Loading...
HomeMy WebLinkAboutBOARD STANDING COMMITTEES - 07132020 - TWIC Agenda Pkt            TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE July 13, 2020 09:00 AM Pacific Time (US and Canada) To slow the spread of COVID-19, the Health Officer’s Shelter Order of April 29, 2020, prevents public gatherings (Health Officer Order). In lieu of a public gathering, the Transportation, Water & Infrastructure meeting will be available via remote access per Governor’s Executive Order N29-20. Supervisor Candace Andersen, Chair Supervisor Karen Mitchoff, Vice Chair Meeting Process: Items may be taken out of order based on the business of the day and preference of the Committee Persons who wish to address the TWI Committee during public comment or with respect to an item that is on the agenda may submit public comments before or during the meeting by email, voicemail or online participation as described below: 1) Email to transportation@dcd.cccounty.us In the subject line, please include "TWIC" and enter the agenda item number and description. 2) Voicemail at (925) 674-7833. The caller should start the message by stating “TWIC public comments – not on the agenda” or “TWIC public comments – agenda item #”, followed by the caller’s name and comments. 3) To participate directly in the meeting please click the following link: https://cccounty-us.zoom.us/j/92685143346 Request to speak by using the "raise hand" function. 4) To participate directly in the meeting by phone call: 888-278-0254 (US Toll Free) Enter code: 198675, request to speak by dialing #2. * Commenters will be limited to three (3) minutes each; * Comments submitted by email or voicemail will be included in the record of the meeting but will not be read or played along during the meeting. Transportation, Water, and Infrastructure Committee Agenda Please click the link to join the webinar: https://cccounty-us.zoom.us/j/92685143346 Or by Telephone, dial: USA 888-278-0254 (US Toll Free) Conference code: 198675              1.Introductions   2.Public comment on any item under the jurisdiction of the Committee and not on this agenda (speakers may be limited to three minutes).   3. REVIEW record of meeting for June 8, 2020, Transportation, Water and Infrastructure Committee Meeting. This record was prepared pursuant to the Better Government Ordinance 95-6, Article 25-205 (d) of the Contra Costa County Ordinance Code. Any handouts or printed copies of testimony distributed at the meeting will be attached to this meeting record. (John Cunningham, Department of Conservation and Development). 07-13-20 TWIC Committee Mtg Agenda Packet Page 1 of 250   4. ACCEPT the Capital Road Improvement and Preservation Program (CRIPP) for fiscal year 2020/2021 to 2026/2027 and RECOMMEND the Board of Supervisors fix a public hearing for approval of the CRIPP. (Larry Leong, Public Works Department)   5. CONSIDER report on Local, State, Regional, and Federal Transportation Related Legislative Issues and take ACTION as appropriate. (John Cunningham, Department of Conservation and Development)   6.The next meeting is currently scheduled for Monday, August 10, 2020.   7.Adjourn   The Transportation, Water & Infrastructure Committee (TWIC) will provide reasonable accommodations for persons with disabilities planning to attend TWIC meetings. Contact the staff person listed below at least 72 hours before the meeting. Any disclosable public records related to an open session item on a regular meeting agenda and distributed by the County to a majority of members of the TWIC less than 96 hours prior to that meeting are available for public inspection at the County Department of Conservation and Development, 30 Muir Road, Martinez during normal business hours. Public comment may be submitted via electronic mail on agenda items at least one full work day prior to the published meeting time. For Additional Information Contact: John Cunningham, Committee Staff Phone (925) 674-7833 john.cunningham@dcd.cccounty.us 07-13-20 TWIC Committee Mtg Agenda Packet Page 2 of 250 Glossary of Acronyms, Abbreviations, and other Terms (in alphabetical order): Contra Costa County has a policy of making limited use of acronyms, abbreviations, and industry-specific language in meetings of its Board of Supervisors and Committees. Following is a list of commonly used abbreviations that may appear in presentations and written materials at meetings of the Transportation, Water and Infrastructure Committee: AB Assembly Bill ABAG Association of Bay Area Governments ACA Assembly Constitutional Amendment ADA Americans with Disabilities Act of 1990 ALUC Airport Land Use Commission AOB Area of Benefit BAAQMD Bay Area Air Quality Management District BART Bay Area Rapid Transit District BATA Bay Area Toll Authority BCDC Bay Conservation & Development Commission BDCP Bay-Delta Conservation Plan BGO Better Government Ordinance (Contra Costa County) BOS Board of Supervisors CALTRANS California Department of Transportation CalWIN California Works Information Network CalWORKS California Work Opportunity and Responsibility to Kids CAER Community Awareness Emergency Response CAO County Administrative Officer or Office CCTA Contra Costa Transportation Authority CCWD Contra Costa Water District CDBG Community Development Block Grant CEQA California Environmental Quality Act CFS Cubic Feet per Second (of water) CPI Consumer Price Index CSA County Service Area CSAC California State Association of Counties CTC California Transportation Commission DCC Delta Counties Coalition DCD Contra Costa County Dept. of Conservation & Development DPC Delta Protection Commission DSC Delta Stewardship Council DWR California Department of Water Resources EBMUD East Bay Municipal Utility District EIR Environmental Impact Report (a state requirement) EIS Environmental Impact Statement (a federal requirement) EPA Environmental Protection Agency FAA Federal Aviation Administration FEMA Federal Emergency Management Agency FTE Full Time Equivalent FY Fiscal Year GHAD Geologic Hazard Abatement District GIS Geographic Information System HBRR Highway Bridge Replacement and Rehabilitation HOT High-Occupancy/Toll HOV High-Occupancy-Vehicle HSD Contra Costa County Health Services Department HUD United States Department of Housing and Urban Development IPM Integrated Pest Management ISO Industrial Safety Ordinance JPA/JEPA Joint (Exercise of) Powers Authority or Agreement Lamorinda Lafayette-Moraga-Orinda Area LAFCo Local Agency Formation Commission LCC League of California Cities LTMS Long-Term Management Strategy MAC Municipal Advisory Council MAF Million Acre Feet (of water) MBE Minority Business Enterprise MOA Memorandum of Agreement MOE Maintenance of Effort MOU Memorandum of Understanding MTC Metropolitan Transportation Commission NACo National Association of Counties NEPA National Environmental Protection Act OES-EOC Office of Emergency Services-Emergency Operations Center PDA Priority Development Area PWD Contra Costa County Public Works Department RCRC Regional Council of Rural Counties RDA Redevelopment Agency or Area RFI Request For Information RFP Request For Proposals RFQ Request For Qualifications SB Senate Bill SBE Small Business Enterprise SR2S Safe Routes to Schools STIP State Transportation Improvement Program SWAT Southwest Area Transportation Committee TRANSPAC Transportation Partnership & Cooperation (Central) TRANSPLAN Transportation Planning Committee (East County) TWIC Transportation, Water and Infrastructure Committee USACE United States Army Corps of Engineers WBE Women-Owned Business Enterprise WCCTAC West Contra Costa Transportation Advisory Committee WETA Water Emergency Transportation Authority WRDA Water Resources Development Act 07-13-20 TWIC Committee Mtg Agenda Packet Page 3 of 250 TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE 3. Meeting Date:07/13/2020   Subject:REVIEW record of meeting for June 8, 2020, Transportation, Water and Infrastructure Meeting. Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE,  Department:Conservation & Development Referral No.: N/A   Referral Name: N/A  Presenter: John Cunningham, DCD Contact: John Cunningham (925)674-7833 Referral History: County Ordinance (Better Government Ordinance 95-6, Article 25-205, [d]) requires that each County Body keep a record of its meetings. Though the record need not be verbatim, it must accurately reflect the agenda and the decisions made in the meeting. Referral Update: Any handouts or printed copies of testimony distributed at the meeting will be attached to this meeting record. Links to the agenda and minutes will be available at the TWI Committee web page: http://www.cccounty.us/4327/Transportation-Water-Infrastructure Recommendation(s)/Next Step(s): Staff recommends approval of the attached Record of Action for the June 8th, 2020, Committee Meeting with any necessary corrections. Fiscal Impact (if any): N/A Attachments 06-08-20 TWIC Sign-In  06-08-20 TWIC Minutes 07-13-20 TWIC Committee Mtg Agenda Packet Page 4 of 250 Signing in is voluntary. You may attend this meeting without signing in. (If front is filled, please use back.) Name Representing Phone EMAIL Mark Watts TWIC/DCD Mark Watts <mark@whstrat.com> Candace Andersen Board of Supervisors candace.andersen@bos.cccounty.us Karen Mitchoff Board of Supervisors karen.mitchoff@bos.cccounty.us Jeff Valeros Public Works <Jeff.Valeros@pw.cccounty.us> Jerry Fahy Public Works <jerry.fahy@pw.cccounty.us> Steve Kowaleski Public Works <steve.kowalewski@pw.cccounty.us> John Cunningham TWIC/DCD <John.Cunningham@dcd.cccounty.us> Colin Piethe DCD <colin.piethe@dcd.cccounty.us > Maureen Toms DCD <maureen.toms@dcd.cccounty.us> Debi Melendres DCD IT <debi.melendres@dcd.cccounty.us> Jamar Stamps DCD <jamar.stamps@dcd.cccounty.us > Dominic Aliano City of Concord dominic.aliano@cityofconcord.org 07-13-20 TWIC Committee Mtg Agenda Packet Page 5 of 250 D R A F T TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE RECORD OF ACTION FOR June 8, 2020   Supervisor Candace Andersen, Chair Supervisor Karen Mitchoff , Vice Chair    Present: Candace Andersen, Chair      Karen Mitchoff, Vice Chair    Staff Present:John Cunningham, DCD/TWIC Staff; Steve Kowalewski, PWD - Deputy Director; Jeff Valeros, PWD Staff; Jerry Fahy, PWD Staff; Maureen Toms, DCD - Deputy Director; Colin Piethe, DCD Staff; Debi Melendres, DCD Staff - IT; Jamar Stamps, DCD Staff; Mark Watts, County Legislative Advocate; Dominic Aliano, District V Staff                   1.Introductions   2.Public comment on any item under the jurisdiction of the Committee and not on this agenda (speakers may be limited to three minutes).   3.Staff recommends approval of the attached Record of Action for the February 10, 2020, Committee Meeting with any necessary corrections.       The Committee unanimously APPROVED the meeting record.   4.RECEIVE staff report and RECOMMEND that the Board of Supervisors authorize the Public Works Director, or designee, to submit grant applications to the State Department of Transportation and the Metropolitan Transportation Commission under the Active Transportation Program.       The Committee unanimously APPROVED the staff recommendation and DIRECTED staff to bring the grant applications with an approval recommendation to the full Board of Supervisors on consent.   5.CONSIDER report on Local, Regional, State, and Federal Transportation Related Legislative Issues and take ACTION as appropriate.       The Committee RECEIVED the report and DIRECTED staff to bring the 07-13-20 TWIC Committee Mtg Agenda Packet Page 6 of 250  The Committee RECEIVED the report and DIRECTED staff to bring the County's micromobility ordinance forward for adoption once it can be made consistent with CCTA's model ordinance, and to develop a letter from the County to MTC re: the Blue Ribbon Transit Recovery Task Force urging the inclusion of accessible transit in the dialog and to coordinate with other County interests in the drafting of the letter.   6.RECEIVE information and DIRECT staff as appropriate.      The Committee RECEIVED communication and news clippings.   7.The next meeting is currently scheduled for July 13, 2020, 9:00 a.m.   8.Adjourn      For Additional Information Contact:  John Cunningham, Committee Staff Phone (925) 674-7833, Fax (925) 674-7250 john.cunningham@dcd.cccounty.us 07-13-20 TWIC Committee Mtg Agenda Packet Page 7 of 250 TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE 4. Meeting Date:07/13/2020   Subject:Capital Road Improvement and Preservation Program (CRIPP) for Fiscal Year 2020/2021 to 2026/2027 Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE,  Department:Conservation & Development Referral No.: 1   Referral Name: Review legislative matters on transportation.  Presenter: Larry Leong, Public Works Department Contact: Larry Leong (925)313-2026 Referral History: The CRIPP is a programming document for the funding of capital road improvement and preservation projects within Contra Costa County. It includes estimated project costs, funding source information, and scheduling information for known potential projects within the next seven fiscal years. It also includes revenue projections and a summary of estimated project-related expenditures for each funding source. The CRIPP was established by Resolution 89/306 under the County Road Improvement Policy (Policy). The Policy was authorized by Government Code Section 66002 and is required under the Growth Management Element of the Contra Costa Transportation and Growth Management Program Ordinance approved by the voters in November 1988 (Measure C-88) and reaffirmed in 2004 with passage of Measure J. Measure J requires that each participating local agency develop a five-year CRIPP. In 1991, the CRIPP was expanded to cover seven years to conform to the Congestion Management Plan, and in 1992 the CRIPP update was changed to a biennial schedule. Approval of the CRIPP by the Board of Supervisors does not automatically approve each individual project listed in the CRIPP. Each project in the CRIPP is subject to a separate public review, engineering feasibility analysis, and environmental assessment before the Board of Supervisors will consider final approval of the project. As this is a planning level document, adoption of the CRIPP will not preclude development and construction of projects that have not been identified. As more information is gathered about a project, the Public Works Department may determine that the project will cost more than originally estimated for reasons not known at this time. In such a case, the Public Works Department will study various alternatives to find a solution to the funding shortfall. The Public Works Department will adjust subsequent CRIPPs to reflect any 07-13-20 TWIC Committee Mtg Agenda Packet Page 8 of 250 changes in project scope or cost. Adopting a CRIPP to guide our capital improvements will do several things for the County: • Increase public awareness of how and where funds will be spent on our road system. • Enhance public trust and increase funding transparency by demonstrating that funds are programmed and expended in accordance with an approved program. • Encourage more public involvement in the programming and expenditure of our capital funds. • Provide accurate “accountability” of whether our transportation system will meet an acceptable level of service to satisfyour growth management policies. • Provide a basis for projecting staffing needs over the next seven years. • Provide a budget tool to track expenditures of each type of funding utilized for capital improvements. Referral Update: The CRIPP provides a generally positive outlook over the next 7-year period as gas taxes have been increased through the 2017 Senate Bill 1. However, as of the publish date of this CRIPP, the immediate effects of the expected economic downturn caused by the COVID-19 pandemic are yet unknown. It is likely that because people are driving significantly less, revenues from gas taxes will be down. One or more active projects identified in this CRIPP may need to be delayed. The Public Works Transportation Engineering Division will continue to actively seek grants to offset the probable decrease in gas tax funding and the overall cost of capital projects in addition to seeking money to finance the unfunded projects listed in the document. Any changes in forecasted revenue and capital project expenditures due to COVID 19 will be reflected in the next CRIPP. During the course of the next 7-years, the County will continue to improve roadway safety through adoption of a Vision Zero Program and the complete streets initiatives where transportation is improved for all four modes of travel: pedestrian, bicycle, transit, and the automobile. The County will continue to innovate in the areas of safety and reliability. Recommendation(s)/Next Step(s): ACCEPT the Capital Road Improvement and Preservation Program (CRIPP) for fiscal year 2020/2021 to 2026/2027 and RECOMMEND the Board of Supervisors fix a public hearing for approval of the CRIPP. Fiscal Impact (if any): No Fiscal Impact. Approval and adoption of the CRIPP will provide a programming document that programs funds for capital road improvement and preservation projects within the County. Preparation of the CRIPP is a requirement of the Growth Management Program and Measure J Funding. Attachments 2020 CRIPP-TWIC version 07-13-20 TWIC Committee Mtg Agenda Packet Page 9 of 250 Capital Road Improvement & Preservation Program (CRIPP) FISCAL YEAR 2020/21 TO FISCAL YEAR 2026/27 255 Glacier Drive Martinez, CA 94553-4897 (925) 313-2000 www.contracosta.ca.gov/227/Public-Works 07-13-20 TWIC Committee Mtg Agenda Packet Page 10 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 11 of 250 EXECUTIVE SUMMARY The Capital Road Improvement & Preservation Program Report (CRIPP) summarizes the County’s road improvement projects for the next seven years (Fiscal Years 2020/21 through 2026/27). The CRIPP is a programming document that is updated every two years to provide a strategy to program projects. The Board of Supervisors adopted the Capital Road Improvement Policy on May 19, 1989 to guide the development and continuation of the Capital Road Improvement & Preservation Program (CRIPP). The first CRIPP was approved by the Board of Supervisors on April 17, 1990. When the Board approves the biennial CRIPP, it does not approve each individual project. The CRIPP often changes during the two-year cycle as each project is conceived, planned evaluated, designed, and ultimately constructed. The CRIPP conforms to the Countywide Congestion Management Plan prepared and administered by the Contra Costa Transportation Authority, which is also a seven- year planning document that is produced biennially. The following is a brief description of the CRIPP contents. Section I provides an introduction and background of the Capital Road Improvement & Preservation Program and how it relates to the overall County Road Program. Section II includes summary tables of the revenue and expenditure forecasts for the Capital Road Projects followed by a listing of each primary Capital Road Project funding source over the next seven years by and its related active project expenditures. Section III displays projects by Supervisor District with a detailed description of the active projects identified in Section II. The information provided for each active project includes a map and anticipated expenditure plan. Projects that are proposed but are not funded are listed in this section by Supervisor District as “unfunded” projects. The appendices include the County road improvement policies, CRIPP related Board Documents and Resolutions, Area of Benefit project lists, and the Senate Bill 1 (SB1) -Road Maintenance Rehabilitation Act Resolution and project list. The CRIPP provides a generally positive outlook over the next 7-year period as gas taxes have been increased through Senate Bill 1. However, as of the publish date of this CRIPP, the immediate effects of the expected economic downturn caused by the COVID-19 pandemic are yet unknown. It is likely that because people are driving significantly less, revenues from gas taxes will be down. One or more projects identified in this CRIPP may need to be postponed. The Public Works Transportation Engineering Division will continue to actively seek grants to offset the probable decrease in gas tax funding and the overall cost of capital projects in addition to seeking money to finance the unfunded projects listed in the document. During the course of the next CRIPP, the County will continue to improve roadway safety through adoption of a Vision Zero Program and the complete streets initiatives where transportation is improved for all four modes of travel: pedestrian, bicycle, transit, and the automobile. The County will continue to innovate in the areas of safety and reliability. 07-13-20 TWIC Committee Mtg Agenda Packet Page 12 of 250 Page # 1. Introduction to the 2020 CRIPP 7 2. History of the CRIPP 8 3. The County Road Program 8 Figure 1: Average Annual County Road Program Budget Percentage 10 4. The Capital Road Program 10 Figure 2: Gax Tax Percentage Allocation 11 5. CRIPP Future Outlook 13 6. Project Highlights 17 Page # 1. Projected Annual Revenue Summary - Table A 23 2. Estimated Annual Expenditures Summary - Table B 23 3. Funding Source Descriptions & Tables 26-38 Page # Introduction 41 County-Wide Projects Bridge Preventative Maintenance Projects 54 County-Wide Curb Ramp Projects 55 County-Wide Guardrail Upgrade Project 56 Pavement Surface Treatments 57 Projects By Supervisor District Supervisor District I Projects 59 Map 60 Active Project Descriptions 61 Active Project Data Sheets 62-71 Unfunded Project Descriptions 72-75 Supervisor District II Projects 77 Map 78 Active Project Descriptions 79 Active Project Data Sheets 82-95 Unfunded Project Descriptions 96-98 Supervisor District III Projects 99 Map 100 Active Project Descriptions 101 Active Project Data Sheets 104-117 Unfunded Project Descriptions 118-123 Supervisor District IV Projects 125 Map 126 Active Project Descriptions 127 Active Project Data Sheets 128-137 Unfunded Project Descriptions 138-140 Supervisor District V Projects 141 Map 142 Active Project Descriptions 143 Active Project Data Sheets 146-173 Unfunded Project Descriptions 174-178 Section III: Capital Road Projects by Countywide and Supervisor Districts CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM Table of Contents Section I: Introduction Section II: CRIPP - Funding Sources 07-13-20 TWIC Committee Mtg Agenda Packet Page 13 of 250 CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM Table of Contents Complete List of Active Projects in Alphabetical Order Page # Alhambra Valley Road Embankment Repair Site 1 - West of Castro Ranch Road 62 Alhambra Valley Road Embankment Repair – 0.4 miles west of Bear Creek Road 64, 146 Alhambra Valley Road Storm Repair Project - Ferndale Site 148 Bailey Road/State Route 4 Interchange Improvements 150 Bay Point Utility Undergrounding Project 152 Bear Creek Road - Road Embankment Repair 66, 154 Bel Air Trail Crossing Safety Improvements 156 Bridge Preventative Maintenance Program 54 Byron Highway / Byer Road Safety Improvements 104 Byron Highway Bridge Replacement over California Aqueduct (Bridge No. 28C0121)106 Camino Tassajara Safety Improvements -Windemere Parkway to Alameda County Line 108 Crockett Area Guardrail Upgrades 158 County-Wide Curb Ramp Projects 55 County-Wide Guardrail Upgrades Project 56 Danville Boulevard/Orchard Court Complete Streets Improvements (AOB)82 Fred Jackson Way First Mile/Last Mile Connection Project 68 Freeman Road and Briones Valley Road Bridge Maintenance Project 84, 110 Happy Valley road Embankment Repair 86 Imhoff Drive Bicycle Shoulder Restriping 160 Kirker Pass Road Northbound Truck Climbing Lane 128, 162 Kirker Pass Road Safety Improvements 164 Marsh Creek Road Bridge Replacement (Bridge No. 28C0143 & 28C0145)112 Marsh Drive Bridge Project 130, 166 Norris Canyon Road Safety Improvements -- west of Ashbourne Drive 88 Oak Road Bikeway Project -- Treat Boulevard to City of Pleasant Hill 132 Pavement Surface Treatments 57 Pinehurst Road - Sinkhole and Culvert Repair 90 Pleasant Hill Road Bridge Rehabilitation 168 Rodeo Downtown Infrastructure Improvements 170 Rodeo Pedestian Enhancement Project - 6th and 7th Streets 172 San Pablo Dam Road Traffic Safety Improvements 70 Treat Boulevard Corridor Improvements 92, 134 Vasco Road Safety Improvements (Phase 2)114 Walnut Boulevard Shoulder Widening 116 Walnut Creek Crosswalk Improvements - Bridgefield Road and Walden Road 94, 136 07-13-20 TWIC Committee Mtg Agenda Packet Page 14 of 250 CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM Table of Contents Page # A-1 B-1 C-1 D-1 E-1 F-1 G-1Appendix G: Complete Streets Policy Appendix F: Road Maintenance and Rehabilitation Account (RMRA) Appendix A: Acronyms used in the CRIPP Appendix C: Guidelines For Expenditure of Gas Tax Revenue Appendix D: Board Order Approving the 2020 CRIPP and TWIC Report (pending) Appendix E: Area of Benefit Maps and Project Lists Appendices Appendix B: County Road Improvement Policy 07-13-20 TWIC Committee Mtg Agenda Packet Page 15 of 250 COUNTY OF CONTRA COSTA DISCLAIMER OF LIABILITY AND WARRANTIES USER UNDERSTANDS AND AGREES THAT IT IS QUITE POSSIBLE THAT ERRORS AND OMISSIONS WILL OCCUR IN DATA INPUT AND/OR PROGRAMMING DONE BY COUNTY TO PROVIDE THE DATA IN THE FORM DESIRED, AND USER FURTHER UNDERSTANDS AND AGREES THAT IT IS HIGHLY PROBABLE THAT ERRORS AND OMISSIONS WILL OCCUR IN ANY RECORD KEEPING PROCESS, ESPECIALLY WHEN LARGE NUMBERS OF RECORDS ARE DEVELOPED AND MAINTAINED, AND THAT THE DATA MAY NOT MEET USER’S STANDARDS AS TO ACCURACY OR COMPLETENESS; NOTWITH- STANDING, USER AGREES TO TAKE THE DATA “AS IS,” FULLY EXPECTING THAT THERE MAY WELL BE ERRORS AND OMISSIONS IN THE DATA OBTAINED FROM COUNTY. USER FURTHER UNDERSTANDS AND AGREES THAT COUNTY MAKES ABSOLUTELY NO WARRANTY WHATSOEVER, WHETHER EXPRESSED OR IMPLIED, AS TO THE ACCURACY, THOROUGHNESS, VALUE, QUALITY, VALIDITY, MERCHANTABILITY, SUITABILITY, CONDITION, OR FITNESS FOR A PARTICULAR PURPOSE OF THE DATA OR ANY PROGRAMMING USED TO OBTAIN THE DATA, NOR AS TO WHETHER THE DATA IS ERROR-FREE, UP-TO-DATE, COMPLETE OR BASED UPON ACCURATE OR MEANINGFUL FACTS. USER FURTHER UNDERSTANDS AND AGREES THAT IT FOREVER WAIVES ANY AND ALL RIGHTS, CLAIMS, CAUSES OF ACTION OR OTHER RECOURSE THAT IT MIGHT OTHERWISE HAVE AGAINST COUNTY FOR ANY INJURY OR DAMAGE OF ANY TYPE, WHETHER DIRECT, INDIRECT, INCIDENTAL, CONSEQUENTIAL OR OTHERWISE, RESULTING FROM ANY ERROR OR OMISSION IN DATA OR IN ANY PROGRAMMING USED TO OBTAIN THE DATA, OR IN ANY MANNER ARISING OUT OF OR RELATED TO THIS AGREEMENT OR THE DATA PROVIDED HEREUNDER. USER AGREES THAT COUNTY SHALL NOT BE LIABLE TO USER FOR ANY LIABILITY, CLAIM, LOSS, DAMAGE, INJURY OR EXPENSE OF ANY KIND CAUSED OR ALLEGED TO BE CAUSED, DIRECTLY OR INDIRECTLY, BY THE INADEQUACY OF ANY CMS OR GIS DATA OR ANY OTHER DEFICIENCY OF THE SYSTEMS, BY ANY DELAY OR FAILURE TO PROVIDE ANY SERVICE, OR BY ANY OTHER INTERRUPTION, DISRUPTION OR LOSS OF USER OPERATIONS. USER AGREES THAT IT WILL, IRRESPECTIVE OF ANY ALLEGED LIABILITY, CLAIM, LOSS, INJURY, DAMAGE OR EXPENSE CONTINUE TO PAY ALL CHARGES IN THE AMOUNTS STATED HEREIN UNTIL THIS AGREEMENT IS PROPERLY TERMINATED IN ACCORDANCE WITH ITS TERMS. NOTE: “THIS DATA CONTAINS COPYRIGHTED INFORMATION OF THE COUNTY OF CONTRA COSTA” 07-13-20 TWIC Committee Mtg Agenda Packet Page 16 of 250 SECTION I Introduction 07-13-20 TWIC Committee Mtg Agenda Packet Page 17 of 250 1. INTRODUCTION TO THE 2020 CRIPP This Capital Road Improvement & Preservation Program (CRIPP) publication is a programming document for the funding of capital road improvement projects within unincorporated Contra Costa County. Pursuant to the County Road Improvement Policy, this 2020 CRIPP schedules capital road improvement projects for fiscal years 2020/2021 through 2026/2027 and balances the estimated project costs with the projected revenues. Actual costs for Fiscal Year 2019/2020 data have been included to provide information on current fiscal year revenues and expenditures. The CRIPP is used by the Public Works Director and staff to communicate upcoming capital road improvement projects. Section II describes the various funding sources for road projects, revenue projections and a summary of estimated project-related expenditures. For fully funded projects that are proposed to be constructed within the next seven fiscal years, estimated project costs, funding source information, and scheduling information are provided in Section III on detailed project sheets. Section III is also subdivided into Countywide area and Supervisor District. Projects covering more than one Supervisor District will be shown in their respective districts. Unfunded projects are listed after the project data sheets for each Supervisor District. In addition to fully funded transportation capital projects, the CRIPP also includes a forecast of the budget to be spent on roadway preservation. Each year, selected roads throughout unincorporated Contra Costa County receive a surface treatment between June and October. The County Public Works Department has found that preventive maintenance using surface treatments is the most cost-effective way to extend the useful life of the County’s road network. Approval of the CRIPP by the Board of Supervisors does not automatically approve each individual project listed in the CRIPP. Each project in the CRIPP is subject to a separate public environmental review, engineering feasibility analysis, and environmental assessment. Also, each project is evaluated to be consistent with County policies, design guidelines, and regional planning documents, and other policies as may be adopted by the County where feasible. As each project is scoped and funding is sought, each project is assessed for opportunities for cost effectiveness, safety, reliability and sustainability. Since the CRIPP is a planning document, the details of each project are considered prior to the Board of Supervisors approval of each capital project just before construction. Some projects may have cost increases and scope changes once these elements are evaluated in more detail. As information is gathered about each project, the Public Works Department may determine that the project will cost more than originally estimated for reasons not known at the time the CRIPP is published. In such cases, the Public Works Department will study various alternatives to find a solution to address the funding shortfall or by identifying other funding sources. The Public Works Department will then adjust subsequent CRIPPs to reflect any changes in project scope or cost. 07-13-20 TWIC Committee Mtg Agenda Packet Page 18 of 250 2. HISTORY OF THE CRIPP The CRIPP was established by Resolution 89/306 under the County Road Improvement Policy (attached as Appendix A). The Policy was authorized by Government Code Section 66002 and is required under the Growth Management Element of the Contra Costa Transportation and Growth Management Program approved by the voters in November 1988. This element was approved again in 2004 when Measure J, the half cent sales tax increase to fund transporation projects, was approved. Measure J funding, including the growth management program, is administerd by the Contra Costa Transporation Authority. In order to receive its share of funds from Measure J, all agencies are required by CCTA to develop and maintain a five-year CRIPP to meet and/or preserve traffic service and performance standards. In 1991, the CRIPP was expanded to cover seven years to conform to the Congestion Management Plan, and in 1992 the CRIPP update was changed to a biennial schedule. 3. THE COUNTY ROAD PROGRAM The following pages describe the principal elements and activities of the County Road Program, and how the County Road Program budget is allocated.  The Capital Road Program is the primary focus of this CRIPP document. The capital road program contains projects that have been scoped and included as part of the budget with a complete funding plan. Projects include safety improvements, active transportation improvements (such as bicycle and pedestrian-focused projects), pavement preservation and emergency repair projects in response to natural disasters.  Roadway Maintenance ensures that the existing roadway system remains safe and convenient for public travel in a variety of modes: driving, walking and bicycling. Significant funding for the road program goes to public roadway maintenance and repair for the approximately 660 miles of the roadway network in the unincorporated areas of Contra Costa County maintained by the Public Works Department. Some of the types of work include the following: o Repair failed pavement and road shoulders o Repair road slides o Install traffic signs and striping o Repair and replace guardrails o Install and repair culverts and storm drain pipe o Remove debris from the public road right of way 07-13-20 TWIC Committee Mtg Agenda Packet Page 19 of 250  Traffic-related activities typically include the responsibility for traffic control devices on County roadway and activities such as the following: o Review plans for construction projects proposed in the County o Coordinate with California Highway Patrol and other Law Enforcement Agencies in regards to traffic enforcement on County Roadways o Respond to residents regarding traffic complaints and concerns o Investigate collision reports on County roads o Identify locations with recurring or high collision rates o Conduct Engineering and Traffic Surveys on major roadways to establish speed limits o Ensure necessary roadway signing, striping, and pavement markings are in place on County roadways  Transportation planning activities include the following activities: o Developing and implementing capital improvements, maintenance projects, bicycle and pedestrian projects, and neighborhood traffic management plans, o Advanced planning for the County’s transportation system o Developing long-term strategic plans to implement the circulation element of the County General Plan o Developing and updating the seven year CRIPP, seeking funding opportunities to support public works road related activities (e.g., traffic mitigation fee program, grant program) o Working with the Engineering Services Division and Community Development to review and comment on development projects’ impacts to the County’s road network, o Working with the Board of Supervisors, community and other jurisdictions to resolve transportation/traffic concerns o Coordinating with state, regional, and other local governments on major roadway projects important to the region (e.g. State Route 4 Bypass) The average annual total budget for the County road program is $62.1 million for the period FY17/18 to FY22/23. This six-year period includes actual expenses for the past 3 years and a projection of future expenditures for the next 3 years. The average annual Capital Road Program budget accounts for approximately 42% of the total road program budget for this same six-year period (see Figure 1). The average annual budget for Maintenance activities is approximately 48% of the road program budget. Lastly, Traffic Engineering and Transportation Planning activities are 1% and 9% of the program, respectively. 07-13-20 TWIC Committee Mtg Agenda Packet Page 20 of 250 Figure 1: Average Annual County Road Program Budget Percentage (FY 17/18 to FY 22/23) 4. THE CAPITAL ROAD PROGRAM The Capital Road Program contains projects that have been scoped and included as part of the budget with a complete funding plan. Projects include safety improvements, active transportation improvements (such as bicycle and pedestrian-focused projects), pavement preservation and emergency repair projects in response to natural disasters. Capital Road Program projects are funded by a variety of local, state and federal funding sources as discussed in Section II of this CRIPP. Examples of Federal grants include the Active Transporation Plan (ATP) and Highway Safety Improvement Plan (HSIP). Grants may be offered through the State level with Caltrans Local Assistance or through the Regional level with from the Bay Area Metropolitan Transporation Commission (MTC). Local funds include developer fees collected through the Area of Benefit (AOB) program and Measure J funds from the countywide quarter cent increase in sales tax . Additional information on funding sources and grants can be found in Section II of this CRIPP. The primary and most critical funding source for all roadway capital projects is gas tax as discussed below. Road Maintenance 42% Capital Road Improvements 48% Traffic Related Activites 1% Transportation Planning Activities 9% Road Maintenance Capital Road Improvements Traffic Related Activities Transportation Planning Activities 07-13-20 TWIC Committee Mtg Agenda Packet Page 21 of 250 A. IMPORTANCE OF GAS TAX The County uses the majority of the Gas Tax funds for road operation and maintenance, but the next most significant portion is used for capital projects. Gas tax funds are also the main source of funding for traffic and transportation planning activities. (Figure 2 shows how the gas tax is distributed between these four categories.) Figure 2: Gas Tax Percentage Allocation (FY 17/18 to FY 22/23) Gas Taxes as Leverage for State and Federal Grant Programs Gas tax is the primary source for the required local match necessary to go after state and federal grants for capital projects. Without it the County would miss an opportunity to obtain additional outside funding to help construct much needed safety, maintenance, and multi-modal transportation improvements. Gas taxes also fund staff time to prepare the actual grant application. Last year for every $1 dollar spent on staff time to prepare grant applications, the County was able to get about $9 dollars in return. This resulted in successfully securing $4,449,000 at a cost of $498,900. There are currently 26 active projects that are grant funded in the amount of $66 million with a $24.1 million gas tax match. Road Maintenance 73% Capital Road Improvements 21% Traffic Related Activites 2% Transportation Planning Activities 10% Road Maintenance Capital Road Improvements Traffic Related Activities Transportation Planning Activities 07-13-20 TWIC Committee Mtg Agenda Packet Page 22 of 250 Gas Tax Update: Excise Taxes and Senate Bill 1 Gas Tax Funds come from the Gas Excise Tax which is based on the number of gallons of gasoline sold. The County has seen a slight increase in the Gas Excise Tax over the past several years because the number of gallons overall has increased but this increase is tempered by the use of more fuel-efficient cars and electric vehicles. Despite this increase and prior to Senate Bill 1 (SB1) described below, the amount of gas tax that the County received was not sufficient to fund ongoing maintenance and repair of roadways in the unincorporated areas. To address the need for additional local road funds for cities and counties throughout the State, the Governor signed SB1 in 2017. SB 1, is also known as the Road Repair and Accountability Act (RRAA) of 2017. SB1 provides much needed transportation funding for California to address basic road maintenance, rehabilitation, and critical safety needs on both the state highway and local streets and road system. The California State Association of Counties (CSAC) annually provides an estimate of the yearly revenues generated from this transportation bill. As of the publish date of the CRIPP, the economic impacts of the COVID 19 virus are not yet known and the estimates below do not yet reflect the expected decline in gas tax revenue. CSAC has estimated the County will receive a a total estimated amount of $41million in gas tax revenue for FY19/20 with approximately $16 million from the Road Maintenance and Rehabilitation Account (RMRA) program under SB1. Total gas tax revenues in FY20/21 are estimated to be $41.7 million, of which the RMRA portion is $16.4 million. Gas tax revenue to Cities and Counties will steadily grow in future years due to the built-in inflationary index. SB1 emphasizes the importance of accountability and transparency in the delivery of California’s transportation programs. Therefore, in order to be eligible for RMRA funding, state statute requires cities and counties to provide basic RMRA project reporting to the California Transportation Commission (Commission), which the Public Works Department does on an annual basis. Prior to receiving an apportionment of RMRA funds from the State Controller in a fiscal year, a city or county must submit to the Commission a list of projects proposed to be funded with these funds. All projects proposed to receive funding must be included in a city or county budget that is adopted by the applicable city council or county board of supervisors at a regular public meeting. The list of projects must include a description and location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement. The project list does not limit the flexibility of an eligible city or county to fund projects in accordance with local needs and priorities so long as the projects are consistent with RMRA priorities. Some example projects and uses for RMRA funding include, but are not limited to the following:  Road Maintenance and Rehabilitation  Safety Projects  Railroad Grade Separations 07-13-20 TWIC Committee Mtg Agenda Packet Page 23 of 250  Complete Streets Components (including active transportation purposes, pedestrian and bicycle safety projects, transit facilities, and drainage and stormwater capture projects in conjunction with any other allowable project)  Traffic Control Devices The County Board of Supervisors adopted a list of projects to be funded with RMRA funds for the FY20/21 on April 28,2020 (See Appendix E). It should be noted that this project list is a small subset of the proposed project delivery list that is outlined in the CRIPP and only focuses on how the RMRA funds will be expended as required by the Commission. 5. CRIPP FUTURE OUTLOOK A. DIFFERENCES IN PROGRAMMING OF EARLIER YEARS VERSUS LATER YEARS The years at the beginning of the period covered by this program have more projects programmed than in later years. Additional funding will need to be sought in the later years to offset transportation needs. For example, the funds needed for maintenance activities continue to increase as more infrastructure is built, the construction costs rise, new regulatory standards are adopted, and additional maintenance activities beyond the scope of regular maintenance work are needed. In addition, projects may have unexpected cost increases and/or project scope changes, therefore, the CRIPP will change as more is learned more about each project. As transportation issues arise, new projects will be programmed in response to these issues and supplemental funding (such as grants) will be sought to balance the new project costs. These changes will be reflected in future CRIPP publications. B. SEVEN YEAR OUTLOOK 1.) Revenues The CRIPP provides a generally positive outlook over the next 7-year period, however, the immediate effects of the expected economic downturn caused by the COVID-19 pandemic are yet unknown. It is likely that because people are driving significantly less, revenues from gas taxes will be down. One or more projects identified in this CRIPP may need to be postponed. The Public Works Transportation Engineering Division will continue to actively seek grants to offset the probable decrease in gas tax funding and the overall cost of capital projects in addition to seeking money to finance the unfunded projects listed in the document. 07-13-20 TWIC Committee Mtg Agenda Packet Page 24 of 250 2.) Complete Streets Figure 3: Typical Complete Streets Concept from bouldercolorado.gov In 2016, the County Board of Supervisors adopted the Complete Streets Policy to ensure that Complete Streets infrastructure was incorporated, wherever feasible and as opportunities were presented into Capital Projects developed and constructed by the Public Works Department. The Complete Streets concept is to provide safe, comfortable, and convenient travel along and across public rights-of-way (including streets, roads, highways, bridges, paths, and other portions of the County’s transportation system) through a comprehensive integrated transportation network that serves all categories of users, including pedestrians, bicyclist, persons with disabilities, motorists, movers of commercial goods, users and operators of public transportation, seniors, children, youth, students, and families. Complete Streets is a design approach that requires roadways to be planned, designed, operated, and maintained to enable safe, convenient and comfortable travel and access for users of all ages and abilities, regardless of their mode of transportation. In the past, significant resources went to developing projects that solely benefitted motorists by increasing capacity and resulting in greater vehicular speeds. In recent years, there has been more sensitivity toward the other modes of travel. The challenge for Public Works Department is to determine which roads are suitable for Complete Streets and achieve a balance between right- of-way and utility impacts, and the responsibility of managing project budget to construct the additional improvements while anticipating and projecting future maintenance costs associated with added pavement widths, streetscapes, and landscaping. 07-13-20 TWIC Committee Mtg Agenda Packet Page 25 of 250 3.) Vision Zero The County is looking ahead to adopt a Vision Zero program. Vision Zero is a shift in the way we think of injury and deaths on our roadways systems. Instead of thinking of them an inevitable, no collision that results in death or serious injury is considered acceptable. Vision Zero is used to identify the six “E’s”: education, encouragement, engineering, enforcement, emergency services, and evaluation that will make the roadways safer. Rather than focus all efforts in reaction to a single collision, the Vision Zero concept takes a holistic approach to proactively educate users through public service campaigns and targeted enforcement. Vision Zero requires agencies to rethink how and where to devote limited resources towards the end goal of saving lives and pain from injury on its roadway network. Figure 4: County Roadways are patrolled by CHP. Collision reports produced by CHP on County roads provides a data source for our Traffic Section to regularly review potential “hot spots”; and propose potential countermeasures to reduce collision rates. 07-13-20 TWIC Committee Mtg Agenda Packet Page 26 of 250 4.) Improving Water Quality The County is looking to incorporate Green Infrastructure into future road improvement projects to comply with the State of California Regional Water Quality Control Board Municipal Regional Permit, which also represents a new challenge facing the County as it creates additional demand on the budget. The County will be considering more features such as bioretention basins and trash capture devices to improve the water quality of urban runoff into the Bay from the public road right of way. Funding for these features must be idenfied as it often relates to an increase in construction cost, as additional environmental impacts and more right-of-way may be needed, as well as an increase in annual maintenance costs. Figure 5: Sample Bioretention Basin Project to support our Green Infrastructure Policy 07-13-20 TWIC Committee Mtg Agenda Packet Page 27 of 250 6. PROJECT HIGHLIGHTS Over the past two years, since the publication of the last CRIPP, the County has constructed a variety of projects ranging from safety improvements, active transportation improvements (such as bicycle and pedestrian-focused projects), to emergency repair projects. Examples of these types of projects are described below. A. Pacheco Boulevard Sidewalk Gap Closure Phase III Project (Bike/Ped Project Gap Closure) Figure 6: Without a continuous path, pedestrains walked in the roadway shoulder This project on Pacheco Boulevard in Pacheco was envisioned to increase connectivity for pedestrians and bicyclists over Vine Hill Creek along the Pacheco Boulevard corridor adjacent to Las Juntas Elementary School. This project is part of a series of sidewalk gap closure projects along the Pacheco Boulevard corridor. This segment is important due to its proximity to Las Juntas Elementary School and sensitivity to a creek crossing. Surveys from parents and school administrators advocating for the project indicated that they wanted to improve safety for students walking to school. The project was funded by an Active Transportation Program (ATP) federal grant, the Martinez Area of Benefit (AOB), Measure J, and gas taxes. The Public Works Department Design- Construction Division engineered, advertised, and in 2018, completed the project. The project has been well-received by the users of the new sidewalk. Figure 7: Post-construction image of the new sidewalk/culvert extension 07-13-20 TWIC Committee Mtg Agenda Packet Page 28 of 250 B. Rio Vista Pedestrian Connection Project (Ped Project/Water Quality Treatment) The Rio Vista Pedestrian Connection Project closed a sidewalk gap on the north side of Pacifica Avenue, across from Rio Vista Elementary School, Bay Point, and brought an existing bike lane up to standard to improve the pedestrian and bicycle infrastructure in the area. The concern that initiated this project was potential risks due to traffic congestion and the large number of students that converge on Pacifica Avenue during drop-off and pick-up times. The community-based public participation process for this project consisted of meetings with the individual school principals and the staff at the Mt. Diablo Unified School District. District 5 spearheaded this effort and was grant funded. The project was funded by an Active Transportation Program (ATP) federal grant, Bay Point Area of Benefit (AOB), and gas taxes. The project was designed in-house by the Public Works Department Design-Construction Division. The project was constructed in 2018 and included pervious concrete sidewalk as part of the County’s Green Infrastructure. The purpose of the permeable concrete is to help clean the storm water before it drains into a public drainage system and ultimately into the Bay. Figure 8: Pre-Construction Image of Pacific Avenue (above) Figure 9: Post-Construction Image with bike lanes and new sidewalk with permeable concrete 07-13-20 TWIC Committee Mtg Agenda Packet Page 29 of 250 C. Emergency Projects: Morgan Territory Road Slide Repair and Alhambra Valley Road Slide Repair In between the publication of the last CRIPP, two large-scale emergency projects occurred. The first was the Morgan Territory Slide repair that resulted in a stabilization of a road that was sliding. The second was the Alhambra Valley Road Washout project that resulted in the construction of a new bridge over Pinole Creek Both projects. Both projects used gas taxes to get started and to apply for emergency funding. Each project had to go through the environmental process (CEQA) and coordinate with regulatory agencies. Although they were each designed by consultants, the Design-Construction Division oversaw the work to ensure it met County standards. These sorts of projects would normally take five or more years to program, design, and build, but due to their emergency nature and the high importance of returning public access, these bridge projects were designed and constructed in less than two years from the time of the storm event. This means that the projects were “active projects” that were never shown in the seven year CRIPP because they occurred between publications. Figure 11: Washout of Alhambra Valley Road in West County Figure 10: Post Construction Image of Alhambra Valley Road Figure 13: Resident surveying the Morgan Territory Washout in Central County Figure 12: Post Construction – Community Opening Ceremony 07-13-20 TWIC Committee Mtg Agenda Packet Page 30 of 250 SECTION II Funding Sources 07-13-20 TWIC Committee Mtg Agenda Packet Page 31 of 250 CAPITAL ROAD IMPROVEMENT & PRESERVATION PROGRAM – FUNDING SOURCES 1. PROJECTED ANNUAL REVENUE SUMMARY Table A, on page 24, is a summary of future revenue based on historical trends and current AOB development applications for the Capital Road Program. Part I of Table A is a summary of the primary funding sources for the capital road program including an estimate of gas tax revenues, Measure J Return to Source Funds and Area of Benefit programs. Other funding sources such as state match program funds and federal funds are based on actual amounts the County is expected to receive for the various road projects in the program. Continued efforts to secure grants and maintain cooperative relationships with other public agencies will allow the County to make the best use of its financial resources for capital improvement projects. Part II of Table A represents an estimate of the individual funding sources from the Area of Benefit (AOB) program. The rate at which AOB revenue is generated is tied to the land development rate. Future AOB revenue is expected to increase at a steady pace. Part III of Table A represents the funding sources from the County Trust Funds. Funds held in County Trust Funds are only shown in the CRIPP if they are proposed to be used on specific projects within the CRIPP time period. 2. ESTIMATED ANNUAL EXPENDITURES SUMMARY Table B, on page 25, is an estimate of the future expenditures for each funding source. This table is based on the costs of the active projects within each funding source, and the expected expenditures for that funding source. If the revenues in Table A fall short of expectations, the expenditures in Table B will have to be adjusted accordingly. 07-13-20 TWIC Committee Mtg Agenda Packet Page 32 of 250 Program Element End of FY Balance FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total Revenue Gas Tax Funds $ 0 $ 5,551 $ 7,735 $ 13,586 $ 17,000 $ 18,000 $ 19,000 $ 20,000 $ 21,000 $ 121,872 State Match Funds $ 1,850 $ 1,721 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 2,421 Measure J Return to Source $ 3,000 $ 1,353 $ 1,440 $ 400 $ 400 $ 400 $ 400 $ 400 $ 400 $ 5,193 Total of all Areas of Benefit (AOB) Funds $ 18,896 $ 1,037 $ 1,482 $ 1,482 $ 1,482 $ 1,482 $ 1,482 $ 1,482 $ 1,482 $ 11,411 Total County Trust Funds $ 12,661 $ 47 $ 47 $ 47 $ 47 $ 47 $ 47 $ 0 $ 0 $ 282 Federal, State, and Other Regional Grant Funds $ 0 $ 9,176 $ 12,365 $ 25,908 $ 20,867 $ 9,549 $ 2,077 $ 0 $ 0 $ 79,942 Measure J Regional $ 0 $ 4,978 $ 707 $ 110 $ 819 $ 0 $ 0 $ 0 $ 0 $ 6,614 Other Local Funds $ 0 $ 1,432 $ 1,477 $ 8,696 $ 9,786 $ 9,926 $ 304 $ 0 $ 0 $ 31,621 Total $ 36,407 $ 25,294 $ 25,353 $ 50,329 $ 50,501 $ 39,504 $ 23,410 $ 21,982 $ 22,982 $ 259,355 Alamo AOB $ 1,005 $ 50 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 750 Bay Point AOB $ 1,680 $ 20 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 720 Bethel Island AOB $ 305 $ 1 $ 10 $ 10 $ 10 $ 10 $ 10 $ 10 $ 10 $ 71 Briones AOB $ 530 $ 8 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 $ 15 Central County AOB $ 3,521 $ 200 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 900 Discovery Bay AOB $ 34 $ 25 $ 50 $ 50 $ 50 $ 50 $ 50 $ 50 $ 50 $ 375 East County (Regional) AOB $ 4,571 $ 400 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 4,600 Hercules/Rodeo/ Crockett AOB $ 12 $ 3 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1 $ 10 Martinez AOB $ 2,498 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 800 North Richmond AOB $ 2,157 $ 60 $ 200 $ 200 $ 200 $ 200 $ 200 $ 200 $ 200 $ 1,460 Pacheco (West Concord) AOB $ 433 $ 7 $ 5 $ 5 $ 5 $ 5 $ 5 $ 5 $ 5 $ 42 Richmond/El Sobrante AOB $ 379 $ 2 $ 25 $ 25 $ 25 $ 25 $ 25 $ 25 $ 25 $ 177 South County AOB $ 2,789 $ 100 $ 150 $ 150 $ 150 $ 150 $ 150 $ 150 $ 150 $ 1,150 South Walnut Creek AOB $ 163 $ 1 $ 30 $ 30 $ 30 $ 30 $ 30 $ 30 $ 30 $ 211 West County AOB $ 104 $ 60 $ 10 $ 10 $ 10 $ 10 $ 10 $ 10 $ 10 $ 130 Subtotal $ 20,181 $ 1,037 $ 1,482 $ 1,482 $ 1,482 $ 1,482 $ 1,482 $ 1,482 $ 1,482 $ 11,411 Discovery Bay West Mitigation Funds $ 4,187 $ 20 $ 20 $ 20 $ 20 $ 20 $ 20 $ 0 $ 0 $ 120 Keller Canyon Landfill Mitigation Funds $ 2,490 $ 27 $ 27 $ 27 $ 27 $ 27 $ 27 $ 0 $ 0 $ 162 Navy Mitigation Funds $ 5,403 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Subtotal $ 12,080 $ 47 $ 47 $ 47 $ 47 $ 47 $ 47 $ 0 $ 0 $ 282 PART III: Itemization of County Trust Fund Revenues PART II: Itemization of Area of Benefit Revenues (All values shown in thousands of dollars) PART I: Revenues from all County Sources Table A: Summary of Projected Annual Revenues for Capital Projects and Pavement Surface Treatments 07-13-20 TWIC Committee Mtg Agenda Packet Page 33 of 250 Program Element FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Expenditures Gas Tax Funds $ 5,551 $ 7,735 $ 13,586 $ 15,770 $ 13,622 $ 13,384 $ 14,000 $ 15,000 $ 98,648 State Match Funds $ 1,721 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 1,721 Measure J Return to Source $ 1,353 $ 1,440 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 2,793 Total of all Areas of Benefit (AOB) Funds $ 484 $ 1,227 $ 1,947 $ 60 $ 0 $ 0 $ 0 $ 0 $ 3,717 Total County Trust Funds $ 639 $ 504 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 1,143 Federal, State, and Other Regional Grant Funds $ 9,176 $ 12,365 $ 25,908 $ 20,867 $ 9,549 $ 2,077 $ 0 $ 0 $ 79,942 Measure J Regional $ 4,978 $ 707 $ 110 $ 819 $ 0 $ 0 $ 0 $ 0 $ 6,614 Other Local Funds $ 1,432 $ 1,477 $ 8,696 $ 9,786 $ 9,926 $ 304 $ 0 $ 0 $ 31,621 Total $ 25,332 $ 25,456 $ 50,246 $ 47,302 $ 33,097 $ 15,765 $ 14,000 $ 15,000 $ 226,199 Alamo AOB $ 0 $ 0 $ 0 $ 0 $ 0 $ 250 $ 250 $ 250 $ 750 Bay Point AOB $ 0 $ 0 $ 0 $ 200 $ 200 $ 500 $ 0 $ 0 $ 900 Bethel Island AOB $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Briones AOB $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Central County AOB $ 0 $ 0 $ 100 $ 200 $ 200 $ 1,500 $ 0 $ 0 $ 2,000 Discovery Bay AOB $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 East County (Regional) AOB $ 350 $ 1,104 $ 0 $ 0 $ 0 $ 100 $ 200 $ 500 $ 2,254 Hercules/Rodeo/ Crockett AOB $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Martinez AOB $ 0 $ 0 $ 0 $ 0 $ 100 $ 200 $ 300 $ 0 $ 600 North Richmond AOB $ 134 $ 123 $ 0 $ 100 $ 200 $ 500 $ 0 $ 0 $ 1,057 Pacheco (West Concord) AOB $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Richmond/El Sobrante AOB $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 South County AOB $ 0 $ 0 $ 1,947 $ 60 $ 0 $ 0 $ 0 $ 0 $ 2,007 South Walnut Creek AOB $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 West County AOB $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Subtotal $ 484 $ 1,227 $ 2,047 $ 560 $ 700 $ 3,050 $ 750 $ 750 $ 9,567 Discovery Bay West Mitigation Funds $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Keller Canyon Landfill Mitigation Funds $ 126 $ 504 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 630 Navy Mitigation Funds $ 513 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 513 Subtotal $ 639 $ 504 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 1,143 PART III: Itemization of County Trust Fund Expenditures Table B: Summary of Projected Annual Expenditures (CIP) (All values shown in thousands of dollars) PART I: Expenditures from all County Sources PART II: Itemization of Area of Benefit Expenditures 07-13-20 TWIC Committee Mtg Agenda Packet Page 34 of 250 3.Gas Tax Funds: Gas Tax Funds, also known as the Highway Users Tax Account, are revenues paid by the State to cities and counties from the per-gallon motor vehicle fuel tax. This section is a continuation of the Introduction’s background description of the Gas Tax. Appendix B of this CRIPP shows the County-adopted guidelines for the expenditure of Gas Tax revenues following passage of Proposition 111 in 1990. Gas Tax Funds End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 19/20 FY 19/20 FY 19/20 FY 19/20 FY 19/20 FY 19/20 FY 26/27 End of Year Balance $ 0 $ 0 $ 0 $ 0 $ 1,230 $ 5,608 $ 11,224 $ 17,224 $ 23,224 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 121,872 $ 5,551 $ 7,735 $ 13,586 $ 17,000 $ 18,000 $ 19,000 $ 20,000 $ 21,000 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total(1) FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 97,837 $12,011 $15,464 $13,586 $15,770 $13,622 $13,384 $14,000 $15,000 Alhambra Valley Road - Ferndale Site $ 720 $ 0 $ 720 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Alhambra Valley Road Embankment Repair $ 1,280 $ 294 $ 986 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Bailey Road/State Route 4 Interchange Pedestrian & Bicycle Improvement Project $ 164 $ 57 $ 107 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Bel Air Trail Crossing Project $ 182 $ 0 $ 182 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Bridge Preventative Maintenance Project $ 249 $ 40 $ 55 $ 137 $ 17 $ 0 $ 0 $ 0 $ 0 Byron Highway Bridge Replacement over California Aqueduct (Bridge No. 28C0121) $ 884 $ 45 $ 65 $ 100 $ 288 $ 302 $ 84 $ 0 $ 0 Byron Highway / Byer Road Safety Improvements $ 444 $ 0 $ 18 $ 427 $ 0 $ 0 $ 0 $ 0 $ 0 Camino Tassajara Safety Improvements - S of Windemere Pkwy to County Line $ 483 $ 0 $ 0 $ 0 $ 0 $ 483 $ 0 $ 0 $ 0 Countywide Curb Ramp Project $ 1,800 $ 300 $ 300 $ 300 $ 300 $ 300 $ 300 $ 0 $ 0 Crocket Area Guardrail Upgrade $ 756 $ 285 $ 471 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Countywide Guardrail Upgrades $ 175 $ 0 $ 175 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Happy Valley Road - Embankment Repair $ 319 $ 0 $ 319 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Kirker Pass Road Northbound Truck Lanes $ 6,739 $ 3,094 $ 3,646 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Kirker Pass Road Safety Project $ 185 $ 36 $ 26 $ 123 $ 0 $ 0 $ 0 $ 0 $ 0 Marsh Creek Road Bridge Replacement (Bridge No. 28C143 & 28C145) $ 1,856 $ 0 $ 80 $ 345 $ 1,031 $ 400 $ 0 $ 0 $ 0 07-13-20 TWIC Committee Mtg Agenda Packet Page 35 of 250 Marsh Drive Bridge Replacement (Bridge No. 28C0442) $ 1,723 $ 310 $ 200 $ 578 $ 540 $ 95 $ 0 $ 0 $ 0 Norris Canyon Road Safety Improvements $ 775 $ 0 $ 0 $ 161 $ 614 $ 0 $ 0 $ 0 $ 0 Oak Road Bikeway Project $ 283 $ 45 $ 10 $ 228 $ 0 $ 0 $ 0 $ 0 $ 0 Pavement Surface Treatments $ 89,189 $ 6,460 $ 7,729 $ 10,000 $ 11,000 $ 12,000 $ 13,000 $ 14,000 $ 15,000 Pinehurst Road -- Sinkhole and Culvert Repair $ 59 $ 59 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Pleasant Hill Road Bridge Rehabilitation (Bridge No. 28C0154) $ 585 $ 100 $ 200 $ 25 $ 218 $ 42 $ 0 $ 0 $ 0 Rodeo Downtown Infrastructure Project $ 408 $ 408 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Rodeo Pedestrian Enhancement Project $ 320 $ 0 $ 0 $ 320 $ 0 $ 0 $ 0 $ 0 $ 0 San Pablo Dam Rd Traffic Safety Improvements $ 254 $ 251 $ 3 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Vasco Road Safety - Phase 2 $ 2,607 $ 0 $ 3 $ 842 $ 1,762 $ 0 $ 0 $ 0 $ 0 Walnut Boulevard Shoulder Widening $ 228 $ 58 $ 171 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Walnut Creek Crosswalk Improvements $ 170 $ 170 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Note: Expenditure Total represents future cost only. For actual costs to date, please refer to the project data sheets in Section III 4.State Match Funds: State Match Funds are revenues paid by the State to counties from the State Highway Account. The funds are to be used for transportation purposes to match federally funded transportation projects. Funds received are treated as grants with up-front lump sum payments and the unobligated balance of the County’s State Matching monies is paid directly to the County, subject to availability from the State. The County uses the State Match Funds to supplement federally funded projects. State Match Funds End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 1,850 $ 229 $ 329 $ 429 $ 529 $ 629 $ 729 $ 829 $ 929 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 700 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total(1) FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 1,721 $ 1,721 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Kirker Pass Road Northbound Truck Lanes $ 1,721 $ 1,721 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Note: Expenditure Total represents future cost only. For actual costs to date, please refer to the project data sheets in Section III 07-13-20 TWIC Committee Mtg Agenda Packet Page 36 of 250 5. Measure J (formerly Measure C): The voters approved the Contra Costa Transportation Improvement and Growth Management Program Ordinance (Measure C) in November 1988. Measure C provides for a ½-cent sales tax for transportation projects within Contra Costa County. Measure C had a twenty-year life and expired in 2009. In November 2004, voters approved the continuation of the County’s ½ - cent sales tax by passing Measure J and extended the transportation funding for 25 more years. The Measure J funds are composed of several different funding programs. Return to Source Funds and Regional Funds are described here. a. Measure J - Return to Source Funds: A portion of the revenue is returned to local jurisdictions to be used for maintenance of existing roadways and construction of new facilities to fix capacity and safety problems in existence before 1988 (those problems that came into existence after 1988 are presumed to be the responsibility of new development). The proposed use for these funds is outlined in this CRIPP. b. Measure J - Subregional Transportation Needs Funds: A portion of the revenue is designated for projects of a regional significance. For the portion of these funds that the County has access to, the proposed use is outlined in this CRIPP. Measure J: Return to Source Funds End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 3,000 $ 3,000 $ 3,000 $ 3,400 $ 3,800 $ 4,200 $ 4,600 $ 5,000 $ 5,400 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 4,793 $ 1,353 $ 1,440 $ 400 $ 400 $ 400 $ 400 $ 400 $ 400 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total(1) FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 2,793 $1,353 $1,440 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Alhambra Valley Embankment Repair Site 1 - West of Castro Ranch Rd $ 1,006 $ 286 $ 720 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Alhambra Valley Road - Ferndale Site $ 291 $ 291 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Bear Creek Road - Road Embankment Repair $ 1,037 $ 317 $ 720 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Happy Valley Road - Embankment Repair $ 257 $ 257 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Vasco Road Safety - Phase 2 $ 202 $ 202 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Note: Expenditure Total represents future cost only. For actual costs to date, please refer to the project data sheets in Section III 07-13-20 TWIC Committee Mtg Agenda Packet Page 37 of 250 Measure J: Subregional Transportation Needs Funds (Regional) End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 6,614 $ 4,978 $ 707 $ 110 $ 819 $ 0 $ 0 $ 0 $ 0 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total(1) FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 6,614 $4,978 $ 707 $ 110 $ 819 $ 0 $ 0 $ 0 $ 0 Danville Blvd/Orchard Ct Complete Streets Improvements $ 1,184 $ 687 $ 497 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Kirker Pass Road Northbound Truck Lanes $ 4,000 $ 4,000 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Norris Canyon Road Safety Improvements $ 1,430 $ 291 $ 210 $ 110 $ 819 $ 0 $ 0 $ 0 $ 0 Note: Expenditure Total represents future cost only. For actual costs to date, please refer to the project data sheets in Section III 6. Federal, State, and Regional Grant Funds: The Public Works Department continuously submits grant applications due at various times of the year for projects throughout the County. Each type of grant has unique funding objectives. Some of these grants and their descriptions are listed in Appendix A. Most applications compete statewide for funding, from the smallest safety project to the largest road extension project. In many cases where Gas Tax funds are used, the Public Works Department looks for grants or other ways to stretch its budget and to increase the number of improvement and maintenance projects. A quick summary of Federal, State, and Regional grants that are funding active projects in this CRIPP are listed below. To see what funds are associated with the projects in the table, please refer to the detail project sheets in Section III.  ATP – Active Transportation Program consolidated various transportation grant programs, which included various state and federal funds. The goals of the ATP include, but are not limited to, increasing the proportion of trips accomplished by walking and biking, increasing safety and mobility of non-motorized users, advancing efforts of regional agencies to achieve greenhouse gas reduction goals, enhancing public health, and providing a broad spectrum of projects to benefit many types of users including disadvantaged communities.  HBP – Highway Bridge Program is to replace or rehabilitate public bridges when State and Federal Highway Administration determine that a bridge is significantly important and qualifies under the HBP program guidelines. 07-13-20 TWIC Committee Mtg Agenda Packet Page 38 of 250  HSIP – Highway Safety Improvement Program is a Federal-aid program with the goal to reduce the number of traffic fatalities and serious injuries on all public roads.  OBAG – One Bay Area Grant program is a Metropolitan Transportation Commission funding approach that target project investments in Priority Development Areas and regional capital projects that focus on 1) local street and road maintenance, 2) streetscape enhancements, 3) bicycle and pedestrian improvements, 4) transportation planning, and Safe Routes to School projects.  TDA – Transportation Development Act is an annual competitive regional fund intended for projects to improve pedestrians and bicyclist safety and accessibility. Federal, State, and Regional Grant Funds End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 79,942 $9,176 $ 12,365 $ 25,908 $ 20,867 $ 9,549 $ 2,077 $ 0 $ 0 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total(1) FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 79,942 $9,176 $12,365 $25,908 $20,867 $9,549 $2,077 $ 0 $ 0 Bailey Road/State Route 4 Interchange Pedestrian & Bicycle Improvement Project $ 3,744 $ 2,423 $ 1,321 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Bel Air Trail Crossing Project $ 92 $ 43 $ 49 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Bridge Preventative Maintenance Project $ 870 $ 80 $ 85 $ 616 $ 89 $ 0 $ 0 $ 0 $ 0 Byron Highway Bridge Replacement over California Aqueduct (Bridge No. 28C0121) $ 15,519 $ 340 $ 490 $ 1,030 $ 5,647 $ 5,935 $ 2,077 $ 0 $ 0 Byron Highway / Byer Road Safety Improvements $ 552 $ 44 $ 0 $ 508 $ 0 $ 0 $ 0 $ 0 $ 0 Crocket Area Guardrail Upgrade $ 1,000 $ 0 $ 1,000 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Danville Blvd/Orchard Ct Complete Streets Improvements $ 2,593 $ 50 $ 130 $ 2,413 $ 0 $ 0 $ 0 $ 0 $ 0 Fred Jackson Way, First mile/Last Mile Connection Project $ 3,941 $ 610 $ 3,331 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Countywide Guardrail Upgrades $ 1,109 $ 26 $ 1,083 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Imhoff Drive Bicycle Shoulder Restriping $ 55 $ 0 $ 0 $ 55 $ 0 $ 0 $ 0 $ 0 $ 0 Kirker Pass Road Northbound Truck Lanes $ 3,993 $ 2,650 $ 1,343 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Kirker Pass Road Safety Project $ 1,164 $ 51 $ 41 $ 1,072 $ 0 $ 0 $ 0 $ 0 $ 0 07-13-20 TWIC Committee Mtg Agenda Packet Page 39 of 250 Marsh Creek Road Bridge Replacement (Bridge No. 28C143 & 28C145) $ 10,704 $ 320 $ 460 $ 805 $ 8,019 $ 1,100 $ 0 $ 0 $ 0 Marsh Drive Bridge Replacement (Bridge No. 28C0442) $ 14,086 $ 455 $ 1,235 $ 5,932 $ 5,810 $ 654 $ 0 $ 0 $ 0 Oak Road Bikeway Project $ 80 $ 0 $ 0 $ 80 $ 0 $ 0 $ 0 $ 0 $ 0 Pinehurst Road -- Sinkhole and Culvert Repair $ 564 $ 564 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Pleasant Hill Road Bridge Rehabilitation (Bridge No. 28C0154) $ 1,672 $ 0 $ 0 $ 106 $ 1,302 $ 264 $ 0 $ 0 $ 0 Rodeo Downtown Infrastructure Project $ 525 $ 525 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Rodeo Pedestrian Enhancement Project $ 121 $ 32 $ 37 $ 52 $ 0 $ 0 $ 0 $ 0 $ 0 San Pablo Dam Rd Traffic Safety Improvements $ 672 $ 672 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Treat Boulevard Corridor Improvements $ 1,596 $ 0 $ 0 $ 0 $ 0 $ 1,596 $ 0 $ 0 $ 0 Vasco Road Safety - Phase 2 $ 15,000 $ 0 $ 1,760 $ 13,240 $ 0 $ 0 $ 0 $ 0 $ 0 Walnut Boulevard Shoulder Widening $ 75 $ 75 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Walnut Creek Crosswalk Improvements $ 217 $ 217 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Note: Expenditure Total represents future cost only. For actual costs to date, please refer to the project data sheets in Section III 07-13-20 TWIC Committee Mtg Agenda Packet Page 40 of 250 7. Area of Benefit (AOB) Revenues: The unincorporated areas of Contra Costa County are divided into several Area of Benefits for road improvements focused on mitigating impacts of new development on the transportation network. Appendix D has a page for each AOB containing the current Ordinance Number, the project list, and an AOB map. Within each AOB, road improvement projects to alleviate known traffic congestion or traffic safety problems have been identified and prioritized. An AOB fee is charged to all developments that create additional traffic in the area, to pay for these projects. The fee amount varies depending on which AOB the property is located in, the amount of traffic generated by the development, and the cost of the projects identified on that AOB’s Project List. A seven-year revenue estimate was made for each of the AOBs using the past five-year revenue history. The development potential within their respective AOB is also taken into account after consulting with the Engineering Services and the Finance Division within the Public Works Department. The AOB program is constantly being updated. The updates include, revising the AOB project lists, revising the fee schedules, adjusting the fee schedule for inflation, and adjusting the remaining development potential. The updates may have a significant impact on potential project funding. In addition, several AOBs are being merged or incorporated into an adjacent AOB to become more fiscally efficient. Current AOB fees can be accessed on the County web site at http://www.cccounty.us/AOB. The following AOBs have active capital projects and/or proposed future AOB projects.  Alamo AOB  Bay Point AOB  Central County AOB  East County (Regional) AOB  Martinez AOB  North Richmond AOB  South County AOB In the past CRIPPS, AOB Administrative expenditures were shown but are no longer considered as a capital improvement project. As a result, the following AOBs and mitigation funds have no active project and will not be shown in this section:  Bethel Island AOB  Briones AOB  Bethel Island AOB  Discovery Bay AOB  Hercules/Crockett/Rodeo AOB  Pacheco (West) FOAB  Richmond/El Sobrante AOB  South Walnut Creek AOB  West County AOB  Discovery Bay West Mitigation Funds Revenue and End of Year balance for these AOBs can be found in Table A and Table B. 07-13-20 TWIC Committee Mtg Agenda Packet Page 41 of 250 Alamo Area of Benefit End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 1,005 $ 1,055 $ 1,155 $ 1,255 $ 1,355 $ 1,455 $ 1,305 $ 1,155 $ 1,005 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 650 $ 50 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 750 $ 0 $ 0 $ 0 $ 0 $ 0 $ 250 $ 250 $ 250 Future AOB Project (to be determined) $ 750 $ 0 $ 0 $ 0 $ 0 $ 0 $ 250 $ 250 $ 250 * Please note that only fully funded projects are listed under expenditures. Also refer to Appendix E for other proposed AOB project(s). Bay Point Area of Benefit End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 1,680 $ 1,700 $ 1,800 $ 1,900 $ 1,800 $ 1,700 $ 1,300 $ 1,400 $ 1,500 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 620 $ 20 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 900 $ 0 $ 0 $ 0 $ 200 $ 200 $ 500 $ 0 $ 0 Future AOB Project (to be determined) $ 900 $ 0 $ 0 $ 0 $ 200 $ 200 $ 500 $ 0 $ 0 * Please note that only fully funded projects are listed under expenditures. Also refer to Appendix E for other proposed AOB project(s). 07-13-20 TWIC Committee Mtg Agenda Packet Page 42 of 250 Central County Area of Benefit End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 3,521 $ 3,721 $ 3,821 $ 3,821 $ 3,721 $ 3,621 $ 2,221 $ 2,321 $ 2,421 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 800 $ 200 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 2,000 $ 0 $ 0 $ 100 $ 200 $ 200 $ 1,500 $ 0 $ 0 Future AOB Project (to be determined) $ 2,000 $ 0 $ 0 $ 100 $ 200 $ 200 $ 1,500 $ 0 $ 0 * Please note that only fully funded projects are listed under expenditures. Also refer to Appendix E for other proposed AOB project(s). East County (Regional) Area of Benefit End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 4,571 $ 4,622 $ 4,117 $ 4,717 $ 5,317 $ 5,917 $ 6,417 $ 6,817 $ 6,917 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 4,000 $ 400 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 $ 600 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 1,454 $ 350 $ 1,104 $ 0 $ 0 $ 0 $ 100 $ 200 $ 500 Byron Highway / Byer Road Safety Improvements $ 241 $ 51 $ 190 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Countywide Guardrail Upgrades $ 943 $ 149 $ 795 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Future AOB Project (to be determined) $ 800 $ 0 $ 0 $ 0 $ 0 $ 0 $ 100 $ 200 $ 500 Marsh Creek Road Bridge Replacement (Bridge No. 28C143 & 28C145) $ 270 $ 150 $ 120 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 * Please note that only fully funded projects are listed under expenditures. Also refer to Appendix E for other proposed AOB project(s). 07-13-20 TWIC Committee Mtg Agenda Packet Page 43 of 250 Martinez Area of Benefit End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 2,499 $ 2,599 $ 2,699 $ 2,799 $ 2,899 $ 2,899 $ 2,799 $ 2,599 $ 2,699 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 700 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Future AOB Project (to be determined) $ 600 $ 0 $ 0 $ 0 $ 0 $ 100 $ 200 $ 300 $ 0 * Please note that only fully funded projects are listed under expenditures. Also refer to Appendix E for other proposed AOB project(s). North Richmond Area of Benefit End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 2,157 $ 2,083 $ 2,160 $ 2,360 $ 2,460 $ 2,460 $ 2,160 $ 2,360 $ 2,560 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 1,260 $ 60 $ 200 $ 200 $ 200 $ 200 $ 200 $ 200 $ 200 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 1057 $ 134 $ 123 $ 0 $ 100 $ 200 $ 500 $ 0 $ 0 Fred Jackson Way, First mile/Last Mile Connection Project $ 257 $ 134 $ 123 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Future AOB Project (to be determined) $ 800 $ 0 $ 0 $ 0 $ 100 $ 200 $ 500 $ 0 $ 0 * Please note that only fully funded projects are listed under expenditures. Also refer to Appendix E for other proposed AOB project(s). 07-13-20 TWIC Committee Mtg Agenda Packet Page 44 of 250 South County Area of Benefit End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 2,789 $ 2,889 $ 3,039 $ 1,242 $ 1,332 $ 1,482 $ 1,632 $ 1,782 $ 1,932 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 1,000 $ 100 $ 150 $ 150 $ 150 $ 150 $ 150 $ 150 $ 150 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 2,007 $ 0 $ 0 $1,947 $ 60 $ 0 $ 0 $ 0 $ 0 Camino Tassajara Safety Improvements - S of Windemere Pkwy to County Line $ 2,007 $ 0 $ 0 $ 1,947 $ 60 $ 0 $ 0 $ 0 $ 0 * Please note that only fully funded projects are listed under expenditures. Also refer to Appendix E for other proposed AOB project(s). 07-13-20 TWIC Committee Mtg Agenda Packet Page 45 of 250 8. Trust Funds: When a large development makes a significant impact on the roadway system, the developer may be required to contribute to a road improvement fund to mitigate the impacts of the development. The County has three trust funds to be used for specific projects. Navy Mitigation Funds in the Bay Point Area provided $5 million to help fund new transportation improvements and waterfront access to offset the loss of Port Chicago Highway through the Concord Naval Weapons Station. Other developer fees include the Discovery Bay West Traffic Mitigation Funds, and the Keller Canyon Mitigation Funds. Each of these funds is held in trust by the County and is listed as separate funding sources in this CRIPP. Keller Canyon Landfill Mitigation Funds End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 2,490 $ 2,391 $ 1,914 $ 1,941 $ 1,968 $ 1,995 $ 2,022 $ 2,022 $ 2,022 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 162 $ 27 $ 27 $ 27 $ 27 $ 27 $ 27 $ 0 $ 0 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 630 $ 126 $ 504 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Bailey Road/State Route 4 Interchange Pedestrian & Bicycle Improvement Project $ 630 $ 126 $ 504 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 * These funds are to be only used for pavement rehabilitation along Bailey Road. Navy Mitigation Funds End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 5,403 $ 4,890 $ 4,890 $ 4,890 $ 4,890 $ 4,890 $ 4,890 $ 4,890 $ 4,890 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 513 $ 513 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Bay Point Utility Undergrounding Project $ 513 $ 513 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 07-13-20 TWIC Committee Mtg Agenda Packet Page 46 of 250 9. Other Local Funds: These funds include monies from other partner agencies that are participating in construction of a project due to a shared responsibility of the facility. In addition, funds also come from several Regional Fee programs throughout the County where the fee program is adopted by several participating jurisdictions and is administered jointly through a separate authority. As these Regional Fee programs are not under the authority of the County, the revenue and expenditures for these programs are not included in the CRIPP. The Regional Fee programs include the East Contra Costa Regional Fee and Financing Authority (ECCRFFA), the Southern Contra Costa (SCC) Fees, West Contra Costa Transportation Advisory Committee Fee (WCCTAC), and the Tri Valley Transportation Development (TVTD) Fee. Other Local Funds End of Year Cash Balance (in 1,000's of Dollars) End of FY 18/19 Balance FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 End of Year Balance $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Projected Revenue (in 1,000's of Dollars) Revenue Total FISCAL YEAR (F.Y.) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Projected Revenue $ 31,621 $ 1,432 $ 1,477 $ 8,696 $ 9,786 $ 9,926 $ 304 $ 0 $ 0 Estimated Project Expenditures (in 1,000's of Dollars) Expenditure Total(1) FISCAL YEAR (F.Y.) (FY 19/20 to FY 26/27) FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Total of All Projects $ 31,621 $ 1,432 $ 1,477 $ 8,696 $ 9,786 $ 9,926 $ 304 $ 0 $ 0 Byron Highway Bridge Replacement over California Aqueduct (Bridge No. 28C0121) $ 2,549 $ 145 $ 185 $ 280 $ 835 $ 800 $ 304 $ 0 $ 0 Camino Tassajara Safety Improvements - S of Windemere Pkwy to County Line $ 27,477 $ 922 $ 1,247 $ 7,936 $ 8,407 $ 8,964 $ 0 $ 0 $ 0 Marsh Drive Bridge Replacement (Bridge No. 28C0442) $ 700 $ 0 $ 0 $ 350 $ 350 $ 0 $ 0 $ 0 $ 0 Rodeo Downtown Infrastructure Project $ 350 $ 350 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 Treat Boulevard Corridor Improvements $ 546 $ 15 $ 45 $ 130 $ 194 $ 162 $ 0 $ 0 $ 0 07-13-20 TWIC Committee Mtg Agenda Packet Page 47 of 250 SECTION III Capital Road Projects by Countywide and Supervisor Districts 07-13-20 TWIC Committee Mtg Agenda Packet Page 48 of 250 III. PROJECTS BY DISTRICT CAPITAL ROAD PROJECTS This section contains the projects, project descriptions, and proposed funding schedule. The projects are sorted geographically by County Board of Supervisor Districts (District) and each “tabbed” District displays project information on data sheets. Each tabbed District section contains the following information: District-wide project overview map provides a quick reference to locate active projects. Active project list within the District (excluding countywide projects as discussed below) with project descriptions allow the reader to view the active projects. Active project data sheets include a project description, funding schedule, and vicinity map. In support of Road Program's four areas of focus, these projects are categorized as follows: Project Category Description Safety Safety projects are scoped primarily to reduce vehicle, pedestrian, and bicycle collisions. Almost all projects have a safety aspect; however to be categorized as a safety project, it must have been originally scoped to have a safety component rather than specifically for a reliability, efficiency, or accessibility component. For example, p edestrian enhancements and other non-vehicular safety projects are categorized “Accessibility.” Reliability Reliabilty projects are scoped to improve or sustain a rating index such as pavement condition index (PCI), Bridge Sufficiency rating, Bridge Health Index, and Culvert Condition Index (under development). Pavement and bridge projects are typically categorized “Reliabilty.” Efficiency Efficiency projects are usually generated from Level Of Service (LOS) studies, from roadway capacity issues, or from traffic signal warrants. LOS studies are often found in Area of Benefit studies. Efficiency projects tend to be more costly to design and construct since these are more systemic improvement than localized improvements. Mobility Accessibility project include ADA upgrades, pedestrian and bicycle improvements, and pedestrian flashers. Complete street projects are usually placed in this category. County-Wide Projects are introduced before District I. These projects are on-going programs that vary geographically on a yearly basis. For example, a County-Wide Curb Ramp project may focus on one area of the County, and another area in the following year. Unfunded projects are listed last in each tabbed area. These projects have been proposed but await funding. Many of these projects are part of a long-term, regional transportation plan, so it may be many years before these projects are considered. The list is reevaluated from time to time to add new projects or to remove projects that no longer suit the County. 07-13-20 TWIC Committee Mtg Agenda Packet Page 49 of 250 The following is a complete project list, sorted by Active and Underfunded projects and its associated Board of Supervisor District location. PROJECT DESCRIPTION ACTIVE/ UNFUNDED BOS DISTRICT 6th Street Rodeo Sidewalk Project – Parker Avenue to Garretson Unfunded 5 7th Street Sidewalk Project – Parker Avenue to Garretson Unfunded 5 Alhambra Valley Road Safety Improvements – (Various Locations) Unfunded 5 Alhambra Valley Road Embankment Repair Site 1 – West of Castro Ranch Road Active 1 Alhambra Valley Road Embankment Repair – 0.4 miles west of Bear Creek Road Active 1, 5 Alhambra Valley Road Storm Repair Project – Ferndale Site Active 5 Alves Lane Extension – Willow Pass Road to Pacifica Avenue (AOB) Unfunded 5 Appian Way & Argyle Drive Signal Project Unfunded 1 Appian Way & Pebble Drive Traffic Signal Project Unfunded 1 Appian Way & Santa Rita Road Traffic Signal and Safety Improvements Unfunded 1 Appian Way Complete Streets Project - San Pablo Dam Road to Valley View Road Unfunded 1 Appian Way Complete Streets Project - Valley View Road to Pinole City Limits Unfunded 1 Arlington Boulevard Intersection Improvements at Rincon Road/Kensington Road, Westminster Avenue, Sunset Drive, Coventry Road, Amherst Avenue, and Vine Avenue/Highland Avenue Unfunded 1 Ayers Road & Concord Boulevard Intersection Improvements (AOB) Unfunded 4 Ayers Road & Laurel Avenue Intersection Improvements (AOB) Unfunded 4 Ayers Road & Myrtle Drive Intersection Improvements (AOB) Unfunded 4 Bailey Road & Myrtle Drive Intersection Improvements (AOB) Unfunded 4 Bailey Road and Mary Anne Lane Signal Project Unfunded 5 Bailey Road Improvements - Myrtle Drive to Concord City Limits (AOB) Unfunded 4 07-13-20 TWIC Committee Mtg Agenda Packet Page 50 of 250 PROJECT DESCRIPTION ACTIVE/ UNFUNDED BOS DISTRICT Bailey Road Overlay Project - SR4 to Keller Canyon Landfill Entrance Unfunded 5 Bailey Road Pedestrian & Bicycle Improvements – Canal Road to Willow Pass Road (AOB) Unfunded 5 Balfour Road & Byron Highway Intersection Improvements (AOB) Unfunded 3 Balfour Road Shoulder Widening – Deer Valley Road to Brentwood City Limits Unfunded 3 Bailey Road/SR4 Interchange Improvements Active 5 Bay Point Utility Undergrounding Project Active 5 Bear Creek Road – Road Embankment Repair Active 1,5 Bear Creek Road & Happy Valley Road Intersection Improvements (AOB) Unfunded 1, 2 Bear Creek Road Safety Improvements – Alhambra Valley Road to the City of Orinda Unfunded 1, 2, 5 Bel Air Trail Crossing Project Active 5 Bella Vista Infrastructure Improvements Unfunded 5 Bethel Island Road & Sandmound Road Intersection Improvements Unfunded 3 Bethel Island Road Widening - Taylor Road to Sandmound Boulevard (AOB) Unfunded 3 Bixler Road Improvements - SR 4 to Byer Road (AOB) Unfunded 3 Boulevard Way Bicycle and Pedestrian Project Unfunded 2 Bridge Preventative Maintenance Program Active Various Brookside Drive Complete Streets – Central Street to Union Pacific Railroad (AOB) Unfunded 1 Buskirk Avenue Improvements - Treat Boulevard to Pleasant Hill City Limits (AOB) Unfunded 4 Byer Road Improvements - Bixler Road to Byron Highway (AOB) Unfunded 3 Byron Highway / Byer Road Safety Improvements Active 3 Byron Highway / SR4 / Point of Timber Intersection Improvements (AOB) Unfunded 3 07-13-20 TWIC Committee Mtg Agenda Packet Page 51 of 250 PROJECT DESCRIPTION ACTIVE/ UNFUNDED BOS DISTRICT Byron Highway Bridge Replacement over California Aqueduct (Bridge No. 28C0121)(Project Sponsor: Dept of Water Resources) Active 3 Byron Highway Safety Improvements (Various Locations) Unfunded 3 Byron Highway Widening - Camino Diablo to the Alameda County Line (AOB) Unfunded 3 Byron Highway Widening (Chestnut Street to SR4)(AOB) Unfunded 3 Byron Highway Widening (Delta Road to Chestnut Street) (AOB) Unfunded 3 Byron Highway Widening (SR 4 to Camino Diablo)(AOB) Unfunded 3 Camino Diablo Widening – Vasco Road to Byron Highway (AOB) Unfunded 3 Camino Tassajara Safety Improvements – Windemere Parkway to Alameda County Line Active 3 Camino Tassajara Safety Improvements (Various Locations) Unfunded 3 Canal Road Sidewalk Project – 420 feet south of Winterbrook Drive to Chadwick Lane Unfunded 5 Castro Ranch Road Widening - San Pablo Dam Road to Olinda Road Unfunded 1 Center Avenue Bicycle and Pedestrian Improvements - Pacheco Boulevard to Marsh Drive (AOB) Unfunded 5 Central Street Complete Street - Brookside Drive and Pittsburg Avenue (AOB) Unfunded 1 Chesley Avenue Traffic Calming – Fred Jackson Way and AOB Boundary (AOB) Unfunded 1 Chestnut Street Widening – Sellers Avenue to Byron Highway (AOB) Unfunded 3 Clifton Court Road Bridge Repair (Bridge No. 28C0403) Unfunded 3 Clipper Drive Improvements – Newport Drive to Discovery Bay Boulevard (AOB) Unfunded 3 Colusa Avenue Complete Streets Project Unfunded 1 Concord Avenue Shared Use Path (AOB) Unfunded 4 Countywide Curb Ramp Project Active Various Countywide Guardrail Upgrade Project Active Various 07-13-20 TWIC Committee Mtg Agenda Packet Page 52 of 250 PROJECT DESCRIPTION ACTIVE/ UNFUNDED BOS DISTRICT Crockett Area Guardrail Upgrades Active 5 Crockett Area Overlays & Reconstruction Project Unfunded 5 Cummings Skyway - Widen Interchange at I-80 Unfunded 5 Cummings Skyway Truck Climbing Lane Extension Unfunded 5 Danville Boulevard & Hemme Avenue Intersection Improvements (AOB) Unfunded 2 Danville Boulevard/Orchard Court Complete Streets Improvements (AOB) Active 2 Deer Valley Road Safety Improvements (Various Locations) Unfunded 3 Delta DeAnza Trail Connection – Class I bikeway Port Chicago Highway in Bay Point to Iron Horse Trail in Concord Unfunded 5 Delta DeAnza Trail Connection – Upgrade trail crossings Driftwood Drive to Canal Road Unfunded 5 Delta Road Sidewalk & Bike Lanes Project – Knightsen Avenue to Knightsen Elementary School Unfunded 3 Delta Road Widening – Byron Highway to Holland Tract Road (AOB) Unfunded 3 Delta Road Widening - Sellers Avenue to Byron Highway (AOB) Unfunded 3 Dewing Lane Pedestrian Bridge (AOB) Unfunded 2 Discovery Bay Boulevard & Clipper Drive Intersection Improvements (AOB) Unfunded 3 Driftwood Drive Improvements – Port Chicago Highway to Pacifica Avenue (AOB) Unfunded 5 Eden Plains Road Widening – Sunset Road to Marshall Court Unfunded 3 Evora Road & Willow Pass Road Intersection Improvements Unfunded 5 Evora Road Extension – Current western terminus of Evora Road, to Port Chicago Highway Unfunded 5 Evora Road Widening – Willow Pass Road (Bay Point) to Willow Pass Road(Concord) Unfunded 5 Fish Ranch Road Safety Improvements - SR 24 to Grizzly Peak Road (AOB) Unfunded 2 Franklin Canyon Undercrossing – Sobrante Ridge to Carquinez Strait Trail Unfunded 5 07-13-20 TWIC Committee Mtg Agenda Packet Page 53 of 250 PROJECT DESCRIPTION ACTIVE/ UNFUNDED BOS DISTRICT Fred Jackson Way Complete Streets Project - Between Chesley and Parr Boulevard (AOB) Unfunded 1 Fred Jackson Way Complete Streets Project - Intersection with Chelsey Avenue (AOB) Unfunded 1 Fred Jackson Way, First Mile/Last Mile Connection Active 1 Fred Jackson Way/Goodrick Avenue Realignment Unfunded 1 Freeman Road and Briones Valley Road Bridge Maintenance Project Active 2, 3 Gateway Road Widening – Bethel Island Road to Piper Road (AOB) Unfunded 3 Gloria Terrace Sidewalk Project – Taylor Boulevard to Reliez Valley Road Unfunded 5 Goodrick Avenue - Fred Jackson Way to AOB Boundary (AOB) Unfunded 1 Happy Valley Road Embankment Repair Active 2 Hemme Avenue Sidewalk Improvements between La Sonoma Way (west side) to Iron Horse Trail (two segments) Unfunded 2 Highland Road Improvements – Camino Tassajara to Alameda County Line Unfunded 3 Holway Drive Safety Improvements – Main Street to Camino Diablo Road Unfunded 3 I-680 Bikeway Signage – Rudgear Road to Danville Town Limits Unfunded 2 Imhoff Drive Bicycle Shoulder Restriping Active 5 Iron Horse Trail Flashers Unfunded 2, 4 Jones Rd Bike Route Project -- Oak Road to Canal Trail Unfunded 4 Kirker Pass Road Bicycle Project Unfunded 4, 5 Kirker Pass Road Northbound Runaway Truck Ramp Unfunded 5 Kirker Pass Road Northbound Truck Climbing Lane Active 4, 5 Kirker Pass Road Safety Project Active 5 Kirker Pass Road Southbound Truck Lane Unfunded 5 07-13-20 TWIC Committee Mtg Agenda Packet Page 54 of 250 PROJECT DESCRIPTION ACTIVE/ UNFUNDED BOS DISTRICT Knightsen Avenue & Delta Road Intersection Improvements (AOB) Unfunded 3 Knightsen Avenue Widening – East Cypress Road to Delta Road (AOB) Unfunded 3 Knightsen Avenue/Eden Plains Road Widening – Delta Road to Chestnut Street (AOB) Unfunded 3 La Paloma Road Pedestrian and Roadway Improvements Unfunded 1 Las Juntas Way & Coggins Drive Intersection Improvements (AOB) Unfunded 4 Local Road Pedestrian and Bicycle Upgrade at Benicia Bridge Unfunded 5 Loftus Road Pedestrian Improvements – Canal Road to Willow Pass Road (AOB) Unfunded 5 Lone Tree Way Bike Lane Gap Closure – Anderson Lane to Virginia Drive Unfunded 3 Market Avenue Complete Streets – Fred Jackson Way to 7th Street (AOB) Unfunded 1 Marsh Creek Road & Camino Diablo Intersection Improvements Unfunded 3 Marsh Creek Road & Deer Valley Road Intersection Improvements Unfunded 3 Marsh Creek Road and Morgan Territory Road Intersection Improvements Unfunded 3 Marsh Creek Road Bridge Replacement (Bridge No. 28C0143 & 28C0145) Active 3 Marsh Creek Road Improvements (AOB) Unfunded 3 Marsh Creek Trail Unfunded 3, 4 Marsh Drive Bridge Replacement Active 4, 5 Marsh Drive Improvements - Center Avenue to Iron Horse Trail (AOB) Unfunded 4, 5 Marshall Drive Sidewalk – Indian Valley Elementary School/City of Walnut Creek to El Verano Drive Unfunded 4 Mayhew Way Bicycle and Pedestrian Improvements - 200' west of Oberon Drive to Bancroft Road (AOB) Unfunded 4 McNabney Marsh Open Space Connection to Waterfront Road Unfunded 5 Miranda Avenue Pathway Improvements – Stone Valley Road to Stone Valley Middle School (AOB) Unfunded 2 07-13-20 TWIC Committee Mtg Agenda Packet Page 55 of 250 PROJECT DESCRIPTION ACTIVE/ UNFUNDED BOS DISTRICT Mitchell Canyon Road Bike Lanes Unfunded 4 Monterey Street Safety Improvements – Veale Avenue to Palm Avenue Unfunded 5 Morgan Territory Road Safety Improvements Unfunded 3 Mountain View Boulevard Pedestrian Improvements – San Miguel Drive to Walnut Boulevard (AOB) Unfunded 4 Norris Canyon Road Safety Improvements – West of Ashbourne Drive Active 2 Norris Canyon Road Shoulder Widening – Ashbourne Drive to Alameda County Limits Unfunded 2 North Richmond Improvements – Pittsburg Avenue Extension from Fred Jackson Way to 7th Street extension Unfunded 1 North Richmond Truck Route – Parr Boulevard to Market Avenue (AOB) Unfunded 1 Oak Road Bikeway Project – Treat Boulevard to City of Pleasant Hill Active 4 Olinda Road Pedestrian Improvements – Valley View Road to 850 feet south of Valley View Road Unfunded 1 Olympic Boulevard & Boulevard Way & Tice Valley Boulevard Intersection Improvements (AOB) Unfunded 2 Olympic Boulevard & Bridgefield Road Signal Project Unfunded 2 Olympic Corridor Pedestrian and Bicycle Improvements Unfunded 2 Pacheco Boulevard & Center Avenue Intersection Improvements(AOB) Unfunded 5 Pacheco Boulevard & Muir Road Intersection Improvements(AOB) Unfunded 5 Pacheco Boulevard & North Buchanan Circle Intersection Improvements (AOB) Unfunded 5 Pacheco Boulevard Complete Streets – Arnold Drive to Muir Road(AOB) Unfunded 5 Pacheco Boulevard Improvements – Morello Avenue to Blum Road Unfunded 5 Pacifica Avenue Extension – Port Chicago Highway to Alves Lane (AOB) Unfunded 5 Parr Boulevard Complete Streets Project - Richmond Parkway to Union Pacific Railroad (AOB) Unfunded 1 Pavement Surface Treatment Change the Data Sheet Active Various 07-13-20 TWIC Committee Mtg Agenda Packet Page 56 of 250 PROJECT DESCRIPTION ACTIVE/ UNFUNDED BOS DISTRICT Pedestrian and Bicycle Improvements on Livorna Road, Stone Valley Road, and Danville Boulevard (CTPL) Unfunded 2 Pedestrian Improvements near Rodeo Hills Elementary School Unfunded 5 Pedestrian Safety Improvements at Stone Valley Middle and Rancho Romero School (AOB) Unfunded 2 Pinehurst Road Bicycle Improvements (AOB) Unfunded 2 Pinehurst Road Sinkhole and Culvert Repair Active 2 Pinole Valley Road Safety Improvements between Pinole City Limits and the AOB Boundary Unfunded 1 Piper Road Widening - Gateway Road to Willow Road Unfunded 3 Pitt Way Roadway Improvements (DCD) Unfunded 1 Pittsburg Avenue Intersection Improvements (AOB) Unfunded 1 Pittsburg Avenue Widening - Fred Jackson Way to Richmond Parkway (AOB) Unfunded 1 Pleasant Hill BART Station Bicycle and Pedestrian Access Unfunded 4 Pleasant Hill Road & Taylor Boulevard Bicycle and Pedestrian Improvements Unfunded 5 Pleasant Hill Road Bicycle Improvements – Geary Road to Taylor Boulevard (AOB) Unfunded 2 Pleasant Hill Road Bridge Rehabilitation (Bridge No. 28C0154) Active 2, 5 Pleasant Hill Road Sidewalk Project – 1700 Block to Diablo View Road on west side only Unfunded 5 Pomona Street Sidewalk Project – 3rd Avenue to Rolph Park Drive (south side of road) Unfunded 5 Pomona Street/Winslow Avenue/Carquinez Scenic Drive Safety Alignment Study Unfunded 5 Port Chicago Highway Bicycle and Pedestrian Improvements – Driftwood Drive to McAvoy Road (AOB) Unfunded 5 Port Chicago Highway Realignment Project – McAvoy Road to Pacifica Avenue Unfunded 5 Reliez Valley Road Bicycle Improvements – North of Grayson Road to Withers Avenue (AOB) Unfunded 2, 4, 5 Rincon Road Widening and Pedestrian Improvements Project Unfunded 1 07-13-20 TWIC Committee Mtg Agenda Packet Page 57 of 250 PROJECT DESCRIPTION ACTIVE/ UNFUNDED BOS DISTRICT Rodeo Downtown Infrastructure Improvements Active 5 Rodeo Pedestrian Enhancement Project - 6th and 7th Street Active 5 Rudgear Road & San Miguel Drive Intersection Safety Improvements (AOB) Unfunded 4 San Miguel Drive Bicycle and Pedestrian Improvements (AOB) Unfunded 4 San Pablo Avenue / Parker Avenue Sidewalk Unfunded 5 San Pablo Avenue Complete Street Project Unfunded 1 San Pablo Avenue Complete Streets Project – Rodeo to Crockett Unfunded 5 San Pablo Dam Road & Greenridge Drive Signal Improvements Unfunded 1 San Pablo Dam Road Safety Improvements (AOB) Unfunded 1 San Pablo Dam Road Pedestrian Improvements – Tri Lane to Appian Way Unfunded 1 San Pablo Dam Road Traffic Safety Improvements Active 1 Sandmound Boulevard Improvements – Mariner Road to Cypress Road Unfunded 3 Sandmound Boulevard Widening – Oakley City Limits to Mariner Road Unfunded 3 Sellers Avenue & Balfour Road Intersection Improvements (AOB) Unfunded 3 Sellers Avenue & Chestnut Avenue Intersection Improvements (AOB) Unfunded 3 Sellers Avenue & Marsh Creek Road Intersection Improvements (AOB) Unfunded 3 Sellers Avenue & Sunset Road Intersection Improvements (AOB) Unfunded 3 Sellers Avenue Widening – Delta Road to Chestnut Street (AOB) Unfunded 3 Sellers Avenue Widening – Main Canal to Marsh Creek Road) (AOB) Unfunded 3 Springbrook Road Bicycle and Pedestrian Improvements (AOB) Unfunded 2 SR239/Trilink: Vasco Road-Byron Highway Connector Unfunded 3 07-13-20 TWIC Committee Mtg Agenda Packet Page 58 of 250 PROJECT DESCRIPTION ACTIVE/ UNFUNDED BOS DISTRICT State Route 4 & Byron Highway (South) Intersection Widening (Phase 2)(AOB) Unfunded 3 State Route 4 & Newport Drive Traffic Signal (AOB) Unfunded 3 State Route 4 Widening – Bixler Road to Discovery Bay Boulevard - Complete Streets and Bridge Widening (AOB) Unfunded 3 State Route 4 Widening – Byron Highway and Regatta Drive (AOB) Unfunded 3 Stone Valley Road at Roundhill Road Intersection Improvements Unfunded 2 Stone Valley Road Left Turn Lane at Smith Road Unfunded 2 Sunset Road Widening - Sellers Avenue to Byron Highway (AOB) Unfunded 3 Tara Hills Complete Streets Project Unfunded 1 Tara Hills Elementary School, Shannon Elementary School, Pinole Middle School Pedestrian Crossing Upgrades Unfunded 1 Tice Valley Boulevard Bike and Pedestrian Project Unfunded 2 Treat Boulevard & Jones Road Intersection Improvements (AOB) Unfunded 4 Treat Boulevard Bicycle Improvements - Jones Road easterly to Walnut Creek City Limits (AOB) Unfunded 4 Treat Boulevard Corridor Improvements Active 2, 4 Valley View Road Widening - San Pablo Dam Road to Appian Way Unfunded 1 Vasco Road / Camino Diablo Intersection Improvements (AOB) Unfunded 3 Vasco Road Safety Improvements (Phase 2) Active 3 Verde Elementary School Secondary Access (AOB) Unfunded 1 Walnut Boulevard Pedestrian Improvements – View Lane to 250' west of Walnut Court (AOB) Unfunded 4 Walnut Boulevard Shoulder Widening Active 3 Walnut Creek Crosswalk Improvements - Bridgefield Road and Walden Road Active 2, 4 Waterfront Road Grade Change Project Unfunded 5 07-13-20 TWIC Committee Mtg Agenda Packet Page 59 of 250 PROJECT DESCRIPTION ACTIVE/ UNFUNDED BOS DISTRICT Willow Pass Road & Bailey Road Intersection Improvements (AOB) Unfunded 5 Willow Pass Road (West) & SR 4 Interchange Improvements (AOB) Unfunded 5 Willow Pass Road Improvements – Bailey Road to Pittsburg City Limits (AOB) Unfunded 5 Willow Pass Road Improvements – Evora Road to SR 4 (AOB) Unfunded 5 07-13-20 TWIC Committee Mtg Agenda Packet Page 60 of 250 Countywide Projects07-13-20 TWIC Committee Mtg Agenda Packet Page 61 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED Countywide reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 255 27 120 100 8 Environmental Design Engineering + Right-of-Way 85 40 45 + Construction 806 700 106 Total 1,146 27 120 140 753 106 + Gas Tax (c)276 27 40 55 137 17 HBP 870 80 85 616 89 Bridge Preventative Maintenance Project Ensure the maintenance and safety of the existing bridges throughout the County. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to perform maintenance such as surface treatments to various bridges in the County based on the periodic bridge inspections of County bridges. ● Del Monte Drive Overhead Bridge (28C-0207) ● Bear Creek Bridge (28C-0227) ● Pacheco Slough Bridge (28C-0006) and Peyton Slough Bridge (28C-0150) on Waterfront Road ● Marsh Creek Bridge on Concord Avenue (28C-0398) ● San Pablo Creek Bridge on La Honda Road (28C-0382) ● Kellogg Creek Bridge on Byron Highway (28C-0122) ● San Pablo Creek Bridge on Appian Way (28C-0329) ● Contra Costa Canal Bridge on Golf Club Road (28C-0396) ● Nichols Road Bridge (28C-0171) ● Garrity Creek Bridge (28C-0059) PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 62 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED Countywide mobility Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 + Gas Tax (c)2,400 600 300 300 300 300 300 300 Countywide Curb Ramp Project The purpose is to provide equal access to all users within the public road right-of-way. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to retrofit curb ramps throughout Contra Costa County to meet Americans with Disabilities Act (ADA) standards. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 63 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED Countywide safety Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 29 29 Environmental 89 89 Design Engineering 282 152 130 + Right-of-Way + Construction 2,096 44 2,052 Total 2,497 271 174 2,052 East County Regional AOB 943 149 795 + Gas Tax (c)326 152 175 HSIP 1,228 119 26 1,083 Guardrail Upgrade Project The project will reduce fatalities and severity of injuries resulting from collisions with guardrail terminals. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to upgrade existing guardrail end treatment to the current Caltrans standard. This project is funded by Highway Safety Improvement Project (HSIP). Currently, approximately 167 guardrail are to be upgraded with HSIP Cycle 8 Funds. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 64 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED Countywide reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 + Gas Tax (c)N/A N/A 6,460 7,729 10,000 11,000 12,000 13,000 14,000 15,000 Pavement Surface Treatments Surface treatment projects will rehabilitate the existing roadway pavement, extend the life of the road, and reduce the long-term maintenance costs. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Various locations throughout the County (Subject to Change) Group 1 -Alamo, El Sobrante, North Richmond, Knightsen/Brentwood Area, Franklin Canyon Area Group 2 - Bay Point,Concord, East Richmond, Kensington, Rodeo, Bethel Island Group 3 - Crockett, Pacheco, Contra Costa Centre, Tara Hills, Kirker Pass Road Area, El Sobrante Group 4 - Tassajara Rural Area, Walnut Creek Group 5 - Alamo, Crockett Rural Roads, Pacheco Area, Clayton Area PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 65 of 250 Board of Supervisor District I07-13-20 TWIC Committee Mtg Agenda Packet Page 66 of 250 Note:1) Projects are identified with Supervisor District number and project number for its District. 2) County-wide Projects are not shown on this map. 3) District I contains 119.63 miles of the 662.23 miles of County maintained roadway as of 1/1/2019. I-4 2020 CRIPP –Active Project Map I-5 I-2 I-1 I-307-13-20 TWIC Committee Mtg Agenda Packet Page 67 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District I Project List & Descriptions CRIPP PROJECT DESCRIPTIONS FOR DISTRICT I ACTIVE PROJECTS – These projects are fully funded and will be constructed in the near future. These active projects are mapped on the previous page. I-1. Alhambra Valley Road Embankment Repair Site 1 – West of Castro Ranch Road – This project proposes to repair the roadway embankment and restore the roadway shoulder. Construction is expected in 2020. Measure J and Gas Taxes fund this project. I-2. Alhambra Valley Road Embankment Repair – 0.4 miles west of Bear Creek Road – This project proposes to repair an existing slide along Alhambra Valley Road (approximately 0.4 miles west of Bear Creek Road). Currently the one-way traffic control is established around the eroded embankment. Construction is expected in 2020. Measure J and Gas Taxes fund this project. I-3. Bear Creek Road – Road Embankment Repair – This project proposes to repair the roadway embankment along Bear Creek Road. Currently the one-way traffic control is established around the eroded embankment. Construction is expected in 2020. Gas Taxes fund this project. I-4. Fred Jackson Way First Mile/Last Mile Connection Project (CTPL) – This project is to construct complete street improvements along Fred Jackson Way from Brookside Drive to Grove Avenue. Construction is expected in 2021. Funding Sources include the Federal Active Transportation Program (ATP), Transportation for Livable Communities (TLC), State Coastal Conservancy, and North Richmond AOB funds. This project was previously named Fred Jackson Way Improvements – Grove Avenue to Brookside Drive. I-5. San Pablo Dam Road Traffic Safety Improvements – This project is to install centerline rumble strips along 3.4 miles of San Pablo Dam Road from the Richmond City limit near Kennedy Grove Park to Bear Creek Road/Wildcat Canyon Road. This project is intended to improve driver safety and reduce the number of lane crossover collisions. Construction is schedule for 2020. Funding sources include Highway Safety Improvement Program (HSIP) and Gas Tax Funds. 07-13-20 TWIC Committee Mtg Agenda Packet Page 68 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering Environmental 71 1 50 20 Design Engineering 181 16 165 + Right-of-Way 21 21 + Construction 750 50 700 Total 1,023 17 286 720 + Gas Tax (c)17 17 Measure J RTS 1,006 286 720 Alhambra Valley Embankment Repair Site 1 - West of Castro Ranch Rd The road embankment needs be repaired. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project proposes to repair the roadway embankment and restore the roadway shoulder. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 69 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Alhambra Valley Embankment Repair Site 1 - West of Castro Ranch Road 07-13-20 TWIC Committee Mtg Agenda Packet Page 70 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1, 5 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 61 1 60 Environmental 60 8 26 26 Design Engineering 139 89 50 + Right-of-Way 20 2 18 + Construction 1,100 140 960 Total 1,380 100 294 986 + Gas Tax (c)1,380 100 294 986 Alhambra Valley Road Embankment Repair Purpose is to re-established the roadway to accommodate two-lanes of traffic and widen the roadway for shoulders Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project proposes to repair an existing slide along Alhambra Valley Road (approximately 0.4 miles west of Bear Creek Road). Currently the one-way traffic control is established around the eroded embankment. Construction is expected in 2020. Measure J and Gas Taxes fund this project. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 71 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Alhambra Valley Road Embankment Repair 07-13-20 TWIC Committee Mtg Agenda Packet Page 72 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1, 5 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering Environmental 70 50 20 Design Engineering 196 196 + Right-of-Way 21 21 + Construction 750 50 700 Total 1,037 317 720 Measure J RTS 1,037 317 720 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Bear Creek Road - Road Embankment Repair This project proposes to repair the roadway embankment along Bear Creek Road. Currently the one-way traffic control is established around the eroded embankment. Construction is expected in 2020. Gas Taxes fund this project. The purpose of this project is to repair two embankment sites adjace to the northbound lane of Bear Creek Road. Erosion has occurred at both embankments, resulting in massive deterioration of the road shoulders. The damage has already encroached into the traveled way at Embankment 1. Reparing the two embankments will restore the roadway shoulder and prevent further erosion. The northbound traveled lane at Embankment 1 is currently closed off due to deteriorated pavement, and will be restored to allow two-way traffic flow to resume. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 73 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Bear Creek Road – Road Embankment Repair 07-13-20 TWIC Committee Mtg Agenda Packet Page 74 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1 mobility Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 202 89 80 34 Environmental 196 186 10 Design Engineering 567 219 311 37 + Right-of-Way 344 1 343 + Construction 3,383 3,383 Total 4,692 495 744 3,454 ATP 3,298 131 3,167 Measure J TLC 700 291 409 N Richmond AOB 460 203 134 123 State Coastal Conservancy Prop 1 234 70 164 Fred Jackson Way,First Mile/Last Mile Connection The purpose of the project is to implement a complete street project and improve connectivity and safety for pedestrians and bicyclists in North Richmond. Currently, from Grove Avenue to Wildcat Creek, there are substandard sidewalks with utility poles blocking pedestrian access, and pedestrians often walk on the street as a result. From Wildcat Creek to Brookside Drive, there are no sidewalks or bike lanes. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to construct complete street improvements along Fred Jackson Way from Brookside Drive to Grove Avenue. Construction is expected in FY2021. Funding Sources include the Federal Active Transportation Program (ATP), Transportation for Livable Communities (TLC), State Coastal Conservancy, and North Richmond AOB funds. This project was formerly named Fred Jackson Way Improvements – Grove Avenue to Brookside Drive. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 75 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Fred Jackson Way, First Mile/Last Mile Connection 07-13-20 TWIC Committee Mtg Agenda Packet Page 76 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1 safety Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination 29 11 15 3 Preliminary Engineering Environmental 33 22 11 Design Engineering 99 79 20 + Right-of-Way + Construction 876 876 Total 1,037 111 923 3 + Gas Tax (c)309 55 251 3 HSIP 728 56 672 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT San Pablo Dam Road Traffic Safety Improvements This project is to install centerline rumble strips along 3.4 mile of San Pablo Dam Road from the Richmond City limit near Kennedy Grove Park to Bear Creek Road/Wildcat Canyon Road. This project is to improve driver safety and reduce the number of lane crossover accidents. Construction is schedule for 2020. Funding sources include Highway Safety Improvement Program (HSIP) and Gas Tax Funds. Project is to improve the public safety by constructing rumble strips and upgrading the visibility of regulatory and warning signs along the rural, two lane segment of San Pablo Dam Road. There were four separate fatal collisions in 2015 dealing with lane crossovers. San Pablo Dam Road also ranks 4th in the County for roadways with the highest volume of collisions. A total of 25 collisions occurred between 2011 and 2015. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 77 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads San Pablo Dam Road Traffic Safety Improvements 07-13-20 TWIC Committee Mtg Agenda Packet Page 78 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District I Project List & Descriptions UNFUNDED PROJECTS – This is a comprehensive list of projects that have been conceived but not funded. This project list originated from the following sources: Area of Benefit (AOB) project lists, the Regional Transportation Plan (RTP), Comprehensive Transportation Project List (CTPL) through Contra Costa Transportation Authority (CCTA), Transportation Expenditure Plan (TEP), Department of Conservation and Development (DCD) and a Public Works List that was generated from community input/need. District I includes the North Richmond AOB, Central County AOB, and West County AOB. I-6. Appian Way & Argyle Drive Signal Project (CTPL) – This project proposes to install a new traffic signal at the intersection of Appian Way and Argyle Drive. I-7. Appian Way & Pebble Drive Traffic Signal Project (CTPL) – This project proposes to install a new traffic signal at the intersection of Appian Way and Pebble Drive. I-8. Appian Way & Santa Rita Road Traffic Signal Project (CTPL) – This project proposes to install a new traffic signal at the intersection of Appian Way and Santa Rita Road. I-9. Appian Way Complete Streets Project – San Pablo Dam Road to Valley View Road (RTP) (CTPL) – This Complete Streets Project proposes to improve pedestrian and bicycle safety along Appian Way from San Pablo Dam Road to Valley View Road. I-10. Appian Way Complete Streets Project – Valley View Road to Pinole City Limits (RTP) (CTPL) – This Complete Streets Project proposes to improve pedestrian and bicycle safety along Appian Way from Valley View Road to the Pinole city limit. I-11. Arlington Boulevard Intersection Improvements at Rincon Road/Kensington Road, Westminster Avenue, Sunset Drive, Coventry Road, Amherst Avenue, and Vine Avenue/Highland Avenue – This project proposes to construct safety improvements at the intersections streets listed above. I-12. Bear Creek Road & Happy Valley Road Intersection Improvements (Central County AOB) – This project proposes to install all-way stop at the T- intersection of Happy Valley Road and Bear Creek Road. I-13. Bear Creek Road Safety Improvements – Alhambra Valley Road to the City of Orinda (CTPL) – This project proposes to improve roadway safety along Bear Creek Road. 07-13-20 TWIC Committee Mtg Agenda Packet Page 79 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District I Project List & Descriptions I-14. Brookside Drive Complete Streets – Central Street to Union Pacific Railroad (North Richmond AOB) – This project proposes to widen Brookside Drive from Central Street to the Union Pacific Railroad and provide complete street improvements. I-15. Castro Ranch Road Widening – San Pablo Dam Road to Olinda Road (CTPL) – This project proposes to widen Castro Ranch Road and install sidewalk improvements from San Pablo Dam Road to Olinda Road. I-16. Central Street Complete Street – Brookside Drive and Pittsburg Avenue (North Richmond AOB) – This project proposes to construct complete streets along Central Avenue between Brookside Drive and Pittsburg Avenue. I-17. Chesley Avenue Traffic Calming – Fred Jackson Way and the AOB boundary (North Richmond AOB) – This project proposes to provide traffic calming roadway features along Chesley Avenue between Fred Jackson Way and the North Richmond AOB boundary. I-18. Colusa Avenue Complete Streets Project (CTPL) – This Complete Streets Project proposes to improve pedestrian and bicycle safety along a 0.5-mile stretch of Colusa Avenue. I-19. Fred Jackson Way Complete Streets Project between Chesley and Parr Boulevard (North Richmond AOB) – This project proposes to install pedestrian and bicycle improvements along Fred Jackson Way between Chesley and Parr Boulevard. This project is intended to meet the County’s Complete Street Policy. I-20. Fred Jackson Way Complete Streets Project – Intersection with Chesley Avenue (North Richmond AOB) – This project proposes to install traffic calming improvements at the intersection of Fred Jackson Way and Chesley Avenue. This project is intended to meet the County’s Complete Street Policy. I-21. Fred Jackson Way/Goodrick Avenue Realignment (CTPL) – This project proposes to realign these streets to form one intersection instead of two offset intersections. I-22. Goodrick Avenue – Fred Jackson Way to AOB Boundary (North Richmond AOB) – This project would enhance vehicle, bicycle, and pedestrian safety by providing bike lanes and sidewalks along Goodrick Avenue. I-23. La Paloma Road Pedestrian and Roadway Improvements (CTPL) – This project proposes to install traffic safety and pedestrian improvements along La Paloma Road. 07-13-20 TWIC Committee Mtg Agenda Packet Page 80 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District I Project List & Descriptions I-24. Market Avenue Complete Streets – Fred Jackson Way to 7th Street (North Richmond AOB) – This project proposes to install pedestrian improvements and traffic calming improvements along Market Avenue between Fred Jackson and 7th Street. I-25. North Richmond Improvements – Pittsburg Avenue Extension from Fred Jackson Way to 7th Street Extension (CTPL) – This project proposes to extend Pittsburg Avenue from Fred Jackson Way to the projection of 7th Street. I-26. North Richmond Truck Route – Parr Boulevard to Market Avenue (North Richmond AOB) (CTPL) – This project proposes to reduce truck traffic in the residential area of North Richmond by upgrading existing roadways or constructing new roads to accommodate truck traffic from Parr Boulevard to Market Avenue. I-27. Olinda Road Pedestrian Improvements – Valley View Road to 850 feet south of Valley View Road (CTPL) – The project proposes to close a gap of sidewalk along Olinda Road in order to provide pedestrian facilities to De Anza High School and Olinda Elementary School. I-28. Parr Boulevard Complete Street Project – Richmond Parkway to Union Pacific Railroad (North Richmond AOB) (CTPL) – This project proposes to widen Parr Boulevard from Richmond Parkway to the UPRR crossing and provide complete street improvements. I-29. Pinole Valley Road Safety Improvements between Pinole City Limits and the AOB Boundary (AOB) – This project proposes safety improvement on Pinole Valley Road between the Pinole City Limits and the AOB Boundary. I-30. Pitt Way Roadway Improvements (DCD) – This project proposes to construct a new collector roadway along Pitt Way from San Pablo Dam Road to Hillcrest Road in the future town square area of El Sobrante. I-31. Pittsburg Avenue Intersection Improvements (North Richmond AOB) – This project proposes to construct intersection improvements at the intersection of Pittsburg Avenue and Richmond Parkway. I-32. Pittsburg Avenue Widening – Fred Jackson Way to Richmond Parkway (North Richmond AOB) – This project proposes to widen and construct complete street improvements on Pittsburg Avenue from Fred Jackson Way to Richmond Parkway. I-33. Rincon Road Widening and Pedestrian Improvements Project (CTPL) – This project proposes to widen Rincon Road and construct pedestrian improvements between the two Arlington Avenue intersections. 07-13-20 TWIC Committee Mtg Agenda Packet Page 81 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District I Project List & Descriptions I-34. San Pablo Avenue Complete Streets Project (CTPL) – This project proposes to upgrade San Pablo Avenue to multi-modal roadway from Tara Hills Drive to the City of Pinole. I-35. San Pablo Dam Road & Greenridge Drive Signal Improvements (CTPL) – This project proposes to install a new traffic signal at the intersection of San Pablo Dam Road and Greenridge Drive. I-36. San Pablo Dam Road Pedestrian Improvements – Tri Lane to Appian Way (CTPL) – This project proposes to install pedestrian improvements along San Pablo Dam Road from Tri Lane to Appian Way. This project may be incorporated into the other San Pablo Dam Road projects. I-37. San Pablo Dam Road Safety Improvements (AOB) – This project proposes to construct safety improvements and bicycle improvements along San Pablo Dam Road and within the West County AOB limits. I-38. Tara Hills Drive Complete Streets Project (CTPL) – This project proposes to install bicycle and pedestrian improvements along Tara Hills Drive from San Pablo Avenue to the end of Tara Hills Drive and Cornelius Drive to the City of Pinole. I-39. Tara Hills Elementary School, Shannon Elementary School, Pinole Middle School Pedestrian Crossing Upgrades – This project is improve pedestrian crossing at several schools in the Tara Hills area. I-40. Valley View Road Widening – San Pablo Dam Road to Appian Way (CTPL) – This project proposes to widen Valley View Road from San Pablo Dam Road to Appian Way. I-41. Verde Elementary School Secondary Access (North Richmond AOB) – This project proposes to provide a secondary access to Verde Elementary. Currently, vehicular traffic can only enter from Giaramita Street and its bridge. 07-13-20 TWIC Committee Mtg Agenda Packet Page 82 of 250 Board of Supervisor District II07-13-20 TWIC Committee Mtg Agenda Packet Page 83 of 250 Note:1) Projects are identified with Supervisor District number and project number for its District. 2) County-wide Projects are not shown on this map. 3) District II contains 102.13 miles of the 662.23 miles of County maintained roadway as of 1/1/2019. 2020 CRIPP –Active Project Map II-1 II-6 II-2 II-3 II-4 II-5 07-13-20 TWIC Committee Mtg Agenda Packet Page 84 of 250 CRIPP PROJECT DESCRIPTIONS FOR DISTRICT II ACTIVE PROJECTS – These projects are fully funded and will be constructed in the near future. These active projects are mapped on the previous page. II-1. Danville Boulevard/Orchard Court Complete Streets Improvements (Alamo AOB) – This project is to construct a roundabout at the Danville Boulevard/Orchard Court intersection and install complete street improvements along Danville Boulevard between Jackson Way and Stone Valley Road in Downtown Alamo. Construction is scheduled for the summer of 2021. Funds collected from developers, Federal Highway Safety Improvement Program (HSIP), and Measure J, fund this project. II-2. Freeman Road and Briones Valley Road Bridge Maintenance Project – This project is to perform bridge maintenance by removing and application of paint to the steel bridge structure. Construction schedule is pending the award of the federal grant. A federal grant and Gas Taxes fund this project. II-3. Happy Valley Road Embankment Repair – This project is to repair an existing slide along Happy Valley Road and restore the roadway to its original pavement width. Construction is expected in 2020. A federal grant and Gas Taxes fund this project. II-4. Norris Canyon Road Safety Improvements – West of Ashbourne Drive – This project is to widen a rural section of roadway for shoulders and bike lane. Construction is projected for 2022. This project is funding by Gas Tax Funds. II-5. Pinehurst Road Sinkhole and Culvert Repair – This project is to repair the undermining of the culvert and roadway. Construction is scheduled for 2020. A federal grant and Gas Taxes fund this project. II-6. Pleasant Hill Road Bridge Rehabilitation (Bridge No. 28C0154) – This project is to extend the service life of the Pleasant Hill Road Bridge over Taylor Boulevard. Construction is estimated for 2022. Highway Bridge Program (HBP) and Gas Taxes fund this project. II-7. Treat Boulevard Corridor Improvements – This project is to improve safety and connectivity for pedestrian and bicyclist along Treat Boulevard between North Main Street and Jones Road. Construction is scheduled for 2024. The State Transportation Improvement Program (STIP) and Gas Taxes fund this project. 07-13-20 TWIC Committee Mtg Agenda Packet Page 85 of 250 II-8. Walnut Creek Crosswalk Improvements – This project is to improve pedestrian safety at two crosswalk locations near unincorporated Walnut Creek. One of the two crossings is located in District II at the intersection of Olympic Boulevard and Bridgefield Road. The project is scheduled for construction in the summer of 2020. The Highway Safety Improvement Program (HSIP), Transportation Development Act (TDA), and Gas Taxes fund this project. 07-13-20 TWIC Committee Mtg Agenda Packet Page 86 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2 efficiency Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 54 51 2 Environmental 101 97 4 Design Engineering 630 208 352 70 + Right-of-Way 390 13 377 + Construction 2,970 557 2,413 Total 4,145 369 736 627 2,413 HSIP 2,718 125 50 130 2,413 Measure J Regional 1,370 186 687 497 Trust 8192 57 57 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Danville Boulevard/Orchard Court Complete Streets Improvements This project is to construct a roundabout at the Danville Boulevard/Orchard Court intersection and install complete street improvements along Danville Boulevard between Jackson Way and Stone Valley Road in Downtown Alamo. Construction is schedule for construction in the summer of 2021. This project is funded by Highway Safety Improvement Program (HSIP), Measure J, and Developer Fees. The Danville Boulevard/Orchard Court intersection is ranked within the top five locations in the County with the highest number of bicycle and/or pedestrian collisions at an intersection. The increased amount of motorized and non-motorized users is due to this corridor being part of Downtown Alamo, with the Alamo Plaza shopping center on one side and another shopping center across the street. Mature trees in the sidewalk have damaged the existing sidewalks and made them uneven. The project aims to improve safety through the corridor for all users by improving sidewalks to meet ADA requirements and reducing conflicts at this intersection. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 87 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Danville Boulevard/Orchard Court Complete Streets Improvements 07-13-20 TWIC Committee Mtg Agenda Packet Page 88 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2, 3 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering Environmental Design Engineering 150 50 50 50 + Right-of-Way 25 25 + Construction 694 694 Total 869 50 50 75 694 HBP 869 50 50 75 694 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Freeman Road and Briones Valley Road Bridge Maintenance Project In District II, Freeman Road Bridge Maintenance Project over Las Trampas Creek is to clean and repaint all structural steel members, replace joint seals at the abutments, backfill any eroded embankment slope paving with concrete, and seal the concrete curbs and roadway deck. In District III, Briones Valley Road Preventative Maintenance project includes repainting the bridge superstructure and replacing or tightening all bolted connections between the deck and steel plates. This is a bridge maintenance project to paint the bridge for long-term upkeep of the bridge. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 89 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Freeman Road and Briones Valley Road Bridge Maintenance Project Note: See Board of Supervisior District III for other project site. 07-13-20 TWIC Committee Mtg Agenda Packet Page 90 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination 8 4 4 Preliminary Engineering Environmental 75 3 72 Design Engineering 199 53 146 + Right-of-Way 20 10 10 + Construction 309 309 Total 717 141 257 319 + Gas Tax (c)460 141 319 Measure J RTS 257 257 Happy Valley Road - Embankment Repair The project is needed to restore the roadway to its original pavement width. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to repair an existing slide along Happy Valley Road and restore the roadway to its original pavement width. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 91 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Happy Valley Road – Embankment Repair 07-13-20 TWIC Committee Mtg Agenda Packet Page 92 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2 mobility Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 171 60 61 30 20 Environmental 175 15 100 60 Design Engineering 350 55 195 70 30 + Right-of-Way 30 20 10 + Construction 1,594 161 1,433 Total 2,320 115 291 210 271 1,433 + Gas Tax (c)890 115 161 614 Measure J Regional 1,430 291 210 110 819 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Norris Canyon Road Safety Improvements The project will improve safety on Norris Canyon Road by widening a segment west of Ashbourne Drive to the County/City limits and installing a safety rail/guard rail on the south side of the roadway. Installation of a guardrail is warranted where the roadway is immediately adjacent to San Catanio Creek. To minimize environmental impact and avoid filling the creek bank to construct road shoulders, the proposed safety project includes construction of a retaining wall on the northside of the roadway to allow for widened shoulders and support a safety rail to keep motorists from leaving the roadway. Currently the travel lanes vary between 7’ and 10’ wide with little to no shoulder for vehicles. There is a 1:1 slope on the north and south sides of the roadway. By widening the most narrow section of roadway, vehicles will comfortably be able to drive on Norris Canyon Road without having to stop and let other vehicles through the narrow sections first. The guardrail is also needed to ensure vehicles don’t run off the road into San Catanio Creek. The creek bed is nearly a 20’ drop from the travel way at a 1:1 slope. The guardrail will keep vehicles on the roadway and prevent potentially severe injury. Pavement widening will provide a wider travel way and shoulders. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 93 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Norris Canyon Road Safety Improvements 07-13-20 TWIC Committee Mtg Agenda Packet Page 94 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2 safety Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 34 34 Environmental 150 37 113 Design Engineering 173 98 75 + Right-of-Way 24 4 20 + Construction 381 381 Total 840 217 623 FHWA/FEMA/Cal OES 564 564 + Gas Tax (c)267 208 59 Measure J RTS 8 8 Pinehurst Road - Sinkhole and Culvert Repair Project would ensure that storm drainage is conveyed through the culvert instead of bypassing the culvert to the side and bottom. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to repair the undermining of the culvert and roadway. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 95 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Pinehurst Road - Sinkhole and Culvert Repair 07-13-20 TWIC Committee Mtg Agenda Packet Page 96 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2, 4 mobility Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering Environmental 70 15 45 10 Design Engineering 314 120 194 + Right-of-Way + Construction 1,758 1,758 Total 2,142 15 45 130 194 1,758 Former RDA 546 15 45 130 194 162 STIP 1,596 1,596 Treat Boulevard Corridor Improvements The purpose of this project is to improve safety and connectivity for pedestrians and bicyclists along Treat Blvd. Treat Blvd currently creates challenges for the users of transit as the wide roadways (up to nine lanes) and intersections become barriers for pedestrians to cross. Without bicycle infrastructure, the first/last mile for transit users becomes even more constrained. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to improve safety and connectivity for pedestrian and bicyclist along Treat Boulevard between North Main Street and Jones Road. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 97 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Treat Boulevard Corridor Improvements 07-13-20 TWIC Committee Mtg Agenda Packet Page 98 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2, 4 safety Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 32 31 1 Environmental 23 8 15 Design Engineering 160 112 48 + Right-of-Way 20 20 + Construction 303 303 Total 538 151 387 + Gas Tax (c)250 80 170 HSIP 224 31 194 TDA 64 41 23 Walnut Creek Crosswalk Improvements Improve pedestrian safety at two pedestrian crosswalk locations in unincorporated Walnut Creek. The purpose of this project is to improve pedestrian safety at two crosswalk locations in unincorporated Walnut Creek—the intersection of Olympic Boulevard and Bridgefield Road and the intersection of Walden Road and Westcliffe Lane. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to improve pedestrian safety at two crosswalk locations in the vicinity of unincorporated Walnut Creek. One of the two crossings is located in District II at the intersection of Olympic Boulevard and Bridgefield Road. The other project site is located in District IV at Walden Road and Westcliffe Lane. The project is schedule for construction in the summer of 2020. This project is funded by the Highway Safety Improvement Program (HSIP), Transportation Development Act (TDA), and Gas Tax Funds. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 99 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Walnut Creek Crosswalk Improvements Note: See Board of Supervisior District IV for other project site. 07-13-20 TWIC Committee Mtg Agenda Packet Page 100 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District II Project List & Descriptions UNFUNDED PROJECTS – This is a comprehensive list of projects that have been conceived but not funded. This project list originated from the following sources: Area of Benefit (AOB) project lists, the Regional Transportation Plan (RTP), Comprehensive Transportation Project List (CTPL) through Contra Costa Transportation Authority (CCTA), Transportation Expenditure Plan (TEP), and a Public Works List that was generated from community input/need. District II includes Alamo AOB, South Walnut Creek AOB, South County AOB, and Central County AOB. II-9. Bear Creek Road & Happy Valley Road Intersection Improvements (Central County AOB) – This project proposes to construct all-way stop control at the T-intersection. II-10. Bear Creek Road Safety Improvement – Alhambra Valley Road to the City of Orinda (CTPL) – This project proposes to construct safety improvements along Bear Creek Road from Alhambra Valley Road to the City of Orinda. II-11. Boulevard Way Bicycle and Pedestrian Project (CTPL) – This project proposes to construct bicycle and pedestrian improvements along Boulevard Way. II-12. Danville Boulevard & Hemme Avenue Intersection Improvements (Alamo AOB) – This project proposes to extend the existing northbound left turn lane on Danville Boulevard at the intersection of Danville Boulevard and Hemme Ave. This is also located near Rancho Romero Elementary School. II-13. Dewing Lane Pedestrian Bridge (Central County AOB) – This project proposes to construct a pedestrian bridge over Las Trampas Creek in the vicinity of Dewing Lane (unincorporated Walnut Creek). II-14. Fish Ranch Road Safety Improvements - SR 24 to Grizzly Peak Road (CTPL) (Central County AOB) – This project proposes to enhance vehicle and bicycle safety by widening Fish Ranch Road to provide roadway shoulders between Grizzly Peak Road to State Route 24. II-15. Hemme Avenue Sidewalk (Alamo AOB) – This project proposes to extend the existing sidewalk on the north side of Hemme Avenue from Barbee Lane to La Sonoma Way, just west of Rancho Romero Elementary School. II-16. Hemme Avenue Sidewalk (CTPL) – This project proposes to extend the existing sidewalk on the north side of Hemme Avenue from the Rancho Romero Elementary School to the Iron Horse Trail. II-17. I-680 Bikeway Signage – Rudgear Road to Danville Town Limits (CTPL) – This project proposes to install signage for bicyclists in unincorporated portions of the I-680 Bikeway. 07-13-20 TWIC Committee Mtg Agenda Packet Page 101 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District II Project List & Descriptions II-18. Iron Horse Trail Flashers (CTPL) – This project proposes to install pedestrian actuated flashers at select locations along the full length of the Iron Horse Trail. II-19. Miranda Avenue Pathway Improvements – Stone Valley Road to Stone Valley Middle School (Alamo AOB) – This project proposes to construct sidewalk improvements along Miranda Avenue from Stone Valley Middle School to Stone Valley Road. II-20. Norris Canyon Road Shoulder Widening – Ashbourne Drive to Alameda County Limits (CTPL) – This project proposes to widen the shoulders along Norris Canyon Road from Ashbourne Drive to the Alameda County Line. II-21. Olympic Boulevard & Boulevard Way & Tice Valley Boulevard Intersection Improvements (Central County AOB) – This project proposes to construct intersection modifications to improve the traffic circulation for the south leg of the intersection of Olympic Boulevard and Tice Valley Boulevard. II-22. Olympic Boulevard & Bridgefield Road Signal Project (CTPL) – This project proposes to construct a traffic signal at the intersection of Olympic Boulevard and Bridgefield Road. (See also Active Project #II-4). II-23. Olympic Corridor Pedestrian and Bicycle Improvements (Central County AOB) – This project proposes to construct pedestrian and bicycle improvements along the Olympic Boulevard Corridor to connect South Walnut Creek. II-24. Pedestrian and Bicycle Improvements on Livorna Road, Stone Valley Road, and Danville Boulevard (CTPL) – This project proposes to construct pedestrian and bicycle improvements along Livorna Road, Stone Valley Road, and Danville Boulevard. II-25. Pedestrian Safety Improvements at Stone Valley Middle and Rancho Romero School (Alamo AOB) – This project proposes to construct pedestrian and bicycle improvements near Stone Valley Middle School and Rancho Romero Elementary School. (Also see Hemme Avenue Sidewalk project and Miranda Avenue Pathway Improvements – Stone Valley Road to Stone Valley Middle School project) II-26. Pinehurst Road Bicycle Improvements (Central County AOB) – This project proposes to construct bicycle turnouts/rest stops every half-mile along Pinehurst Road and Canyon Road. 07-13-20 TWIC Committee Mtg Agenda Packet Page 102 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District II Project List & Descriptions II-27. Pleasant Hill Road Bicycle Improvements – Geary Road to Taylor Boulevard (Central County AOB) – This project proposes to construct curb, gutter and sidewalk and prohibit curbside parking to create bicycle lanes along Pleasant Hill Road. II-28. Reliez Valley Road Bicycle Improvements – North of Grayson Road to Withers Avenue (Central County AOB) – This project proposes to construct bicycle lanes by widening the shoulders along Reliez Valley Road. There are drainage modifications and parking considerations to be resolved. II-29. Springbrook Road Bicycle and Pedestrian Improvements (Central County AOB) – This project proposes to construct sidewalk improvements and stripe shoulder along Springbrook Road starting near Gilmore Court to about Regency Court. II-30. Stone Valley Road at Roundhill Road Intersection Improvements (CTPL) – This project proposes to construct crosswalk improvements at the Roundhill Road Intersection. II-31. Stone Valley Road Left Turn Lane at Smith Road (CTPL) – This project proposes to install a left turn lane at Smith Road. II-32. Tice Valley Boulevard Bike and Pedestrian Project (Central County AOB) – This project proposes to construct bicycle and pedestrian improvements along Tice Valley Boulevard. (Also see Tice Valley Linear Park in completed projects) 07-13-20 TWIC Committee Mtg Agenda Packet Page 103 of 250 Board of Supervisor District III07-13-20 TWIC Committee Mtg Agenda Packet Page 104 of 250 Note:1) Projects are identified with Supervisor District number and project number for its District. 2) County-wide Projects are not shown on this map. 3) District III contains 218.91 miles of the 662.23 miles of County maintained roadway as of 1/1/2019. 2020 CRIPP –Active Project Map III-1 III-2 III-5 III-3 III-7III-6 III-407-13-20 TWIC Committee Mtg Agenda Packet Page 105 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District III Project List & Descriptions CRIPP PROJECT DESCRIPTIONS FOR DISTRICT III ACTIVE PROJECTS – These projects are fully funded and will be constructed in the near future. These active projects are mapped on the previous page. III-1. Byron Highway / Byer Road Safety Improvements (Discovery Bay AOB and East County Regional AOB) – This project is to install safety improvements along the frontage of Excelsior Middle School. These improvements include the construction of a left turn pocket from southbound Byron Highway to eastbound Byer Road, a two-way left turn lane on Byron Highway, and widening of the roadway shoulders. Construction is scheduled for 2021. Highway Safety Improvement Program (HSIP), Discovery Bay AOB, Gas Taxes, and East County Regional AOB fund this project. III-2. Byron Highway Bridge Replacement over California Aqueduct – Bridge No. 28C0121 (Project Sponsor: Dept. of Water Resources) – This project is to replace the Byron Highway Bridge, approximately 1.4 miles northwest of the Alameda County Line. Construction is projected for 2022. This project is funded with Highway Bridge Program (HBP) and Gas Taxes, and is co-sponsored with the Department of Water Resources. III-3. Camino Tassajara Safety Improvements – Windemere Parkway to Alameda County Line – This project is to realign and widen the Camino Tassajara at the S-curve at the County Line, south of Windemere Parkway to include additional travel lanes, bike lines, and Class I trail between the City of Dublin and County. Construction is scheduled for 2023. This project is co-sponsored with the City of Dublin. Developer Fees fund this project. III-4. Freeman Road and Briones Valley Road Bridge Maintenance Project – This project is to perform bridge maintenance by removing and application of paint to the steel bridge structure. III-5. Marsh Creek Road Bridge Replacement – Bridge No. 28C0143 & 28C0145 – This project is replace two bridges on Marsh Creek Road, located approximately 3.0 miles east of Deer Valley Road and 7.3 miles east of Morgan Territory Road. Preliminary engineering is currently underway. Construction is scheduled in 2021. Highway Bridge Program (HBP), East County Regional AOB, and Gas Taxes fund this project. III-6. Walnut Boulevard Shoulder Widening – This project is to construct bicycle roadway improvements along Walnut Boulevard (East County) from Marsh Creek Road to Vasco Road. Construction is projected for 2021. Transportation Development Act (TDA) and Gas Taxes fund this project. 07-13-20 TWIC Committee Mtg Agenda Packet Page 106 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District III Project List & Descriptions III-7. Vasco Road Safety Improvements (Phase 2) – This project proposes to widen the roadway and construct a median barrier for about 1.5 miles of Vasco Road, approximately 3.0 miles to 5.5 miles north of the Alameda/Contra Costa County Line. Regional Measure 3, Gas Taxes, and Measure J fund this project. 07-13-20 TWIC Committee Mtg Agenda Packet Page 107 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 3 safety Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination 94 82 4 4 4 Preliminary Engineering Environmental 114 99 1 1 14 Design Engineering 338 225 60 53 + Right-of-Way 180 30 150 + Construction 917 917 Total 1,643 406 95 208 935 Disco Bay AOB 170 170 East County Regional AOB 412 170 51 190 + Gas Tax (c)445 18 427 HSIP 617 65 44 508 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Byron Highway/Byer Road Intersection Improvements This project is to install safety improvements along the frontage of Excelsior Middle School. These improvements include the construction of a left turn pocket from southbound Byron Highway to eastbound Byer Road, a two-way left turn lane on Byron Highway, and a widening of the roadway shoulders. Construction is scheduled for 2021. This project is funded by Highway Safety Improvement Program (HSIP), Discovery Bay AOB, and East County Regional AOB. The purpose of this project is to improve traffic circulation along the frontage of the Excelsior Middle School and at uncontrolled intersection of Byron Highway and Byer Road. The Byron Union School District has requested the County’s assistance in addressing a series of accidents that occurred along the frontage of the school. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 108 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Byron Highway/Byer Road Safety Improvements 07-13-20 TWIC Committee Mtg Agenda Packet Page 109 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 3 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 455 135 150 150 20 Environmental Design Engineering 2,328 796 365 450 450 230 37 + Right-of-Way 300 30 140 110 20 + Construction 16,665 700 6,500 7,000 2,465 Total 19,748 796 530 740 1,410 6,770 7,037 2,465 DWR 2,549 145 185 280 835 800 304 + Gas Tax (c)1,366 482 45 65 100 288 302 84 HBP 15,834 315 340 490 1,030 5,647 5,935 2,077 Byron Highway Bridge Replacement over California Aqueduct (Bridge No. 28C0121) The existing bridge is approaching the end of its service life. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to replace the Byron Highway Bridge, approximately 1.4 miles northwest of the Alameda County Line. Construction is scheduled for 2023. This project is funded by Highway Bridge Program (HBP) and Gas Tax Funds, and is co-sponsored with the Department of Water Resources. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 110 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Byron Highway Bridge Replacement over California Aqueduct (Bridge No. 28C0121) 07-13-20 TWIC Committee Mtg Agenda Packet Page 111 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 3 safety Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination 286 121 20 20 20 15 30 Preliminary Engineering 20 11 Environmental 2,807 15 200 200 2,392 Design Engineering 1,867 129 702 702 329 2 4 + Right-of-Way 6,710 3 325 6,382 + Construction 18,623 760 8,450 9,413 Total 30,314 280 922 1,247 9,883 8,467 9,447 City of Dublin funds 12,492 22 452 477 2,375 4,202 4,964 + Gas Tax (c)483 483 SCC D. Valley 4,000 4,000 SCC Sub-Regional 4,481 208 4,205 So County AOB 2,007 1,947 60 TVTC Fee 6,851 50 470 770 5,561 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Camino Tassajara Safety Improvements - South of Windemere Parkway to County Line This project is to realign the Camino Tassajara at the S-curve at the County Line, south of Windemere Parkway. This project will be also adding bike lanes along Camino Tassajara. Construction is scheduled for 2023. This project is co-sponsored with the City of Dublin. This project is funded by Developer Fees. Improve safety along roadway. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 112 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Camino Tassajara Safety Improvements – South of Windemere Parkway to County Line 07-13-20 TWIC Committee Mtg Agenda Packet Page 113 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2, 3 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering Environmental Design Engineering 150 50 50 50 + Right-of-Way 25 25 + Construction 694 694 Total 869 50 50 75 694 HBP 869 50 50 75 694 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Freeman Road and Briones Valley Road Bridge Maintenance Project In District II, Freeman Road Bridge Maintenance Project over Las Trampas Creek is to clean and repaint all structural steel members, replace joint seals at the abutments, backfill any eroded embankment slope paving with concrete, and seal the concrete curbs and roadway deck. In District III, Briones Valley Road Preventative Maintenance project includes repainting the bridge superstructure and replacing or tightening all bolted connections between the deck and steel plates. This is a bridge maintenance project to paint the bridge for long-term upkeep of the bridge. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 114 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Note: See Board of Supervisior District II for other project site. Freeman Road and Briones Valley Road Bridge Maintenance Project 07-13-20 TWIC Committee Mtg Agenda Packet Page 115 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 3 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering Environmental Design Engineering 2,253 1,023 400 400 380 50 + Right-of-Way 413 13 70 260 70 + Construction 11,200 700 9,000 1,500 Total 13,867 1,037 470 660 1,150 9,050 1,500 East County Regional AOB 270 150 120 + Gas Tax (c)2,511 655 80 345 1,031 400 HBP 11,085 381 320 460 805 8,019 1,100 Marsh Creek Road Bridge Replacement (Bridge No. 28C143 & 28C145) The existing bridges are approaching the end of their service life. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is replace two bridges on Marsh Creek Road, located approximately 3.0 miles east of Deer Valley Road and 7.3 miles east of Morgan Territory Road. Preliminary engineering is currently underway. Construction is scheduled in 2022. This project is funded by Highway Bridge Program (HBP), East County Regional AOB, and Gas Tax Funds. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 116 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Marsh Creek Road Bridge Replacement (Bridge No. 28C0143 & 28C0145) 07-13-20 TWIC Committee Mtg Agenda Packet Page 117 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 3 safety Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination 97 88 2 3 2 2 Preliminary Engineering 250 100 150 Environmental 150 100 50 Design Engineering 1,335 1,335 + Right-of-Way 245 245 + Construction 17,600 1,760 14,080 1,760 Total 19,691 1,882 202 1,763 14,082 1,762 + Gas Tax (c)2,961 354 3 842 1,762 Measure C 327 327 Measure J RTS 202 202 Prop 1B 1,200 1,200 Regional Measure 3 15,000 1,760 13,240 Vasco Road Safety - Phase 2 Vasco Road is a major rural arterial that is heavily traveled by commuters and has a history of severe collisions. The project will improve safety on Vasco Road by reducing cross median crashes. These long term upgrades and improvements will provide substantial safety improvements to the roadway. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project proposes to widen the roadway and construct a median barrier for about 1.5 miles of Vasco Road, approximately 3.0 miles to 5.5 miles north of the Alameda/Contra Costa County Line. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 118 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Vasco Road Safety – Phase 2 07-13-20 TWIC Committee Mtg Agenda Packet Page 119 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 3 mobility Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 30 7 23 Environmental Design Engineering 100 100 + Right-of-Way 15 10 5 + Construction 166 166 Total 311 7 133 171 + Gas Tax (c)236 7 58 171 TDA 75 75 Walnut Boulevard Shoulder Widening Improve bicyclist safety along Walnut Boulevard between Marsh Creek Road and Vasco Road in unincorporated Brentwood. Walnut Boulevard is included in the 2009 Contra Costa Countywide Bicycle and Pedestrian Plan as a future Class II bike lane, and constructing this project would continue the progress towards creating this bike facility. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to construct bicycle roadway improvements along Walnut Boulevard (East County) from Marsh Creek Road to Vasco Road. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 120 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Walnut Boulevard Shoulder Widening 07-13-20 TWIC Committee Mtg Agenda Packet Page 121 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District III Project List & Descriptions UNFUNDED PROJECTS – This is a comprehensive list of projects that have been conceived but not funded. This project list originated from the following sources: Area of Benefit (AOB) project lists, the Regional Transportation Plan (RTP), Comprehensive Transportation Project List (CTPL) through Contra Costa Transportation Authority (CCTA), Transportation Expenditure Plan (TEP), and a Public Works List that was generated from community input/need. District III includes the Discovery Bay AOB, East County Regional AOB, and Bethel Island AOB. III-8. Balfour Road & Byron Highway Intersection Improvements (East County Regional AOB) – This project proposes to install a traffic signal and exclusive left- turn lanes at the intersection of Balfour Road and Byron Highway. Left turn lanes will be installed with Balfour Road Shoulder widening (see also Balfour Road Shoulder Widening - Sellers Avenue to Bixler Road). III-9. Balfour Road Shoulder Widening – Deer Valley Rd to Brentwood City Limits – This project proposes to widen about 1.2 miles of Balfour Road between Deer Valley Road and Brentwood City Limits. III-10. Bethel Island Road & Sandmound Road Intersection Improvements– This project proposes to construct intersection improvements at the intersection of Bethel Island Road and Sandmound Boulevard. III-11. Bethel Island Road Improvements – Taylor Road to Sandmound Boulevard (Bethel Island AOB) – This project proposes to add bicycle and pedestrian improvements along Bethel Island Road between Sandmound Boulevard and Taylor Road. III-12. Bixler Road Improvements – SR 4 to Byer Road (Discovery Bay AOB) – This project proposes to widen Bixler Road to include shoulders and bike lane from State Route 4 south to Byer Road. III-13. Byer Road Improvements – Bixler Road to Byron Highway (Discovery Bay AOB) – This project proposes to widen Byer Road to include shoulder and bike lanes from Byron Highway east to Bixler Road. III-14. Byron Highway / SR4 / Point of Timber Intersection Improvements (East County Regional AOB) – This project proposes intersection improvements at the intersection of Byron Highway, State Route 4, and Point of Timber. These improvements include installation of a traffic signal and the addition of an exclusive left turn lane and an exclusive right turn lane. 07-13-20 TWIC Committee Mtg Agenda Packet Page 122 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District III Project List & Descriptions III-15. Byron Highway Safety Improvements (Various Locations) – This project proposes to construct safety improvements at various locations along Byron Highway to include shoulder widening, drainage improvements, and intersection improvements. III-16. Byron Highway Widening – Camino Diablo to the Alameda County Line (East County Regional AOB) – This project proposes to widen 5 miles of roadway shoulders on Byron Highway from Camino Diablo to the Alameda County Line. III-17. Byron Highway Widening – Chestnut Street to State Route 4 (East County Regional AOB) – This project proposes to widen shoulders for 1.6 miles of Byron Highway from Chestnut Street to State Route 4. III-18. Byron Highway Widening – Delta Road to Chestnut Street (East County Regional AOB) – This project proposes to widen shoulders for 2.5 miles of Byron Highway from Delta Road to Chestnut Street. III-19. Byron Highway Widening – SR 4 to Camino Diablo (East County Regional AOB) – This project proposes to widen shoulders along Byron Highway from State Route 4 south to Camino Diablo. III-20. Byron Highway Extension to Bethel Island – Delta Road to Bethel Island (CTPL) – This project proposes to extend Byron Highway northward, from its current northern terminus at Delta Road, to the East Cypress Road/Bethel Island Road intersection. Project will include the construction of a bridge over Rock Slough. III-21. Camino Diablo Widening – Vasco Road to Byron Highway (East County Regional AOB) – This project proposes to widen shoulders on Camino Diablo from Vasco Road east to Byron Highway. III-22. Camino Tassajara Safety Improvements (Various Locations) – This project proposes to construct roadway and intersection improvements along Camino Tassajara to include shoulder widening and drainage improvements (Also see Active Project III-3). III-23. Chestnut Street Widening – Sellers Avenue to Byron Highway (East County Regional AOB) – This project proposes to widen shoulders along Chestnut Street from Sellers Avenue east to Byron Highway. III-24. Clifton Court Road Bridge Repair (Bridge No. 28C0403) – This project is to repair and maintain the bridge on Clifton Court Road. III-25. Clipper Drive Improvements - Newport Drive to Discovery Bay Boulevard (Discovery Bay AOB) – This project proposes to construct traffic calming measures along Clipper Drive from Newport Drive east to Discovery Bay Boulevard. 07-13-20 TWIC Committee Mtg Agenda Packet Page 123 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District III Project List & Descriptions III-26. Deer Valley Road Safety Improvements (Various Locations) – This project proposes to construct safety improvements along Deer Valley Road at various locations. III-27. Delta Road Sidewalk & Bike Lanes Project – Knightsen Avenue to Knightsen Elementary School (CTPL) – This project proposes to construct sidewalk and Class II bike lanes along Delta Road. III-28. Delta Road Widening – Byron Highway to Holland Tract Road (East County Regional AOB) – This project proposes to widen shoulders for about 1.7 miles of Delta Road from Byron Highway to Holland Tract Road. III-29. Delta Road Widening – Sellers Avenue to Byron Highway (East County Regional AOB) – This project proposes to widen shoulders for about 2.0 miles of Delta Road from Sellers Avenue to Byron Highway. III-30. Discovery Bay Boulevard & Clipper Drive Intersection Improvements (Discovery Bay AOB) – This project proposes to modify intersection traffic control to improve level of service at the intersection of Discovery Bay Boulevard and Clipper Drive. III-31. Eden Plains Road Widening – Sunset Road to Marshall Court (CTPL) – This project proposes to widen Eden Plains Road to two-lane arterial standard design, with two 12-foot lanes and paved shoulders on both sides of the street. III-32. Gateway Road Project – Bethel Island Road to Piper Road (Bethel Island AOB) – This project proposes to provide walkable shoulders and bikeway for about 1.0 mile of Gateway Road from Bethel Island Road to Piper Road. III-33. Highland Road Improvements – Camino Tassajara to Alameda County Line – This project proposes to construct safety improvements along Highland Road from Camino Tassajara to the Alameda County Line. III-34. Holway Drive Safety Improvements – Main Street to Camino Diablo Road (CTPL) – This project proposes to connect sidewalks, curb ramps, and crosswalks. III-35. Knightsen Avenue & Delta Road Intersection Improvements (East County Regional AOB) – This project proposes to install a new traffic signal and exclusive left turn lanes at the intersection of Knightsen Avenue and Delta Road. III-36. Knightsen Avenue Widening – East Cypress Road to Delta Road (East County Regional AOB) – This project proposes to widen shoulders for about 1.6 miles of Knightsen Avenue from East Cypress Road to Delta Road. 07-13-20 TWIC Committee Mtg Agenda Packet Page 124 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District III Project List & Descriptions III-37. Knightsen Avenue/Eden Plains Road Widening – Delta Road to Chestnut Street (East County Regional AOB) – This project proposes to widen shoulders for about 2.6 miles of Knightsen Avenue/Eden Plains Road from Delta Road to Chestnut Street. III-38. Lone Tree Way Bike Lane Gap Closure – Anderson Lane to Virginia Drive (CTPL) – This project proposes to provide Class II bike lanes. III-39. Marsh Creek Road & Camino Diablo Intersection Improvements – This project proposes to construct safety improvements at the intersection of Marsh Creek Road and Camino Diablo. III-40. Marsh Creek Road & Deer Valley Road Intersection Improvements – This project proposes to widen the roadway and construct turn pockets at the intersection of Marsh Creek Road and Deer Valley Road. III-41. Marsh Creek Road and Morgan Territory Road Intersection Improvements (CTPL) – This project proposes to widen the travel lanes and the shoulders. III-42. Marsh Creek Road Improvements (East County Regional AOB) – This project is to construct various roadway and intersection improvements along Marsh Creek Road to include shoulder widening to enhance bicycle use and drainage improvements. (Also see Marsh Creek Road Realignment & Safety Improvements, III-43) III-43. Marsh Creek Trail – This project is to close the 15-mile bike and pedestrian gap along Marsh Creek Road between Clayton and Brentwood. This project is to construct a bicycle and pedestrian facility from the City of Clayton to East Bay Regional Park District’s Round Hill Park. The existing trail in Brentwood is to be extended by others to Round Hill Park. The overall intent is to provide a commuter bicycle trail, which connects Central County to East County. Project continues into District IV. III-44. Morgan Territory Road Safety Improvements (various locations) – This project proposes to construct safety improvements at various locations along Morgan Territory Road. III-45. Piper Road Project – Gateway Road to Willow Road (Bethel Island AOB) – This project proposes to provide bicycle and pedestrian improvements on Piper Road (Bethel Island) from Gateway Road to Willow Road. 07-13-20 TWIC Committee Mtg Agenda Packet Page 125 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District III Project List & Descriptions III-46. Sandmound Boulevard Improvements – Mariner Road to Cypress Road (Bethel Island AOB) – This project proposes to install bicycle and pedestrian improvements along 1.1 miles of Sandmound Boulevard from Mariner Road to Cypress Road. III-47. Sandmound Boulevard Widening – Oakley City Limits to Mariner Road (Bethel Island AOB) – This project proposes to widen travel lanes and improve shoulders for about 0.3 miles of Sandmound Boulevard from Oakley City Limits to Mariner Road. III-48. Sellers Avenue & Balfour Road Intersection Improvements (East County Regional AOB) – This project proposes to install a new traffic signal and exclusive left-turn lanes at the intersection of Sellers Avenue and Balfour Road. III-49. Sellers Avenue & Chestnut Avenue Intersection Improvements (East County Regional AOB) – This project proposes to install a new traffic signal and exclusive left-turn lane at the intersection of Sellers Avenue and Chestnut Avenue. III-50. Sellers Avenue & Marsh Creek Road Intersection Improvements (East County Regional AOB) – This project proposes to install a new traffic signal at the intersection of Sellers Avenue and Marsh Creek Road in cooperation with Caltrans. III-51. Sellers Avenue & Sunset Road Intersection Improvements (East County Regional AOB) – This project proposes to install a new traffic signal and exclusive left-turn lanes at the intersection of Sellers Avenue and Sunset Road. III-52. Sellers Avenue Widening – Delta Road to Chestnut Street (East County Regional AOB) – This project proposes to widen about 2.5 miles of Sellers Avenue from Delta Road to Chestnut Street. III-53. Sellers Avenue Widening – Main Canal to Marsh Creek Road (East County Regional AOB) – This project proposes to widen shoulders for about 1.5 miles of Sellers Avenue from the ECCID canal south to Marsh Creek Road. III-54. SR239/Trilink: Vasco Road-Byron Highway Connector – This project proposes to construct a new roadway as part of the future Route 239 connector between Vasco Road and Byron Highway. III-55. State Route 4 & Byron Highway (South) Intersection Widening – Phase 2 (East County Regional AOB) – This project proposes to widen the existing pavement on Byron Highway’s portion of the intersection to provide turn lanes onto State Route 4. 07-13-20 TWIC Committee Mtg Agenda Packet Page 126 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District III Project List & Descriptions III-56. State Route 4 & Newport Drive Signal (Discovery Bay AOB) – This project proposes to install a new traffic signal at the intersection of State Route 4 and Newport Drive in cooperation with Caltrans. Community support is a key aspect to this project. III-57. State Route 4 Widening – Bixler Road to Discovery Bay Boulevard – Complete Streets and Bridge Widening (Discovery Bay AOB) – This project proposes to widen about 1.2 miles of State Route 4 from Bixler Road to Discovery Bay Boulevard in cooperation with Caltrans. III-58. State Route 4 Widening – Byron Highway to Regatta Drive (Discovery Bay AOB) – This project proposes to widen State Route 4 between Byron Highway and Regatta Drive. III-59. Sunset Road Widening – Sellers Avenue to Byron Highway (East County Regional AOB) – This project proposes to widen shoulders for about 2.0 miles of Sunset Road from Sellers Avenue to Byron Highway. III-60. Vasco Road / Camino Diablo Intersection Improvements (East County Regional AOB) – This project is to modify the intersection at Vasco Road and Camino Diablo. Improvements include dual left turn lanes on westbound Camino Diablo, dual right turn lanes on eastbound Camino Diablo, lengthen the 4-lane section on Vasco Road near the intersection, and maintain the exclusive right lane on northbound Vasco Road. 07-13-20 TWIC Committee Mtg Agenda Packet Page 127 of 250 Board of Supervisor District IV07-13-20 TWIC Committee Mtg Agenda Packet Page 128 of 250 Note:1) Projects are identified with Supervisor District number and project number for its District. 2)County-wide Projects are not shown on this map. 3)District IV contains 40.07 miles of the 662.23 miles of County maintained roadway as of 1/1/2019. 2020 CRIPP –Active Project Map IV-1 IV-2 IV-3 IV-4 IV-507-13-20 TWIC Committee Mtg Agenda Packet Page 129 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District I V Project List & Descriptions CRIPP PROJECT DESCRIPTIONS FOR DISTRICT IV ACTIVE PROJECTS – These projects are fully funded and will be constructed in the near future. These active projects are mapped on the previous page. IV-1. Kirker Pass Road Northbound Truck Climbing Lane – This project is to construct a truck-climbing lane in the northbound direction from Clearbrook Drive to the northern Hess Road intersection. The project started construction in 2019. State Transportation Improvement Program (STIP), Gas Taxes, and Measure J fund this project. In addition, this project is to conduct pavement rehabilitation on a portion of Kirker Pass Road from the City of Concord/County boundary to approximately 4,200 feet of the northern Hess Road intersection. This project is scheduled for construction in 2020 after the Northbound Truck Climbing Lane Project. The One Bay Area Grant (OBAG) and Gas Taxes fund this project. IV-2. Marsh Drive Bridge Replacement – This project is to remove and replace the existing Marsh Drive Bridge in cooperation with the City of Concord. Construction is scheduled for 2021. Highway Bridge Program (HBP) and Gas Tax es fund this project. IV-3. Oak Road Bikeway Project – This project is to improve bicyclist safety by providing Class II bicycle lanes and related improvements on Oak Road between Treat Boulevard and Buskirk Avenue in unincorporated Walnut Creek. Construction is scheduled for 2021. Transportation Development Act (T DA) and Gas Tax es fund this project. IV-4. Treat Boulevard Corridor Improvements – This project is to improve safety and connectivity for pedestrian and bicyclist along Treat Boulevard between North Main Street and Jones Road. Construction is scheduled for 2024. State Transportation Improvement Program (STIP) and Gas Tax es fund this project. IV-5. Walnut Creek Crosswalk Improvements – This project is to improve pedestrian safety at two crosswalk locations in unincorporated Walnut Creek. One of the crossings, located in District IV, is at the intersection of Walden Road and Westcliffe Lane. The project is schedule for construction in the summer of 2020. The Highway Safety Improvement Program (HSIP), Transportation Development Act (TDA), and Gas Tax es fund this project. 07-13-20 TWIC Committee Mtg Agenda Packet Page 130 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 4, 5 efficiency Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 614 614 Environmental 635 585 50 Design Engineering 2,123 2,023 100 + Right-of-Way 114 64 50 + Construction 18,270 2,017 11,265 4,989 Total 21,755 5,302 11,465 4,989 + Gas Tax (c)9,189 2,450 3,094 3,646 LSRP 1,343 1,343 Measure J Regional 6,181 2,181 4,000 Measure J RTS 399 399 State Match 1,993 272 1,721 STIP 2,650 2,650 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Kirker Pass Road Northbound Truck Climbing Lane This project is to widen Kirker Pass Road to add a northbound truck-climbing lane. Construction started in 2019. State Transportation Improvement Program (STIP), Measure J, and Gas Taxes fund this project. In addition, this project is to conduct pavement rehabilitation on a portion of Kirker Pass Road from the City of Concord/County boundary to approximately 4,200 feet of the northern Hess Road intersection. The One Bay Area Grant (OBAG) and Gas Taxes fund this project. Reduce congestion and improve safety along Kirker Pass Road. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 131 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Kirker Pass Road Northbound Truck Climbing Lane 07-13-20 TWIC Committee Mtg Agenda Packet Page 132 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 4, 5 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering Environmental 247 247 Design Engineering 1,742 462 625 625 30 + Right-of-Way 280 140 110 30 + Construction 14,949 700 6,800 6,700 749 Total 17,218 709 765 1,435 6,860 6,700 749 City of Concord Funds 300 150 150 EBRPD 400 200 200 + Gas Tax (c)2,156 433 310 200 578 540 95 HBP 14,362 276 455 1,235 5,932 5,810 654 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Marsh Drive Bridge Replacement (Over Walnut Creek) This project is to remove and replace the existing Marsh Drive Bridge in cooperation with the City of Concord. This project is scheduled for construction in 2021. This project is funded by Highway Bridge Program (HBP) and Gas Tax Funds. The existing bridge is approaching the end of its service life and does not meet current seismic standards. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 133 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Marsh Drive Bridge Replacement 07-13-20 TWIC Committee Mtg Agenda Packet Page 134 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 4 realibility Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination 5 5 Preliminary Engineering Environmental Design Engineering 50 40 10 + Right-of-Way + Construction 308 308 Total 363 45 10 308 + Gas Tax (c)283 45 10 228 TDA 80 80 Oak Road Bikeway Project Improve bicyclist safety by providing bicycle lanes and related improvements on Oak Road between Treat Blvd and Buskirk Ave Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to improve bicyclist safety by providing Class II bicycle lanes and related improvements on Oak Road between Treat Boulevard and Buskirk Avenue in unincorporated Walnut Creek. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 135 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Oak Road Bikeway Project 07-13-20 TWIC Committee Mtg Agenda Packet Page 136 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2, 4 mobility Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering Environmental 70 15 45 10 Design Engineering 314 120 194 + Right-of-Way + Construction 1,758 1,758 Total 2,142 15 45 130 194 1,758 Former RDA 546 15 45 130 194 162 STIP 1,596 1,596 Treat Boulevard Corridor Improvements The purpose of this project is to improve safety and connectivity for pedestrians and bicyclists along Treat Blvd. Treat Blvd currently creates challenges for the users of transit as the wide roadways (up to nine lanes) and intersections become barriers for pedestrians to cross. Without bicycle infrastructure, the first/last mile for transit users becomes even more constrained. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to improve safety and connectivity for pedestrian and bicyclist along Treat Boulevard between North Main Street and Jones Road. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 137 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Treat Blvd Corridor Improvements 07-13-20 TWIC Committee Mtg Agenda Packet Page 138 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2, 4 safety Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 32 31 1 Environmental 23 8 15 Design Engineering 160 112 48 + Right-of-Way 20 20 + Construction 303 303 Total 538 151 387 + Gas Tax (c)250 80 170 HSIP 224 31 194 TDA 64 41 23 Walnut Creek Crosswalk Improvements Improve pedestrian safety at two pedestrian crosswalk locations in unincorporated Walnut Creek. The purpose of this project is to improve pedestrian safety at two crosswalk locations in unincorporated Walnut Creek—the intersection of Olympic Boulevard and Bridgefield Road and the intersection of Walden Road and Westcliffe Lane. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to improve pedestrian safety at two crosswalk locations in the vicinity of unincorporated Walnut Creek. One of the two crossings is located in District II at the intersection of Olympic Boulevard and Bridgefield Road. The other project site is located in District IV at Walden Road and Westcliffe Lane. The project is schedule for construction in the summer of 2020. This project is funded by the Highway Safety Improvement Program (HSIP), Transportation Development Act (TDA), and Gas Tax Funds. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 139 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Note: See Board of Supervisior District II for other project site. Walnut Creek Crosswalk Improvements 07-13-20 TWIC Committee Mtg Agenda Packet Page 140 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District IV Project List & Descriptions UNFUNDED PROJECTS – This is a comprehensive list of projects that have been conceived but not funded. This project list originated from the following sources: Area of Benefit (AOB) project lists the Regional Transportation Plan (RTP), Comprehensive Transportation Project List (CTPL) through Contra Costa Transportation Authority (CCTA), Transportation Expenditure Plan (TEP), and a Public Works List that was generated from community input/need. District IV includes Pacheco AOB, Central County AOB, East County Regional AOB, and South Walnut Creek AOB. IV-6. Ayers Road & Concord Boulevard Intersection Improvements (Central County AOB) – This project proposes to add a southbound right-turn lane and sidewalk at the intersection of Ayers Road and Concord Boulevard. IV-7. Ayers Road & Laurel Avenue Intersection Improvements (Central County AOB) – This project proposes to widen the approaches to the intersection at Ayers Road and Laurel Drive and to install new curb, gutter, sidewalk, and traffic signal. Improvements require coordination with the City of Concord. IV-8. Bailey Road & Myrtle Drive Intersection Improvements (Central County AOB) – This project proposes to improve the safety at the intersection at Bailey Road and Myrtle Drive by widening Bailey Road for a new through-lane and westbound left turn pocket. IV-9. Bailey Road Improvements – Myrtle Drive to Concord City Limits (Central County AOB) – This project proposes to add shoulders north and south of Myrtle Drive to the Concord City Limits. IV-10. Buskirk Avenue Improvements – Treat Boulevard to Pleasant Hill City Limits (Central County AOB) – This project proposes to widen the roadway along Buskirk Avenue from Treat Boulevard to the Pleasant Hill City limit. IV-11. Concord Avenue Shared Use Path (Pacheco AOB) – This project proposes to construct a 10’ wide Class I shared use path on the south side of Concord Avenue from Contra Costa Boulevard to the Iron Horse Trail. IV-12. Iron Horse Trail Flashers (CTPL) – This project proposes to add pedestrian crossing flashers along the Iron Horse Trail to improve pedestrian safety at trail crossings. IV-13. Jones Road Bike Route Project – Oak Road to Canal Trail (CTPL) – This project proposes to provide a Class III bike route. IV-14. Kirker Pass Road Bicycle Project (CTPL) – This project proposes to provide Class II bike lanes from the City of Pittsburg to the City of Concord. 07-13-20 TWIC Committee Mtg Agenda Packet Page 141 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District IV Project List & Descriptions IV-15. Las Juntas Way & Coggins Drive Intersection Improvements (Central County AOB) – This project proposes to improve the intersection level of service through intersection modifications at Las Juntas Way and Coggins Drive near the Pleasant Hill Bart Station. IV-16. Marsh Creek Trail (CTPL) – This project proposes to construct a bicycle and pedestrian facility and close the 15-mile bike and pedestrian gap along Marsh Creek Road between Clayton and Brentwood. The existing trail in Brentwood is to be extended by others to Round Hill Park. The overall intent is to provide a commuter bicycle trail which connects Central County to East County (Also see District III). IV-17. Marsh Drive Improvements – Center Avenue to Walnut Creek Bridge (Pacheco AOB) – This project proposes to widen or restripe the roadway to provide shoulders/bike lanes on both sides of Marsh Drive from Center Avenue up to the Walnut Creek Bridge (near the Iron Horse Trail). IV-18. Marshall Drive Sidewalk – Indian Valley Elementary School / City of Walnut Creek to El Verano Drive (CTPL) – This project proposes to construct sidewalk on both sides of Marshall Drive. This is about a one-mile segment of roadway. IV-19. Mayhew Way Bicycle and Pedestrian Improvements – 200' west of Oberon Drive to Bancroft Road (Central County AOB) – This project proposes to construct bicycle and pedestrian improvements along Mayhew Way from Bancroft Road to 200’ west of Oberon Drive (Pleasant Hill City Limit). IV-20. Mitchell Canyon Road Bike Lanes – This project proposes to widen about one mile of roadway to install Class II bike lanes to connect the City of Clayton and the Mitchell Canyon Staging area for Mount Diablo State Park. Areas of limited sight distance make it difficult for cars to anticipate bicyclist on the narrow two-lane roadway. IV-21. Mountain View Boulevard Pedestrian Improvements – San Miguel Drive to Walnut Boulevard (Central County AOB) – This project proposes to construct pedestrian and bicycle facilities along Mountain View Boulevard from San Miguel Drive to Walnut Boulevard. IV-22. Pleasant Hill BART Station Bicycle and Pedestrian Access (CTPL) – This project proposes to construct and improve bicycle and pedestrian access to the Pleasant Hill BART Station. IV-23. Reliez Valley Road Bicycle Improvements – North of Grayson Road to Withers Avenue (Central County AOB) – This project proposes to install bicycle improvements along Reliez Valley Road between Grayson Road to Withers Avenue. 07-13-20 TWIC Committee Mtg Agenda Packet Page 142 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District IV Project List & Descriptions IV-24. Rudgear Road & San Miguel Drive Intersection Safety Improvements (Central County AOB) – This project proposes to construct safety and efficiency improvements at the intersection of Rudgear Road and San Miguel Drive. IV-25. San Miguel Drive Bicycle and Pedestrian Improvements (Central County AOB) – This project proposes to construct a pedestrian path along the west side of San Miguel Drive from Blackwood Drive to Rudgear Road. IV-26. Treat Boulevard & Jones Road Intersection Improvements (Central County AOB) – This project proposes to modify the intersection in order to improve the level of service at the intersection of Treat Boulevard and Jones Road. On the southbound approach, an additional southbound left turn bay is proposed. On the northbound approach, a separate northbound right turn lane is proposed. IV-27. Treat Boulevard Bicycle Improvements – Jones Road easterly to Walnut Creek City Limits (Central County AOB) – This project proposes to improve bicycle accessibility and safety along Treat Boulevard. IV-28. Walnut Boulevard Pedestrian Improvements – View Lane to 250' west of Walnut Court (Central County AOB) – This project proposes to construct pedestrian and bicycle facilities along Walnut Boulevard from View land to 250’ west of Walnut Court. 07-13-20 TWIC Committee Mtg Agenda Packet Page 143 of 250 Board of Supervisor District V07-13-20 TWIC Committee Mtg Agenda Packet Page 144 of 250 Note:1) Projects are identified with Supervisor District number and project number for its District. 2) County-wide Projects are not shown on this map. 3) District V contains 181.49 miles of the 662.23 miles of County maintained roadway as of 1/1/2019. 2020 CRIPP –Active Project Map V-5 V-14 V-4 V-3 V-9 V-13 V-2 V-6 V-8 V-12 V-1 V-7 V-10 V-1107-13-20 TWIC Committee Mtg Agenda Packet Page 145 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District V Project List & Descriptions CRIPP PROJECT DESCRIPTIONS FOR DISTRICT V ACTIVE PROJECTS – These projects are fully funded and will be constructed in the near future. These active projects are mapped on the previous page. V-1. Alhambra Valley Road Embankment Repair – 0.4 miles west of Bear Creek Road – This project proposes to repair an existing slide along Alhambra Valley Road (approximately 0.4 miles west of Bear Creek Road). Currently the one-way traffic control is established around the eroded embankment. Construction is expected in 2020. Measure J and Gas Taxes fund this project. V-2. Alhambra Valley Road Storm Repair Project – Ferndale Site – This project is to repair storm damage to Alhambra Valley Road. Construction is schedule for 2020. Measure J and Gas Taxes fund this project. V-3. Bay Point Utility Undergrounding Project – This project is to relocate overhead utilities into a trench along Bailey Road and Willow Pass Road. Construction started in 2018 and expected to be completed in 2021. Navy Mitigation, Gas Taxes, and Rule 20A work credits through PG&E fund this project. V-4. Bailey Road/SR4 Interchange Improvements – This project is to modify the intersection at State Route 4 and Bailey Road. Improvements will encourage pedestrian safety by changing the traffic circulation at the off-ramps. An additional traffic signal will be installed for the new interchange configuration. Bicyclist will also benefit from the intersection revisions. Construction is scheduled for 2020. Funding is provided by Active Transportation Program (ATP), Bay Point AOB, Measure J, Navy Mitigation Fund, and Gas Tax Funds. V-5. Bear Creek Road – Road Embankment Repair – This project proposes to repair the roadway embankment along Bear Creek Road. Currently the one-way traffic control is established around the eroded embankment. Construction is expected in 2020. Gas Taxes fund this project. V-6. Bel Air Trail Crossing Project – This project is to construct safety improvements at the Bel Air Trail Crossing on Madison Avenue which is behind the Bel Air Elementary School in Bay Point. Sidewalk (gap closure) improvements will also take place along Madison Avenue where there is only a dirt shoulder. Construction is scheduled for 2020. Transportation Development Act and Gas Taxes fund this project. 07-13-20 TWIC Committee Mtg Agenda Packet Page 146 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District V Project List & Descriptions V-7. Crockett Area Guardrail Upgrades – This project is to remove existing guardrails and end treatments and replace them with current Caltrans standard guardrails and end treatments on arterials and major collector roadways in the unincorporated Crockett area. Construction is scheduled for 2022. Gas Taxes and the Highway Safety Improvement Program (HSIP) fund this project. V-8. Imhoff Drive Bicycle Shoulder Restriping – This project will stripe shoulders to create Class II bike lanes for bicyclists to utilize for travel for 0.3 miles along Imhoff Drive between Blum Road and the State Route 4 Bikeway east of Waterbird Way within the existing roadway. Construction is scheduled for 2022. The Transportation Development Act (TDA) and Gas Taxes fund this project. V-9. Kirker Pass Road Northbound Truck Climbing Lane – This project is to widen Kirker Pass Road to add a northbound truck-climbing lane. Construction started in 2019. State Transportation Improvement Program (STIP), Measure J, and Gas Taxes fund this project. In addition, this project is to conduct pavement rehabilitation on a portion of Kirker Pass Road from the City of Concord/County boundary to approximately 4,200 feet of the northern Hess Road intersection. This project is scheduled for construction in 2020 after the Northbound Truck Climbing Lane Project. The One Bay Area Grant (OBAG) and Gas Taxes fund this project. V-10. Kirker Pass Road Safety Project – This project is to improve driver safety and awareness and reduce the severity of collision events along 3.1-mile segment of Kirker Pass Road between the city borders of Concord and Pittsburg. Construction is scheduled for 2022. Gas Taxes and Federal Highway Safety Improvement Program (HSIP) fund this project. V-11. Marsh Drive Bridge Replacement – This project is to remove and replace the existing Marsh Drive Bridge in cooperation with the City of Concord. Construction is scheduled for 2021. Highway Bridge Program (HBP) and Gas Taxes fund this project. V-12. Pleasant Hill Road Bridge Rehabilitation (Bridge No. 28C0154) – This project is to extend the service life of the Pleasant Hill Road Bridge over Taylor Boulevard. Construction is schedule for 2022. Highway Bridge Program (HBP) and Gas Taxes fund this project. V-13. Rodeo Downtown Infrastructure Improvements – This project is to construct sidewalks and curb ramps along Pacific Avenue and a section along Parker Avenue near 7th Street. Project is to improve pedestrian access to Rodeo Creek Trail on Investment Street and fill in sidewalk gap segments. Construction is scheduled for 2020. Department of Conservation and Development, Transportation Development Act, and Gas Taxes fund this project. 07-13-20 TWIC Committee Mtg Agenda Packet Page 147 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District V Project List & Descriptions V-14. Rodeo Pedestrian Enhancement Project – 6th and 7th Street – This project will install two ADA curb ramps on Parker Avenue at 6th Street and three rapid repeating flash beacons. Along 7th Street, pedestrian crossing enhancements are to be constructed in front of Saint Patrick School. Construction is scheduled for 2021. This project is funded by the Transportation Development Act and Gas Tax Funds. 07-13-20 TWIC Committee Mtg Agenda Packet Page 148 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1, 5 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 61 1 60 Environmental 60 8 26 26 Design Engineering 139 89 50 + Right-of-Way 20 2 18 + Construction 1,100 140 960 Total 1,380 100 294 986 + Gas Tax (c)1,380 100 294 986 Alhambra Valley Road Embankment Repair Purpose is to re-established the roadway to accommodate two-lanes of traffic and widen the roadway for shoulders Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project proposes to repair an existing slide along Alhambra Valley Road (approximately 0.4 miles west of Bear Creek Road). Currently the one-way traffic control is established around the eroded embankment. Construction is expected in 2020. Measure J and Gas Taxes fund this project. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 149 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Alhambra Valley Road Embankment Repair 07-13-20 TWIC Committee Mtg Agenda Packet Page 150 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering Environmental 110 40 50 20 Design Engineering 237 67 170 + Right-of-Way 21 21 + Construction 750 50 700 Total 1,126 115 291 720 + Gas Tax (c)835 115 720 Measure J RTS 291 291 Alhambra Valley Road Storm Repair Project - Ferndale Site To reconstruct the road embankment and restore the eastbound lane of Alhambra Valley Road which was washed out/slid in the January 2017 storm events. Currently, Alhambra Valley Road has been reduced to a single lane. The eastbound lane has been closed off with concrete K-Rail adn stop signs ahve been installed on both sides of partial lane closure to allow one-way traffic. The proposed project will restore the eastbound lane of the road to traffic and allow unimpeded traffic flow. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to repair storm damage to Alhambra Valley Road. Construction is schedule for 2020. Measure J and Gas Taxes fund this project. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 151 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Alhambra Valley Road Storm Repair Project – Ferndale Site 07-13-20 TWIC Committee Mtg Agenda Packet Page 152 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 safety Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination 872 872 Preliminary Engineering 79 69 10 Environmental 52 29 23 Design Engineering 608 568 40 + Right-of-Way 10 1 9 + Construction 4,458 2 2,524 1,932 Total 6,079 1,541 2,606 1,932 ATP 4,160 416 2,423 1,321 Bay Point AOB 233 233 + Gas Tax (c)171 7 57 107 Keller Canyon Mit Fund 630 126 504 Measure J PBTF 345 345 Measure J RTS 100 100 Navy Mit 440 440 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Bailey Road/SR 4 Interchange Improvements This project will improve safety and circulation of pedestrians and bicyclists along Bailey Road through the State Route 4 (SR4) interchange. Construction is scheduled for 2020. Funding is provided by Active Transportation Program (ATP), Bay Point AOB, Measure J, Navy Mitigation Fund, and Gas Tax Funds. The project will improve safety and circulation of pedestrians and bicyclists along Bailey Road through the State Route 4 (SR4) Interchange. Bailey Road is a principal arterial road that connects residents to the Pittsburg/Bay Point BART station, Bel Air Elementary School, Delta De Anza Regional Trail and nearby commercial areas. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 153 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Bailey Road/SR 4 Interchange Improvements 07-13-20 TWIC Committee Mtg Agenda Packet Page 154 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 efficiency Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 359 351 8 Environmental 4 4 Design Engineering + Right-of-Way 102 99 4 + Construction 501 501 Total 967 454 513 + Gas Tax (c)7 7 Navy Mit 959 447 513 Bay Point Utility Undergrounding Project Utilities will be placed underground to improve the aesthetics of the Bay Point community near BART. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to relocate overhead utilities into a trench along Bailey Road and Willow Pass Road. Construction is scheduled for 2018 to 2020. Funding is provided through Navy Mitigation, Gas Tax Funds, and Rule 20A work credits through PG&E. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 155 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Bay Point Utility Undergrounding Project 07-13-20 TWIC Committee Mtg Agenda Packet Page 156 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 1, 5 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering Environmental 70 50 20 Design Engineering 196 196 + Right-of-Way 21 21 + Construction 750 50 700 Total 1,037 317 720 Measure J RTS 1,037 317 720 Bear Creek Road - Road Embankment Repair The purpose of this project is to repair two embankment sites adjace to the northbound lane of Bear Creek Road. Erosion has occurred at both embankments, resulting in massive deterioration of the road shoulders. The damage has already encroached into the traveled way at Embankment 1. Reparing the two embankments will restore the roadway shoulder and prevent further erosion. The northbound traveled lane at Embankment 1 is currently closed off due to deteriorated pavement, and will be restored to allow two-way traffic flow to resume. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project proposes to repair the roadway embankment along Bear Creek Road. Currently the one-way traffic control is established around the eroded embankment. Construction is expected in 2020. Gas Taxes fund this project. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 157 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Bear Creek Road – Road Embankment Repair 07-13-20 TWIC Committee Mtg Agenda Packet Page 158 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 mobility Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination 12 7 3 2 Preliminary Engineering Environmental Design Engineering 95 1 40 54 + Right-of-Way + Construction 175 175 Total 282 8 43 231 + Gas Tax (c)182 182 TDA 100 8 43 49 Bel Air Trail Crossing Project The purpose of this project is to improve pedestrian access and safety at the Bel Air Trail crossing. Bel Air Elementary School has a rear entrance that leads to the Bel Air Trail, a County maintained trail. Madison Avenue and Bel Air Trail Crossing is a “known” drop off point to get to the school’s rear entrance. During drop off and pick up times at school, double parking often becomes problematic due to U-turn movements by vehicles and double parking. This type of vehicle activity makes it difficult to see students who are using the trail crossing. There is also a sidewalk gap along Madison Avenue along the Bel Air trail corridor where vehicles tend to restrict and block the pedestrian path of travel to and from the school. As a result, pedestrians are walking on the shoulder or pinched between the parked vehicles and the trail fencing. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to construct safety improvements at the Bel Air Trail Crossing on Madison Avenue which is behind the Bel Air Elementary School in Bay Point. Sidewalk (gap closure) improvements will also take place along Madison Avenue where there is only a dirt shoulder. Construction is scheduled for 2020. Transportation Development Act and Gas Taxes fund this project. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 159 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Bel Air Trail Crossing Improvements 07-13-20 TWIC Committee Mtg Agenda Packet Page 160 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 safety Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 20 5 15 Environmental 140 10 130 Design Engineering 140 140 + Right-of-Way + Construction 1,471 1,471 Total 1,771 15 285 1,471 + Gas Tax (c)771 15 285 471 HSIP 1,000 1,000 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Crockett Area Guardrail Upgrade This project is to remove existing guardrails and end treatments and replace them with current Caltrans standard guardrails and end treatments on arterials and major collector roadways in the unincorporated Crockett area. Construction is scheduled for 2022. Gas Taxes and the Highway Safety Improvement Program (HSIP) fund this project. The County needs to upgrade deficient guardrails to reduce the potential and severity of injuries when vehicles collide with them. The HSIP grant allows the County to leverage its funds and upgrade more guardrails in a more timely manner, providing a safer environment for drivers in the event of a collision. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 161 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Crockett Area Guardrail Upgrade 07-13-20 TWIC Committee Mtg Agenda Packet Page 162 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 safety Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering Environmental Design Engineering + Right-of-Way + Construction 55 55 Total 55 55 TDA 55 55 Imhoff Drive Bicycle Shoulder Restriping The purpose of this project is to improve bicyclist safety along Imhoff Drive between Blum Road and the State Route 4 Bikeway, which starts approximately 200 feet east of Waterbird Way, in unincorporated Martinez. There are no bicycle facilities along Imhoff Drive between Blum Road and the State Route 4 Bikeway. This project will allow bicyclists to safely access the State Route 4 Bikeway, which connects the City of Martinez to the City of Concord. This roadway segment is included in the 2009 Contra Costa Countywide Bicycle and Pedestrian Plan. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project will stripe shoulders to create Class II bike lanes for bicyclists to utilize for travel for 0.3 miles along Imhoff Drive between Blum Road and the State Route 4 Bikeway east of Waterbird Way within the existing roadway. Construction is scheduled for 2022. The Transportation Development Act (TDA) and Gas Taxes fund this project. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 163 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Imhoff Drive Bicycle Shoulder Restriping 07-13-20 TWIC Committee Mtg Agenda Packet Page 164 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 4, 5 efficiency Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 614 614 Environmental 635 585 50 Design Engineering 2,123 2,023 100 + Right-of-Way 114 64 50 + Construction 18,270 2,017 11,265 4,989 Total 21,755 5,302 11,465 4,989 + Gas Tax (c)9,189 2,450 3,094 3,646 LSRP 1,343 1,343 Measure J Regional 6,181 2,181 4,000 Measure J RTS 399 399 State Match 1,993 272 1,721 STIP 2,650 2,650 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Kirker Pass Road Northbound Truck Climbing Lane This project is to widen Kirker Pass Road to add a northbound truck-climbing lane. Construction started in 2019. State Transportation Improvement Program (STIP), Measure J, and Gas Taxes fund this project. In addition, this project is to conduct pavement rehabilitation on a portion of Kirker Pass Road from the City of Concord/County boundary to approximately 4,200 feet of the northern Hess Road intersection. The One Bay Area Grant (OBAG) and Gas Taxes fund this project. Reduce congestion and improve safety along Kirker Pass Road. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 165 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Kirker Pass Road Northbound Truck Climbing Lane 07-13-20 TWIC Committee Mtg Agenda Packet Page 166 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 safety Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination 10 3 2 2 3 Preliminary Engineering Environmental 80 10 40 20 10 Design Engineering 139 19 45 45 30 + Right-of-Way + Construction 1,051 1,051 Total 1,380 32 87 67 1,194 + Gas Tax (c)200 16 36 26 123 HSIP 1,180 17 51 41 1,072 Kirker Pass Road Safety Project The purpose of the Kirker Pass Road Safety Improvements project is to improve driver safety and awareness and reduce the severity of collision events . From 2014 to 2018, Kirker Pass Road ranks as one of the County roadways with the highest rate of severe-injury collisions, which resulted in 117 accidents, five of them being fatal collisions. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to improve driver safety and awareness and reduce the severity of collision events along 3.1-mile segment of Kirker Pass Road between the city borders of Concord and Pittsburg. Improvements include guardrail installation, street lights at the intersections at Hess Road, and median reflectors. Construction is scheduled for 2022. Gas Taxes and Federal Highway Safety Improvement Program (HSIP) fund this project. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 167 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Kirker Pass Road Safety Project 07-13-20 TWIC Committee Mtg Agenda Packet Page 168 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 4, 5 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering Environmental 247 247 Design Engineering 1,742 462 625 625 30 + Right-of-Way 280 140 110 30 + Construction 14,949 700 6,800 6,700 749 Total 17,218 709 765 1,435 6,860 6,700 749 City of Concord Funds 300 150 150 EBRPD 400 200 200 + Gas Tax (c)2,156 433 310 200 578 540 95 HBP 14,362 276 455 1,235 5,932 5,810 654 Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT Marsh Drive Bridge Replacement (Over Walnut Creek) This project is to remove and replace the existing Marsh Drive Bridge in cooperation with the City of Concord. This project is scheduled for construction in 2021. This project is funded by Highway Bridge Program (HBP) and Gas Tax Funds. The existing bridge is approaching the end of its service life and does not meet current seismic standards. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 169 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Marsh Drive Bridge Replacement 07-13-20 TWIC Committee Mtg Agenda Packet Page 170 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 2, 5 reliability Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering Environmental Design Engineering 396 100 200 86 10 + Right-of-Way 55 45 10 + Construction 1,806 1,500 306 Total 2,257 100 200 131 1,520 306 + Gas Tax (c)585 100 200 25 218 42 HBP 1,672 106 1,302 264 Pleasant Hill Road Bridge Rehabilitation (Bridge No. 28C0154) This project is needed in order to extend the service life of the bridge. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to extend the service life of the Pleasant Hill Road Bridge over Taylor Boulevard. Construction is schedule for 2022. Highway Bridge Program (HBP) and Gas Taxes fund this project. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 171 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Pleasant Hill Road Bridge Rehabilitation (Bridge No. 28C0154) 07-13-20 TWIC Committee Mtg Agenda Packet Page 172 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 mobility Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination Preliminary Engineering 311 306 5 Environmental 28 19 9 Design Engineering 567 477 90 + Right-of-Way 65 65 + Construction 1,114 1,114 Total 2,084 802 1,282 Former RDA 1,152 802 350 + Gas Tax (c)408 408 Measure J TLC 470 470 TDA 55 55 Rodeo Downtown Infrastructure The project proposes to improve pedestrian infrastructure between the Rodeo Creek trailhead on Investment Street, along Pacific Avenue from Parker Avenue to the existing trail entrance at San Pablo Avenue. Pedestrian facilities in the downtown area and between these two trails have several gaps and outdated or non-existent ADA-compliant sidewalks and curb ramps. The project will fill these gaps to provide continuous pedestrian infrastructure. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project is to construct sidewalks and curb ramps along Pacific Avenue and a section along Parker Avenue near 7th Street. Project is to improve pedestrian access to Rodeo Creek Trail on Investment Street and fill in sidewalk gap segments. Construction is scheduled for 2020. Department of Conservation and Development, Transportation Development Act, and Gas Taxes fund this project. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 173 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Rodeo Downtown Infrastructure Improvements Vaqueros AveFourth St First St Napa StParker AveSeventh St Elm DrGarretson AveThird St Hawthorne DrVallejo AveLake AveSuisun AveRodeo AveSecond St Viewpoint BlvdMariposa St San Pablo A v e C a l i f o r n i a S t S a n d p o i n t D r Mah o n e y S tPacific AveHarris AveSonoma AvePinole AveWil low AveRailroad AveSixth St Bay p o i n t W a y Spruce Ct Myrna WaySeascape Cir La u r e l C t Harbor WaySharon AveBeachpoint Way Fifth St Coral DrLanglie Way Trigger Rd Investment St D em p s e y W a y S p r i n g w o o d C t Tormey Ave Tullibee Rd Springwood S t T r i g g e r C t D o l p h i n C t Coral Ridge CirSeascape CtBarnes Wa y Third St San P a bl o Av e Second St San Pablo Ave C a l i f o r n i a S tLake AveRodeo AveSixth St Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community 07-13-20 TWIC Committee Mtg Agenda Packet Page 174 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME PROJECT DESCRIPTION PURPOSE AND NEED 5 safety Phase/Funding Source Cost Cost to Date FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 Planning/ Coordination 45 39 2 2 2 Preliminary Engineering Environmental Design Engineering 74 30 35 9 + Right-of-Way 3 3 + Construction 350 350 Total 480 39 32 37 372 + Gas Tax (c)320 320 TDA 160 39 32 37 52 Rodeo Pedestrian Enhancement Project The purpose of this project is to improve pedestrian safety at the intersection of Parker Avenue and 6th Street and in front of Saint Patrick School on 7th Street in Rodeo. The need is based on the numerous requests for pedestrian safety improvements due to on- going issues of motorists not yielding to pedestrians at 6th Street and speeding in front of St. Patrick School. Amounts shown in thousands of dollars Anticipated Project Expenditures SUPERVISOR DISTRICT This project will install two ADA curb ramps on Parker Avenue at 6th Street and three rapid repeating flash beacons. Along 7th Street, pedestrian crossing enhancements are to be constructed in front of Saint Patrick School. Construction is scheduled for 2021. This project is funded by the Transportation Development Act and Gas Tax Funds. PROJECT CATEGORY 07-13-20 TWIC Committee Mtg Agenda Packet Page 175 of 250 Contra Costa County Capital Road Improvement & Preservation Program PROJECT NAME Source: County GIS Legend: County Maintained Roads Rodeo Pedestrian Enhancement Project 07-13-20 TWIC Committee Mtg Agenda Packet Page 176 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District V Project List & Descriptions UNFUNDED PROJECTS – This is a comprehensive list of projects that have been conceived but not funded. This project list originated from the following sources: Area of Benefit (AOB) project lists, the Regional Transportation Plan (RTP), Comprehensive Transportation Project List (CTPL) through Contra Costa Transportation Authority (CCTA), Transportation Expenditure Plan (TEP), and a Public Works List that was generated from community input/need. District V includes Martinez AOB, Pacheco AOB, and Bay Point AOB. V-15. 6th Street, Rodeo Sidewalk Project (CTPL) – This project proposes to provide sidewalk along one side of 6th Street between Parker Avenue and Garretson Avenue. V-16. 7th Street, Rodeo Sidewalk Project (CTPL) – This project proposes to provide sidewalk along one side of 7th Street between Parker Avenue and Garretson Avenue. V-17. Alhambra Valley Road Safety Improvements – Various Locations – This project proposes to construct safety improvements along Alhambra Valley Road. V-18. Alves Lane Extension – Willow Pass Road to Pacifica Avenue (Bay Point AOB) – This project proposes to construct a new roadway extension and modify the existing traffic signal at Alves Lane and Willow Pass Road. V-19. Bailey Road and Mary Anne Lane Signal Project (CTPL) – This project proposes to install a traffic signal at Bailey Road and Mary Anne Lane. V-20. Bailey Road Overlay Project – SR4 to Keller Canyon Landfill Entrance. – This project includes pavement rehabilitation on the County-maintained portion of Bailey Road. This project will be scheduled for construction as soon Maintenance deems it appropriate. Funding is through the Keller Canyon Mitigation Fund for pavement rehabilitation and Gas Tax Funds. V-21. Bailey Road Pedestrian & Bicycle Improvements – Canal Road to Willow Pass Road (Bay Point AOB) – This project proposes to construct pedestrian and bicycle improvements along Bailey Road from Canal Road to Willow Pass Road. (see also Active Project #V-3 Bay Point Undergrounding Project) V-22. Bear Creek Road Safety Improvements – Alhambra Valley Road to the City of Orinda (CTPL) – This project proposes to construct roadway safety improvements along Bear Creek Road between Alhambra Valley Road to the City of Orinda. V-23. Bella Vista Infrastructure Improvements (CTPL) – This project proposes to construct capital improvements in accordance with the Bella Vista Infrastructure Study. 07-13-20 TWIC Committee Mtg Agenda Packet Page 177 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District V Project List & Descriptions V-24. Canal Road Sidewalk Project – 420 feet South of Winderbrook Drive to Chadwick Lane (CTPL) – This project proposes to construct sidewalk along a segment of Canal Road between Chadwick Lane and 420 feet south of Winterbrook Drive. V-25. Center Avenue Bicycle and Pedestrian Improvements – Pacheco Boulevard to Marsh Drive (Pacheco AOB) (CTPL) – This project proposes to construct bike lanes, widen the roadway by reducing the existing sidewalk, and construct new sidewalk to provide a continuous path of travel along Center Avenue. V-26. Crockett Area Overlays & Reconstruction Project – This project proposes to conduct pavement overlays and reconstruction in the Crockett area. V-27. Cummings Skyway – Widen Interchange at I-80 (CTPL) – This project proposes to widen the interchange between I-80 and Cummings Skyway. V-28. Cummings Skyway Truck Climbing Lane Extension (RTP) – This project proposes to extend the existing eastbound truck-climbing lane on Cummings Skyway. V-29. Delta De Anza Trail Connection – Class I bikeway from Evora Road in Bay Point to Port Chicago Highway in Concord to Iron Horse Trail (CTPL) – This project is a combination of two CTPL projects, which proposes a Class I bikeway. The first segment is from Evora Road in Bay Point to Port Chicago Highway (Concord), and the second segment is from Port Chicago Highway (Concord) to the Iron Horse Trail. V-30. Delta De Anza Trail Connection (CTPL) – This project proposes to upgrade trail crossings from Driftwood Drive to Canal Road. V-31. Driftwood Drive Improvements – Port Chicago Highway to Pacifica Avenue (Bay Point AOB) – This project proposes to construct six-foot shoulders and six-and-a-half wide sidewalks on both sides of Driftwood Drive. V-32. Evora Road & Willow Pass Road Intersection Improvements (CTPL) – This project proposes intersection improvements to facilitate movement to and from State Route 4, including signal modifications and new signal installation. V-33. Evora Road Extension – Western Terminus to Port Chicago Highway (CTPL) – This project proposes to extend Evora Road westward to Port Chicago Highway. 07-13-20 TWIC Committee Mtg Agenda Packet Page 178 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District V Project List & Descriptions V-34. Evora Road Widening – Willow Pass Road in Bay Point to Willow Pass Road in Concord (CTPL) – This project proposes to widen Evora Road to four lanes from Bay Point to Concord. V-35. Franklin Canyon Undercrossing – Sobrante Ridge to Carquinez Strait Trail (CTPL) – This project proposes to construct a Franklin Canyon undercrossing to facilitate regional trail access. V-36. Gloria Terrace Sidewalk Project – Taylor Boulevard to Reliez Valley Road (CTPL) – This project proposes to provide a sidewalk or walkable shoulders on Gloria Terrace. V-37. Kirker Pass Road Bicycle Project (CTPL) – This project proposes to provide Class II bike lanes from the City of Pittsburg to the City of Concord. V-38. Kirker Pass Road Northbound Runaway Truck Ramp (CTPL) – This project proposes to construct a northbound runaway truck ramp along Kirker Pass Road prior to the City of Pittsburg. V-39. Kirker Pass Road Southbound Truck Lane (RTP) – This project proposes to construct a southbound trunk climbing lane along Kirker Pass Road. V-40. Local Road Pedestrian and Bicycle Upgrade at Benicia Bridge – This project proposes to construct and upgrade pedestrian and bicycle improvements leading up to Benicia Bridge. V-41. Loftus Road Pedestrian Improvements – Canal Road to Willow Pass Road (Bay Point AOB) – This project proposes pedestrian and bicycle improvements on both sides of Loftus Road. V-42. Marsh Drive Improvements – Center Avenue to Walnut Creek Bridge Pacheco AOB) – This project proposes to widen or restripe the roadway to provide shoulders/bike lanes on both sides of Marsh Drive from Center Avenue up to the Walnut Creek Bridge (near the Iron Horse Trail). V-43. McNabney Marsh Open Space Connection to Waterfront Road Project (CTPL) – This project proposes to provide an entrance to the McNabney Marsh Open Space from Waterfront Road. V-44. Monterey Street Safety Improvements – Veale Avenue to Palm Avenue (CTPL) – This project proposes to pipe an existing ditch, conduct drainage improvements and provide walkable shoulders. 07-13-20 TWIC Committee Mtg Agenda Packet Page 179 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District V Project List & Descriptions V-45. Pacheco Boulevard & Center Avenue Intersection Improvements (Pacheco AOB) – This project proposes to construct modifications to the intersection of Pacheco Boulevard and Center Avenue. V-46. Pacheco Boulevard & Muir Road Intersection Improvements (Pacheco AOB) – This project proposes to construct intersection modifications at Pacheco Boulevard and Muir Road. V-47. Pacheco Boulevard & North Buchanan Circle Intersection Improvements (Pacheco AOB) – This project proposes to signalize the intersection at Pacheco Boulevard and Carolos Drive/North Buchanan Circle. V-48. Pacheco Boulevard Complete Streets – Arnold Drive to Muir Road (Pacheco AOB) – This project proposes to construct new bike lanes along Pacheco Boulevard from Arnold Drive to Muir Road. V-49. Pacheco Boulevard Improvements – Morello Avenue to Blum Road (RTP) (TEP) – This project proposes to improve the Pacheco Boulevard Corridor with Complete Streets concept. This project will be in cooperation with the City of Martinez. V-50. Pacifica Avenue Extension – Port Chicago Highway to Alves Lane (Bay Point AOB) – This project proposes to construct a new roadway and modification of the existing traffic signal at Pacifica Avenue and Port Chicago Highway. V-51. Pedestrian Improvements Near Rodeo Hills Elementary School – This project proposes to construct pedestrian improvements in the vicinity of the Rodeo Hill Elementary School in Rodeo. V-52. Pleasant Hill Road & Taylor Boulevard Bicycle and Pedestrian Improvements (Central County AOB) – This project proposes to construct improvements to the intersection of Pleasant Hill Road and Taylor Boulevard. V-53. Pleasant Hill Road Sidewalk Project – 1700 block to Diablo View Road on west side only (CTPL) – This project proposes to construct a sidewalk on the west side of Pleasant Hill Road. V-54. Pomona Street Sidewalk Project (CTPL) – This project proposes to construct a sidewalk along the south side of Pomona Street from 3rd Street to Rolph Avenue. V-55. Pomona Street/Winslow Avenue/Carquinez Scenic Drive Safety Alignment Study – This project proposes to conduct a safety alignment study along Pomona Street, Winslow Avenue, and Carquinez Scenic Drive. 07-13-20 TWIC Committee Mtg Agenda Packet Page 180 of 250 FY 20/21 to FY 26/27 Capital Road Improvement Preservation Program (CRIPP) District V Project List & Descriptions V-56. Port Chicago Highway Bicycle and Pedestrian Improvements – Driftwood Drive to McAvoy Road (Bay Point AOB) – This project proposes to construct a bike lane/shoulder along both sides of Port Chicago Highway, and a sidewalk along the south side. V-57. Port Chicago Highway Realignment Project – McAvoy Road to Pacifica Avenue (Bay Point AOB) – This project proposes to realign the sharp horizontal curve in Port Chicago Highway, add an eastbound left turn pocket at McAvoy Road, and add sidewalks along both sides of Port Chicago Highway. V-58. Reliez Valley Road Bicycle Improvements – North of Grayson Road to Withers Avenue (Central County AOB) – This project proposes to construct bicycle improvements along Reliez Valley Road from Grayson Road to Withers Avenue. V-59. San Pablo Avenue/Parker Avenue Sidewalk (CTPL) – This sidewalk project proposes to provide a pedestrian connection between Rodeo and the City of Hercules. V-60. San Pablo Avenue Complete Streets Project - Rodeo to Crockett (RTP) – This project proposes to construct complete streets improvements along San Pablo Avenue from Rodeo to Crockett. V-61. Waterfront Road Grade Change Project – This project proposes to raise the roadway in anticipation of global sea level rise. McNabney Marsh and other wetlands that occasionally spill onto and flood Waterfront Road. V-62. Willow Pass Road & Bailey Road Intersection Improvements (Bay Point AOB) – This project proposes to widen Willow Pass Road to accommodate an additional westbound turn lane and a new eastbound right turn lane. V-63. Willow Pass Road (West) & SR4 Interchange Improvements (Bay Point AOB) – This project proposes to install new traffic signals at interchange of Willow Pass Road (West) and State Route 4 westbound and eastbound off ramps. V-64. Willow Pass Road Improvements – Bailey Road to Pittsburg City Limits (Bay Point AOB) – This project proposes to restripe Willow Pass Road to provide four travel lanes and an application of slurry. V-65. Willow Pass Road Improvements – Evora Road to SR4 (Bay Point AOB) – This project proposes to widen Willow Pass Road and modify the Willow Pass Road/Evora traffic signal. 07-13-20 TWIC Committee Mtg Agenda Packet Page 181 of 250 Appendix A: Acronyms used in the CRIPP 07-13-20 TWIC Committee Mtg Agenda Packet Page 182 of 250 Acronym Full Name Description Type Alamo AOB Alamo Area of Benefit Traffic mitigation fees.Local ATP Active Transportation Program Funds for projects/programs that encourage increased use of active modes of transportation.Federal Bay Point AOB Bay Point Area of Benefit Traffic mitigation fees.Local Bethel Island AOB Bethel Island Area of Benefit Traffic mitigation fees.Local Briones AOB Briones Area of Benefit Traffic mitigation fees.Local CCWD Contra Costa Water District Funds contributed by the Contra Costa Water District Local CDBG Communtiy Development Block Grant Funds that can be used for frontage improvements in economically depressed areas Federal Cent County AOB Central County Area of Benefit Traffic mitigation fees.Local Disco Bay AOB Discovery Bay Area of Benefit Traffic mitigation fees.Local Disco Bay West Discovery Bay West Mitigation Funds Mitigation fees collected for the Discovery Bay West (Subdivision 8023)Local DWR Department of Water Resources Bridge improvements.Local East County Regional AOB East County (Regional) Area of Benefit Traffic mitigation fees.Local Former RDA Former Redevelopment Agency Bond funds designated for former redevelopment areas.Local Gas Tax Gas Tax Funds Sales tax on gasoline used to enhance road operation and maintenance.Local HBP Highway Bridge Program Funds for bridges in need of replacement, and for seismic retrofit program.Federal Herc/Rodeo/Crock AOB Hercules/Rodeo/Crockett Area of Benefit Traffic mitigation fees.Local HR3 High Risk Rural Road Program Funds for safety improvements to rural roads defined as high risk.Federal HSIP Highway Safety Improvement Program Funds for infrastructure-related highway safety improvements that lead to a significant reduction in traffic fatalities and serious injuries on all public roads. Federal Keller Canyon Mit Fund Keller Canyon Landfill Mitigation Fund Mitigation funds from Keller Canyon Landfill. Funds are for pavement maintenance between SR4 and Keller Canyon Landfill Entrance. City of Pittsburg has a fair-share portion of these funds. Local Lifeline Grant Lifeline Grant Funds intended to improve mobility for low-income residents.Federal Martinez AOB Martinez Area of Benefit Traffic mitigation fees.Local Measure J PBTF Measure J Pedestrian, Bicycle and Trail Facilities Program Funds for pedestrian, bicycle, and trail facilities.Local Measure J Regional Measure J: Regional Funds Portion of sales tax measure designated for projects of regional significance.Local Measure J RTS Measure J: Return to Source Funds Portion of sales tax measure returned to local jurisdictions to be used for transportation projects within Contra Costa County. Local Measure J TLC Measure J Transportation for Livable Communities Program Funds for projects/programs for plans and facilities that encourage more walking, bicycling and transit use. Local N Richmond AOB North Richmond Area of Benefit Traffic mitigation fees.Local Navy Mit Navy Mitigation Funds Mitigation funds from closure of Port Chicago Highway.Local OBAG One Bay Area Grant Program Grant program that focuses on transportation investments in priority development areas (PDA's).Federal Pacheco AOB Pacheco (West Concord) Area of Benefit Traffic mitigation fees.Local Table C: Acronyms used in the CRIPP 07-13-20 TWIC Committee Mtg Agenda Packet Page 183 of 250 Acronym Full Name Description Type Phillips 66 funds Conoco Phillips 66 Conoco Phillips grant program to support the community.Local Prop 1B Proposition 1B This act makes safety improvements and repairs to local streets and roads and improves seismic safety of local bridges by providing for a bond issue. State RMRA Road Maintenance and Rehabilitation Account State funding to local munipalities as a response to the decrease in gas tax revenue State Rich/El Sobr AOB Richmond/El Sobrante Area of Benefit Traffic mitigation fees.Local RSS Abatement Fund Richmond Sanitary Service Abatement Funds Funds appropriated for the purchase of historic markers on San Pablo Dam Road.Local So County AOB South County Area of Benefit Traffic mitigation fees.Local So Walnut Cr AOB South Walnut Creek Area of Benefit Traffic mitigation fees.Local SR2S Safe Routes to School (State)Funds emphasize construction of infrastructure to aid in safety near schools.Federal State Match State Match Funds Funds to match federally funded transportation projects.State STIP State Transportation Improvement Program Funds transportation projects on and off the State Highway System.Federal TDA Transportation Development Act Funds for construction of bicycle and pedestrian facilities.State TVTC Fee Tri-Valley Transportation Development Fee Regional traffic mitigation fees.Local West County AOB West County Area of Benefit Traffic mitigation fees.Local 07-13-20 TWIC Committee Mtg Agenda Packet Page 184 of 250 Appendix B: County Road Improvement Policy 07-13-20 TWIC Committee Mtg Agenda Packet Page 185 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 186 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 187 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 188 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 189 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 190 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 191 of 250 Appendix C: Guidelines for Expenditure of Gas Tax Revenue (Proposition 111 Funds) 07-13-20 TWIC Committee Mtg Agenda Packet Page 192 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 193 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 194 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 195 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 196 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 197 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 198 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 199 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 200 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 201 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 202 of 250 Appendix D: Board Order Approving the 2020 Capital Road Improvement and Preservation Program and the month 2020 TWIC Report 07-13-20 TWIC Committee Mtg Agenda Packet Page 203 of 250 (This page is intentionally left blank until the Board of Supervisors approves the 2020 CRIPP) 07-13-20 TWIC Committee Mtg Agenda Packet Page 204 of 250 Appendix E: Area of Benefit Maps and Project Lists 07-13-20 TWIC Committee Mtg Agenda Packet Page 205 of 250 HOW DOES THE AREA OF BENEFIT PROGRAM FIT INTO THE CRIPP? As explained in the CRIPP Introduction and Background section, the CRIPP is a planning document for known potential projects in the next 7 years. The Area of Benefit Program (AOB) is just one potential funding source for County road projects. Some of these road improvement projects are funded by AOB revenues, provided those projects are on the approved AOB project list. Projects on the AOB project lists will appear in either the active project list or underfunded list. Some of the projects on the AOB project lists fall outside of the seven-year, active- project, planning window, but are included in the underfunded CRIPP project lists. Each AOB project list was approved with each respective AOB ordinance. In order to update an AOB project list, a separate update process will need to occur. Projects within each AOB program may be removed or added when each AOB ordinance is updated and adopted by the Board of Supervisors. The update of a CRIPP is not the process in which the County updates an AOB. For reference, the following information for each adopted Area of Benefit is included: Ordinance number Approved/Proposed Project List Boundary for the Area of Benefit The AOB program consists of 15 separate areas. At any given time, several of these areas may be in the process of a program update. These updates may include revisions to the AOB project list; thus, a draft of a pending project list may be included in this section of the CRIPP but are yet to be approved by the Board of Supervisors. For more information about the Areas of Benefit, contact the AOB manager at (925) 313- 2000 or visit the AOB website, http://www.cccounty.us/AOB. 07-13-20 TWIC Committee Mtg Agenda Packet Page 206 of 250 Alamo Regional Area of Benefit Project List Schedule Current Ordinance 2016-25 Item Location Description Project Status 1 Danville Boulevard/Orchard Court Complete Streets Improvements Construct roundabout and complete streets features Incomplete 2 Alamo Schools Construct pedestrian safety improvements at Stone Valley Middle School, Alamo Elementary School, and Rancho Romero Schools. 1)Hemme Avenue Sidewalk (between Rancho Romero Elem. and La Sonoma Way) 2)Miranda Avenue Natural Pathway (betw. Stone Valley Middle and Stone Valley Road) 3)Livorna Road Sidewalk Improvements – (Completed) Incomplete 3 Danville Boulevard at Hemme Avenue Intersection Safety improvements. Incomplete For more AOB information, visit http://www.cccounty.us/AOB Alamo Area of Benefit Boundary WALNUT CREEK 1 2 2 3 DANVILLE 07-13-20 TWIC Committee Mtg Agenda Packet Page 207 of 250 Bay Point Area of Benefit Project List Schedule Current Ordinance 2016-18 Item Location (Nexus Id) Description Project Status 1 Willow Pass Road (1.1) Signalize EB and WB off-ramps at west interchange of SR4 Incomplete 2 Willow Pass Road (1.2) Intersection improvements at Willow Pass Road and Evora Road to facilitate traffic flow to WB SR 4. Incomplete 3 Willow Pass Road (2.1) Restriping from Bailey Road to Pittsburg City Limits to improve capacity. Incomplete 4 Willow Pass Road (2.2) Bailey Road intersection improvements. Incomplete 5 Port Chicago Highway (3.1) Widen to accommodate bicycle and pedestrian improvements from Driftwood Drive to west of McAvoy Road. Incomplete 6 Port Chicago Highway (3.2) Realign from west of McAvoy Road to Pacifica Avenue. Incomplete 7 Port Chicago Highway & Willow Pass Rd Intersection (4) Construct multi-modal safety improvements through intersection from Lynbrook Drive to Weldon Street. Complete 8 Driftwood Drive (5) Construct pedestrian and bicycle safety improvements from Port Chicago Highway to Pacifica Avenue. Incomplete 9 Pacifica Avenue (6) Extend roadway from Port Chicago Highway to Alves Lane extension. Incomplete 10 Alves Lane (7) Extend roadway from Willow Pass Road to Pacifica Avenue extension. Incomplete 11 Loftus Road (8) Construct bicycle and pedestrian safety improvements from Canal Road to Willow Pass Road. Incomplete 11 Bailey Road (9) Bicycle and pedestrian improvements from Willow Pass Road to Canal Road. In Design Phase 12 Bailey Road (10) Bicycle and pedestrian improvements from Canal Road to BART. In Design Phase For more AOB information, visit http://www.cccounty.us/AOB 07-13-20 TWIC Committee Mtg Agenda Packet Page 208 of 250 Bay Point Area of Benefit Boundary Willow Pass Rd Bailey Rd Evora Rd Port Chicago Hwy Pacifica Ave Driftwood Dr Alves Ln Loftus Rd Canal Rd PITTSBURG CONCORD McAvoy Rd 1 2 12 11 11 3 4 10 9 6 5 8 PITTSBURG 07-13-20 TWIC Committee Mtg Agenda Packet Page 209 of 250 Bethel Island Area of Benefit Project List Schedule Current Ordinance 2016-12 Item Location Description Project Status 1 Bethel Island Road Add bicycle and pedestrian improvements from Taylor Road to Sandmound Boulevard Incomplete 2 Sandmound Boulevard Add bicycle and pedestrian improvements from Oakley City Limits to Mariner Road Incomplete 3 Sandmound Boulevard Add bicycle and pedestrian improvements from Mariner Road to Cypress Road. Incomplete 4 Gateway Road Add bicycle and pedestrian improvements from Bethel Island Road to Piper Road Incomplete 5 Piper Road Add bicycle and pedestrian improvements from Gateway Road to Willow Road Incomplete For more AOB information, visit http://www.cccounty.us/AOB Bethel Island Area of Benefit Boundary 1 1 1 1 2 3 4 5 5 07-13-20 TWIC Committee Mtg Agenda Packet Page 210 of 250 Briones Area of Benefit Project List Schedule Current Ordinance 88-27 Item Location Description Project Status 1 Alhambra Valley Road Realign curves at Ferndale Road (mile post 5.6), Main Road (mile post 6.2), and 4000 feet northwest of Bear Creek road (mile post 2.9) Incomplete For more AOB information, visit http://www.cccounty.us/AOB Briones Area of Benefit Boundary HERCULES PINOLE RICHMOND MARTINEZ 07-13-20 TWIC Committee Mtg Agenda Packet Page 211 of 250 Central County Area of Benefit Project List Schedule Current Ordinance 95-32 Item Location Description Project Status 1 Taylor Boulevard Safety and capacity improvements from Pleasant Hill Road to Boyd Road Incomplete 2 Pleasant Hill Road / Taylor Boulevard Safety and Capacity improvements to existing intersection Incomplete 3 Bailey Road Remove and replace existing bridge. New bridge adequate for standard two-lane arterial Complete 4 Rudgear Road / San Miguel Drive / Walnut Boulevard / Mountain View Boulevard Safety Improvements Incomplete 5 San Pablo Dam Road / Bear Creek Road Construct Signal (County share) Complete 6 Paso Nogal / Golf Club Road Improve intersection Complete 7 Evora Road Extension Construct new road from Willow Pass Road (Concord) to Port Chicago Highway Incomplete For more AOB information, visit http://www.cccounty.us/AOB Central County Area of Benefit Boundary CONCORD WALNUT CREEK CLAYTON PLEASANT HILL LAFAYETTE ORINDA MORAGA MARTINEZ HERCULES PINOLE EI CERRITO RICHMOND PITTSBURG ANTIOCH DANVILLE 1 2 4 7 07-13-20 TWIC Committee Mtg Agenda Packet Page 212 of 250 Discovery Bay Area of Benefit Project List Schedule Current Ordinance 2018-16 Item Location Description Project Status 1 Discovery Bay Boulevard Construct intersection improvements at Clipper Drive Incomplete 2.1 State Route 4 Widen and provide pedestrian and bicycle improvements between Bixler Road and Discovery Bay Boulevard Incomplete 2.2 Rebuild bridge to accommodate four lanes between Bixler Road and Discovery Bay Blvd Incomplete 2.3 Construct intersection improvements at Newport Drive Incomplete 2.4 Widen Roadway between Byron Highway and Bixler Road Incomplete 3 Byron Highway Construct school safety improvements at the intersection with Byer Road Incomplete 4 Clipper Drive Construct traffic calming measures between Newport Drive and Discovery Bay Boulevard Incomplete 5 Bixler Road Construct complete Street Improvements between SR-4 and Byer Road Incomplete 6 Byer Road Construct complete Street Improvements between Bixler Road and Byron Highway Incomplete For more AOB information, visit http://www.cccounty.us/AOB Discovery Bay Area of Benefit Boundary 6 3 Byron Hwy Bixler Rd Marsh Creek Rd Byron Elementary School Discovery Bay Blvd BRENTWOOD Bixler Rd 5 Byer Rd 4 2.1 5 2.3 5 2.2 5 2.4 5 07-13-20 TWIC Committee Mtg Agenda Packet Page 213 of 250 East County Regional Area of Benefit Project List Schedule Current Ordinance 2013-26 Item Location Description Project Status 1 Vasco Rd/Camino Diablo intersection Construct intersection improvements. Incomplete 2 Marsh Creek Rd Construct safety improvements. Incomplete 3 Chestnut Street Widen roadway from Sellers Avenue to Byron Hwy. Incomplete 4 Delta Road Widen roadway from Byron Highway to Holland Tract Rd. Incomplete 5 Knightsen Ave & Eden Plains Rd Widen roadway from Delta Rd to Chestnut St. Incomplete 6 Sunset Rd Widen roadway from Sellers Ave to Byron Hwy. Incomplete 7 Byron Highway Widen roadway from Camino Diablo to the Alameda County Line. Incomplete 8 Byron Highway Construct two way left turn lane at Byron Elementary School. Incomplete 9 SR 4/Byron Highway intersection Widen southern intersection of Byron Highway with SR 4 (Phase 2). Incomplete 10 Knightsen Avenue Widen roadway from East Cypress Rd to Delta Rd. Incomplete 11 Delta Road Widen roadway from Sellers Ave to Byron Highway. Incomplete 12 Sellers Avenue Widen roadway from Delta Rd to Chestnut St. Incomplete 13 Sellers Avenue Widen roadway from Main canal to Marsh Creek Rd. Incomplete 14 Byron Highway Widen roadway from Delta Rd to Chestnut St. Incomplete 15 Byron Highway Widen roadway from Chestnut St to SR 4. Incomplete 16 Byron Highway Widen roadway from SR 4 to Camino Diablo. Incomplete 17 Camino Diablo Widen roadway from Vasco Rd to Byron Highway. Incomplete 18 Knightsen Ave/Delta Rd intersection Construct intersection improvements. Incomplete 19 Byron Highway/Camino Diablo intersection Construct intersection improvements. Incomplete 20 Byron Highway/SR 4 /Point of Timber intersection Construct intersection improvements. Incomplete 21 Sellers Ave/Marsh Creek Rd intersection Construct intersection improvements. Incomplete 22 Balfour Rd/Byron Highway intersection Construct intersection improvements. Incomplete 23 Sellers Ave/Sunset Rd intersection Construct intersection improvements. Incomplete 24 Sellers Ave/Chestnut St intersection Construct intersection improvements. Incomplete 25 Sellers Ave/Balfour Rd intersection Construct intersection improvements. Incomplete For more AOB information, visit http://www.cccounty.us/AOB 07-13-20 TWIC Committee Mtg Agenda Packet Page 214 of 250 East County Regional Area of Benefit Boundary PITTSBURG ANTIOCH BRENTWOOD OAKLEY DISCOVERY BAY Legend: Roadway Improvements Intersection Improvements 07-13-20 TWIC Committee Mtg Agenda Packet Page 215 of 250 Hercules / Rodeo / Crockett Area of Benefit Project List Schedule Current Ordinance 88-27 Item Location Description Project Status 1 Pomona Street Widen to provide shoulder from Crockett Boulevard to 2nd street Complete 2 Pomona St / Winslow Ave / Carquinez Scenic Alignment Study Incomplete 3 Crockett Boulevard Widen to three lane arterial to provide for truck climbing lane from Pomona Street to Cummings Skyway Complete 4 San Pablo Ave Modify signal at Union Oil entrance Complete 5 Pomona St Modify signal at 2nd Ave Complete 6 Parker Ave / San Pablo Avenue / Willow Intersection Modify intersection and install signal Complete 7 Parker / Fourth Modify intersection and install signal Complete 8 Willow / Hawthorne Modify intersection and install signal Complete For more AOB information, visit http://www.cccounty.us/AOB Hercules / Rodeo / Crockett Area of Benefit Boundary HERCULES CROCKETT RODEO PORT COSTA Pomona St Winslow St 07-13-20 TWIC Committee Mtg Agenda Packet Page 216 of 250 Martinez Area of Benefit Project List Schedule Current Ordinance 95-38 Item Location Description Project Status 1 Alhambra Valley Road Safety and capacity improvements from Martinez City Limits to Ferndale Road Incomplete 2 Alhambra Valley Road Realign curves at Ferndale Road Complete 3 Pacheco Boulevard Realign grade crossing with AT&SF Incomplete 4 Pacheco Boulevard Widen arterial standard Incomplete For more AOB information, visit http://www.cccounty.us/AOB Martinez Area of Benefit Boundary Alhambra Valley Rd 1 3 4 MARTINEZ HERCULES PINOLE RICHMOND LAFAYETTE WALNUT CREEK PLEASANT HILL CONCORD 07-13-20 TWIC Committee Mtg Agenda Packet Page 217 of 250 North Richmond Area of Benefit Project List Schedule Current Ordinance 2017-22 Item Location Description Project Status 1 Pittsburg Avenue at Richmond Parkway Intersection Improvements Improve intersection operations which may include modification to traffic signal, additional turn lanes, or other safety improvements Incomplete 2 Market Avenue Complete Streets Project between Fred Jackson Way and easterly AOB boundary Improvements to include pedestrian infrastructure and traffic/truck calming measures to create a pedestrian friendly environment conducive to all travel modes. Incomplete 3 Fred Jackson Way Complete Streets Project Improvements to include pedestrian and bicycle infrastructure and traffic/truck calming measures between Chesley Avenue and Parr Boulevard. Incomplete 4 Parr Boulevard Complete Streets Project Improvements to include pedestrian and bicycle infrastructure between Richmond Parkway and AT&SF railroad tracks. Incomplete 5 Brookside Drive Complete Streets Project Improvements to include pedestrian and bicycle infrastructure between Central Street and AT&SF railroad tracks. Incomplete 6 Truck route between Verde Avenue and Parr Boulevard Determine a bypass route for trucks to minimize truck traffic through the residential area. Incomplete 7 Circulation and safety improvements for Verde Elementary School Improve circulation and safety to Verde Elementary School including a potential secondary access. Incomplete 8 Safety improvements on Central Street, between Brookside Drive and Pittsburgh Avenue Provide safety improvements to provide a roadway that meets County standards and provides for bicycle and pedestrian safety. Incomplete 9 Pittsburgh Avenue Complete Streets Project Improvements to include pedestrian and bicycle infrastructure between Richmond Parkway and Fred Jackson Way. Incomplete 10 Safety improvements on Goodrick Avenue, between Parr Boulevard and AOB Boundary (550’ South of Richmond Parkway) Provide safety improvements to provide a roadway that meets County standards and provides for bicycle and pedestrian safety. Incomplete 11 Chesley Avenue Traffic Calming Measures Install traffic calming measures on Chesley Avenue to create a pedestrian friendly environment. Incomplete For more AOB information, visit http://www.cccounty.us/AOB 07-13-20 TWIC Committee Mtg Agenda Packet Page 218 of 250 North Richmond Area of Benefit Boundary Parr Blvd Richmond Pkwy RICHMOND 4 Brookside Dr 5 Pittsburg Ave 1 Market Ave Fred Jackson Way 2 Chesley Ave 3 Central St Verde Ave 8 9 Goodrick Ave 10 11 SAN PABLO 07-13-20 TWIC Committee Mtg Agenda Packet Page 219 of 250 Pacheco (West Concord) Area of Benefit Proposed Project List Schedule Pending Pacheco AOB update expected in 2021. Item Location Description Project Status 1 Pacheco Boulevard and Muir Road Construct 2nd right turn lane and reconstruct/relocate bike pedestrian and traffic signal improvements Incomplete 2 Pacheco Boulevard and Center Avenue Improve traffic circulation improvements at the intersection of Pacheco Boulevard and Center Avenue Incomplete 3 Pacheco Boulevard from Arnold Drive to Muir Road Construct bike lanes from Arnold Drive to Muir Road Incomplete 4 Pacheco Boulevard and Carolos Drive/N. Buchanan Circle Construct traffic signal at intersection of Pacheco Boulevard and Carolos Drive/N. Buchanan Circle Incomplete 5 Center Avenue from Pacheco Boulevard to Buchanan Field Road Construct bike lanes on Center Avenue from Pacheco Boulevard to Buchanan Field Road Incomplete 6 Center Avenue from Berry Drive to Marsh Drive Construct sidewalk on Center Avenue from Berry Drive to Marsh Drive Incomplete 7 Marsh Drive from Center Avenue to the bridge near the Iron Horse Regional Trail Construct shoulders and bike lanes along Marsh Drive from Center Avenue to Iron Horse Trail Incomplete 8 Concord Avenue from Contra Costa Boulevard to the Iron Horse Regional Trail Construct a shared-use path along Concord Avenue starting near Contra Costa Boulevard to the Iron Horse Regional Trail Incomplete For more AOB information, visit http://www.cccounty.us/AOB Pacheco (West Concord) Area of Benefit Boundary 07-13-20 TWIC Committee Mtg Agenda Packet Page 220 of 250 Richmond / El Sobrante Area of Benefit Project List Schedule Current Ordinance 91-27 Item Location Description Project Status 1 San Pablo Dam Road Construct signal at Castro Ranch Rd Complete 2 Appian Triangle Construct new intersection Complete 3 San Pablo Dam Road Dual left turn lanes at Appian Way Complete 4 Appian Way Construct signal at Manor Rd Complete 5 San Pablo Dam Road Construct signal at Milton Drive Complete 6 Valley View Rd. Construct signal at May Rd Complete 7 Appian Way Construct signal at Pebble Drive Incomplete 8 Castro Ranch Road Widen from San Pablo Dam Rd to Olinda Rd Incomplete 9 El Portal Widen from I-80 to San Pablo Dam Rd Incomplete 10 San Pablo Dam Road Construct middle turn lane from Appian Way to Castro Ranch Rd Incomplete 11 Appian Way Construct signal at Allview Ave Complete 12 San Pablo Dam Road Construct signal at Clark Rd Complete 13 Appian Way Construct ultimate improvements from Valley View Rd to Pinole Incomplete 14 San Pablo Dam Rd. Construct improvements from Richmond to Appian Way Incomplete 15 San Pablo Dam Rd. Construct signal at Greenridge Drive Incomplete 16 Appian Way Construct ultimate improvements from Valley View Rd. to San Pablo Dam Rd Incomplete 17 Appian Way Construct signal at La Paloma Rd Complete 18 El Portal Construct signal at Barranca Incomplete For more AOB information, visit http://www.cccounty.us/AOB 07-13-20 TWIC Committee Mtg Agenda Packet Page 221 of 250 Richmond / El Sobrante Area of Benefit Boundary 7 8 9 10 13 14 15 16 18 PINOLE HERCULES RICHMOND RICHMOND SAN PABLO 07-13-20 TWIC Committee Mtg Agenda Packet Page 222 of 250 South County Area of Benefit Project List Schedule Current Ordinance 96-27 Item Location Description Project Status 1 Camino Tassajara Improve County portion to two lane rural highway standard Incomplete 2 Crow Canyon Road Various safety and capacity improvements, including a truck climbing lane (Crow Canyon Incorporated into the City of San Ramon) Incomplete For more AOB information, visit http://www.cccounty.us/AOB South County Area of Benefit Boundary DANVILLE SAN RAMON WALNUT CREEK LAFAYETTE MORAGA 1 07-13-20 TWIC Committee Mtg Agenda Packet Page 223 of 250 South Walnut Creek Area of Benefit Project List Schedule Current Ordinance 94-72 Item Location Description Project Status 1 Olympic Boulevard Widen from Tice Valley Boulevard to I - 680 Complete For more AOB information, visit http://www.cccounty.us/AOB South Walnut Creek Area of Benefit Boundary 07-13-20 TWIC Committee Mtg Agenda Packet Page 224 of 250 West County Area of Benefit Proposed Project List Schedule Pending West County AOB update expected in 2021 Item Location Description Project Status 1 Arlington Avenue, Intersection with Rincon Road and Kensington Road Intersection Safety Improvements Incomplete 2 Arlington Avenue, Intersection with Westminster Avenue Intersection Safety Improvements Incomplete 3 Arlington Avenue, Intersection with Sunset Drive Intersection Safety Improvements Incomplete 4 Arlington Avenue, Intersection with Coventry Road Intersection Safety Improvements Incomplete 5 Arlington Avenue, Intersection with Amherst Avenue Intersection Safety Improvements Incomplete 6 Arlington Boulevard, Intersection with Vine Avenue and Highland Avenue Intersection Safety Improvements Incomplete 7 Pinole Valley Road, Between Pinole City Limits and AOB boundary Safety Improvements Incomplete 8 Tara Hills Drive, Between San Pablo Avenue and Pinole City Limits Pedestrian Safety Improvements and Traffic Calming Incomplete 9 San Pablo Avenue, Between Kay Road and Pinole City Limits Bicycle Improvements Incomplete 10 San Pablo Avenue, Between Eire Drive and the Pinole City Limits Striped Pedestrian Crossing with Beacons Incomplete 11 Tara Hills Elementary School, Shannon Elementary School, Pinole Middle School Striped Pedestrian Crossing with Beacons Incomplete 12 San Pablo Dam Road, Between the top of the San Pablo Dam Reservoir and the AOB Boundary Safety Improvements Incomplete 07-13-20 TWIC Committee Mtg Agenda Packet Page 225 of 250 West County Area of Benefit Boundary 10 9 12 1 HERCULES PINOLE RICHMOND SAN PABLO EL CERRITO ORINDA 2 3 4 5 6 11 2 8 7 07-13-20 TWIC Committee Mtg Agenda Packet Page 226 of 250 Appendix F: Road Maintenance and Rehabilitation Account Information 07-13-20 TWIC Committee Mtg Agenda Packet Page 227 of 250 RECOMMENDATION(S): ADOPT Resolution No. 2020/121 approving a list of projects for Fiscal Year 2020/21 funded by Senate Bill 1 (SB1): The Road Repair and Accountability Act of 2017, Road Maintenance and Rehabilitation Account funds, and DIRECT staff to submit the list to the California Transportation Commission. (All Districts) FISCAL IMPACT: 100% allocation to the Road Fund from Road Maintenance and Rehabilitation Account program under Senate Bill 1 (SB1) in the approximate amount of $16.4 million. BACKGROUND: California cities and counties are seeing a significant influx of new revenue to invest in the local street and road system from Senate Bill 1 (Beall and Frazier), a landmark transportation funding package that was signed by Governor Brown on April 28, 2017. This measure was in response to California’s significant funding shortfall to maintain the state’s multimodal transportation network. SB1 increased several taxes and fees to raise over $5 billion annually in new transportation APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 04/28/2020 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Candace Andersen, District II Supervisor Diane Burgis, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor Contact: Nancy Wein, 925.313.2275 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: April 28, 2020 David J. Twa, County Administrator and Clerk of the Board of Supervisors By: June McHuen, Deputy cc: C. 2 To:Board of Supervisors From:Brian M. Balbas, Public Works Director/Chief Engineer Date:April 28, 2020 Contra Costa County Subject:FY 2020/2021 Road Maintenance and Rehabilitation Account Project List for Unincorporated Contra Costa County. 07-13-20 TWIC Committee Mtg Agenda Packet Page 228 of 250 revenues. SB1 also includes inflationary adjustments in the revenue to local agencies so that the purchasing power of the funds does not decrease as it has in the past. SB1 prioritizes funding towards maintenance, rehabilitation and safety improvements on state highways, local streets and roads, and bridges and to improve the state’s trade corridors, transit, and active transportation facilities. SB1 Funds were available to cities and counties starting in FY 2017/2018 and are comprised of two parts - an increase in the annual gas tax revenue that local agencies have historically been receiving and a new funding source called Road Maintenance and Rehabilitation Account (RMRA) program funds. The California State Association of Counties (CSAC) annually provides an estimate of the total gas tax revenues the County can expect to see from transportation bill, including the total estimated revenue from RMRA program funds. CSAC estimates the County will receive about $41.7 million in total transportation funding for FY 20/21 from SB1, approximately double what the County received just a few years ago. About $16.4 million of that amount is from the RMRA program. This amount will continue to grow in future years with the built-in inflationary index. SB1 emphasizes the importance of accountability and transparency in the delivery of California’s transportation programs. Therefore, in order to be eligible for RMRA funding, 07-13-20 TWIC Committee Mtg Agenda Packet Page 229 of 250 state statute requires cities and counties to provide basic RMRA project reporting to the California Transportation Commission (CTC). Prior to receiving an apportionment of RMRA funds from the State Controller in a fiscal year, a city or county must submit to the CTC a list of projects proposed to be funded with these funds. All projects proposed to receive funding must be reviewed and approved by the applicable city council or county board of supervisors at a public meeting. The list of projects must include a description and location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement. The project list does not limit the flexibility of an eligible city or county to fund projects in accordance with local needs and priorities so long as the projects are consistent with RMRA priorities as outlined in the applicable code sections. Some example projects and uses for RMRA funding include, but are not limited to the following: Road Maintenance and Rehabilitation Safety Projects Railroad Grade Separations Complete Streets Components (including active transportation purposes, pedestrian 07-13-20 TWIC Committee Mtg Agenda Packet Page 230 of 250 and bicycle safety projects, transit facilities, and drainage and stormwater capture projects in conjunction with any other allowable project) Traffic Control Devices Streets and Highways Code Section 2030(b)(2) states that funds made available by the program may also be used to satisfy a match requirement in order to obtain state or federal funds for projects authorized by this subdivision. Staff has developed a recommended list of projects the Board of Supervisors to consider for submitting to CTC. The following criteria will be used by staff when developing the current and future project lists for RMRA funds: Eligibility criteria for RMRA funds Emergency storm damage projects that exceeded existing road fund revenue capacity Maintenance and rehabilitation priorities Roadway safety Expiring grants where local funds are necessary to complete the funding package 07-13-20 TWIC Committee Mtg Agenda Packet Page 231 of 250 Expiring grants where local funds are necessary to complete the funding package Geographic equity Projects where expenditures had already occurred for design of the project and had been shelved due to declining gas tax revenues Multi-modal benefits in accordance with the Board of Supervisor’s Complete Streets policy Positive impact to Road Program performance metrics Clearing the queue of delayed projects that were a result of declining gas tax revenues Meeting customer expectations With the passage of SB1, the County will now receive about $41.7 million in total transportation funding in FY 20/21, with approximately $16.4 million of that amount from the RMRA program. The County currently uses the majority of the Gas Tax funds towards public roadway maintenance and repair for approximately 660 miles of the roadway network in the unincorporated areas of Contra Costa County to ensure a safe and convenient public travel in a variety of modes: driving, walking and bicycling. These funds are also used to improve traffic safety throughout the County by using it as the local match to leverage funds from state and federal grant programs. 07-13-20 TWIC Committee Mtg Agenda Packet Page 232 of 250 The majority of the RMRA funds are designated for maintenance activities but the range of proposed projects in future years is expected to broaden as the amount of RMRA funds increases. It should be noted that project list below is a small subset of projects in overall road program and only focuses on how the RMRA funds will be expended as required by the Commission. 07-13-20 TWIC Committee Mtg Agenda Packet Page 233 of 250 BACKGROUND: (CONT'D) PROPOSED PROJECTS (Total RMRA = $16.4 million) Proposed Project No. 1: Road Drainage Maintenance (RMRA = $1.2 million)- Countywide Ditch Cleaning – This routine maintenance item is to perform drainage ditch cleaning to remove debris and vegetation which may obstruct the passage of stormwater and cause local flooding. (RMRA = $400,000) County Project No.: 0672-6U2303 Clean Catch Basin – This routine maintenance item is to perform cleaning of sediment and prevent obstructions of catch basins (drainage inlets) and related pipe systems. The County has over twenty thousand catch basins throughout the unincorporated portions of the County. (RMRA = $500,000) County Project No.: 0672-6U2308 Inspect Catch Basin – This routine maintenance item is to perform inspections of catch basins and associated systems. This includes a visual inspection of the drainage inlet and any clean water inserts. Follow-up video inspections may be required for deeper inlets and/or suspected structural issue concerning the inlets. (RMRA = $300,000) County Project No.: 0672-6U2316 Proposed Project No.2: Traffic Safety Devices Maintenance (RMRA = $950,000) - Countywide Traffic Signing – This routine maintenance item is to perform sign repair, replacement, and installation along the unincorporated County roadways. (RMRA = $450,000) County Project No.: 0672-6U2504 Traffic Striping – This routine maintenance item is to perform new painting, routine painting and replacement of pavement striping along the unincorporated County roadways to enhance public safety. (RMRA = $500,000) County Project No.: 0672-6U2505 Proposed Project No. 3: Pavement Repairs and Preparation (RMRA = $4.2 million)- Countywide Pot Hole Patching – This routine maintenance item is to perform spot pavement repairs of pot holes along the unincorporated County roadways to eliminate surface hazards. (RMRA = $500,000) County Project No.: 0672-6U2101 Pavement Fabric Patching – This routine maintenance item is to perform pavement fabric patching along the unincorporated County roadways to correct minor pavement defects and prevent further cracking. An area of existing damaged 07-13-20 TWIC Committee Mtg Agenda Packet Page 234 of 250 asphalt will be removed and excavated to allow a fabric patch to be placed. The roadway base will be compacted and leveled to support the new fabric layer and asphalt layer. (RMRA = $500,000) County Project No.: 0672-6U2102 Pavement Failure Repair - Backhoe – This routine maintenance item is to conduct pavement failure repair along the unincorporated County roadways. This task requires the removal of a larger area of cracked or damaged pavement with a backhoe. The roadway base will be compacted and overlaid with new asphalt. (RMRA = $500,000) County Project No.: 0672-6U2103 Pull Box Paving – This is a roadway paving operation to place asphalt on localized roadway depressions to provide a smooth riding surface for the motorized public along the unincorporated County roadways. (RMRA = $525,000) County Project No.: 0672-6U2104 Hand Patching – This is similar to pot hole patching to conduct spot pavement repairs along unincorporated County roadway, but on a smaller scale. (RMRA = $500,000) County Project No.: 0672-6U2105 Crack Sealing – This pavement preservation task is to seal cracks in the roadway. Cracks are typically filled in to seal the roadway structural section from water penetration. The goal is to prolong the service life of the pavement and/or prepare the roadway surface for an overlay. (RMRA = $600,000) County Project No.: 0672-6U2106 Leveling – This task is associated with leveling of large settlements, depressions, surface irregularities and recent large pavement repairs. This is to provide a smooth riding surface for the motorized public along unincorporated County roadways. (RMRA = $475,000) County Project No.: 0672-6U2107 Pavement Failure Repair – Grinder – This task is to remove badly cracked or broken pavement. The roadway is then replaced with new asphalt and roadway base rock. This task supports pavement preservation operations and also extends the service life of the roadway pavement. (RMRA = $600,000) County Project No.: 0672-6U2123 Proposed Project No. 4: County-Wide Surface Treatments (RMRA = $6.9 million) Countywide: Double Chip Seal Project (2019) – This project will apply a double chip seal to various roads as a pavement preservation project in the unincorporated Contra Costa County. Locations will include Orinda (Bear Creek Road), Franklin Canyon, Knightsen/Brentwood, Bryon and San Ramon areas. Work will also include surface preparation and pavement striping and markings. (RMRA = $2.200,000) County Project No. 0672-6U2182 07-13-20 TWIC Committee Mtg Agenda Packet Page 235 of 250 Asphalt Rubber Cape Seal Project - The project will apply an asphalt rubber chip seal covered with a type II slurry seal to various roadways in the El Sobrante, North Richmond, and Alamo areas. Work will also include surface preparation and pavement striping and markings. (RMRA = $4,750,000) County Project No. 0672-6U2184 Proposed Project No. 5: Kirker Pass Road Northbound Truck Lanes ($3.1 million) The project consists of pavement widening for a truck climbing lane with 8 foot paved shoulders; relocation of HMA dike, concrete ditches, and other drainage features; retaining wall construction; installation of signage and striping; construction of two C.3 bioretention areas; relocation of existing roadside features, and pavement rehabilitation on Kirker Pass Road which consists of 0.1 feet grind and overlay of open grade rubberized hot mix asphalt (HMA). There are significant roadway conforms at Hess Road due to change in grade. (RMRA = $3,100,000) County Project No. 0662-6R4052 With the annual reporting requirement, the Department will begin strategizing how the County can allocate the new funding to achieve the Road Program’s mission and improve the program’s key performance metrics for safety, efficiency, reliability and accessibility. CONSEQUENCE OF NEGATIVE ACTION: If a project list is not approved by the Board of Supervisors and submitted to the CTC by the May 1, 2020 deadline, the County will not be eligible to receive its portion of RMRA funds and the projects listed above will not be constructed. ATTACHMENTS Resolution No. 2020/121 07-13-20 TWIC Committee Mtg Agenda Packet Page 236 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 237 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 238 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 239 of 250 Appendix G: Complete Streets Policy 07-13-20 TWIC Committee Mtg Agenda Packet Page 240 of 250 This Complete Streets Policy was adopted by Resolution No. 2016/374 by the Board of Supervisors of Contra Costa County on July 12, 2016. COMPLETE STREETS POLICY OF CONTRA COSTA COUNTY A. Complete Streets Principles 1. Complete Streets Serving All Users. Contra Costa County expresses its commitment to creating and maintaining Complete Streets that provide safe, comfortable, and convenient travel along and across rights-of-way (including streets, roads, highways, bridges, paths, and other portions of the transportation system) through a comprehensive, integrated transportation network that serves all categories of users, including pedestrians, bicyclists, persons with disabilities, motorists, movers of commercial goods, users and operators of public transportation, seniors, children, youth, students and families. 2. Context Sensitivity. In planning and implementing street projects, departments and agencies of Contra Costa County shall maintain sensitivity to local conditions in both residential and business districts as well as urban, suburban, and rural areas, and shall work with residents, merchants, school representatives, and other stakeholders to ensure that a strong sense of place ensues. Improvements that will be considered include sidewalks, shared use paths, separated bikeways/cycle tracks, bicycle lanes, bicycle routes, paved shoulders, street trees and landscaping, planting strips, accessible curb ramps, crosswalks, refuge islands, pedestrian signals, signs, street furniture, bicycle parking facilities, public transportation stops and facilities, transit priority signalization, traffic calming circles, transit bulb outs, road diets and other features assisting in the provision of safe travel for all users and those features and concepts identified in the Contra Costa County Complete Streets General Plan Amendment of April 2008. 3. Complete Streets Routinely Addressed by All Departments. All departments and agencies of Contra Costa County shall work towards making Complete Streets practices a routine part of everyday operations, approach every relevant project, program, and practice as an opportunity to improve streets and the transportation network for all categories of users/modes, and work in coordination with other departments, agencies, and jurisdictions to maximize opportunities for Complete Streets, connectivity, and cooperation. Example activities include, but are not necessarily limited to the following: pavement resurfacing, restriping, accessing above and underground utilities, signalization operations or modifications, maintenance of landscaping/related features, and shall exclude minor (catch basin cleaning, sign replacement, pothole repair, etc.) maintenance and emergency repairs. 4. All Projects and Phases. Complete Streets infrastructure sufficient to enable reasonably safe travel along and across the right of way for each category of users shall be incorporated into all planning, funding, design, approval, and implementation processes for any construction, reconstruction, retrofit, maintenance, operations, alteration, or repair of streets (including streets, roads, highways, bridges, and other portions of the transportation system), except that specific infrastructure for a given category of users may be excluded if an exemption is approved via the process set forth in section C.1 of this policy. B. Implementation 1. Plan Consultation and Consistency. Maintenance, planning, and design of projects affecting the transportation system shall be consistent with the Contra Costa County General Plan, as well as other applicable bicycle, pedestrian, transit, multimodal, best practices, and other relevant documents. Where such consistency cannot be achieved without negative consequences, consistency shall not be required if the head of the relevant departments, or designees, provides written approval explaining the basis of such deviation. 2. Street Network/Connectivity. As feasible, and as opportunities arise, Contra Costa County shall incorporate Complete Streets infrastructure into existing streets to improve the safety and convenience of users, with the particular goal of creating a connected network of facilities accommodating each category of users, increasing connectivity across jurisdictional boundaries, and for accommodating existing and anticipated future areas of travel origination or destination. A well connected network should include non-motorized connectivity to schools, parks, Exhibit A 07-13-20 TWIC Committee Mtg Agenda Packet Page 241 of 250 commercial areas, civic destinations and regional non-motorized networks on both publically owned roads/land and private developments (or redevelopment areas). 3.Countywide Bicycle Advisory Committee (CBAC) Consultation. The CBAC may review the design principles used by staff to accommodate motor vehicle, bicycle, pedestrian, and transit modes of travel when reviewing projects. The CBAC will be engaged early in the planning and design stage to provide an opportunity for comments and recommendations regarding Complete Street features of major public transportation projects. 4.Evaluation. The County will establish a means to collect data and evaluate the implementation of complete streets policies. For example tracking the number of miles of paths, bike lanes and sidewalks, numbers of street crossings, signage etc. C. Exceptions 1.Required Findings and Leadership Approval for Exemptions. Plans or projects that seek exemptions from incorporating Complete Streets design principles must provide a written explanation of why accommodations for all modes were not included in the project. An exemption may be granted by the Director of Public Works or Director of Conservation and Development upon finding that inclusion of Complete Streets design principles are not possible or appropriate under one or more of the following circumstances: 1) bicycles or pedestrians are not permitted on the subject transportation facility pursuant to state or local laws; 2) inclusion of Complete Streets design principles would result in a disproportionate cost to the project; 3) there is a documented absence of current and future need and demand for Complete Streets design elements on the subject roadway; and, 4) one or more significant adverse effects would outweigh the positive effects of implementing Complete Streets design elements. Plans or projects that are granted exceptions must be made available for public review. 07-13-20 TWIC Committee Mtg Agenda Packet Page 242 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 243 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 244 of 250 TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE 5. Meeting Date:07/13/2020   Subject:CONSIDER report: Local, Regional, State, and Federal Transportation Issues: Legislation, Studies, Miscellaneous Updates, take ACTION as Appropriate Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE,  Department:Conservation & Development Referral No.: 1   Referral Name: REVIEW legislative matters on transportation, water, and infrastructure.  Presenter: John Cunningham, DCD Contact: John Cunningham (925)674-7883 Referral History: This is a standing item on the Transportation, Water, and Infrastructure Committee referral list and meeting agenda. Referral Update: In developing transportation related issues and proposals to bring forward for consideration by TWIC, staff receives input from the Board of Supervisors (BOS), references the County's adopted Legislative Platforms, coordinates with our legislative advocates, partner agencies and organizations, and consults with the Committee itself. This report includes four sections, 1: LOCAL, 2: REGIONAL, 3: STATE, and 4: FEDERAL . 1. LOCAL No written report in July  2. REGIONAL No written report in July 3. STATE A written legislative status report from Mark Watts is attached and he will attend the July Committee meeting to provide a verbal report. 4. FEDERAL No written report in July  07-13-20 TWIC Committee Mtg Agenda Packet Page 245 of 250 Recommendation(s)/Next Step(s): CONSIDER report on Local, Regional, State, and Federal Transportation Related Legislative Issues and take ACTION as appropriate. Fiscal Impact (if any): There is no fiscal impact. Attachments July TWIC Leg Report 07-08-20 Secretary of State Ltr 07-13-20 TWIC Committee Mtg Agenda Packet Page 246 of 250 June 19, 2020 TO: Transportation, Water, and Infrastructure Committee Meeting FROM: Mark Watts SUBJECT: Legislative Report – July TWIC Meeting This report provides a brief status update on legislative or state budget activities. Legislature Both Houses faced parliamentary deadlines as of June 19; in the Assembly, they were required to pass bills introduced in their house by that date, while the Senate adjusted their deadline for this date to apply to consideration by fiscal committees of Senate bills. The Senate extended until June 26 the deadline to move Senate bills out of their house. Meeting their “house of origin” deadline allowed the Assembly to take begin their summer recess, adjourning on June 19 until July 13, while the Senate will continue to work until their adjournment date, scheduled for June 26. Likewise, they will return on July 13, as well; both houses will then be in synch. With respect to the budget, as of this writing, the budget bill and major trailer bills are pending consideration by Governor Newsom (see below). As discussions ensue between the three parties, it is anticipated by both houses that they will have one day of Floor Session in the coming week; if so, the Assembly members have been cautioned to be prepared to be called back to consider budget trailer bills to make necessary policy changes to the budget act. Finally, the Assembly Rules Committee is expected to meet at the end of the month to make bill referrals for measures that came over from the Senate. Governor Newson On Friday, June 19th, Governor Newsom made 2 appointments to the CTC, bringing to nine the requisite number of gubernatorial appointees as authorized under statute. Jon Rocco Davis, 61, of Rocklin. Davis has been vice president and regional manager of Laborers’ International Union of North America (LiUNA) since 2001. He is chairman of the LiUNA Pacific Southwest Regional Organizing Coalition, National Alliance for Fair Contracting, Laborers-Employers Cooperation and Education 07-13-20 TWIC Committee Mtg Agenda Packet Page 247 of 250 Trust Southwest and International Accreditation Service. Rocco is a trustee of a number of affiliated entities. Lee Ann Eager, 64, of Fresno. Eager has been president and chief executive officer at the Fresno County Economic Development Corporation since 2009. She is a board member of the California Workforce Development Board, California Partnership for San Joaquin Valley and the California International Trade and Investment Council and a number of organizations affiliated with central valley economic interests. Eager earned a Juris Doctor degree from the University of California, Davis School of Law. State Budget On June 15 the Legislature acted to approve the balanced, but somewhat incomplete, 2020 State Budget. This action allowed the Legislature to meet the requirement in the State Constitution to pass a balanced State Budget by June 15th of every year. Although the bill provides $143 billion in General Fund appropriations for the continued functioning of the state government, legislative leaders openly acknowledged that the Budget Bill they passed, SB 74 (Mitchell), does not represent a final agreement with Governor Newsom and does not signify the end of state budget negotiations. As a reminder, the initial January Budget proposal sought $220 million in State expenditures. However, the COVID-19 pandemic responses at the state and federal levels have greatly affected state revenues and the present working “budget shortfall” was estimated to be $54 billion. The Governor used the annual May Budget Revision to strike some of his earlier budget requests and to recommend a series of revenue actions, budgetary transfers, and other actions to form a fiscal pathway forward to meet the deficit. In addition to the budget bill, the legislature also passed AB 76 (Budget), a budget trailer bill that was necessary for providing current-year funding to schools; the bill also included provisions related to victim restitution. AB 85 (Budget), the so-called tax revenue budget trailer bill, makes several changes to state taxes that would raise about $4 billion. This measure was somewhat controversial, although both houses met the super majority requirement to successfully pass the measure to the governor. The major differences that remain total billions of dollars and include whether to make deeper cuts to state programs like In Home Supportive Services (IHSS) or rely more on deferrals and borrowing, how much school funding to provide, and how to structure trigger cuts related to a possible federal aid package. The size of the unresolved issues makes it hard to predict a final 07-13-20 TWIC Committee Mtg Agenda Packet Page 248 of 250 outcome on items important to counties, even where the Governor and Legislature seem to be in agreement. Deferred Budget Actions The Legislature and the Governor will continue to negotiate, though their timeline is unclear on items for which agreement can be reached. Rumors have it that Legislative Leaders have indicated to their members that there may be developments during the week of June 22nd and to be prepared to consider these emerging proposals. The next practical deadline is the beginning of the fiscal year on July 1, which has not been missed since California voters gave the Legislature authority to pass a budget with a majority vote. Major budgetary actions that may eventually be agreed upon will be incorporated into what has become known as the “Budget Bill Junior” in recent years. Budget Trailer bills Other important policy changes necessary to ensure that the budget bill appropriations are correctly applied will follow in the coming weeks. Included among these will be a Transportation Trailer Bill that for many interested transportation agencies will contain several policy modifications and policy deferrals applicable to transit funding programs. These will include: 1 – More flexibility for Good Repair and LCTOP funds. 2 – Temporary elimination of TDA/STA compliance penalties. 3 – Allocation factor language for use by Controller in calculating STA/LCTOP Good Repair programs. Transportation Tax Rate Increases SB 1 requires the State to adjust the gas tax rate for inflation on an annual basis, including the base 18-cents, the 17.3-cent rate that replaced the sales tax on gas in 2010, and the 12-cent SB 1 increment. The Department of Finance provides the calculation, based on the Consumer Price Index, to the Department of Tax and Fee Authority who will implement the new rate on July 1 of every year (please see attached memo for more detail on the July 1, 2020 rate increase). In total, the inflationary adjustment to all increments of the gas tax that will take effect on July 1, 2020 is 3.2-cents. The tax rate for a gallon of diesel fuel will also be adjusted for inflation, by 2.5-cents. 07-13-20 TWIC Committee Mtg Agenda Packet Page 249 of 250 07-13-20 TWIC Committee Mtg Agenda Packet Page 250 of 250