard Way to Bridge Road (CTPL) – This project proposes to construct sidewalk between Boulevard Way and Bridge Road. Supervisor District: 2 239. Willow Pass Road and Evora Road Intersection Improvements (Bay Point AOB) - This project proposes intersection improvements, including signal modifications and the addition of second left turn lanes at westbound Evora Road and northbound Willow Pass Road, and a right turn lane at eastbound Evora Road. Supervisor District: 5 240. Willow Pass Road (West) and SR4 Interchange Improvements (Bay Point AOB) - This project is to install new traffic signals at the interchange of Willow Pass Road (West) and SR4 westbound and eastbound off ramps. Supervisor District: 5 241. Willow Pass Road Improvements - Bailey Road to Pittsburg City Limits (ECCRFFA) - This project proposes to widen Willow Pass Road to provide four travel lanes and an application of slurry. Supervisor District: 5 242. Willow Pass Road Improvements - Evora Road to SR4 (Bay Point AOB) - This project is to widen Willow Pass Road to add a second right turn on southbound Evora Rd onto the westbound SR4 on- ramp and two left turn pockets onto the SR4 eastbound on-ramp. The project also modifies the signal at the Evora Road/Willow Pass Road intersection. Supervisor District: 5 243. Willow Pass Road Restriping - Bailey Road to Pittsburg City Limit (Bay Point AOB) - This project proposes to restripe Willow Pass Road to provide four travel lanes and an application of slurry. Supervisor District: 5 J-2010-10-12 TWIC Meeting - Agenda Packet, Page 261 of 330 TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE 5. Meeting Date:10/10/2022   Subject:CONSIDER report: Local, Regional, State, and Federal Transportation Issues: Legislation, Studies, Miscellaneous Updates, take ACTION as Appropriate Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE,  Department:Conservation & Development Referral No.: 1   Referral Name: REVIEW legislative matters on transportation, water, and infrastructure.  Presenter: John Cunningham, DCD Contact: John Cunningham (925)655-2915 Referral History: CONSIDER report on Local, State, Regional, and Federal Transportation Related Legislative Issues and take ACTION as appropriate. (John Cunningham, Department of Conservation and Development) Referral Update: In developing transportation related issues and proposals to bring forward for consideration by TWIC, staff receives input from the Board of Supervisors (BOS), references the County's adopted Legislative Platforms, coordinates with our legislative advocates, partner agencies and organizations, and consults with the Committee itself. This report includes four sections, 1: LOCAL , 2: REGIONAL, 3: STATE, and 4: FEDERAL . 1. LOCAL Accessible Transportation Strategic (ATS) Plan Staff from the County and the Contra Costa Transportation Authority (CCTA) continue to pursue the implementation of the ATS Plan under the direction of the ATS Task Force. Updates:  A memorandum of understanding (MOU) between the County and CCTA for the use of Measure X funds is secheduled for the October 18th Board of Supervisors meeting. Status of the four specific ATS initiatives approved for Measure X funding:  Establishment of a Coordinating Entity (CE): The ATS Task Force directed staff to focus on one option for the CE, the “hybrid” approach. This would be a partnership between a nonprofit and CCTA in implementing the ATS Plan. Staff will present their focused staff report and recommendations at the ATS Task Force's October 20th meeting. Staff is anticipating bringing a final CE recommendation to the BOS and the CCTA Board before the end of the year. Concurrence between the BOS and CCTA on the form of the CE is included in the Measure X funding MOU.  One Seat Ride: The ATS staff and consultant team continues to meet with the transit operators to iron out the financial, operational, and policy unknowns of the program. One-Call/On-Click: This program is on hold until the establishment of the Coordinating Entity Low Income Fare Subsidy Program: The operational details of this program are being worked out, staff anticipates the program will be running in early 2023.  2. REGIONAL No report in May. 10-10-12 TWIC Meeting - Agenda Packet, Page 262 of 330 3. STATE Mark Watts, the County's legislative advocate will be in attendance at the October meeting to provide an update. The following items will be covered: 1. Legislation Update: AB 2438: Transportation funding: guidelines and plans - VETOED AB 2441: Public employment: local public transit agencies: autonomous transit vehicle technology - VETOED AB 1951: Sales and use tax: exemptions: manufacturing - VETOED 2. Climate Action Plan for Transportation Infrastructure (CAPTI) Report (CalSTA) 3. Budget Report 4. FEDERAL No report in October. Recommendation(s)/Next Step(s): CONSIDER report on Local, Regional, State, and Federal Transportation Related Legislative Issues and take ACTION as appropriate. Fiscal Impact (if any): n/a Attachments October 2022 Tracked Legislation 10-10-12 TWIC Meeting - Agenda Packet, Page 263 of 330 10/5/22, 1:07 PM State Net https://sn.lexisnexis.com/secure/pe/trackingPage/index.cgi?view=1&upfn=Master 1/2 List Visualize Clear Filters Refresh List Private File: View: BILL TITLE AUTHOR SUMMARY PROGRESS LOCATION LAST STATUS UPCOMING DATES EFFECTIVE DATES TAGS PRIORITY POSITION 1 to 10 (10) 50 CA AB 1789 California Recreaonal Trails System Plan Benne (D) Requires the California Recreaonal Trails System Plan to include recommended priories for... more... ✓ Chaptered 09/25/2022 Chaptered by Secretary of State. Chapter No. 2022- 522 more... 01/01/2023 [code impact] CA AB 2097 Residenal, Commercial, or Other Development Types Friedman (D) Prohibits a public agency from imposing any minimum automobile parking requirement on any... more... ✓ Chaptered 09/22/2022 Chaptered by Secretary of State. Chapter No. 2022- 459 more... 01/01/2023 [code impact] CA AB 2295 Local Educaonal Agencies: Housing Development Project Bloom (D) Deems a housing development project an allowable use on any real property owned by a local... more... ✓ Chaptered 09/28/2022 Chaptered by Secretary of State. Chapter No. 2022- 652 more... 01/01/2023 [code impact] CA AB 2346 Outdoor Recreaon: Outdoors for All Program Gabriel (D) Establishes in the Natural Resources Agency the Outdoors for All Program to support access to... more... — Assembly Appropriaons Commiee 05/19/2022 In ASSEMBLY Commiee on APPROPRIATIONS: Held in... more... CA AB 2419 Environmental Jusce: Federal Infrastructure Bryan (D) Requires a minimum of 40% of funds received by the state under the Infrastructure Investment and... more... — Senate Appropriaons Commiee 08/11/2022 In SENATE Commiee on APPROPRIATIONS: Held in... more... CA AB 2428 Migaon Fee Act: Fees for Improvements: Timeline Ramos (D) Requires a local agency that requires a qualified applicant to deposit fees for improvements, as... more... — Assembly Local Government Commiee 03/03/2022 To ASSEMBLY Commiees on LOCAL GOVERNMENT and... more... CA AB 2438 Transportaon Funding: Guidelines and Plans Friedman (D) Requires, no later than specified date, the guidelines or plans applicable to certain programs to... more... — Vetoed 09/29/2022 Vetoed by GOVERNOR. more... 12/05/2022 Hearing Date Access New State Net Master Standard   Filters ∨ 1 to 10 (10) 50 ||| Save View Edit Columns 10-10-12 TWIC Meeting - Agenda Packet, Page 264 of 330 10/5/22, 1:07 PM State Net https://sn.lexisnexis.com/secure/pe/trackingPage/index.cgi?view=1&upfn=Master 2/2 BILL TITLE AUTHOR SUMMARY PROGRESS LOCATION LAST STATUS UPCOMING DATES EFFECTIVE DATES TAGS PRIORITY POSITION 1 to 10 (10) 50 CA AB 2645 Local Emergency Plans: Integraon of Access Rodriguez (D) Relates to local emergency plans. Requires a county to address specific addional plan elements.... more... ✓ Chaptered 09/06/2022 Chaptered by Secretary of State. Chapter No. 2022- 247 more... 01/01/2023 [code impact] CA SB 1067 Housing Development Projects: Automobile Parking Portanno (D) Prohibits these provisions from reducing, eliminang, or precluding the enforcement of any... more... — Assembly Appropriaons Commiee 08/11/2022 In ASSEMBLY Commiee on APPROPRIATIONS: Held in... more... CA SB 1251 Governor's Office of Business and Economic Development Gonzalez (D) Connues the zero- emission vehicle division of the Governor's Office of Business and Economic... more... ✓ Chaptered 09/16/2022 Chaptered by Secretary of State. Chapter No. 2022- 372 more... 01/01/2023 [code impact] 10-10-12 TWIC Meeting - Agenda Packet, Page 265 of 330 TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE 6. Meeting Date:10/10/2022   Subject:DISCUSS and REVISE the County's 2022-23 State and Federal Legislative Platforms (TWIC Referrals Only) and DIRECT staff as appropriate. Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE,  Department:Conservation & Development Referral No.: 1   Referral Name: Review legislative matters on transportation, water, and infrastructure  Presenter: John Cunningham, DCD Contact: John Cunningham, (925) 655-2915 Referral History: The Transportation, Water, and Infrastructure Committee (TWIC) conducts a biennial review of the State and Federal Legislative Platforms for revisions to sections under its purview. Recommendations are forwarded to the full Board of Supervisors who then adopts the platforms in January. Staff with responsibility for items on TWIC's referral list are provided the option to bring platform revisions to either TWIC or the Legislation Committee given the dual responsibility for the platform update. In the event that legislative platform modifications for TWIC referred items are brought to the Legislation Committee, staff is requested to inform TWIC of the changes. Lara Delaney, the County's staff lead on legislation, sent out a request for review and comment on the platform. This item is in response to that request. Ms. Delaney included several other requests of interest to TWIC:  Policy positions, when included in the Platform, should be refashioned to “principles". This is intended to streamline the documents, moving away from program, project, or legislation-specific policy statements and toward more general principles. The prioritization of your advocacy needs (including state or federal funding needs) should be clearly articulated in your submittal. Referral Update: At the time the packet was posted staff did not have any recommended changes to either the state or federal platforms. Staff may bring revisions for consideration by the Committee at their October 10th meeting. Recommendation(s)/Next Step(s): DISCUSS and REVISE the County's 2022-23 State and Federal Legislative Platforms (TWIC Referrals Only) and DIRECT staff as appropriate. Fiscal Impact (if any): n/a Attachments 2021-22 Adopted Federal Platform--as amended 03.09.21 2021-22 Adopted State Platform--as amended 01.18.22 10-10-12 TWIC Meeting - Agenda Packet, Page 266 of 330 2021-22 Adopted Federal Platform Contra Costa County Website: www.contracosta.ca.gov As Amended March 9, 2021 10-10-12 TWIC Meeting - Agenda Packet, Page 267 of 330 2 TABLE OF CONTENTS Introduction ___________________________________________________________ 3 County Profile ____________________________________________________________________ 3 Demographic Highlights ____________________________________________________________ 3 Governance _____________________________________________________________________ 4 Legislative Platform Purpose ________________________________________________________ 6 Mission, Vision, and Values __________________________________________________________ 6 Federal Funding Needs: Project specific ____________________________________ 7 Surface Transportation Funding Needs ________________________________________________ 8 Federal Funding Needs: Program specific __________________________________ 10 Priority Policy Statements _______________________________________________ 12 Climate Change _________________________________________________________________ 12 Criminal Justice and Mental Health __________________________________________________ 12 The Delta ______________________________________________________________________ 12 Health Care ____________________________________________________________________ 13 Homeless Services ________________________________________________________________ 14 Human Services __________________________________________________________________ 15 Land Use _______________________________________________________________________ 19 Library Services _________________________________________________________________ 19 Natural Resources/Permit Streamlining _______________________________________________ 19 Pipeline Safety __________________________________________________________________ 19 Telecommunications and Broadband _________________________________________________ 19 Transportation, Mobility Management and Coordination _________________________________ 20 Veterans _______________________________________________________________________ 20 Waste Management ______________________________________________________________ 20 10-10-12 TWIC Meeting - Agenda Packet, Page 268 of 330 3 INTRODUCTION County Profile One of the original 27 counties established in California in 1850, Contra Costa County is home to more than one million people, making it the ninth most populous county in the state. Physically, Contra Costa is over 733 square miles and extends from the northeastern shore of the San Francisco Bay easterly about 50 miles to San Joaquin County. The County is bordered on the south and west by Alameda County and on the north by the Suisun and San Pablo Bays. The western and northern shorelines are highly industrialized, while the interior sections are suburban/residential, commercial and light industrial. About 40 percent of the county is under the jurisdiction of 19 incorporated cities and towns, and large portions of the remaining unincorporated area are part of public park systems. Most of the population is consolidated along the major transportation corridors--Interstates 80 and 680, Highways 4 and 24, and the BART lines. Contra Costa County is also very diverse, with communities that range from small agricultural towns like Byron, with a population density of about 200 people per square mile, to urban population centers like Contra Costa Centre, a bustling transit village with a population density of 8,400 people per square mile. With its strategic location as The Capital of The Northern California Mega-RegionTM and easy access to suppliers and customers, Contra Costa County is a business destination full of opportunity. Demographic Highlights Approximately 1.1 million people live in Contra Costa County; only 15%, or about 172,513 people, reside in the unincorporated areas of the county. The median age of Contra Costa County residents is 39 years old. Our population of seniors age 60 or older is expected to grow by approximately 47% between 2020 and 2050, making this age group our fastest growing. 10-10-12 TWIC Meeting - Agenda Packet, Page 269 of 330 4 The majority (44%) of County residents are white, with significant proportions of Asian (16.5%) and African American (8%) people. The Census tracks Latinx ethnicity separately from other populations; in total, the Hispanic/Latino population makes up approximately 26% of the total population. Governance A five-member Board of Supervisors, each elected to four-year terms, serves as the legislative body of the County, which has a general law form of government. Also elected are the County Assessor, Auditor- Controller, Clerk-Recorder, District Attorney, Sheriff-Coroner and Treasurer-Tax Collector. The County Administrator, Monica Nino, is appointed by the Board and is responsible for running the day-to-day business of the County. 10-10-12 TWIC Meeting - Agenda Packet, Page 270 of 330 5 Contra Costa County Board of Supervisors: District 1: John M. Gioia District II: Candace Andersen District III: Diane Burgis District IV: Karen Mitchoff District V: Federal D. Glover 10-10-12 TWIC Meeting - Agenda Packet, Page 271 of 330 6 Legislative Platform Purpose The Legislative Platform establishes the priorities, principles, and policy statements of the Contra Costa County Board of Supervisors and establishes the basis for its advocacy efforts, alerting our legislative partners of the greatest needs of our residents and where we need additional help. The Platform also provides general direction to County departments and agencies, legislative advocates, delegation members, and the public on our positions on key policy matters that would impact the way the County does business. Throughout the legislative session, the County will review and take positions on various policy and regulatory proposals. When a recommended position is consistent with existing County policy, as adopted in the Platform, the CAO’s office or department staff will prepare a County position letter for signature by the Board Chair. Contra Costa County has also adopted a Delta Water Platform to identify and promote activities and policy positions that support the creation of a healthy Sacramento-San Joaquin Delta. Contra Costa County uses this Delta Water Platform to guide its actions and advocacy regarding the future of the Delta. Mission, Vision, and Values Contra Costa County has adopted the following Mission, Vision and Values statement: 10-10-12 TWIC Meeting - Agenda Packet, Page 272 of 330 7 FEDERAL FUNDING NEEDS: PROJECT SPECIFIC 1. Secure funding for the Army Corps’ annual maintenance dredging of the federal channels along the County’s borders that maintain the ship channel to the authorized depth of -35 feet. 2. Advocate for and support the San Francisco to Stockton Navigation Improvement Project that proposes to deepen the ship channel to realize transportation efficiencies. 3. Mount Diablo Mercury Mine. Support legislation in the Water Resources Development Act that would give authority to the Army Corps of Engineers to build remediation projects in the Remediation of Abandoned Mine Sites program. 4. Buchanan Field and Byron Airports: Secure funding for Master Plan/Business Plan Implementation. 10-10-12 TWIC Meeting - Agenda Packet, Page 273 of 330 8 Surface Transportation Funding Needs  Vasco Road Safety Improvements: Project components (barriers, shoulders, passing facilities) will eliminate cross median collisions, wildlife undercrossing/overcrossing will preserve migration patterns.  North Richmond Community Supportive Transportation Improvements: Alternate truck route/regulations, trail/school access improvements to address community safety, public health and livability needs, and general transportation improvements to support job growth and priority development area access.  Eastern Contra Costa Multi-use Trail Network: Active mode access improvements for planned and existing mass transit stations, schools, and activity centers.  Brentwood Intermodal Transit Center: Multimodal station access improvements and the extension of mass transit from the Antioch BART station.  Iron Horse Corridor Enhancement Program: Improvements to trail access (to/from activity center and other regional trails), additional facilities for different active modes, overcrossings, and at grade intersection improvements. 10-10-12 TWIC Meeting - Agenda Packet, Page 274 of 330 9  State Route 4 / Old River Bridge Study: The existing structure is narrow; improvements would address safety and traffic flow.  West Contra Costa High Capacity Transit: Implementation of the WCCTAC High Capacity Transit Study.  Kirker Pass Truck Climbing Lane (southbound) and Turn Channelization: Needed for improved traffic flow and safety.  Vasco Road – Byron Highway Connector: Connection between two major arterials improving connectivity while removing through/truck traffic from the Byron community. 10-10-12 TWIC Meeting - Agenda Packet, Page 275 of 330 10 FEDERAL FUNDING NEEDS: PROGRAM SPECIFIC 1. Housing: Support funding for economic development and affordable housing for local agencies engaged in building stronger, more economically viable communities. 2. Local Cost Share. Support legislation that would give the Army Corps of Engineers the authority to reduce the project cost share in disadvantaged communities to 10% local match. 3. Multimodal National Freight Network: Support increases in funding for National Freight Strategic Plan implementation specifically to fulfill the goals of the Northern Waterfront initiative and to address congestion in the I-680 Corridor. 4. Rail Safety: Support measures to enhance the safety of rail transportation of hazardous materials with an emphasis on: increased state oversight of railroad bridges; funding for first responder training; funding to improve rail safety and prevent rail trespass fatalities; funding to improve the rail system to address the impacts of Sea Level Rise; improved regulations for tank car safety standards for hazardous materials; funding for enforcement; data sharing requirements between state emergency managers, local responders and rail operators; support for improved partnerships between state and federal regulators; and addressing the enhanced hazard from incompatible hazardous materials being stored or transported in proximity to each other. 5. Rural Road Funding Program: Support the creation of a new program to modernize rural roads consistent with emerging safety, complete streets, active mode policies. 6. Stormwater Program Funding: Support additional funding through the EPA to enable compliance with the Clean Water Act. 10-10-12 TWIC Meeting - Agenda Packet, Page 276 of 330 11 7. Surface Transportation Program/Increases in Highway (road/rail) Bridge Funding: Consistent with the National Association of Counties (NACo) position, regulation changes are needed that allow for direct funding to qualified local jurisdictions to expedite economic benefits, increase purchasing power, and bolster travel, business and economic growth. 8. Transportation Funding for Disabled, Low-income, and Elderly Persons: Support increased capital and operations funding, in addition to funding and policy changes that would address local, state, and federally identified needs for coordination improvements. 9. Flood Risk and Water Supply Forecasting: Support coordination and funding for the Advanced Quantitative Precipitation Information (AQPI) radar system. https://psl.noaa.gov/aqpi/ 10-10-12 TWIC Meeting - Agenda Packet, Page 277 of 330 12 PRIORITY POLICY STATEMENTS Climate Change • ENSURE that the recovery from the COVID-19 pandemic supports the following:  Technologies that support the County’s climate goals, including battery energy storage and microgrids, solar and wind energy, electric vehicles, and electric vehicle charging infrastructure;  Energy efficiency programs that encourage whole house retrofits and address asthma triggers in the built environment;  Planning work for adapting to rising sea levels;  Planning and implementation of microgrids;  Active transportation and green infrastructure programs;  Job training for careers in clean energy, clean transportation, and green infrastructure. • SUPPORT legislative and administrative efforts that: address the impacts of climate change; support climate adaptation and resilience efforts; support the Green Business program; address the disproportionate impacts that some communities bear because they are located near large industrial facilities; reduce exposure to toxic air pollutants and reduce greenhouse gases; study and recognize the health impacts of global and regional climate change; and study the economic, workforce and social impacts of transitioning away from fossil fuels. • SUPPORT the concept of establishing a national price on carbon-based fuels to address the costs to society of emissions from those fuels. Criminal Justice and Mental Health • SUPPORT policies and approaches that would enhance the ability of county officials and our partners to prevent and treat mental health and substance use disorders, both in the community and within the confines of the criminal justice system. • SUPPORT policies and programs that divert non-violent individuals struggling with mental illness and/or substance use disorders from local jails into more appropriate treatment programs. • SUPPORT legislation and regulations that would amend the federal Medicaid Inmate Exclusion Policy (MIEP) and allow non-convicted individuals to have continued access to necessary treatment through federal health benefits such as Medicaid, Medicare, CHIP and VA health benefits. The Delta • SUPPORT protection and restoration of a healthy sustainable Delta ecosystem including adequate water quality, inflow and outflow, and water supply, to support fisheries, wildlife and habitat in perpetuity and managing or eradicating invasive species. 10-10-12 TWIC Meeting - Agenda Packet, Page 278 of 330 13 • SAFEGUARD Delta Counties’ responsibilities related to land use, water resources, flood management, tax revenues, public health and safety, economic development, agricultural stability, recreation, and environmental protection in any projects, policies, or operations. • SUPPORT rehabilitation, improvement, and maintenance of levees throughout the Delta. • SUPPORT the Delta pool, in which the common resource provides quality freshwater supply to all Delta users, requiring mutual responsibility to maintain, restore, and protect the common resource. • REPRESENT and include local government in any governance structures for the Delta. • OPPOSE isolated conveyance. Health Care • SUPPORT full funding of the Federal Medicaid program. OPPOSE federal efforts to reduce Medicaid funding or restrict access to Medicaid benefits and services. OPPOSE federal legislation and administrative efforts to privatize Medicaid and/or to impose work requirements as a condition of Medicaid (Medi-Cal) eligibility. • OPPOSE efforts to repeal the Affordable Care Act or to replace it with any proposals that represent significant, permanent structural alterations to current subsidized segments of the health care system. SUPPORT efforts to strengthen the ACA and expand eligibility, regardless of immigration status. • OPPOSE new block-granting proposals, harsh cuts, or proposals that will significantly and/or permanently shift the structure of health and human service funding and programming that would lead to the restriction or elimination of safety-net programs. 10-10-12 TWIC Meeting - Agenda Packet, Page 279 of 330 14 • OPPOSE efforts to eliminate or reduce funding for essential public health services, inclusive of funding for immunization, HIV/Ryan White, Communicable Disease and Tuberculosis Control, Hansen’s Disease, Teen Pregnancy, Public Health Preparedness and Maternal Child Health Funding. • OPPOSE changes to Title X Family Planning Program, enacted in 1970, dedicated solely to providing individuals with comprehensive family planning and related preventive health services. • OPPOSE efforts to privatize Medicaid and/or impose work requirement as a condition of Medicaid (Medi-Cal) eligibility. • SUPPORT Medicaid (Medi-Cal) funding for same day mental health appointments. • SUPPORT reauthorization of funding for HIV/Ryan White Care, Maternal Child Health Funding including Maternal Infant Early Childhood Home Visiting (MIECHV), and CHIP (Children’s Health Insurance Program). • SUPPORT legislation and administrative changes that will enhance counties’ ability to provide comprehensive Behavioral Health Services. • PROTECT funding for core local public health and prevention efforts. • ADVOCATE for federal resources to address local pandemic response efforts, including vaccination efforts, that provide direct allocations to local governments to offset revenue losses and maximize local flexibility for use of such funds. Homeless Services • SUPPORT the continuation and expansion of funding for fair and equitable affordable housing, homelessness assistance and prevention programs, and strategic local and regional responses to homelessness that promote transparency, equity and data informed decision-making and enhance access to resources that support the County’s compliance with federal and state anti-homelessness and anti-poverty initiatives and requirements. • SUPPORT increasing and maintaining affordable housing stock and housing stability by way of supporting funding, policy, or regulations that promote fair and equitable housing for the most vulnerable low, very low, and extremely low-income households, including the production and preservation of various housing types and the protection of stable housing for vulnerable persons experiencing homelessness. • SUPPORT removal of barriers in planning processes, regulatory frameworks, funding programs, healthcare access, and policy to promote increased equity, innovation, transparency and data- driven approaches to addressing homelessness and housing affordability, with the goals of increasing affordable housing and eliminating discrimination and disparate treatment of individuals 10-10-12 TWIC Meeting - Agenda Packet, Page 280 of 330 15 based on race, ethnicity, gender, gender identify, sexual orientation, ability, housing status, income, or other household characteristics. • SUPPORT wide variety of housing types and formats, for all persons regardless of personal characteristic or status, and actively promote the equitable distribution and access to affordable units and holistic services, in line with evidence-based practices, to ensure the elimination of discrimination and disparate treatment of individuals, particularly vulnerable individuals and those from communities of color. • SUPPORT increasing funding, policy, and regulations for disaster planning and relief efforts that allow the County and the County’s homeless system to plan for and equitably respond to disasters and pandemics, including for purposes of supporting the health and safety of providers and persons experiencing homelessness, particularly the most vulnerable and those from communities of color. Human Services Older Adults and Aging • OPPOSE elimination or cuts to funding for older adult programs and services. SUPPORT funding for programs that support older adults, veterans, disabled individuals, the homeless, and low-income individuals, especially the most vulnerable in racial minority communities. • SUPPORT funding and policies to provide older adults with holistic (culturally appropriate) services and treatment modalities that support well-being, health, and mental health. • SUPPORT health insurance programs that maintain or expand current services and protections under Medicare, Medicaid and the Affordable Care Act (ACA), including – but not limited to – protections for preexisting conditions. • SUPPORT funding to maintain or increase Social Security. • SUPPORT funding to maintain SSI and Federal Disability programs. Safety Net Programs • SUPPORT funding for entitlement programs that help low-income families, especially the ethnic minority communities, to reach self-sufficiency. This includes efforts to expand eligibility to the Earned Income Tax Credit (EITC) program to all tax filers regardless of immigration status. • SUPPORT funding for retroactive and future COVID-19 related expenses at the state, and ideally, county level, with flexibility to address county-specific needs and ensure protections and the access to treatment modalities in the racial and ethnic communities disproportionately impacted. 10-10-12 TWIC Meeting - Agenda Packet, Page 281 of 330 16 • SUPPORT the extension of flexibilities and waivers for benefit program administration. • OPPOSE actions that would result in cost shifts on federal entitlement programs to state and localities or which would result in greater dependency on county-funded programs. • SUPPORT efforts to increase SNAP benefit amounts to better meet recipients’ nutritional needs, adjust SNAP eligibility requirements to include populations with significant need, and remove current federal barriers that prevent some nutrition programs from employing EBT technology. • OPPOSE efforts to eliminate states’ flexibility in taking high cost of living into eligibility determinations; OPPOSE restoration of asset tests for SNAP. • OPPOSE funding cuts or block granting benefit programs, including SNAP and Medicaid. • SUPPORT efforts that allow people to apply for benefits while incarcerated. OPPOSE efforts to limit eligibility for individuals with certain criminal records or to impose work requirements on them for benefit programs, including SNAP and Medicaid. • SUPPORT efforts to eliminate time limits for TANF recipients and provide families who are working with modest cash assistance grants to supplement low earnings. • SUPPORT reauthorization and increase the TANF Block Grant. OPPOSE changes to TANF that will require counties to invest new funds to administer the program. • OPPOSE efforts to restrict allowable state maintenance-of-effort expenditures and end federal efforts to impose a national TANF error rate. • SUPPORT federal and state financial assistance to aid county and local government efforts to meet unfunded federal mandates. • OPPOSE elimination and reduction in funding for programs that help low-income families pay their heating bills and reduce energy bills by making homes more energy efficient, including LIHEAP and WAP. Child Welfare Services • SUPPORT legislation that increases and protects the safety and well-being of children at risk of abuse, neglect and exploitation. • OPPOSE the elimination or cuts to funding streams for child welfare programs. • SUPPORT increasing prevention dollars to help children who are victims of abuse, neglect and exploitation remain safely in their own homes or family-based settings and provide support to their caregivers. 10-10-12 TWIC Meeting - Agenda Packet, Page 282 of 330 17 • SUPPORT efforts to provide states with financial incentives, as opposed to monetary penalties, and minimize the significant administrative burden associated with child welfare review processes. Early Childhood Development • SUPPORT efforts that ensure all children have access to quality care by expanding high quality learning opportunities for children, expanding subsidized childcare and tax credits, increasing new childcare slots, increasing access to home visiting programs, and making funding available for First 5 commissions, increasing wages and supporting infrastructure of ECE programs. • SUPPORT policies that increase or align eligibility guidelines to ensure more access of services for low income working families to programs such as Head Start. • OPPOSE actions that would reduce funding for early childhood education, including Head Start and Early Head Start programs. • SUPPORT funding and initiatives to support children’s mental health and studies on the long-term impacts of COVID-19 on the physical and mental health of adults and children Immigration, Inclusion, and Racial and Ethnic Equity • OPPOSE actions to repeal DACA (Deferred Action for Childhood Arrivals) as well as legislation and administrative efforts that negatively target immigrants. • OPPOSE actions which discourage or prevent immigrant populations from accessing public benefits and housing, including proposed changes to the Public Charge rule. • OPPOSE any efforts that would restrict a full Census count from including all residents of the county regardless of immigration status. SUPPORT efforts to fully canvas hard-to-count communities. • SUPPORT the inclusion of historically marginalized communities in the development of housing, workforce and health policies including COVID-19 vaccine allocation strategies and clinical trials. • SUPPORT legislation and administrative actions that address inequities in health, education, economic development, reentry and criminal justice. 10-10-12 TWIC Meeting - Agenda Packet, Page 283 of 330 18 Violence Prevention • SUPPORT efforts to prevent, interrupt and end gun violence, child abuse, domestic violence, sexual assault, elder abuse and human trafficking in all its forms. • OPPOSE any elimination and cuts to grant programs for violence prevention, human/labor trafficking, victim services, and federal grants related to the Violence Against Women Act. • SUPPORT efforts that increase access to cultural responsiveness and language support for victims of crime. • SUPPORT efforts to protect housing access and employment rights for victims of harassment and survivors of interpersonal violence. • SUPPORT programs and actions that address suicide, injury and violence prevention. • SUPPORT efforts aimed at reducing health disparities and inequities associated with violence against women, communities of color, and the LGBTQ+ community. • SUPPORT increased funding for Lethality Assessment Protocols (LAP) and reallocation strategies to support other prevention programs and social services. Workforce Development • SUPPORT policies that meet the needs of serving businesses, workers, job seekers, and youth under the Workforce Innovation & Opportunity Act (WIOA) that preserve local decision-making relative to spending, direction of work, and other functions of local workforce boards. • SUPPORT establishing a higher minimum wage. • SUPPORT additional funding for WIOA programs and activities including education, training, apprenticeships, job seeker support, and job placements. SUPPORT additional funding for racial- ethnic minority communities impacted by COVID job loss and displacement. • SUPPORT policies that increase access to training and education for social workers and staff in Aging, including programs that assist students in obtaining a social work degree. • SUPPORT policies that drive innovation in training and apprenticeships for jobs of the future and expansion of equitable economic opportunity. 10-10-12 TWIC Meeting - Agenda Packet, Page 284 of 330 19 Land Use • SUPPORT legislative efforts to evaluate, clean up and redevelop contaminated sites. Library Services • SUPPORT funding for the Institute of Museum and Library Services (IMLS), the primary source of federal support for the nation's approximately 120,000 libraries and 35,000 museums and related organizations. • SUPPORT the reauthorization and funding for the Library Services and Technology Act (LSTA) including the Museum and Library Services Act. Natural Resources/Permit Streamlining • SUPPORT locally-controlled resource permitting to streamline economic development activities and conserve and recover species and the habitats upon which they depend, natural resources, watersheds and open space. Pipeline Safety • SUPPORT legislative efforts that increase the safety of the shipment of hazardous materials by pipeline through better monitoring, technical seismic vulnerability studies, leak detection, operational practices and equipment. Telecommunications and Broadband • SUPPORT the expansion of broadband (high speed internet service) and the deployment of emergency technologies, such as small cell 5G, to drive economic development and job opportunities, support county service delivery, and improve health, education and public safety outcomes for residents. • SUPPORT the restoration of net neutrality to ensure open and nondiscriminatory access to online information. • SUPPORT preservation of local government ownership and control of the local public rights-of-way and ensure reasonable compensation for their use. • OPPOSE Federal Communications Commission (FCC) rulemaking that would reduce franchise fee obligations which fund community television operations and the General Fund. • ENSURE nondiscriminatory treatment of Public, Educational and Government (PEG) channels by cable system operators. SUPPORT continued funding for PEG channels. 10-10-12 TWIC Meeting - Agenda Packet, Page 285 of 330 20 • SUPPORT local decision-making and accountability of local elected officials and OPPOSE any actions that would preempt or limit the zoning and siting authority of local governments. Transportation, Mobility Management and Coordination • SUPPORT and seek opportunities to streamline the regulatory process as well as encourage the development of regulations that are appropriate and flexible. • SUPPORT policies, programs and funding increases that enable new technologies, practices, and services to improve mobility to vulnerable populations. • SUPPORT legislative efforts to increase and improve waterborne transportation of goods when it increases safety. Veterans • SUPPORT legislation to increase availability, accessibility, and utilization of Veterans Benefits. • SUPPORT legislation to provide America’s veterans organizations with resources to make necessary repairs to or replacement of their meeting halls and facilities. Waste Management • SUPPORT legislation that protects human health and the environment from exposure to hazardous materials and hazardous wastes. • SUPPORT legislative efforts that establish producer responsibility for management of products at the end of their useful life including pharmaceuticals, batteries, sharps, and veterinary medicine. • SUPPORT legislative efforts that reduce the quantity of harmful pharmaceuticals (including veterinary medicine) that ultimately enter wastewater treatment facilities, bodies of water, and landfills. 10-10-12 TWIC Meeting - Agenda Packet, Page 286 of 330 2021-22 Adopted State Legislative Platform Contra Costa County Website: www.contracosta.ca.gov Adopted January 19, 2021 Amended January 18, 2022 10-10-12 TWIC Meeting - Agenda Packet, Page 287 of 330 2 TABLE OF CONTENTS Introduction ___________________________________________________________ 3 County Profile ____________________________________________________________________ 3 Demographic Highlights ____________________________________________________________ 3 Governance _____________________________________________________________________ 4 Legislative Platform Purpose ________________________________________________________ 6 Mission, Vision, and Values __________________________________________________________ 6 Sponsored bills and legislative priorities ____________________________________ 7 Advocacy Priorities ________________________________________________________________ 7 Principles and Policy Statements ___________________________________________ 8 Agriculture and Weights & Measures __________________________________________________ 8 Animal Services ___________________________________________________________________ 8 Child Support Services _____________________________________________________________ 9 Climate Change __________________________________________________________________ 9 The Delta ______________________________________________________________________ 11 Economic Development ____________________________________________________________ 11 Elections _______________________________________________________________________ 12 Emergency Preparedness, Emergency Response ________________________________________ 12 Flood Control and Clean Water _____________________________________________________ 12 Finance and Administration _________________________________________________________ 13 Health Care ____________________________________________________________________ 14 Homeless Services ________________________________________________________________ 17 Human Services _______________________________________________________________ 18 Justice Systems __________________________________________________________________ 22 Land Use/Community Development/Natural Resources ___________________________________ 23 Library ________________________________________________________________________ 24 Telecommunications and Broadband _________________________________________________ 24 Transportation __________________________________________________________________ 24 Veterans _______________________________________________________________________ 26 Waste Management ______________________________________________________________ 26 Workforce Development __________________________________________________________ 28 10-10-12 TWIC Meeting - Agenda Packet, Page 288 of 330 3 INTRODUCTION County Profile One of the original 27 counties established in California in 1850, Contra Costa County is home to more than one million people, making it the ninth most populous county in the state. Physically, Contra Costa is over 733 square miles and extends from the northeastern shore of the San Francisco Bay easterly about 50 miles to San Joaquin County. The County is bordered on the south and west by Alameda County and on the north by the Suisun and San Pablo Bays. The western and northern shorelines are industrialized, while the interior sections are suburban/residential, commercial and light industrial. About 40 percent of the county is under the jurisdiction of 19 incorporated cities and towns, and large portions of the remaining unincorporated area are part of public park systems and a habitat conservancy. Contra Costa County is very diverse, with communities that range from small agricultural places like Byron, with a density of about 200 people per square mile, to urban population centers like Contra Costa Centre, a bustling transit village with a density of 8,400 people per square mile. With its strategic location as The Capital of The Northern California Mega-RegionTM and easy access to suppliers and customers, Contra Costa is a business destination full of opportunity. Demographic Highlights Approximately 1.1 million people live in Contra Costa County; only 15%, or about 172,513 people, reside in the unincorporated areas of the county. The median age of County residents is 39 years old. Our population of seniors age 60 or older is expected to grow by approximately 47% between 2020 and 2050, making this age group our fastest growing. 10-10-12 TWIC Meeting - Agenda Packet, Page 289 of 330 4 The majority (44%) of County residents are white, with significant proportions of Asian (16.5%) and African American (8%) people. The Census tracks Latinx ethnicity separately from other populations; in total, the Hispanic/Latino population makes up approximately 26% of the total population. Governance A five-member Board of Supervisors, each elected to four-year terms, serves as the legislative body of the County, which has a general law form of government. Also elected are the County Assessor, Auditor-Controller, Clerk-Recorder, District Attorney, Sheriff-Coroner and Treasurer-Tax Collector. The County Administrator, Monica Nino, is appointed by the Board and is responsible for running the day- to-day business of the County. 10-10-12 TWIC Meeting - Agenda Packet, Page 290 of 330 5 Contra Costa County Board of Supervisors: District 1: John M. Gioia District II: Candace Andersen District III: Diane Burgis District IV: Karen Mitchoff District V: Federal D. Glover 10-10-12 TWIC Meeting - Agenda Packet, Page 291 of 330 6 Legislative Platform Purpose The Legislative Platform establishes the priorities, principles, and policy statements of the Contra Costa County Board of Supervisors and creates the basis for its advocacy efforts, alerting our legislative partners of the greatest needs of our residents and where we need additional help. The Platform provides general direction to County departments and agencies, legislative advocates, delegation members, and the public on our positions on key policy matters that would impact the way the County does business. The Platform also includes new bill requests for which legislation is sought from Contra Costa County. Throughout the legislative session, the County will review and take positions on various policy and State Budget items. When a recommended position is consistent with existing County policy, as adopted in the Platform, the CAO’s office or department staff will prepare a County position letter for signature by the Board Chair. Contra Costa County has also adopted a Delta Water Platform to identify and promote activities and policy positions that support the creation of a healthy Sacramento-San Joaquin Delta. Contra Costa County uses this Delta Water Platform to guide its actions and advocacy regarding the future of the Delta. Mission, Vision, and Values Contra Costa County has adopted the following Mission, Vision and Values statement: 10-10-12 TWIC Meeting - Agenda Packet, Page 292 of 330 7 SPONSORED BILLS AND LEGISLATIVE PRIORITIES Sponsored Bill #1: Legislation to revise state statute to allow for greater monetary penalties for persons who illegally dump commercial quantities, loss of license, paying for the cost of removal, and posting the information publicly in a manner set forth by the court. Budget Proposal #1 : Budget request to provide $15 monthly stipends for the purchase of hygiene products by female, transgender, and non-binary Welfare-to- Work recipients, aged 11-55. Budget Proposal #2 : Budget request to provide $20 million for the Aging in Place Campus project of Choice in Aging. Budget Proposal #3 : Budget request to provide $3 million in seed money for a regional responders complex at the former Concord Naval Weapons Station to advance planning concepts, define facility needs, and begin civil design work. Budget Proposal #4 : Budget request to provide individual or group psychotherapy, psychotropic medication, and discharge planning services to behavioral health patient inmates within County detention facilities, including those committed incompetent to stand trial: $5 million (approximately) Budget Proposal #5 : Funding to support the East Contra Costa County Habitat Conservancy: conservation grazing infrastructure, tree die-off investigation, land acquisition funding, and habitat restoration funding. Advocacy Priorities  COVID-19 Response and Economic Recovery  Climate Change  Heath Care, including Mental Health, Behavioral Health and Substance Use Disorder (SUD) services  Housing and Homelessness  Justice Reform  The Delta/Water and Levees 10-10-12 TWIC Meeting - Agenda Packet, Page 293 of 330 8 PRINCIPLES AND POLICY STATEMENTS Agriculture and Weights & Measures • SUPPORT actions to ensure sufficient state funding for pest and disease control and eradication efforts to protect both agriculture and the native environment. • SUPPORT funding for agricultural land conservation programs and agricultural enterprise programs, and revisions to State school siting policies to protect and enhance the viability of local agriculture. • SUPPORT legislation to facilitate the efforts by the California Department of Food and Agriculture and the Department of Boating and Waterways to survey and treat all infestations in the Delta of invasive aquatic species through integrated pest management. • SUPPORT legislation that preserves the integrity of the Williamson Act, eliminates abuses resulting in unjustified and premature conversions of contracted land for development, and fully restores Williamson Act subventions. • SUPPORT legislation that would preserve or enhance protections now afforded to consumers for commercial transactions involving commercial weighing or measuring devices (scales, meters and scanners) or computed by point-of-sale systems. • SUPPORT efforts to ensure sufficient funding for weights and measures programs that protect consumers and promote fair competition in the marketplace. Animal Services • SUPPORT actions to protect local revenue sources designated for use by the Animal Services Department; i.e., animal licensing, fines and fees. • SUPPORT actions to protect or increase local control and flexibility over the scope and level of animal services. SUPPORT efforts to protect and/or increase County flexibility to provide animal services consistent with local needs and priorities. • SUPPORT actions to protect against unfunded mandates in animal services or mandates that are not accompanied by specific revenue sources which completely offset the costs of the new mandates, both when adopted and in future years. SUPPORT efforts to ensure full funding of State animal services mandates. • SUPPORT efforts to preserve the integrity of existing County policy relating to Animal Services (e.g., the Animal Control Ordinance and land use requirements). 10-10-12 TWIC Meeting - Agenda Packet, Page 294 of 330 9 Child Support Services • SUPPORT recognition, promotion and enhancement of the child support program as a safety net program. • SUPPORT efforts that create new child support collection tools and methods or enhance existing child support collection tools and methods. OPPOSE efforts that eliminate or limit existing child support collection tools and methods. • SUPPORT efforts to increase funding for the child support program. OPPOSE efforts to reduce funding for the child support program. • SUPPORT efforts that enhance or create new data collection tools and methods. OPPOSE efforts that eliminate or limit existing data collection tools and methods. Climate Change • ENSURE that the recovery from the COVID-19 pandemic supports the following:  Technologies that support the County’s climate goals, including battery energy storage and microgrids, solar and wind energy, electric vehicles, and electric vehicle charging infrastructure;  Energy efficiency programs that encourage whole house retrofits and address asthma triggers in the built environment;  Planning work for adapting to rising sea levels;  Planning and implementation of microgrids;  Active transportation and green infrastructure programs;  Job training for careers in clean energy, clean transportation, and green infrastructure. • SUPPORT actions that: address the impacts of climate change; support climate adaptation and resilience efforts; support the Green Business program; address the disproportionate impacts that some communities bear because they are located near large industrial facilities; reduce exposure to toxic air pollutants and greenhouse gases; study and recognize the health impacts of global and regional climate change; and study the economic, workforce and social impacts of transitioning away from fossil fuels. • ENSURE that the implementation of AB 32 and successor bills results in harmony between the greenhouse gas reduction target created by the Air Resources Board for each regional/local agency, the housing needs numbers provided by the state Department of Housing and Community Development pursuant to housing element law, and the Sustainable Communities Strategy developed through the Regional Transportation Plan processes. 10-10-12 TWIC Meeting - Agenda Packet, Page 295 of 330 10 • SUPPORT efforts that favor allocation of funding and infrastructure from the California Climate Investments Program to jurisdictions within whose boundaries are the largest emitters of greenhouse gas, have vulnerable and/or disadvantaged communities that are disproportionately affected by climate change and environmental pollution, have Natural Community Conservation Plans or similar land conservation efforts that will address climate change and have demonstrated a local commitment to climate protection. • SUPPORT revisions to the Public Resources Code and the Air Resources Board’s Investment Plans to provide California Climate Investments funding for the conservation of natural lands, parks and open space through fee title acquisition as well as easements. • SUPPORT efforts to expand eligible expenditures of the Climate Investments to investments in accessible transit/transportation systems (serving seniors, disabled, and veterans) which result in more efficient service and corresponding reductions in greenhouse gas production, and in investments in infrastructure and programs to promote active transportation, particularly bicycling and walking. • OPPOSE changes to the California Environmental Protection Agency’s protocols for designating disadvantaged communities which result in a reduction in the number or size of disadvantaged communities in Contra Costa County prioritized for receipt of California Climate Investment funds. • SUPPORT efforts to ensure life-cycle costs are considered when planning new projects in the state. • SUPPORT the autonomy of community choice aggregators (CCAs) in policymaking and decision- making. OPPOSE legislation and regulatory policies that unfairly disadvantage CCAs or CCA customers or reduce or undermine local decision-making autonomy by the CCA. • SUPPORT continuing development of local renewable energy resources and supply, including protection of local autonomy to administer energy efficiency programs and install and utilize integrated distributed energy resources, and SUPPORT effective leveraging of energy efficiency programs tailored to address local needs and concerns. • SUPPORT complete transparency of all energy procurement practices, stranded costs, and departing load charges; fair competition in statewide energy markets for community choice aggregators (CCAs) and municipal or other publicly owned utilities; legislation and regulatory policies that protect CCA customers from improper cost allocation; and OPPOSE legislation that conflicts with or diminishes CCA procurement autonomy. • SUPPORT requirements for investor-owned and public energy utilities to provide local governments with energy usage data for all facilities in their jurisdictions for purposes of developing inventories of greenhouse gas emissions within their boundaries. • SUPPORT resources for local governments to use in addressing impacts of rising water levels caused by a warming climate. 10-10-12 TWIC Meeting - Agenda Packet, Page 296 of 330 11 The Delta • PROTECTION and RESTORATION of a healthy sustainable Delta ecosystem including adequate water quality, inflow and outflow, and water supply, to support fisheries, wildlife and habitat in perpetuity and managing or eradicating invasive species. • RESPECT and SAFEGUARD Delta Counties’ responsibilities related to land use, water resources, flood management, tax revenues, public health and safety, economic development, agricultural stability, recreation, and environmental protection in any projects, policies, or operations. • SUPPORT rehabilitation, improvement, and maintenance of levees throughout the Delta. • SUPPORT the Delta pool concept, in which the common resource provides quality freshwater supply to all Delta users, requiring mutual responsibility to maintain, restore, and protect the common resource. • REPRESENT and include local government in any governance structures for the Delta. • OPPOSE isolated conveyance. Economic Development • ADVOCATE for jobs-oriented incentive programs for jurisdictions that have met their Regional Housing Needs Assessment (RHNA) numbers. State legislators will continue to advance bills that make it easier to build housing, but it would also benefit the county to have those streamlining measures apply to jobs-oriented development like office and advanced manufacturing as well. • SUPPORT an amendment to the California Competes Tax Credit program guidelines to consider qualifying low-income census tracts within unincorporated areas of a county in the enhanced scoring category. 10-10-12 TWIC Meeting - Agenda Packet, Page 297 of 330 12 Elections • SUPPORT full state reimbursement for state mandates imposed upon local registrars by the Secretary of State, including special state elections. Emergency Preparedness, Emergency Response • ADVOCATE for disaster recovery funding that addresses tax backfills, debris removal, resiliency, forest health, and economic assistance. SUPPORT legislation that will improve forest management and emergency communications systems. • SUPPORT funding for defensible space inspections, community wildfire risk mitigation, and for hardening of existing homes from wildfire exposure. • SUPPORT more authority to train volunteers, provide funding for Community Emergency Response Training (CERT), and help clean-up oil spills without taking on additional legal liability. • SUPPORT a sales tax exemption for public safety related apparatus and/or equipment over a certain value (e.g., $250,000). • SUPPORT exemptions from CEQA for wildfire risk mitigation projects and Essential Services Facilities (ESF) such as fire stations, and exemptions from fees and air quality limitations for emergency generators at fire stations. • SUPPORT changes to EMS regulations that hinder the transport of patients to alternate destinations, provide community paramedicine programs, and engage in other programs that alter or enhance the delivery of 911 emergency ambulance transport. • SUPPORT a permanent resolution to the reimbursement for air ambulance providers. • ENSURE that development impact fees provide adequate funding for public safety facilities and ongoing operations. • SUPPORT legislation to improve telephone access or back-up during emergencies. • SUPPORT actions that increase the safety of the shipment of hazardous materials by pipeline through better monitoring, technical seismic vulnerability studies, leak detection, operational practices, and equipment. Flood Control and Clean Water • SUPPORT legislation that would improve integration of planning between member agencies of an Integrated Regional Water Management Planning group, thereby increasing multi-benefit projects. • SUPPORT legislation that would require Metropolitan Planning Organizations to integrate local and regional stormwater needs into their regional transportation planning process. 10-10-12 TWIC Meeting - Agenda Packet, Page 298 of 330 13 Finance and Administration • SUPPORT the State's effort to balance its budget through actions that do not adversely affect County revenues, services, or ability to carry out its governmental responsibilities. • OPPOSE any state-imposed redistribution, reduction or use restriction on general purpose revenue, sales taxes or property taxes unless financially beneficial to the County. • OPPOSE efforts to limit local authority over transient occupancy taxes (TOT). • OPPOSE any efforts to increase the County's share- of-cost, maintenance-of-effort requirements or other financing responsibility for state-mandated programs, absent new revenues sufficient to meet current and future program needs. • SUPPORT efforts to ensure that Contra Costa County receives its fair share of state allocations. • SUPPORT efforts to receive reimbursement for local tax revenues lost pursuant to sales and property tax exemptions approved by the Legislature and the State Board of Equalization. • SUPPORT efforts to reform the state/local relationship in a way that makes both fiscal and programmatic sense for local government and conforms to the adopted 2010 CSAC Realignment Principles, with an emphasis on maximum flexibility for counties to manage the existing and realigned discretionary programs. • SUPPORT a reduction in the 2/3rd vote requirement to 55% voter approval for locally-approved special taxes that fund health, education, economic, stormwater services, library, transportation and/or public safety programs and services. • SUPPORT efforts to authorize counties to impose forfeitures for violations of ordinances, as authorized for cities. • SUPPORT efforts to redefine the circumstances under which commercial and industrial property is reassessed to reduce the growing imbalance between the share of overall property tax paid by residential property owners versus commercial/industrial owners. • SUPPORT efforts to reduce County costs for Workers’ Compensation, including the ability to control excessive medical utilization and litigation. • SUPPORT actions that maximize federal, state and local revenues for county-run services and programs. 10-10-12 TWIC Meeting - Agenda Packet, Page 299 of 330 14 • SUPPORT legislative compliance with both the intent and language of Proposition 1A. • OPPOSE efforts of the state to avoid state mandate claims through the practice of repealing the statues then re-enacting them. SUPPORT timely, full payments to counties by the state for programs operated on their behalf or by mandate. • SUPPORT full state participation in funding the County’s retiree and retiree health care unfunded liability. • OPPOSE the establishment of specific or stricter standards for the use of personal services contracts by counties that would make contracting with community-based organizations more difficult. • ENABLE the use of Progressive Design-Build project delivery for construction contracts. • ENABLE local governments to continue offering opportunities for public meeting attendance, participation, and accessibility through technological means after the pandemic has ended. • SUPPORT legislation that will facilitate more efficient and effective public service delivery and financial management under alternative governance and administrative structures supported by the Board. Health Care • SUPPORT legislation and administrative policy changes that will continue into the future the flexibilities in use of Telehealth services that have so benefited our community during the Public Health Emergency. • SUPPORT state action to increase health care access and affordability. • SUPPORT Medi-Cal reimbursement rate increases to incentivize providers to participate in the program. SUPPORT Medi-Cal reimbursement rate increases through Proposition 56 funding to provide quality reproductive health care services. • SUPPORT reimbursement for a maximum of 2 visits taking place on the same day at one location if the patient suffers illness/ injury requiring additional diagnosis/ treatment, or if the patient has a medical visit and mental health or dental visit. • SUPPORT actions that address provider shortages (including physicians, particularly specialists, and nurses). Innovative programs, such as loan forgiveness programs, should be expanded. 10-10-12 TWIC Meeting - Agenda Packet, Page 300 of 330 15 • SUPPORT actions that implement comprehensive systems of care, including case management, for frequent users of emergency care and those with chronic diseases and/or dual (or multiple) diagnoses. • SUPPORT actions that provide sufficient time for detailed data gathering of current safety net funding in the system and the impact of any redirection of funds on remaining county responsibilities. • SUPPORT measures that maximize federal reimbursement from Medicaid and S-CHIP. • SUPPORT state action to implement a Medi-Cal waiver in a manner that maximizes the drawdown of federal funds for services and facilities, provides flexibility, and ensures that counties receive their fair share of funding. • SUPPORT actions to extend Drug Medi-Cal and Minor Consent Medi-Cal Coverage to incarcerated youths, many of whom are in custody due to drug related crimes. • SUPPORT coverage of medically necessary alcohol and substance use related disorder treatment at the same level as other medical conditions. • SUPPORT legislation that extends the restrictions and prohibitions against the smoking of, and exposure to, tobacco products; and the promotion of cessation among young people and adults. • SUPPORT actions that further align a statewide regulatory framework for the commercial cannabis industry and that continue to authorize local jurisdictions to adopt more restrictive measures to protect the health, safety and welfare of their residents. OPPOSE legislation and state regulation that seeks to weaken or eliminate local control over the commercial cannabis industry. • SUPPORT necessary County infrastructure and adequate funding related to education, regulation, testing and enforcement functions associated with cannabis regulatory controls. • SUPPORT restricting the sale and use of powdered alcohol and other similar products marketed to youth; restrictions on advertising of cannabis products targeting youth and near places frequented by youth or alcohol and other drug treatment facilities. • SUPPORT legislation that extends the restrictions and prohibitions against the smoking of, and exposure to, cannabis products in various places, including, but not limited to, places of employment, school campuses, public buildings, day care facilities, multi-family housing, health facilities, alcohol and other drug treatment facilities, and homeless shelters. • SUPPORT actions to seek a state ban on electronic devices that deliver flavored e-liquids as well as the e-juice itself. 10-10-12 TWIC Meeting - Agenda Packet, Page 301 of 330 16 • SUPPORT actions aimed at reducing the misuse of prescription drugs, most especially opioids, and increase prevention and treatment of opioid disorders to eliminate overdoses and combat the opioid epidemic. • SUPPORT population-based chronic disease prevention efforts such as the creation and funding of a State Wellness Trust. • SUPPORT developing a workforce with gerontological expertise to manage the exponential growth in the chronically ill aging population. • SUPPORT efforts that would advance a Health-In-All-Policies approach to policy work done across the County. This implies consideration of how health is influenced by the built environment and a connection with land use planning and development. • SUPPORT ongoing study of the health impacts of global and regional climate change and ongoing countywide mitigation and adaptation efforts. • SUPPORT actions that would preserve the nature and quality and continuity of care associated with safety net services historically provided at the local level, such as the California Children’s Services (CCS) and Child Health and Disability Prevention (CHDP) programs. • SUPPORT actions that promote aging in place through the utilization of long-term supports and services and caregiver support services. • SUPPORT increasing the level of funding for Long-Term Services and Supports (LTSS) and Home and Community Based Services (HCBS) to meet the increase in cost to provide services and to meet the tremendous increase in the aging population. • SUPPORT funding, streamlined processes, and greater flexibility for use of state and federal funding to respond to Public Health Emergency Preparedness initiatives including Pandemic Influenza, emerging diseases, and continued funding for all categories related to Public Health Preparedness. • SUPPORT increased funding and policy changes for Tuberculosis (TB) prevention and treatment to reflect the increased risk of transmission faced across the Bay Area. • SUPPORT increased funding for the public health infrastructure, capacity and prevention services. • SUPPORT Local Public Health Departments as an authorized provider for direct billing reimbursement related to the provision of Immunization, Family Planning, HIV, STD and TB services. • SUPPORT the reversal of the pre-emption language regarding local Menu-Labeling that is included the Affordable Care Act. 10-10-12 TWIC Meeting - Agenda Packet, Page 302 of 330 17 • SUPPORT enhanced funding and capacity for public health programs. • SUPPORT efforts to strengthen needle exchange programs as part of an overall program to combat the spread of HIV and other diseases. • SUPPORT legislative efforts to reduce or eliminate lead and toxic substances in consumer products, particularly those used by infants and children. • SUPPORT funding, policy and programs dedicated to suicide, injury and violence prevention. • SUPPORT legislation to tax certain beverages that contain added sugars. • SUPPORT efforts that support healthy meals, adequate meal time, and increased physical activity/education for school-age children. • SUPPORT funding that sustains and expands non-infrastructure Safe Routes to School programs that educate students, parents, and school staff about safe walking and bicycling to school. • SUPPORT efforts to address the underlying determinants of health and health equity, such as housing and prevention of displacement, educational attainment and livable wage jobs, and accessible transportation. Homeless Services • SUPPORT the continuation and expansion of funding for fair and equitable affordable housing, homelessness assistance and prevention programs, and strategic local and regional responses to homelessness that promote transparency, equity and data informed decision-making and enhance access to resources that support the County’s compliance with federal and state anti-homelessness and anti-poverty initiatives and requirements. • SUPPORT increasing and maintaining affordable housing stock and housing stability by way of supporting funding, policy, or regulations that promote fair and equitable housing for the most vulnerable low, very low, and extremely low-income households, including the acquisition, production and preservation of various housing types and the protection of stable housing for vulnerable persons experiencing homelessness. • SUPPORT removal of barriers in planning processes, regulatory frameworks, funding programs, healthcare access, and policy to promote increased equity, innovation, transparency and data- driven approaches to addressing homelessness and housing affordability, with the goals of increasing affordable housing and eliminating discrimination and disparate treatment of individuals based on race, ethnicity, gender, gender identity, sexual orientation, ability, housing status, income, or other household characteristics. 10-10-12 TWIC Meeting - Agenda Packet, Page 303 of 330 18 • SUPPORT a wide variety of housing types and formats, for all persons regardless of personal characteristic or status, and actively promote the equitable distribution and access to affordable units and holistic services, in line with evidence-based practices, to ensure the elimination of discrimination and disparate treatment of individuals, particularly vulnerable individuals and those from communities of color. • SUPPORT increasing funding, policy, and regulations for disaster planning and relief efforts that allow the County and the County’s homeless system to plan for and equitably respond to disasters and pandemics, including for purposes of supporting the health and safety of providers and persons experiencing homelessness, particularly the most vulnerable and those from communities of color. Human Services Older Adults • SUPPORT actions that promote individual choice by easing access to In Home Supportive Services (IHSS). SUPPORT funding to reduce the intake wait-time for eligibility and delivery of in-home care. • SUPPORT allowing counties to use alternative IHSS reassessment approaches including, but not limited to, telephonic reassessments. • SUPPORT programs that increase seniors’ access to technology and internet connection. • SUPPORT fully funding the administration of IHSS. • SUPPORT funding to recruit, train, and retain IHSS home health care workers. SUPPORT increased state investment in livable wages for IHSS care providers. • SUPPORT actions to provide respite for caregivers. • SUPPORT the creation of funding opportunities and policies which promote the development of aging-friendly communities. • SUPPORT actions that strengthen the capacity and funding of Adult Protective Services (APS) to address all forms of abuse and neglect. • SUPPORT funding to expand services for older adults and people with disabilities. • SUPPORT actions to promote the safety of social workers and all in-home care providers. 10-10-12 TWIC Meeting - Agenda Packet, Page 304 of 330 19 Safety Net Programs • OPPOSE actions that result in reduced level of services to families, children, adults and seniors, or that lead to preemption of local control. • SUPPORT continuous investment in safety net programs, including the California Earned Income Tax Credit (Cal EITC) and the Supplemental Security Income/State Supplementary Payment (SSI/SSP) Program. • SUPPORT fully funding administrative costs for administering programs. SUPPORT continued flexibilities and waivers in benefits program administration for the benefit of individuals and families who are struggling. • SUPPORT actions to improve and expand access to food, including emergency food assistance networks (e.g. local food banks, and food pantries), increasing the amount and flexibility of CalFresh and other local assistance programs. • SUPPORT actions to streamline benefit applications, align verifications between programs, and have the same appointment for multiple applications. • SUPPORT the ease of data sharing and coordination of care across safety net programs, including those administered by the Health Department, such as WIC. • SUPPORT actions to ease access to Medi-Cal and its services. • SUPPORT actions which would expand eligibility to CalWORKS. • SUPPORT increased access to employment training programs and subsidized work programs for vulnerable populations, including access to community colleges. • SUPPORT establishing a General Assistance Program with a state share of funding. • SUPPORT actions to create whole family care through a more comprehensive safety net of services that enable families to be stable and have economic opportunities. • SUPPORT research that describes and assesses local service needs and gaps. Child Welfare Services • SUPPORT funding for services that stabilize children and families in the foster care system. 10-10-12 TWIC Meeting - Agenda Packet, Page 305 of 330 20 • SUPPORT full funding of efforts to support the Continuum of Care Reform. • SUPPORT initiatives which would expand benefits and support for reunified families. • SUPPORT restorative justice and healing-centered framework initiatives and programs that seek to eliminate the school-to-prison pipeline and end the criminalization of youth. • SUPPORT funding and initiatives to support children’s mental health and studies on the long-term impacts of COVID-19 on the physical and mental health of adults and children. Early Childhood Development • SUPPORT legislation to expand early childcare, education, mental health and other comprehensive services and holistic approaches. • SUPPORT increased funding and support preschool enrichment programs with family engagement to provide quality care and parent education in early life. • SUPPORT policies and systems changes to foster holistic family and early childhood development and resilience. • SUPPORT early childhood home visitation to enhance parenting skills and promote health child development. • SUPPORT early childhood mental health and trauma prevention programs. Violence Prevention • SUPPORT actions that seek to address the impact of gun violence, domestic violence, sexual assault, human trafficking, elder abuse and child abuse. • SUPPORT actions that seek to prevent the underlying causes of all forms of violence and invest in upstream strategies. • SUPPORT actions to increase cross-agency and cross-system collaboration on cases involving violence, including the sharing of confidential or protected information in multidisciplinary team settings. • SUPPORT actions to reduce the effects of toxic stress, trauma, and adverse childhood experiences. • SUPPORT alternatives to the criminal justice system that center community and survivor needs. 10-10-12 TWIC Meeting - Agenda Packet, Page 306 of 330 21 • SUPPORT actions to support successful transition from incarceration and detention to the community. • SUPPORT increase in funding for Lethality Assessment Protocols and reallocation strategies to support other prevention and social services. Immigration, Equity and Inclusion • SUPPORT the continued expansion of benefits and services for immigrants, refugees, and asylum seekers regardless of immigration status. SUPPORT efforts to expand full scope Medi-Cal to include Deferred Action for Childhood Arrivals (DACA) youth, seniors, and all remaining uninsured residents regardless of their immigration status. • SUPPORT increased language access and culturally responsive social services for all immigrants. SUPPORT funding for the hiring and training of bilingual-bicultural social case workers. • SUPPORT actions to assist immigrants who experience domestic or sexual assault to receive resources, including services to prevent homelessness, and legal resources to help attain citizenship. • SUPPORT funds for education and outreach to engage immigrants, refugees, asylum-seekers, and non-legal status communities to help them access benefits, mitigate concerns around public charge, and address other issues related to their enrollment to safety net programs • OPPOSE any changes that may penalize immigrants for using vital public benefits they are legally allowed to access. OPPOSE any changes to sponsor requirements which add limiting threshold criteria. • SUPPORT funding and other resources for day labor programs and other workforce development programs that serve immigrant communities and undocumented workers. • SUPPORT actions that would eliminate systemic racism and structural inequities, including efforts to refocus Medi-Cal and other social safety net programs toward reducing health disparities. 10-10-12 TWIC Meeting - Agenda Packet, Page 307 of 330 22 Justice Systems • SUPPORT justice reform efforts that reduce racial and ethnic disparities. • SUPPORT justice reform efforts that reduce barriers to success for system-involved youth and adults. SUPPORT legislation that encourages and increases youth engagement. • SUPPORT justice reform legislation that recognizes adolescent brain development and the unique needs of transition-aged youth. • SUPPORT an ongoing commitment to investing in community based organizations and community alternatives to incarceration and detention. • SUPPORT legislation to restore pretrial detainee access to federal health benefits. • SUPPORT legislation raising the maximum age limit for juvenile court jurisdiction, allowing youths to remain on juvenile probation supervision through age 24, with an elevated focus on rehabilitation and restorative justice. • SUPPORT local flexibility and funding to implement justice diversion programs. • OPPOSE legislation that would shift the responsibility of parolees from the state to the counties without adequate notification, documentation and funding. • SUPPORT legislation that will help counties implement 2011 Public Safety Realignment as long as the proposal would provide for county flexibility, eliminate redundant or unnecessary reporting, and would not transfer more responsibility without funding. • SUPPORT legislation that will combat the negative impact that human trafficking has on victims in our communities, including the impact that this activity has on a range of County services and supports, and support additional tools, resources and funding to help counties address this growing problem. • SUPPORT legislative reform of current bail provisions that will replace reliance on money bail with a system that incorporates evidence-based pretrial release decisions. ADVOCATE for funding for any new or revised responsibilities for counties, including the assessment and supervision of people charged with crimes. • SUPPORT legislation that provides a solution to addressing the problems of metal theft and abandoned and trespassing vessels and ground tackle. 10-10-12 TWIC Meeting - Agenda Packet, Page 308 of 330 23 Land Use/Community Development/Natural Resources • ASSIST in the development and preservation of low and moderate income housing through support of programs that: 1) provide access to federal, state and local financing, 2) ensure timely review of residential projects, 3) provide financial and/or regulatory incentives where feasible and appropriate to offset or reduce the costs of affordable housing development, and 4) promote the re-use of existing publicly-owned assets. • MAINTAIN local agency land use authority. • SUPPORT ways to streamline overall compliance with State legislation, while opposing efforts to expedite a particular development project. • ENSURE Contra Costa residents of all income categories have access to adequate housing. • GROW more jobs countywide, particularly in those parts of the County with the longest commutes and most acute jobs-housing imbalance. • SUPPORT historically under-invested communities in their equitable economic growth. • IDENTIFY new or enhanced revenue to support residents’ quality of life. • ESTABLISH, fund and support locally-controlled resource permitting to streamline economic development activities and conserve and recover species and the habitats upon which they depend, natural resources, watersheds and open space. • SUPPORT legislative actions that reduce the risk to students from the accidental release of hazardous materials by requiring risk assessments that account for all sources of hazardous materials as part of school siting and rebuilding decisions. • SUPPORT legislative actions to evaluate, clean up, and redevelop contaminated sites. 10-10-12 TWIC Meeting - Agenda Packet, Page 309 of 330 24 Library • SUPPORT State funding for the operation of public libraries, including full funding of the Public Library Fund (PLF) and the California Research and Education Network (CalREN). • SUPPORT State bonds for public library construction. • SUPPORT funding for the California Library Literacy and English Acquisition Services Program, which provides matching funds for public library adult literacy programs that offer free, confidential, one- on-one basic literacy instruction to English-speaking adults who want to improve their reading, writing, and spelling skills. Telecommunications and Broadband • SUPPORT preservation of local government ownership and control of the local public rights-of-way and ensure reasonable compensation for their use. • SUPPORT continued funding for Public, Educational and Government Access (PEG) channels to provide local community access and benefits and increase flexibility in the use of PEG funds. • ENSURE nondiscriminatory treatment of Public, Educational and Government Access Channels by Cable System Operators. • SUPPORT the expansion of broadband (high speed internet service) to drive economic development and job opportunities, support county service delivery, and improve health, education and public safety outcomes for residents. Transportation • PROVIDE an integrated, multi-modal transportation system that safely and efficiently meets the transportation needs of all economic and social segments of the County and provides for the transport of goods and services throughout Contra Costa County. • EMPHASIZE the efficient use of the existing transportation system and cost-effective enhancements to this system. New and emerging policy direction includes an increase in the support for active transportation modes, support for the development of aging-friendly communities, and a decreasing emphasis on automotive capacity expanding projects which increase greenhouse gas production. • SUPPORT the provision of a safe, reliable, efficient, and accessible transportation system that balances social, environmental, and economic needs of the County. • SUPPORT increased flexibility in the use of transportation funds. 10-10-12 TWIC Meeting - Agenda Packet, Page 310 of 330 25 • Increased regional coordination, while reflecting local input, is necessary for public transit (paratransit and fixed route), roads, trails, advanced mobility technology, and greenhouse gas reduction related projects. • ENSURE complete life-cycle costs, including an emphasis on environmentally friendly construction resources, are considered during state and local project development. • SUPPORT improvements in safety throughout the transportation system, specifically for vulnerable users of the system (children, pedestrians, cyclists, etc.). • PROMOTE the streamlining of transportation safety projects. • SUPPORT actions to put in place local planning coordination mechanisms and requirements for state funded or regulated facilities such as schools, roads, courts, jails, and OPPOSE efforts to compromise the County’s road authority and the ability to protect public health, safety, and welfare. • SUPPORT regional, coordinated aviation transportation planning efforts to improve service delivery and to provide options to the surface transportation system for people and goods movement. • SUPPORT actions to increase waterborne transport of goods, in particular relative to the San Francisco to Stockton Ship Channel. • SUPPORT measures to enhance rail safety with an emphasis on; increased state oversight of railroad bridges, funding for first responder training, funding to improve rail safety and prevent rail trespass fatalities, improved regulations for tank car safety standards, and data sharing requirements between state emergency managers, local responders, and rail operators. • OPPOSE linking transportation funding to housing production. • OPPOSE reducing or eliminating development impact fees (without secured backfill) in an effort to increase housing production. • INCREASE requirements for coordination between transportation agencies and utilities. • SUPPORT funding increases for active transportation projects and planning with an emphasis on facilities and investments that increase the likelihood of a mode shift away from automobiles. 10-10-12 TWIC Meeting - Agenda Packet, Page 311 of 330 26 • PROVIDE resources to facilitate the deployment of electric vehicles and electric vehicle charging infrastructure, including funding for vehicles, chargers, and facility upgrades, and improvements to the electric distribution and transmission grids to safely accommodate increased load. • SUPPORT actions to increase and improve waterborne transportation of goods when it increases safety. Veterans • SUPPORT legislation and budget actions that will continue the state's annual local assistance for County Veterans Service Offices at a minimum of $11 million. • SUPPORT legislation and funding that will provide veterans organizations with resources to operate and make necessary repairs to, or replacement of, their meeting halls and facilities. • SUPPORT legislation that will improve the timeliness and quality of both VA benefits claim decisions and VA healthcare services. Waste Management • MAINTAIN the County’s existing discretionary authority over matters pertaining to waste management, recovery and disposal. ENSURE new or expanded responsibilities are not imposed on the County, either directly or indirectly, without providing statutory authority to guarantee funding to implement actions necessary to adequately enforce or comply. • SUPPORT legislation that provides new or additional funding sources for local implementation of applicable solid waste and waste diversion mandates. • SUPPORT legislation to provide alternative management standards for the Treated Wood program at the Department of Toxic Substance Control so treated wood could be processed at Class II landfills and transfer stations with a composite line. • SUPPORT legislation that:  Protects local decision-making authority regarding solid waste facility siting;  Protects local solid waste franchising authority;  Expands local solid waste and recycling fee-setting authority;  Protects local governments’ authority to direct the flow of waste; and  Seeks to remedy lack of sufficient authority to address statutory responsibilities. • SUPPORT legislation promoting the diversion of recyclables and organics from landfills unless burdensome or impractical for local governments to implement. 10-10-12 TWIC Meeting - Agenda Packet, Page 312 of 330 27 • SEEK more robust local regulatory and enforcement authority relative to the storage, transport, processing, recovery and disposal of waste within our jurisdictional boundaries. • SUPPORT statewide regulation for hauling solid waste and enforcing increased penalties for illegal dumping. • SUPPORT legislation that prioritizes, incentivizes, and innovates waste reduction and reuse practices of the waste hierarchy over traditional recycling. • SUPPORT actions to improve and diversify markets for recyclable materials and that encourages:  Solutions to global policy reforms and development of local recycling markets;  Creation of economic incentives for the use of recycled materials;  Increased use of recycled content in products manufactured or sold in California; and  Increased use of materials that are biodegradable and compostable. • OPPOSE legislation that requires diversion of materials for which there is not adequate markets. • ENSURE manufacturers are held accountable for proper end-of-life management of products and packing materials they produce, including pharmaceuticals, batteries, sharps, and veterinary medicine, to create effective producer-lead reduction, reuse and recycling programs and foster more environmentally sustainable product/packaging design and reduce the quantity of harmful pharmaceuticals (including veterinary medicine) that ultimately enter wastewater treatment facilities, bodies of water, and landfills. • SUPPORT actions that will shift the financial burden of end-of-life management of products from individuals to producers and sellers. • SUPPORT statewide regulation and enforcement to limit production or sale of items that negatively impact the environment or human health. • SUPPORT legislation that protects human health and the environment from exposure to hazardous materials and hazardous wastes. • OPPOSE actions that require counties to site, fund, approve, build and/or operate organic processing facilities, including composting operations. • SUPPORT actions to protect and expand waste diversion credits or disposal reduction credits. 10-10-12 TWIC Meeting - Agenda Packet, Page 313 of 330 28 • SUPPORT the development of conversion technologies as an alternative to land filling and provides state funding to local jurisdictions for such projects; and, provides that all energy produced by such projects be designated as renewable energy. • SUPPORT new or additional funding for expanded recycling and organics processing infrastructure. • SUPPORT funding for CalRecycle to assist in the implementation of laws focused on diverting organic and recyclable waste from landfill. • SUPPORT state investment in expanded clean composting, anaerobic digestion and recyclable materials manufacturing. • SUPPORT legislation to enable additional food rescue and recovery of edible food, including expansion of good Samaritan laws, and support legislation that establishes funding for food recovery programs and develops policies for safe but consistent food date labeling. • SUPPORT legislation that provides for less burdensome recovery of Household Hazardous Waste. Workforce Development • SUPPORT increasing the flexibility of Workforce Development Board spending and ability to partner with community agencies and other county bureaus to increase supportive services and respond to local workforce needs. • SUPPORT establishing a higher minimum wage. SUPPORT paid and job-protected leave policies. • SUPPORT funding for wage stipends for COVID positive workers and other direct cash assistance to COVID impacted families, most critically for ethnic-racial minority front line workers in the non-benefited employment sector. • SUPPORT increased teacher training and education, including funding to support employees to obtain a teaching credential. • SUPPORT policies and programs that increase economic opportunity for women and improve gender equity. • SUPPORT actions that promote training, capacity building and deeper understanding for students, educators and county staff on trauma informed care, interpersonal violence, adverse childhood experiences, and healthy workplaces and schools. • SUPPORT expansion of education and educational materials in multiple languages related to labor rights, wage theft, proper compensation, and other work-related issues for all workers. 10-10-12 TWIC Meeting - Agenda Packet, Page 314 of 330 TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE 7. Meeting Date:10/10/2022   Subject:RECEIVE Communication, News, Miscellaneous Items of Interest to the Committee & DIRECT staff as appropriate. Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE,  Department:Conservation & Development Referral No.: N/A   Referral Name: N/A  Presenter: John Cunningham, DCD Contact: John Cunningham (925)655-2915 Referral History: This is a standing item on the TWIC agenda. Referral Update: Communication Received: 8-30-2022 email from Leland Frayseth (Contra Costa resident) re: "Sites Reservoir - Leadership failure and accountability" 9-7-2022 email from Jonathan Goodwin & Sveinn Erik Ólafsson (Canyon residents) re: Re: Report on Needed Capital Improvements to Pinehurst Road in District 2 9-14-22 Mass email from Seamus Murphy, Executive Director, San Francisco Bay Area Water Emergency Transportation Authority re: A note to WETA/SF Bay Ferry stakeholders Recommendation(s)/Next Step(s): RECEIVE information and DIRECT staff as appropriate. Fiscal Impact (if any): N/A Attachments Public Comment: Canyon: "Needed Repairs on Pinehurst Road" WETA Response to News Article 8-30-2022 email from Leland Frayseth (Contra Costa resident) re: "Sites Reservoir - Leadership failure and accountability" 10-10-12 TWIC Meeting - Agenda Packet, Page 315 of 330 September 7, 2022 To: The Contra Costa Supervisors Transportation, Water & Infrastructure Committee (TWIC) From: Jonathan Goodwin & Sveinn Erik Ólafsson (Canyon residents) Re: Report on Needed Capital Improvements to Pinehurst Road in District 2 Introduction In several places Pinehurst Road has need of structural stabilization which, if neglected, could lead to serious debilitation of the roadway. We request that these repairs be included in the County's CRIPP (Capital Road Improvement & Preservation Program), particularly in light of the public safety considerations involved. General Background Pinehurst Road is the only road serving the southwest area of the County because there is zero redundancy in this part of the road network. From an emergency response perspective, it is imperative to harden this road to make it as reliable and resilient as possible. The late Supervisor Gayle Uilkema told us it was listed in an emergency response plan as a vital alternative route, but we are unable to verify that at this time. However, on recent youtube videos, one can find Moraga-Orinda Fire Chief David Winnacker explaining that Pinehurst Road is an important evacuation route for the Town of Moraga (to which one can add South Orinda). On a regional scale, Pinehurst Road would be a primary evacuation route out of the Piedmont Pines/Montclair sections of Oakland. Additionally, it is increasingly becoming an important commuter route, especially with phone apps now directing drivers to it. Recreational use of this road has increased since the current pandemic began and will increase more so when East Bay Regional Park District opens up their Eastport addition to Sibley with its inter-connecting bike trails in 2023. Locally, the community of Canyon is 100% reliant on Pinehurst Road as the one and only connection to the County Road network and the only access road for emergency services of any sort. It is the only County Road located in a large section of a Very High Fire Severity Zone which augments its importance. Summary of Needed Repairs We are calling your attention to typical challenges found along a roadway which twists along the contours of a steep hillside articulated by numerous side creeks; that is, these all have to do with damage caused by the flow of water. Some instances involve a failed culvert, others are due to surface water sliding off and carving away the hillside supporting the road, and some appear to be due to the action of the creek. All of these are remediable. Conclusion We hope this report amply demonstrates to the TWIC that a conversation about this with Public Works is needed. We trust you will ask them to study the matter and offer recommendations which might be added into the CRIPP. Please see the photos and descriptions below of the areas we feel are most in need of prompt attention. Thank you very much for your consideration of this matter. Page 316 of 33010-10-12 TWIC Meeting - Agenda Packet, Page 316 of 330 Areas threatening Pinehurst Road in District 2, listed in order of apparent severity September 7, 2022 2 Repair Location 1 - On Pinehurst Road near postmile 0.2 there is a culvert washout needing repair with possibly a gabion wall, or interlocking concrete bars or some other form of structural support and possible culvert replacement. Page 317 of 33010-10-12 TWIC Meeting - Agenda Packet, Page 317 of 330 Areas threatening Pinehurst Road in District 2, listed in order of apparent severity September 7, 2022 3 Repair Location 2 – postmile 1.7 two washouts in close proximity, one with black plastic, and one without. The one without black plastic is the site of a fatal accident on December 28, 2009 when a Canyon resident drove into the creek at this site. These sites would benefit from a gabion basket wall or interlocking concrete bars. a culvert replacement and perhaps a guardrail. Page 318 of 33010-10-12 TWIC Meeting - Agenda Packet, Page 318 of 330 Areas threatening Pinehurst Road in District 2, listed in order of apparent severity September 7, 2022 4 Repair Location 3 – postmile 4.6-4.7. Culvert washout undermining road. Replace culvert and establish erosion control such as gabion baskets or interlocking concrete bars, and guardrail. Page 319 of 33010-10-12 TWIC Meeting - Agenda Packet, Page 319 of 330 Areas threatening Pinehurst Road in District 2, listed in order of apparent severity September 7, 2022 5 Repair location 4 – postmile 4.3 Earlier repair that needs new wood and extension to cover undermining shoulder. Page 320 of 33010-10-12 TWIC Meeting - Agenda Packet, Page 320 of 330 Areas threatening Pinehurst Road in District 2, listed in order of apparent severity September 7, 2022 6 Repair location 5 – postmile 4.2 This is the long-term narrow spot that requires widening to remove the two-way stop. Right-of-way issues may be involved as well as possible grading and reinforced wall on the uphill side. Relatively low priority. Page 321 of 33010-10-12 TWIC Meeting - Agenda Packet, Page 321 of 330 Areas threatening Pinehurst Road in District 2, listed in order of apparent severity September 7, 2022 7 Repair location 6 – postmile 0.3 excess soil has been placed over a likely culvert opening and creek crossing. This situation prevents easy maintenance and could cause mud closing of road in a big rainstorm. Relatively low priority. Page 322 of 33010-10-12 TWIC Meeting - Agenda Packet, Page 322 of 330 1 John Cunningham From:Seamus Murphy <murphy@watertransit.org> Sent:Wednesday, September 14, 2022 11:39 AM To:John Cunningham Subject:A note to WETA/SF Bay Ferry stakeholders Dear SF Bay Ferry Stakeholder, You may have seen a recent story in the Mercury News/East Bay Times about the expense of ferry service (https://www.eastbaytimes.com/2022/09/13/343-a-trip-san- francisco-ferry-costs-led-nation-despite-slashed-service/). While the story focuses primarily on the Golden Gate Ferry system, it also mentions data for the SF Bay Ferry system that WETA operates. Despite the points made in the article, SF Bay Ferry’s operating costs are very much in line with other ferry operators and other transit systems providing regional service. FLAWED DATA ANALYSIS The data in the story is from Fiscal Year 2020-21, when transit ridership was at an all-time low, and systems like SF Bay Ferry were maintaining service for essential workers. Data from this period is clearly tainted by the pandemic and cannot represent a viable or accurate reflection of the cost-effectiveness of the region’s ferry services. Since then, SF Bay Ferry became the first Bay Area transit agency to restore full service. At the same time, the agency lowered fares to make sure that the system would be accessible and affordable to a broad and diverse ridership base. We are in a transformative time for transit and how we measure efficiency and effectiveness is changing. COVID relief funding was made available to transit agencies to restore service and preserve jobs for transit workers, and that is exactly what it is being used for at SF Bay Ferry. After restoring service, ridership SF Bay Ferry ridership nearly doubled immediately and it has risen steadily, putting WETA near the top of the list when it comes to ridership return. 10-10-12 TWIC Meeting - Agenda Packet, Page 323 of 330 2 Looking at pandemic data isn't illustrative of the enormous shift we're undergoing. This is especially true given the need to preserve reliable transit for lower income travelers and essential workers in the health care, service, and construction industries. With respect to WETA, we also have a mandate to respond to disasters that disrupt the transportation network with emergency water transit. We cannot do that without investing in the employment of skilled captains, engineers and crews and to keep the fleet well-maintained and ready. FERRY/REGIONAL TRANSIT COST-PER-MILE The article also fails to distinguish between local and regional systems. Local systems like bus agencies carry passengers over a relatively short distance, so their cost/passenger is comparatively low. Regional commuter rail, intercity rail and ferry systems carry riders further. Longer trips reduce a larger share of emissions, and they also cost more to operate. A more accurate analysis would look at cost per passenger mile and would demonstrate that the cost effectiveness of ferry service is comparable to other modes. 10-10-12 TWIC Meeting - Agenda Packet, Page 324 of 330 3 UNIQUE BENEFITS OF WATER TRANSIT Ferry transit is also different from other modes in some unique ways. Ferries can carry up to 445 passengers. These capacities provide superior congestion relief on freeways, bridges, and other transit modes. The system also provides access to areas that other modes don’t. SF Bay Ferry’s Vallejo route provides the only single seat transit option connecting Solano County and San Francisco, and there are no BART stations on Alameda Island, where SF Bay Ferry operates three routes. These are huge reasons why SF Bay Ferry saw its ridership double from 2012 through 2019, and why the ridership rebound from pandemic lows has been so impressive. They are also evidence that more ferry service will be needed to serve the tremendous amount of job and population growth that the Bay Area is seeing on the waterfront. NEW TRANSIT INVESTMENT IS MORE IMPORTANT THAN EVER Bay Area transit recovery has a long way to go and maintaining service over the next several years will almost certainly require new investment. But like other transit operators, WETA is not simply waiting for passengers to reappear. The region has been working collaboratively to improve our transit network so that we can attract a larger share of travelers to our systems. For SF Bay Ferry that means aligning our fares with other modes, efficiently adding service during the off-peak, coordinating new first/last mile connections, and bringing enhancements like real-time departure info to the system. It is unfortunate that the article above uses flawed data to question the value of this transit service at a time when the focus should be on investing more in our regional network so that it can survive, evolve, and thrive as the region recovers. Thank you, as always, for your continued support of WETA, SF Bay Ferry, and our transit partners. If you have any questions or concerns, please be in touch (murphy@watertransit.org). Sincerely, Seamus Murphy and the SF Bay Ferry Team    Water Emergency Transportation Authority/San Francisco Bay Ferry | Pier 9, Suite 111, The Embarcadero, San Francisco, CA 94111 10-10-12 TWIC Meeting - Agenda Packet, Page 325 of 330 4 Unsubscribe john.cunningham@dcd.cccounty.us Update Profile | Our Privacy Policy | Constant Contact Data Notice Sent by murphy@watertransit.org powered by Try email marketing for free today!   10-10-12 TWIC Meeting - Agenda Packet, Page 326 of 330 1 John Cunningham From: Sent: To: Subject: Leland Frayseth Tuesday, August 30, 2022 8:53 PM Samantha.Arthur@cwc.ca.gov; Alexandre.Makler@cwc.ca.gov; daniel.curtin@cwc.ca.gov; Matthew.Swanson@cwc.ca.gov; Kimberly.Gallagher@cwc.ca.gov; fern.steiner@cwc.ca.gov; jose.solorio@cwc.ca.gov; cwc@water.ca.gov; Shoemaker, Brianna@DWR; amy.young@water.ca.gov; Cambra, Paul@CWC; Yun, Joseph@DWR; John Cunningham; john@goldenstatesalmon.org; Obegi, Doug; Dan Bacher; Scott Anderson; syarbrough@sitesproject.org; aforsythe@sitesproject.org; jbrown@sitesproject.org; Kristal.Davis-Fadtke@wildlife.ca.gov; Chuck.Bonham@wildlife.ca.gov; Katja Sites Reservoir - Leadership failure and accountability Subject:  Sites Reservoir ‐ Leadership failure and accountability  Dear CWC Commissioners, Sites Reservoir JPA Directors, Staff and the Public,  This is my 49th letter to the California Water Commission (CWC).  Please embed this public comment into the 16 Sept  2022 Sites Reservoir Joint Powers Authority (JPA) Board and 21 Sept 2022 CWC meeting agendas under public comment. I enjoy rowing, swimming and fishing in the Sacramento San Joaquin Delta.  Sites Reservoir has failed me due to  leadership failure through vacillating project scope.  It is time to hold the leaders responsible accountable by asking for  their resignations so please consider this my request for Sites JPA Directors resignations.  CWC Staff, please return Sites  Early Funding invoices to the JPA that were received prior to 18 Mar 2022 as "Non Reimbursable".   The Sites JPA's 18  Mar 2022 meeting, agenda item 2.1, is the most recent scope do over.  10-10-12 TWIC Meeting - Agenda Packet, Page 327 of 330 2     10-10-12 TWIC Meeting - Agenda Packet, Page 328 of 330 3     10-10-12 TWIC Meeting - Agenda Packet, Page 329 of 330 4     I believe when Sites project estimators dial in 100 years of inflation adjusted electricity costs to pump water uphill into  the reservoir and 100 years of inflation adjusted liquid oxygen costs to control reservoir algal blooms this project will be  astronomically expensive.  Liquid oxygen is costly and energy intensive to manufacture and there is not the capacity to  manufacture it on the scale needed to control algal blooms in California that are popping up everywhere.  I do not think  any fisherwoman or fisherman would approve of California Fish and Wildlife subsidizing Sites off‐stream reservoir  Operations and Maintenance costs; that is a crazy idea.    I believe the West's Colorado, Sacramento and San Joaquin rivers do not have enough water to fill existing reservoirs  now and in the foreseeable future and building new off‐stream reservoirs is wasteful and unnecessary.  California  agriculture is 2.6% of GDP farmers and ranchers need to move to the Mississippi river basin where there is an  abundance of water.  We do not have water, it does not rain and snow here anymore.    Thank you for reading this comment and studying the embedded images.    Leland Frayseth  10-10-12 TWIC Meeting - Agenda Packet, Page 330 of 330