HomeMy WebLinkAboutBOARD STANDING COMMITTEES - 04102017 - TWIC Agenda Pkt
TRANSPORTATION, WATER &
INFRASTRUCTURE
COMMITTEE
April 10, 2017
9:00 A.M.
651 Pine Street, Room 101, Martinez
Supervisor Diane Burgis, District III, Chair
Supervisor Karen Mitchoff, District IV, Vice Chair
Agenda
Items:
Items may be taken out of order based on the business of the day and preference
of the Committee
1.Introductions
2.Public comment on any item under the jurisdiction of the Committee and not on this
agenda (speakers may be limited to three minutes).
3. Administrative Items, if applicable. (John Cunningham, Department of Conservation
and Development)
4. REVIEW record of meeting for February 13, 2017, Transportation, Water and
infrastructure Committee Meeting. This record was prepared pursuant to the Better
Government Ordinance 95-6, Article 25-205 (d) of the Contra Costa County Ordinance
Code. Any handouts or printed copies of testimony distributed at the meeting will be
attached to this meeting record. (John Cunningham, Department of Conservation and
Development).
5. RECEIVE report on the formation of a Contra Costa County Groundwater
Sustainability Agency to undertake sustainable groundwater management via a
Memorandum of Understanding and for the development of a Groundwater
Sustainability Plan in the portion of the Tracy Subbasin within Contra Costa
County. (Ryan Hernandez, Department of Conservation and Development Water
Agency)
6. ACCEPT report from the Public Works Department on meeting Municipal
Regional Permit 2.0 requirements and forward to the Board for approval. (Mike
Carlson, Department of Public Works)
7. ACCEPT report from the Public Works Department on the submittal of a grant
proposal application for the North Richmond Watershed Connections Project to
the State Coastal Conservancy “Urban Greening San Francisco Bay Area”
Proposition 1 Grant. (John Steere, Department of Public Works).
04-10-17 TWIC Mtg Packet Pg 1 of 270
8. CONSIDER report on Local, State, and Federal Transportation Related Issues
and take ACTION as appropriate. (John Cunningham, Department of Conservation
and Development)
9. COMMUNICATION/News Clippings. (John Cunningham, Department of
Conservation and Development)
10.The next meeting is currently scheduled for Monday, May 8, 2017, 9:00 am.
11.Adjourn
The Transportation, Water & Infrastructure Committee (TWIC) will provide reasonable
accommodations for persons with disabilities planning to attend TWIC meetings. Contact the staff
person listed below at least 72 hours before the meeting.
Any disclosable public records related to an open session item on a regular meeting agenda and
distributed by the County to a majority of members of the TWIC less than 96 hours prior to that
meeting are available for public inspection at the County Department of Conservation and
Development, 30 Muir Road, Martinez during normal business hours.
Public comment may be submitted via electronic mail on agenda items at least one full work day
prior to the published meeting time.
For Additional Information Contact:
John Cunningham, Committee Staff
Phone (925) 674-7833, Fax (925) 674-7250
john.cunningham@dcd.cccounty.us
04-10-17 TWIC Mtg Packet Pg 2 of 270
Glossary of Acronyms, Abbreviations, and other Terms (in alphabetical order): Contra Costa County
has a policy of making limited use of acronyms, abbreviations, and industry-specific language in meetings of its
Board of Supervisors and Committees. Following is a list of commonly used abbreviations that may appear in
presentations and written materials at meetings of the Transportation, Water and Infrastructure Committee:
AB Assembly Bill
ABAG Association of Bay Area Governments
ACA Assembly Constitutional Amendment
ADA Americans with Disabilities Act of 1990
ALUC Airport Land Use Commission
AOB Area of Benefit
BAAQMD Bay Area Air Quality Management District
BART Bay Area Rapid Transit District
BATA Bay Area Toll Authority
BCDC Bay Conservation & Development Commission
BDCP Bay-Delta Conservation Plan
BGO Better Government Ordinance (Contra Costa County)
BOS Board of Supervisors
CALTRANS California Department of Transportation
CalWIN California Works Information Network
CalWORKS California Work Opportunity and Responsibility
to Kids
CAER Community Awareness Emergency Response
CAO County Administrative Officer or Office
CCTA Contra Costa Transportation Authority
CCWD Contra Costa Water District
CDBG Community Development Block Grant
CEQA California Environmental Quality Act
CFS Cubic Feet per Second (of water)
CPI Consumer Price Index
CSA County Service Area
CSAC California State Association of Counties
CTC California Transportation Commission
DCC Delta Counties Coalition
DCD Contra Costa County Dept. of Conservation & Development
DPC Delta Protection Commission
DSC Delta Stewardship Council
DWR California Department of Water Resources
EBMUD East Bay Municipal Utility District
EIR Environmental Impact Report (a state requirement)
EIS Environmental Impact Statement (a federal requirement)
EPA Environmental Protection Agency
FAA Federal Aviation Administration
FEMA Federal Emergency Management Agency
FTE Full Time Equivalent
FY Fiscal Year
GHAD Geologic Hazard Abatement District
GIS Geographic Information System
HBRR Highway Bridge Replacement and Rehabilitation
HOT High-Occupancy/Toll
HOV High-Occupancy-Vehicle
HSD Contra Costa County Health Services Department
HUD United States Department of Housing and Urban
Development
IPM Integrated Pest Management
ISO Industrial Safety Ordinance
JPA/JEPA Joint (Exercise of) Powers Authority or Agreement
Lamorinda Lafayette-Moraga-Orinda Area
LAFCo Local Agency Formation Commission
LCC League of California Cities
LTMS Long-Term Management Strategy
MAC Municipal Advisory Council
MAF Million Acre Feet (of water)
MBE Minority Business Enterprise
MOA Memorandum of Agreement
MOE Maintenance of Effort
MOU Memorandum of Understanding
MTC Metropolitan Transportation Commission
NACo National Association of Counties
NEPA National Environmental Protection Act
OES-EOC Office of Emergency Services-Emergency
Operations Center
PDA Priority Development Area
PWD Contra Costa County Public Works Department
RCRC Regional Council of Rural Counties
RDA Redevelopment Agency or Area
RFI Request For Information
RFP Request For Proposals
RFQ Request For Qualifications
SB Senate Bill
SBE Small Business Enterprise
SR2S Safe Routes to Schools
STIP State Transportation Improvement Program
SWAT Southwest Area Transportation Committee
TRANSPAC Transportation Partnership & Cooperation (Central)
TRANSPLAN Transportation Planning Committee (East County)
TWIC Transportation, Water and Infrastructure Committee
USACE United States Army Corps of Engineers
WBE Women-Owned Business Enterprise
WCCTAC West Contra Costa Transportation Advisory
Committee
WETA Water Emergency Transportation Authority
WRDA Water Resources Development Act
04-10-17 TWIC Mtg Packet Pg 3 of 270
TRANSPORTATION, WATER &
INFRASTRUCTURE COMMITTEE 3.
Meeting Date:04/10/2017
Subject:Administrative Items, if applicable.
Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE
COMMITTEE,
Department:Conservation & Development
Referral No.: N/A
Referral Name: N/A
Presenter: John Cunningham, DCD Contact: John Cunningham
(925)674-7833
Referral History:
This is an Administrative Item of the Committee.
Referral Update:
Staff will review any items related to the conduct of Committee business.
Recommendation(s)/Next Step(s):
CONSIDER Administrative items and Take ACTION as appropriate.
Fiscal Impact (if any):
N/A
Attachments
No file(s) attached.
04-10-17 TWIC Mtg Packet Pg 4 of 270
TRANSPORTATION, WATER &
INFRASTRUCTURE COMMITTEE 4.
Meeting Date:04/10/2017
Subject:REVIEW record of meeting for February 13, 2017, Transportation,
Water and Infrastructure Meeting.
Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE
COMMITTEE,
Department:Conservation & Development
Referral No.: N/A
Referral Name: N/A
Presenter: John Cunningham, DCD Contact: John Cunningham
(925)674-7833
Referral History:
County Ordinance (Better Government Ordinance 95-6, Article 25-205, [d]) requires that each
County Body keep a record of its meetings. Though the record need not be verbatim, it must
accurately reflect the agenda and the decisions made in the meeting.
Referral Update:
Any handouts or printed copies of testimony distributed at the meeting will be attached to this
meeting record. Links to the agenda and minutes will be available at the TWI Committee web
page: http://www.cccounty.us/4327/Transportation-Water-Infrastructure
Recommendation(s)/Next Step(s):
Staff recommends approval of the attached Record of Action for the February 13, 2017,
Committee Meeting with any necessary corrections.
Fiscal Impact (if any):
N/A
Attachments
02-13-17 TWIC Sign-In Sheet
02-13-17 TWIC Mtg Minutes
02-13-17 Handout - Turf Conversion
02-13-17 Handout - Advisory Council
02-13-17 TWIC Mtg Speaker Card
04-10-17 TWIC Mtg Packet Pg 5 of 270
04-10-17 TWIC Mtg Packet Pg 6 of 270
TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE
February 13, 2017
9:00 A.M.
651 Pine Street, Room 101, Martinez
Supervisor Diane Burgis, Chair
Supervisor Karen Mitchoff, Vice Chair
Agenda Items:Items may be taken out of order based on the business of the day and preference of the Committee
Present: Diane Burgis, Chair
Karen Mitchoff, Vice Chair
Attendees: Debbie Toth, Choice in Aging
Anne O, Office of Supervisor Karen Mitchoff
Alicia Nuchols, Office of Supervisor Diane Burgis
Jonathan Bash, Office of Supervisor Diane Burgis
Stephen Kowalewski, CCC PWD
Nancy Wein, CCC PWD
Jerry Fahy, CCC PWD
Tanya Drlik, IPM Program Mgr.
Mark Watts, County Advocate
Maureen Toms, CCC DCD
Ryan Hernandez, CCC DCD - Water Agency
John Cunningham, CCC DCD
1.Introductions
2.Public comment on any item under the jurisdiction of the Committee and not on this agenda (speakers may be
limited to three minutes).
3.CONSIDER Administrative items and Take ACTION as appropriate.
4.Staff recommends approval of the attached Record of Action for the December 8, 2016 Committee Meeting
with any necessary corrections.
The Committee unanimously approved the meeting record.
5.DIRECT staff as appropriate.
Tanya Drlik, IPM Coordinator provided an overview of IPM activities. The Committee unanimously directed
staff to: 1) continue reporting to TWIC and the full BOS annually, 2) provide information to TWIC
regarding the cost of the Pittsburg Health Clinic Turf Conversion, 3) bring a report to the full BOS on the
same, and 4) place signage at the Pittsburg Health Clinic explaining the water/money savings resulting from
the conversion.
6.CONSIDER report on Local, State, and Federal Transportation Related Legislative Issues and take ACTION as
appropriate including CONSIDERATION of any specific recommendations in the report above.
The Committee received the report and directed staff to: 1) reach out to CCTA staff regarding potential
timing, cost/funding source, of the proposed accessible transit study, 2) reach out to Senator Glazer's staff to
set up a meeting regarding transportation funding, school siting, and delta issues (and provide necessary
support materials to Supervisorial staff), and 3) report back on the results of the Iron Horse meeting on
February 24th.
04-10-17 TWIC Mtg Packet Pg 7 of 270
7.ACCEPT report on the impacts to County transportation projects from the declining State gas tax; DIRECT the
Public Works Director to make modifications to the Capital Road Improvement and Preservation Program
budget to reflect the reduced gas tax revenues; and ACKNOWLEDGE that unless the State approves a
transportation funding fix, the projects currently recommended to be delayed, will be deferred indefinitely, road
deferred maintenance will continue to increase and our aging transportation infrastructure will cost more to fix in
the future.
The Committee unanimously accepted the report and approved staff recommendations and further directed
staff to 1) bring the report to the full Board of Supervisors (and any necessary changes to the Capital Road
Improvement and, Preservation Program) as a discussion item, and 2) provide report materials to District
III and IV staff in preparation for the requested meeting with Senator Glazer.
8.REVIEW, REVISE as appropriate, and ADOPT the 2017 Calendar.
The Committee unanimously approved the calendar and further directed staff to populate the calendar with
scheduled annual or anticipated discussion items.
9.CONSIDER recommendations on referrals to the Committee for 2017, REVISE as necessary, and take
ACTION as appropriate.
The Committee unanimously approved the recommendations with the additions of: freight issues related to
the Northern Waterfront (added to item #15), and the addition of navigation assistance apps (added to item
#19), and further directed staff to bring the referral list to the full Board of Supervisors for approval.
10.RECEIVE communication and DIRECT staff as appropriate.
The Committee received the communication.
11.The next meeting is currently scheduled for Monday, March 13, 2017.
12.Adjourn
The Transportation, Water & Infrastructure Committee (TWIC) will provide reasonable accommodations for persons with disabilities planning to attend TWIC meetings. Contact the
staff person listed below at least 72 hours before the meeting.
Any disclosable public records related to an open session item on a regular meeting agenda and distributed by the County to a majority of members of the TWIC less than 96 hours prior
to that meeting are available for public inspection at the County Department of Conservation and Development, 30 Muir Road, Martinez during normal business hours.
Public comment may be submitted via electronic mail on agenda items at least one full work day prior to the published meeting time.
For Additional Information Contact:
John Cunningham, Committee Staff
04-10-17 TWIC Mtg Packet Pg 8 of 270
Glossary of Acronyms, Abbreviations, and other Terms (in alphabetical order): Contra Costa County has a policy of making limited use of acronyms,
abbreviations, and industry-specific language in meetings of its Board of Supervisors and Committees. Following is a list of commonly used abbreviations that
may appear in presentations and written materials at meetings of the Transportation, Water and Infrastructure Committee:
AB Assembly Bill
ABAG Association of Bay Area Governments
ACA Assembly Constitutional Amendment
ADA Americans with Disabilities Act of 1990
ALUC Airport Land Use Commission
AOB Area of Benefit
BAAQMD Bay Area Air Quality Management District
BART Bay Area Rapid Transit District
BATA Bay Area Toll Authority
BCDC Bay Conservation & Development Commission
BDCP Bay-Delta Conservation Plan
BGO Better Government Ordinance (Contra Costa County)
BOS Board of Supervisors
CALTRANS California Department of Transportation
CalWIN California Works Information Network
CalWORKS California Work Opportunity and Responsibility
to Kids
CAER Community Awareness Emergency Response
CAO County Administrative Officer or Office
CCTA Contra Costa Transportation Authority
CCWD Contra Costa Water District
CDBG Community Development Block Grant
CEQA California Environmental Quality Act
CFS Cubic Feet per Second (of water)
CPI Consumer Price Index
CSA County Service Area
CSAC California State Association of Counties
CTC California Transportation Commission
DCC Delta Counties Coalition
DCD Contra Costa County Dept. of Conservation & Development
DPC Delta Protection Commission
DSC Delta Stewardship Council
DWR California Department of Water Resources
EBMUD East Bay Municipal Utility District
EIR Environmental Impact Report (a state requirement)
EIS Environmental Impact Statement (a federal requirement)
EPA Environmental Protection Agency
FAA Federal Aviation Administration
FEMA Federal Emergency Management Agency
FTE Full Time Equivalent
FY Fiscal Year
GHAD Geologic Hazard Abatement District
GIS Geographic Information System
HBRR Highway Bridge Replacement and Rehabilitation
HOT High-Occupancy/Toll
HOV High-Occupancy-Vehicle
HSD Contra Costa County Health Services Department
HUD United States Department of Housing and Urban
Development
IPM Integrated Pest Management
ISO Industrial Safety Ordinance
JPA/JEPA Joint (Exercise of) Powers Authority or Agreement
Lamorinda Lafayette-Moraga-Orinda Area
LAFCo Local Agency Formation Commission
LCC League of California Cities
LTMS Long-Term Management Strategy
MAC Municipal Advisory Council
MAF Million Acre Feet (of water)
MBE Minority Business Enterprise
MOA Memorandum of Agreement
MOE Maintenance of Effort
MOU Memorandum of Understanding
MTC Metropolitan Transportation Commission
NACo National Association of Counties
NEPA National Environmental Protection Act
OES-EOC Office of Emergency Services-Emergency
Operations Center
PDA Priority Development Area
PWD Contra Costa County Public Works Department
RCRC Regional Council of Rural Counties
RDA Redevelopment Agency or Area
RFI Request For Information
RFP Request For Proposals
RFQ Request For Qualifications
SB Senate Bill
SBE Small Business Enterprise
SR2S Safe Routes to Schools
STIP State Transportation Improvement Program
SWAT Southwest Area Transportation Committee
TRANSPAC Transportation Partnership & Cooperation (Central)
TRANSPLAN Transportation Planning Committee (East County)
TWIC Transportation, Water and Infrastructure Committee
USACE United States Army Corps of Engineers
WBE Women-Owned Business Enterprise
WCCTAC West Contra Costa Transportation Advisory
Committee
WETA Water Emergency Transportation Authority
WRDA Water Resources Development Act
For Additional Information Contact: Phone (925) 674-7833, Fax (925) 674-7250
john.cunningham@dcd.cccounty.us
04-10-17 TWIC Mtg Packet Pg 9 of 270
04-10-17 TWIC Mtg Packet Pg 10 of 270
04-10-17 TWIC Mtg Packet Pg 11 of 270
04-10-17 TWIC Mtg Packet Pg 12 of 270
04-10-17 TWIC Mtg Packet Pg 13 of 270
TRANSPORTATION, WATER &
INFRASTRUCTURE COMMITTEE 5.
Meeting Date:04/10/2017
Subject:RECEIVE Report on Establishing a Contra Costa County Groundwater
Sustainability Agency
Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE,
Department:Conservation & Development
Referral No.: 6
Referral Name: Sustainable Groundwater Management Act
Presenter: Ryan Hernandez, DCD Water Agency Contact: Ryan Hernandez
(925)674-7824
Referral History:
The Committee received a report on the County's participation in the development of a
Groundwater Sustainability Agency and a Groundwater Sustainability Plan within the Tracy
Subbasin to comply with the Sustainable Groundwater Management Act in March of 2016.
Referral Update:
In September 2014, the California Legislature enacted the Sustainable Groundwater Management
Act of 2014 (SGMA), which established a statewide framework for the sustainable management
of groundwater resources. That framework focuses on granting new authorities and responsibility
to local agencies while holding those agencies accountable. The framework also provides for state
intervention where a local agency fails to develop a groundwater sustainability plan in a timely
manner.
SGMA requires all high-priority and medium-priority groundwater basins, as designated by the
California Department of Water Resources (DWR), be managed by a Groundwater Sustainability
Agency (GSA). A local public agency, or combination of local public agencies overlying a
designated basin, may become a GSA if the agency(ies) has(ve) water supply, water management,
or land use responsibilities within a groundwater basin. A combination of local public agencies
may form a GSA by way of Joint Exercise of Powers Agreement, a Memorandum of
Understanding, or other legal document. (Wat. Code, §§ 10723(a), 10723.6.) SGMA provides that
if no public agency becomes the GSA for a portion of the underlying basin, the County becomes
the GSA by default unless it takes action to decline the responsibility in which case the State
would regulate.
The Tracy Subbasin is referred to as DWR Basin 5-22.15, San Joaquin Valley and is shown on
Exhibit A of Attachment 1. The Tracy Subbasin is located in eastern Contra Costa County, as
well as San Joaquin County and Alameda County, and is a medium-priority groundwater basin.
04-10-17 TWIC Mtg Packet Pg 14 of 270
SGMA sets deadlines for the formation of GSAs and the adoption of Groundwater Sustainably
Plan (GSPs) which, if not met, will allow the State to intervene. By June 30, 2017, all
high-priority or medium-priority groundwater basins are required to have a single GSA or
multiple GSAs that cover the entire basin. All high-priority or medium-priority groundwater
basins must adopt a single GSP or a coordinated set of GSPs by January 31, 2022.
On April 12, 2016, the Board declared its intent to become a member of a Groundwater
Sustainability Agency (GSA) for the portion of the Tracy Subbasin within Contra Costa County
(CCC) and sustainably manage groundwater resources within the County in compliance of the
SGMA.
The Board’s decision in April 2016 contemplated a single GSA collectively managed by the
County, Cities of Antioch and Brentwood, Byron-Bethany Irrigation District, Contra Costa Water
District, Diablo Water District, East Contra Costa Irrigation District and the Discovery Bay
Community Services District. However, as interagency discussions continued it was determined
that the creation of individual GSAs coordinated through a memorandum of understanding was
more appropriate initially in order to avoid creating a new legal entity before a GSP had even
been drafted. During development of the GSP the parties will revisit the governance structure.
The East County entities have prepared a draft Memorandum of Understanding (MOU) for the
development of a single Groundwater Sustainability Plan, Attachment 1, with the intent that each
GSA will adopt the same GSP. The purpose of this MOU is to coordinate the above entities
activities related to each party becoming a GSA, development of the GSP for the Tracy Subbasin
within CCC and each entity’s future consideration of whether to adopt the GSP. The MOU
provides that the ultimate governance structure will be reassessed during development of the GSP.
The GSAs in the portion of the Tracy Subbasin within Contra Costa County are shown on Exhibit
B of Attachment 1.
From the start, the County preferred to collaborate in an effort to ensure sustainable groundwater
management, manage the groundwater basin as efficiently as practicable balancing financial
resources, while retaining the County’s existing land use and groundwater management authority.
The MOU accomplishes these goals for the period during which the GSP is prepared. The MOU
states the GSP will be drafted in a manner that preserves land use authority of each city or county,
or the statutory authority of each special district. It also states the GSP must include provisions for
consultation between a GSA and any public agency that the GSA overlaps before the GSA takes
any action that may relate to the public agency’s exercise of its statutory authority.
Recommendation(s)/Next Step(s):
DISCUSS report on the formation of a Contra Costa County Groundwater Sustainability Agency
04-10-17 TWIC Mtg Packet Pg 15 of 270
DISCUSS report on the formation of a Contra Costa County Groundwater Sustainability Agency
to undertake sustainable groundwater management in the portion of the Tracy Subbasin within
Contra Costa County and CONSIDER recommending the Board conduct a public hearing on
April 25, 2017 to consider Contra Costa County's decision to become a Groundwater
Sustainability Agency for a portion of the Tracy Subbasin within Contra Costa County excluding
the areas of the Cities of Antioch and Brentwood, Byron Bethany Irrigation District, Diablo
Water District, Discovery Bay Community Services District and East Contra Costa Irrigation
District and AUTHORIZE the Conservation and Development Director, or designee, to execute
the Memorandum of Understanding and enter into an agreement with East Contra Costa County
member agencies that will develop a Groundwater Sustainability Plan for the portion of the Tracy
Subbasin within Contra Costa County.
Fiscal Impact (if any):
To date, the Department of Conservation and Development has prepared the maps for the
cooperating entities use and the Contra Costa County Water Agency has participated in the
preparation of the MOU, prepared staff reports and supporting materials for the Board's
consideration in this matter. The outside technical/consultant costs associated with developing the
Groundwater Sustainability Plan will be shared equally among the eight parties. However, the
County, at its sole discretion, may satisfy its share of GSP costs by providing in-kind services,
which may include additional mapping, graphics, and database management services. Other
Departments have regulatory authority and/or expertise relevant to the issue, have been involved
to date, will likely be involved in the future (e.g. Environmental Health Division) and their
involvement may contribute to the County's in-kind services. All in-kind services will be
accomplished through existing staff resources and no augmentation to current budget levels is
anticipated.
Attachments
Att 1 Draft GSA MOU
04-10-17 TWIC Mtg Packet Pg 16 of 270
Page 1 of 17
MEMORANDUM OF UNDERSTANDING 1
2
Development of a Groundwater Sustainability Plan 3
for the East Contra Costa County Portion of the 4
Tracy Subbasin, (DWR Basin 5-22.15, San Joaquin Valley) 5
6
This Memorandum of Understanding for the Development of a Groundwater 7
Sustainability Plan for the East Contra Costa County portion of the Tracy Subbasin, (DWR Basin 8
5-22.15, San Joaquin Valley) (“MOU”) is entered into and effective this _____ day of 9
_________________, 2017 (“Effective Date”) by and among the City of Antioch (“Antioch”), 10
City of Brentwood (“Brentwood”), Byron-Bethany Irrigation District (“BBID”), Contra Costa 11
Water District (“CCWD”), Contra Costa County (“County”), Diablo Water District (“DWD”), 12
East Contra Costa Irrigation District (“ECCID”), and Discovery Bay Community Services 13
District (“Discovery Bay”). Each of the foregoing parties to this MOU is sometimes referred to 14
herein as a “Party” and are collectively sometimes referred to as the “Parties.” 15
Recitals 16
A. In September 2014, the California Legislature enacted the Sustainable Groundwater 17
Management Act of 2014 (“SGMA”), which established a statewide framework for the 18
sustainable management of groundwater resources. That framework focuses on granting new 19
authorities and responsibility to local agencies while holding those agencies accountable. The 20
framework also provides for state intervention where a local agency fails to develop a 21
groundwater sustainability plan in a timely manner. 22
04-10-17 TWIC Mtg Packet Pg 17 of 270
Page 2 of 17
B. The Tracy Subbasin (“Basin”) is referred to as DWR Basin 5-22.15, San Joaquin Valley 23
and is shown on the map attached hereto as Exhibit A and incorporated herein by reference as if 24
set forth in full. The Tracy Subbasin is located in eastern Contra Costa County and in San 25
Joaquin County, and Alameda County. The portion of the Basin within Contra Costa County is 26
referred to herein as the “East CC Basin,” the portion of the Basin within San Joaquin County is 27
referred to herein as the “SJ Basin, and the portion of the Basin within Alameda County is 28
referred to herein as the “Alameda Basin.” The Parties collectively overlie all of the East CC 29
Basin. 30
C. Under SGMA, one or more local agencies may form a groundwater sustainability agency 31
(“GSA”), by memorandum of agreement, joint exercise of powers agreement, or other 32
agreement. (Wat. Code, §§ 10723(a), 10723.6.) The Parties desire for each Party to be the GSA 33
within all or a portion of that Party’s boundary. The Parties further desire to develop a 34
governance structure for the East CC Basin to be considered during development of the 35
groundwater sustainability plan (a “GSP”) for the East CC Basin (the “East CC Basin GSP”). 36
The Parties further desire to resolve areas of jurisdictional overlap so that no two Parties serve as 37
GSAs over the same area. The purpose of this MOU is to coordinate the Parties’ activities 38
related to each Party becoming a GSA, development of the East CC Basin GSP, and each Party’s 39
future consideration of whether to adopt a GSP for the East CC Basin. 40
D. The Parties wish to collaborate in an effort to ensure sustainable groundwater 41
management for the East CC Basin, manage the groundwater basin as efficiently as practicable 42
balancing the financial resources of the agencies with the principles of effective and safe 43
groundwater management, while retaining groundwater management authority within their 44
respective jurisdictions. The Parties desire to share responsibility for East CC Basin 45
04-10-17 TWIC Mtg Packet Pg 18 of 270
Page 3 of 17
management under SGMA. The Parties recognize that the key to success in this effort will be 46
the coordination of activities under SGMA, and the collaborative development of the East CC 47
Basin GSP, which each Party may consider adopting and implementing within its GSA 48
management area. The Parties also will need to confer with GSAs for the SJ Basin and Alameda 49
Basin regarding the terms of an agreement that coordinates the East CC Basin GSP with the 50
GSP(s) of the GSA(s) for the SJ Basin and the Alameda Basin. 51
E. The Basin has been designated by the California Department of Water Resources 52
(“DWR”) as a medium-priority groundwater basin, which, under the terms of SGMA, means that 53
the Parties must submit an East CC Basin GSP to DWR by January 31, 2022. 54
F. The Parties wish to memorialize their commitments by means of this MOU. 55
Understandings 56
1. Term. The term of this MOU begins on the Effective Date, which shall occur upon 57
execution of this MOU by all eight of the parties, and this MOU shall remain in full force 58
and effect until the earliest of the following events: (i) January 31, 2022, (ii) the date 59
upon which the Parties submit an East CC Basin GSP to DWR, or (iii) the date upon 60
which the Parties then party to the MOU execute a document jointly terminating the 61
provisions of this MOU. An individual Party’s obligations under this MOU terminate 62
when the Party withdraws from the MOU in accordance with Section 4. 63
2. Development of the GSP 64
a. Parties to Become GSAs. Each Party, except Contra Costa Water District, agrees 65
to take the necessary actions to become the GSA for all or a portion of that area of 66
the East CC Basin that it overlies, as shown on Exhibit B, attached hereto, no later 67
04-10-17 TWIC Mtg Packet Pg 19 of 270
Page 4 of 17
than April 1, 2017, or shortly thereafter. The Parties shall jointly submit the 68
Parties’ individual elections to become GSAs and this MOU to DWR prior to 69
April 1, 2017, or shortly thereafter. The Parties further agree to develop a 70
governance structure for the East CC Basin to be considered during development 71
of the East CC Basin GSP 72
b. Single GSP. The Parties will collaborate to develop a single East CC Basin GSP 73
that, at a minimum, satisfies the GSP requirements in the SGMA and the 74
regulations promulgated under the SGMA. The East CC Basin GSP must include 75
an analysis of implementation costs and revenue sources, and must include an 76
analysis of governance structure options. The East CC Basin GSP shall be drafted 77
in a manner that preserves, and does not purport to supersede, the land use 78
authority of each city or county, or the statutory authority of each special district, 79
that is a party to this MOU. The East CC Basin GSP must include provisions for 80
consultation between a GSA and any public agency that the GSA overlaps before 81
the GSA takes any action that may relate to that public agency’s exercise of its 82
statutory authority. Unless the Parties later agree otherwise, it is intended that the 83
East CC Basin GSP will be implemented by each Party within its respective GSA 84
management area, and that the Parties will coordinate their implementation of the 85
East CC Basin GSP. The Parties will endeavor to negotiate terms of an 86
agreement with the GSA(s) for the SJ Basin and the Alameda Basin, to ensure 87
that the East CC Basin, SJ Basin, and Alameda Basin GSAs’ GSP(s) are 88
coordinated consistent with the SGMA. If the terms of that MOU are negotiated, 89
the Parties will ask their governing bodies to consider approving the MOU. 90
04-10-17 TWIC Mtg Packet Pg 20 of 270
Page 5 of 17
c. Overlap Areas. Solely for the purpose of complying with the SGMA requirement 91
that GSA management areas not overlap, the Parties agree that there are no 92
overlapping GSA management areas, as shown on Exhibit B. This MOU does not 93
purport to limit any Party’s legal authority to utilize and deliver groundwater or 94
surface water throughout its jurisdictional boundary (as may be amended from 95
time-to-time), which may include area outside of a Party’s management area 96
shown on Exhibit B. 97
d. Cooperation of Efforts. The Parties will designate staff who will endeavor to 98
meet monthly or more frequently if necessary to develop the terms of the East CC 99
Basin GSP in an expeditious manner. 100
e. Financing . 101
(1) The outside technical/consultant costs associated with developing the East CC 102
Basin GSP (“GSP Costs”) will be shared equally among the Parties. However, 103
the County, at its sole discretion, may satisfy its share of GSP Costs by providing 104
in-kind services, which may include mapping, graphics, and database 105
management services. 106
(2) The $118,300 contract with Luhdorff and Scalmanini dated April 1, 2015, for 107
SGMA technical support has been paid one-fifth each by BBID, Brentwood, 108
DWD, ECCID and Discovery Bay. Antioch and CCWD agree that within 60 days 109
of the effective date of this MOU, they shall reimburse BBID, Brentwood, DWD, 110
ECCID and Discovery Bay each $3,380 in order to reallocate the $118,300 111
contract cost into one-seventh portions. 112
04-10-17 TWIC Mtg Packet Pg 21 of 270
Page 6 of 17
f. Approval of the GSP. The Parties agree that the East CC Basin GSP will become 113
effective for each Party when all of the Parties adopt the East CC Basin GSP. 114
3. Savings Provisions. This MOU shall not operate to validate or invalidate, modify or 115
affect any Party’s water rights or any Party’s obligations under any agreement, contract 116
or memorandum of understanding/agreement entered into prior to the effective date of 117
this MOU. Nothing in this MOU shall operate to convey any new right to groundwater to 118
any Party. Each Party to this MOU reserves any and all claims and causes of action 119
respecting its water rights and/or any agreement, contract or memorandum of 120
understanding/agreement; any and all defenses against any water rights claims or claims 121
under any agreement, contract or memorandum of understanding/agreement. 122
4. Withdrawal. Any Party shall have the ability to withdraw from this MOU by providing 123
sixty (60) days written notice of its intention to withdraw. Said notice shall be given to 124
each of the other Parties. 125
a. A Party shall not be fiscally liable for expenditures following its withdrawal from 126
this MOU, provided that the Party provides written notice at least sixty (60) days 127
prior to the effective date of the withdrawal. A withdrawal shall not terminate, or 128
relieve the withdrawing Party from, any express contractual obligation to another 129
Party to to this MOU or to any third party incurred or encumbered prior to the 130
withdrawal. 131
b. In the event of a Party’s withdrawal, this MOU shall continue in full force and 132
effect among the remaining Parties. Further, a Party’s withdrawal from this MOU 133
does not, without further action by that Party, have any effect on the withdrawing 134
Party’s decision to be a GSA. A withdrawing Party shall coordinate the 135
04-10-17 TWIC Mtg Packet Pg 22 of 270
Page 7 of 17
development of its groundwater sustainability plan with the other Parties to this 136
MOU. 137
5. CEQA. Nothing in this MOU commits any Party to undertake any future discretionary 138
actions referenced in this MOU, including but not limited to electing to become a GSA 139
and adopting the East CC Basin GSP. Each Party, as a lead agency under the California 140
Environmental Quality Act (“CEQA”), shall be responsible for complying with all 141
obligations under CEQA that may apply to the Party’s future discretionary actions 142
pursuant to this MOU, including electing to become a GSA and adopting the East CC 143
Basin GSP. 144
6. Books and Records. Each Party shall have access to and the right to examine any of the 145
other Party’s pertinent books, documents, papers or other records (including, without 146
limitation, records contained on electronic media) relating to the performance of that 147
Party’s obligations pursuant to this Agreement, providing that nothing in this paragraph 148
shall be construed to operate as a waiver of any applicable privilege and provided further 149
that nothing in this paragraph shall be construed to give either Party rights to inspect the 150
other Party’s records in excess of the rights contained in the California Public Records 151
Act. 152
7. General Provisions 153
a. Authority. Each signatory of this MOU represents that s/he is authorized to 154
execute this MOU on behalf of the Party for which s/he signs. Each Party 155
represents that it has legal authority to enter into this MOU and to perform all 156
obligations under this MOU. 157
04-10-17 TWIC Mtg Packet Pg 23 of 270
Page 8 of 17
b. Amendment. This MOU may be amended or modified only by a written 158
instrument executed by each of the Parties to this MOU. 159
c. Jurisdiction and Venue. This MOU shall be governed by and construed in 160
accordance with the laws of the State of California, except for its conflicts of law 161
rules. Any suit, action, or proceeding brought under the scope of this MOU shall 162
be brought and maintained to the extent allowed by law in the County of Contra 163
Costa, California. 164
d. Headings. The paragraph headings used in this MOU are intended for 165
convenience only and shall not be used in interpreting this MOU or in 166
determining any of the rights or obligations of the Parties to this MOU. 167
e. Construction and Interpretation. This MOU has been arrived at through 168
negotiations and each Party has had a full and fair opportunity to revise the terms 169
of this MOU. As a result, the normal rule of construction that any ambiguities are 170
to be resolved against the drafting Party shall not apply in the construction or 171
interpretation of this MOU. 172
f. Entire Agreement. This MOU constitutes the entire agreement of the Parties with 173
respect to the subject matter of this MOU and supersedes any prior oral or written 174
agreement, understanding, or representation relating to the subject matter of this 175
MOU. 176
g. Partial Invalidity. If, after the date of execution of this MOU, any provision of 177
this MOU is held to be illegal, invalid, or unenforceable under present or future 178
laws effective during the term of this MOU, such provision shall be fully 179
04-10-17 TWIC Mtg Packet Pg 24 of 270
Page 9 of 17
severable. However, in lieu thereof, there shall be added a provision as similar in 180
terms to such illegal, invalid or unenforceable provision as may be possible and 181
be legal, valid and enforceable. 182
h. Waivers. Waiver of any breach or default hereunder shall not constitute a 183
continuing waiver or a waiver of any subsequent breach either of the same or of 184
another provision of this MOU and forbearance to enforce one or more of the 185
remedies provided in this MOU shall not be deemed to be a waiver of that 186
remedy. 187
i. Necessary Actions. Each Party agrees to execute and deliver additional 188
documents and instruments and to take any additional actions as may be 189
reasonably required to carry out the purposes of this MOU. 190
j. Compliance with Law. In performing their respective obligations under this 191
MOU, the Parties shall comply with and conform to all applicable laws, rules, 192
regulations, and ordinances. 193
k. Liability. Each Party agrees to indemnify and hold every other Party to the 194
Agreement, and their officers, agents and employees, free and harmless from any 195
costs or liability imposed upon any other Party, officers, agents, or employees 196
arising out of any acts or omissions of its own officers, agents or employees. 197
l. Third Party Beneficiaries. This MOU shall not create any right or interest in any 198
non-Party or in any member of the public as a third party beneficiary. 199
04-10-17 TWIC Mtg Packet Pg 25 of 270
Page 10 of 17
m. Counterparts. This MOU may be executed in one or more counterparts, each of 200
which shall be deemed to be an original, but all of which together shall constitute 201
but one and the same instrument. 202
n. Notices. All notices, requests, demands or other communications required or 203
permitted under this MOU shall be in writing unless provided otherwise in this 204
MOU and shall be deemed to have been duly given and received on: (i) the date 205
of service if served personally or served by electronic mail or facsimile 206
transmission on the Party to whom notice is to be given at the address(es) 207
provided below, (ii) on the first day after mailing, if mailed by Federal Express, 208
U.S. Express Mail, or other similar overnight courier service, postage prepaid, and 209
addressed as provided below, or (iii) on the third day after mailing if mailed to the 210
Party to whom notice is to be given by first class mail, registered or certified, 211
postage prepaid, addressed as follows: 212
213
City of Antioch 214
City Manager 215
P.O. Box 5007 216
Antioch, CA 94531-5007 217
Telephone: (925) 779-7011 218
Facsimile: (925) 779-7003 219
220
221
222
04-10-17 TWIC Mtg Packet Pg 26 of 270
Page 11 of 17
City Of Brentwood 223
City Manager 224
150 City Park Way 225
Brentwood, CA 94513 226
Phone: (925) 516-5400 227
Fax: (925) 516-5441 228
229
Byron Bethany Irrigation District 230
General Manager 231
7995 Bruns Road 232
Byron, CA 94514-1625 233
Telephone: (209) 835-0375 234
Facsimile: (209) 835-2869 235
236
237
Contra Costa Water District 238
General Manager 239
Contra Costa Water District 240
P. 0. Box H20 241
Concord, CA 94524 242
Phone (925) 688-8032 243
Fax (925) 688-8197 244
245
246
04-10-17 TWIC Mtg Packet Pg 27 of 270
Page 12 of 17
247
Contra Costa County 248
Director, Department of Conservation and Development 249
30 Muir Road 250
Martinez, CA 94553 251
Phone (925) 674-7866 252
253
Diablo Water District 254
Attn: General Manager 255
P.O. Box 127 256
87 Carol Lane 257
Oakley, CA 94561 258
Phone: (925) 625-3798 259
Fax: (925) 625-0814 260
261
262
East Contra Costa Irrigation District 263
General Manager 264
1711 Sellers Avenue 265
Brentwood, CA 94513 266
Phone: (925) 634-3544 267
Fax: (925) 634-0897 268
269
270
04-10-17 TWIC Mtg Packet Pg 28 of 270
Page 13 of 17
Discovery Bay Community Services District 271
C/O: Mike Davies, General Manager 272
1800 Willow Lake Road 273
Discovery Bay, CA 94505-9376 274
Telephone: (925) 634-1131 275
Facsimile: (925) 513-2705 276
277
8. Signatures. The Following signatures attest each Party’s agreement hereto. 278
CITY OF ANTIOCH 279
280
By: ______________________________________ Date: ____________________ 281
Ron Bernal, Interim City Manager 282
APPROVED AS TO FORM: 283
284
By: ______________________________________ Date: ____________________ 285
Michael Vigilia, City Attorney 286
287
CITY OF BRENTWOOD 288
289
By: ______________________________________ Date: ____________________ 290
Gustavo “Gus” Vina, City Manager 291
292
APPROVED AS TO FORM: 293
294
By: ______________________________________ Date: ____________________ 295
Damien Brower, City Attorney 296
297
04-10-17 TWIC Mtg Packet Pg 29 of 270
Page 14 of 17
BYRON BETHANY IRRIGATION DISTRICT 298
299
By: ______________________________________ Date: ____________________ 300
Rick Gilmore, General Manager 301
302
CONTRA COSTA WATER DISTRICT 303
304
By: ______________________________________ Date: ____________________ 305
Jerry Brown, General Manager 306
307
APPROVED AS TO FORM: 308
309
By: ______________________________________ Date: ____________________ 310
District Legal Counsel 311
312
CONTRA COSTA COUNTY 313
314
By: ______________________________________ Date: ____________________ 315
John Kopchik, Director of 316
Conservation and Development 317
APPROVED AS TO FORM: 318
Sharon L. Anderson, County Counsel 319
320
By: ______________________________________ Date: ____________________ 321
Deputy County Counsel 322
323
DIABLO WATER DISTRICT 324
325
By: ______________________________________ Date: ____________________ 326
Mike Yeraka, General Manager 327
04-10-17 TWIC Mtg Packet Pg 30 of 270
Page 15 of 17
328
EAST CONTRA COSTA IRRIGATION DISTRICT 329
330
By: ______________________________________ Date: ____________________ 331
Patricia A. Corey, General Manager 332
333
DISCOVERY BAY COMMUNITY SERVICES DISTRICT 334
335
By: ______________________________________ Date: ____________________ 336
Michael R. Davies, General Manager 337
04-10-17 TWIC Mtg Packet Pg 31 of 270
Page 16 of 17
338
04-10-17 TWIC Mtg Packet Pg 32 of 270
Page 17 of 17
339
04-10-17 TWIC Mtg Packet Pg 33 of 270
TRANSPORTATION, WATER &
INFRASTRUCTURE COMMITTEE 6.
Meeting Date:04/10/2017
Subject:Accept report from the Public Works Department on meeting Municipal
Regional Permit 2.0 requirements and forward to the Board for approval.
Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE,
Department:Conservation & Development
Referral No.: 5
Referral Name: REVIEW issues associated with the health of the San Francisco Bay and
Delta, including water quality.
Presenter: Mike Carlson, PWD (925)313-2321 Contact: Cece Sellgren, PWD
(925)313-2296
Referral History:
The Regional Water Quality Control Boards issue the County a stormwater permit on a five-year
recurring cycle. The first permit was issued in 1993 and the current permit was issued in
November 2015. The objective of the permit is to reduce pollutants in stormwater to improve
stormwater quality, and increase stormwater infiltration into soils to improve watershed health.
Just before the first permit was issued, the County modified the Flood Control District Act to
allow the District to collect an annual assessment on parcels throughout the County, for the cities
and the County to fund permit compliance costs. The permit compliance cost for each subsequent
permit has increased dramatically over the prior permit. The Transportation, Water, and
Infrastructure Committee and the full Board have been following the policy and financial issues
associated with implementing these stormwater permits for many years.
Board members have testified before the Regional Water Board several times describing the
impacts their stormwater permit has on the County budget.
Referral Update:
The new Stormwater permit, referred to as the Municipal Regional Permit 2.0, follows the prior
Municipal Regional Permit 1.0 issued at the end of 2009.
In 2010, the beginning of the MRP 1.0 five-year permit, there was a surplus of funds in the
County’s Stormwater Program. In 2015, the last year of the MRP 1.0 permit, compliance costs
exceeded the annual revenue of assessment funds and the surplus was virtually gone.
On June 9, 2016, the Committee accepted a report on the policy implications of the MRP 2.0.
04-10-17 TWIC Mtg Packet Pg 34 of 270
On June 9, 2016, the Committee accepted a report on the policy implications of the MRP 2.0.
That was the first of three reports to be developed on the topic. The second report, presented at the
October 13, 2016 Committee meeting, outlined the financial implications of implementing the
new Municipal Regional Permit 2.0.
This third report provides two budget scenarios, one compliance based in the other
resource-based, and includes staff recommendations to implement MRP 2.0.
Recommendation(s)/Next Step(s):
ACCEPT report on implementing the new Municipal Regional Permit 2.0, CONSIDER staff's
recommendations, PROVIDE direction on which budget to pursue, and FORWARD this report to
the full Board for consideration and approval.
Attachments
Report
Appendix A
04-10-17 TWIC Mtg Packet Pg 35 of 270
04-10-17 TWIC Mtg Packet Pg 36 of 270
04-10-17 TWIC Mtg Packet Pg 37 of 270
04-10-17 TWIC Mtg Packet Pg 38 of 270
04-10-17 TWIC Mtg Packet Pg 39 of 270
04-10-17 TWIC Mtg Packet Pg 40 of 270
04-10-17 TWIC Mtg Packet Pg 41 of 270
04-10-17 TWIC Mtg Packet Pg 42 of 270
04-10-17 TWIC Mtg Packet Pg 43 of 270
04-10-17 TWIC Mtg Packet Pg 44 of 270
04-10-17 TWIC Mtg Packet Pg 45 of 270
04-10-17 TWIC Mtg Packet Pg 46 of 270
04-10-17 TWIC Mtg Packet Pg 47 of 270
04-10-17 TWIC Mtg Packet Pg 48 of 270
04-10-17 TWIC Mtg Packet Pg 49 of 270
04-10-17 TWIC Mtg Packet Pg 50 of 270
04-10-17 TWIC Mtg Packet Pg 51 of 270
04-10-17 TWIC Mtg Packet Pg 52 of 270
04-10-17 TWIC Mtg Packet Pg 53 of 270
04-10-17 TWIC Mtg Packet Pg 54 of 270
04-10-17 TWIC Mtg Packet Pg 55 of 270
04-10-17 TWIC Mtg Packet Pg 56 of 270
04-10-17 TWIC Mtg Packet Pg 57 of 270
04-10-17 TWIC Mtg Packet Pg 58 of 270
04-10-17 TWIC Mtg Packet Pg 59 of 270
04-10-17 TWIC Mtg Packet Pg 60 of 270
04-10-17 TWIC Mtg Packet Pg 61 of 270
04-10-17 TWIC Mtg Packet Pg 62 of 270
04-10-17 TWIC Mtg Packet Pg 63 of 270
04-10-17 TWIC Mtg Packet Pg 64 of 270
04-10-17 TWIC Mtg Packet Pg 65 of 270
04-10-17 TWIC Mtg Packet Pg 66 of 270
04-10-17 TWIC Mtg Packet Pg 67 of 270
04-10-17 TWIC Mtg Packet Pg 68 of 270
04-10-17 TWIC Mtg Packet Pg 69 of 270
04-10-17 TWIC Mtg Packet Pg 70 of 270
04-10-17 TWIC Mtg Packet Pg 71 of 270
04-10-17 TWIC Mtg Packet Pg 72 of 270
04-10-17 TWIC Mtg Packet Pg 73 of 270
04-10-17 TWIC Mtg Packet Pg 74 of 270
04-10-17 TWIC Mtg Packet Pg 75 of 270
04-10-17 TWIC Mtg Packet Pg 76 of 270
04-10-17 TWIC Mtg Packet Pg 77 of 270
04-10-17 TWIC Mtg Packet Pg 78 of 270
1
Appendix A
Report to the Transportation, Water and
Infrastructure Committee
April 10, 2017
Detailed cost analysis of the additional requirements in the
Municipal Regional Permit 2.0
Overview ad Corrections ........................................................ Page 2
C.3.j Green Infrastructure ............................................. Page 4
C.10 Trash ....................................................................... Page 11
C.11 Mercury ................................................................... Page 19
C.12 PCB’s ....................................................................... Page 26
04-10-17 TWIC Mtg Packet Pg 79 of 270
2
Overview and Corrections
Overview
The detailed cost analysis that follows for Green infrastructure, Trash, Mercury, and
PCBs, use the Appendix in the October 13, 2016 Financial Report to the Committee as a
base document. Each one of these four additional requirements has been updated to
include any corrections noted below and any new information on costs. It should be
noted that although the cost analysis in this Appendix has been updated, the
assumptions are still based on the worst case scenario outlined in the October 13, 2016
Financial Report.
All of the cost data presented in this Appendix is summarized in Appendix Tables 1
through 4 at the end of this Appendix. These cost estimates are intended to provide an
accuracy level commensurate with the early stages of program planning and
development the County is currently exploring. All of these estimates will become more
accurate as time goes on and more information is known and experience gained with
implementing provisions of MRP 2.0.
Corrections
There were several interpretations of permit requirements that were incorrect and
impacted him for the October 13, 2016 Committee report. This section reviews the
general assumptions made in preparing the cost estimates, the incorrect
interpretations, and the corrections.
The October 13, 2016 Financial Report provided a worst case cost scenario, assuming a
modest amount of source properties and a small amount of private development
treating PCBs, and the County implementing the bulk of the PCB load reduction
measures. The worst case scenario cost for the four additional provisions (Trash, Green
Infrastructure, Mercury, and PCBs) was $202 million. The cost of the four additional
provisions plus the annual compliance cost of MRP 1.0 resulted in the total estimated
cost for implementing MRP 2.0. After adding the $3 million annual cost of
implementing MRP 1.0, the total five-year permit cost for MRP 2.0 was $217 million.
There were three primary assumptions in the Financial Report that impact the worst
case scenario analysis:
-2019 Load Reduction. It was assumed there was a PCB load reduction
requirement every year from 2018 to 2020. In fact, there is only a load reduction
requirement in 2018 and 2020, and not in 2019. Correcting this assumption
reduced the total cost of implementing PCB control measures by about $13 million.
This is also shown in Appendix Table 5 and explained in more detail further in the
Appendix.
-Loads Aren't Additive. It was also assumed that PCB load reductions do not
carry forward from year-to-year. In fact, when a control measure results in a load
04-10-17 TWIC Mtg Packet Pg 80 of 270
3
reduction that load reduction does carry forward, providing the control measure is
maintained on an annual basis to ensure the load reduction is permanent.
Correcting this assumption, and clarifying the assumption of 0.5 grams per year
load reduction from private development in 2018, 2019, and 2020, had a net
reduction in the total cost of implementing PCB control measures of about $1
million. It turns out that clarifying and correcting these two assumptions balance
each other out.
-Unit Treatment Costs. The financial analysis used $215,000 per treated acre as
the cost for Green Infrastructure control measures implemented by the County.
When the Financial Report was prepared the cost analysis was peer-reviewed, and
the peer review consultant indicated the cost range for implementing Green
Infrastructure in the Bay Area was between $200,000 and $365,000 per treated
acre. Subsequent to the Committee meeting, the peer review consultant analyzed
cost data from Southern California. The cost data shows the average cost of
implementing Green Infrastructure in that part of the State is about $110,000 per
treated acre. Adopting a unit cost of $110,000 per treated acre would roughly
reduce the cost estimates in the Financial Report by half. However, staff
recommends continuing to use $215,000 per treated acre at this point in the
planning process. The Bay Area is in the early stages of implementing Green
Infrastructure and the unit costs will undoubtedly go down with increased
experience. Southern California is several years ahead of the Bay Area in
stormwater permit requirements and has been implementing Green Infrastructure
improvements longer. We can certainly learn from the experience in Southern
California, however, there remain differences in soils, climate, and
institutional/financial arrangements that indicate a prudent approach would be to
use a cost at the low end of the Bay Area cost range. Using $215,000 per treated
acre is consistent with that prudent approach. The other assumption that affects
Green Infrastructure costs is its efficiency in reducing PCB loads. Green
Infrastructure treats runoff from land containing PCBs but is not 100% effective at
doing so. The Regional Board assigns a default efficiency factor of 70% to Green
Infrastructure. A remediation project, on the other hand, addresses PCBs on a
specific property to prevent PCBs from running off the property. A remediation
project has a 100% efficiency factor. A 70% efficiency factor is used in this report
unless noted otherwise.
The corrections noted above reduce the worst case cost scenario for MRP 2.0 to about
$200 million over a five-year permit term.
04-10-17 TWIC Mtg Packet Pg 81 of 270
4
GREEN INFRASTRUCTURE
Developing a Green Infrastructure Plan
For Unincorporated Contra Costa County
A requirement of the current Municipal Regional Permit (MRP 2.0)
Updated April 10, 2017
I. Objective and Purpose
The following are the stated objectives and purpose of the Green Infrastructure Plan
requirement in the Municipal Regional Permit 2.0:
- Include LID drainage design into public projects
- Provide an implementation guide and planning tool to meet TMDL requirements
- Develop a reasonable assurance analysis that waste load allocations will be met
- Monitor/track implementation effectiveness
- Provide a vision and strategy to convert gray infrastructure to green infrastructure
- Provide criteria and methodology to prioritize Green Infrastructure projects
- Incorporate other waste load reduction plans into a Green Infrastructure Plan,
creating an overall master plan
- Track area treated by Green Infrastructure and track amount of directly connected
impervious surfaces
Note: This provision C.3.j defines the concept of and outlines the requirements for
Green Infrastructure. The compliance costs for implementing Green Infrastructure to
effectuate pollutant load reduction, however, will be found in the PCB requirements.
II.Plan Development Process and Cost
The following is a step by step process and resultant costs to meet Green
Infrastructure Plan requirements specified in the Municipal Regional Permit 2.0:
Provision C.3.j.i Green Infrastructure Program Plan Development
1.Prepare a Green Infrastructure Plan framework document. (2017)
This will describe the detailed process for the County Board of Supervisors to
approve a Plan by June 30, 2017. The framework must include a statement of
purpose, specific tasks, and time frames to complete the required elements listed
in MRP 2.0. This will entail a primary author, likely an engineer or consultant, for
two weeks at $16,000 (80 x 200), coordination with staff at $2,000, three team
meetings at $1,500 each, and a review process at $5,000. To receive Board
Approval will require a TWIC meeting with a report and other documentation at
$5,000 and a Board of Supervisors report and presentation at $2,000.
04-10-17 TWIC Mtg Packet Pg 82 of 270
5
-Green Infrastructure Plan framework document. $27,500
-Board approval process. $7,000
2.a. Develop a mechanism to map and prioritize GI projects on a watershed
basis. (2019, 20) It is assumed we will use San Francisco Estuary Institute’s
(SFEI) GreenPlanIT tool to some extent to provide water chemistry and water
quality parameters for pollutant loading. The Clean Water Program has
developed a program to map areas for potential and public planned
projects. This program is a GIS-based tool that uses land-use, pollution loading,
hydrology, and cost data to optimize the placement of Green Infrastructure
projects. To use the tool, we will need to provide land-use data at $1,000,
drainage inventory at $50,000, data on source properties at $10,000, data for
developing feasibility criteria, such as utility location, community design,
neighborhood compatibility, soil type, right-of-way availability, etc. at $50,000,
data for developing prioritization criteria, such as water quality parameters,
TMDL load reduction requirements, etc. at $10,000, and coordination at
$5,000. We will also need to ensure data transfer is compatible with our various
CIPs (ie, CRIP, Capital Projects, FCCIP) at $5,000. Finally there will be an annual
cost to utilize SFEI’s GreenPlanIT at $5,000 per year. GreenPlanIT is a new
program still under development and these estimated costs will need to be
verified with SFEI.
For private projects it is assumed we will use the Clean Water Program’s tool for
tracking purposes, and it is assumed project prioritization is NOT required as
implementation is dependent on developer’s independent schedules. This will
entail estimating Green Infrastructure projects proposed developments will
construct, identifying all Green Infrastructure projects under design by
developments, and providing this data to the Clean Water Program at least once
a year at $5,000 per year. Identifying opportunity areas on private property,
such as parking lots, will entail determining criteria for what types of opportunity
areas the County has the jurisdiction to impose Green Infrastructure, and when
and how, at $25,000, reviewing aerial imagery and identifying opportunity sites
at $25,000, and determining and implementing the best way to require Green
Infrastructure on private parcels at $25,000.
- Mapping and prioritization mechanism for public projects. $131,000
- Mapping and prioritization mechanism for private projects. $75,000
- Annual cost to determine private project data. $5,000
- Annual operational costs. $5,000
2.b. Outputs from the mapping and prioritization mechanism. (2019) It is
assumed that the cost for the outputs such as maps, project lists, project
ranking, etc., are included in the development of the mechanism itself
(C.3.j.i.2.a). This may change as we better understand what the output needs
are and how they will be developed.
- No additional cost for this item.
04-10-17 TWIC Mtg Packet Pg 83 of 270
6
2.c. Develop urban built environment retrofit targets. (2019) It is assumed
that the load reduction calculations to determine the targets will be included in
the costs for Provision C.11 and C.12. There will be an administrative cost to
adapt the load reduction calculations into targets and prepare a report at
$10,000 each for public and private spaces.
- Targets to retrofit the public urban built environment. $10,000
- Targets to retrofit the private urban built environment. $10,000
2.d. Develop a process for tracking and mapping completed GI projects.
(2019, 20) It is assumed this capability will be available for both public and
private projects with SFEI’s tool and general coordination will be all that is
needed at $2,000 each year.
- Annual coordination costs. $2,000
2.e. Develop guidelines for project development, design, and construction
to ensure that green infrastructure is not precluded but is included in
projects. (2019) The process to develop these guidelines would be required
for all types of projects, such as roads, buildings, parking lots, parks, airports,
and drainage. It is assumed this would be done at a regional level and our role
would be to coordinate the development of guidelines. For example, perhaps
MTC for ABAG would take the lead in developing some or all of these
guidelines. There would be a cost share to the County for the regional entity to
hire the consultant at $5,000, staff involvement at $10,000, and staff cost to
tweak the guidelines to meet the County's specific needs at $5,000.
- Develop a suite of guidelines. $20,000
2.f. Prepare standard specifications and standard plans. (2019) It is
assumed this could be done at a regional level, however, we have a significant
amount of unique requirements for specifications and construction details that
would add additional costs. There would be a cost share to the County for the
regional entity to hire a consultant at $5,000, staff involvement at $10,000, and
staff cost to tweak the standard specifications and standard plans to meet the
County’s specific needs at $25,000.
- Prepare standard specifications and plans. $40,000
2.g. Develop options to include hydro-modification in GI projects.
(2019) Hydro-modification must be included in Regulated Projects but a variety
of options could be used for non-Regulated Projects. The options analysis
should consider watershed health, creek improvements, TMDL load reductions,
etc. To achieve this will require developing an options analysis at $25,000, a
policy level discussion and decision at $10,000, and staff cost to integrate the
options into our project development, design, and construction checklists and
other planning and implementation processes at $20,000.
04-10-17 TWIC Mtg Packet Pg 84 of 270
7
- Develop options for HMP. $55,000
2.h. Update County’s foundational planning documents. (2019) This entails
updating the County’s General Plan, Specific Plans, Transportation Plan, the
Flood Control District’s 50 Year Plan, and other key planning documents that
impact the design of impervious surfaces. The cost to update the General Plan is
likely $100,000, to develop a Flood Control District plan is also likely $100,000,
and to modify the Transportation Plan is likely $50,000. Other plans would have
to be identified and update costs estimated. These costs represent a placeholder
estimate, as it is difficult to estimate the cost of updating these documents until
more specifics are known about the Green Infrastructure program, which will be
determined when we get closer to implementation and the program is better
defined.
- Update County planning documents. $250,000
2.i. Develop work plan to ensure GI and LID measures are included in
developing and amending future planning documents. (2019) This
would entail developing a process in those departments and programs that have
or will develop or update a key planning document (primarily DCD and PWD) to
ensure GI and LID design elements and requirements are included at $25,000.
- Develop work plan. $25,000.
2.j. Develop work plan to complete prioritized GI projects. (2019) This work
plan is meant to ensure completion of projects identified in an Alternative
Compliance Program or part of the Early Implementation list of projects, but
these underlying processes will also be used for future GI projects. This will
entail developing a separate Green Infrastructure Capital Improvement Program
(CIP) at $50,000, updating our existing road infrastructure CRIP at $25,000, and
modifying our Facilities CIP in Capital Projects at $25,000, and developing a work
plan outlining the process to achieve this at $25,000.
- Develop work plan and CIP modifications. $125,000
2.k. Develop a Green Infrastructure Financing Plan. (2019) This requires an
evaluation and prioritization of project funding options, such as Alternative
Compliance funds, grants, transportation funding from federal, state, and local
sources, etc. To achieve this will require research of available funding options,
analysis of which projects best fit the various funding options, and development
of a strategic plan to go after specific funding for specific projects at $25,000.
- Develop Financing Plan. $25,000
3.Develop and adopt policies, ordinances, etc., to ensure implementation
of the Green Infrastructure Plan. (2019) This will entail developing
standard conditions of approval at $10,000, revising design manuals and
checklists at $10,000, developing ordinance code language at $10,000, and
04-10-17 TWIC Mtg Packet Pg 85 of 270
8
going through the review and adoption process for the ordinance code revisions
at $25,000.
- Adopt policies and ordinances. $45,000
4.a. Conduct public outreach on the Green Infrastructure Plan and its
requirements. (2017, 18, 19, 20) This will entail making presentations at
various organizations, such as the Contra Costa Watershed Forum, East Bay
Municipal Engineers, Public Managers Association, City-County Engineering
Advisory Committee, etc. at $5,000, and planning, preparing, and holding three
workshops at $2,000 each.
- Annual cost to conduct public outreach. $11,000
4.b. Provide training to staff on the Green Infrastructure Plan, its
requirements, and implementation methods. (2017, 18, 19, 20) This
will entail developing a staff training program at $3,000, and implementing a
staff training program at $3,000 per year.
- Develop staff training. $3,000
- Annual cost to train staff. $3,000
4.c. Educate County elected officials on the Green Infrastructure Plan and
its requirements and implementation methods. (2017, 18, 19, 20) This
will entail planning, preparing, and holding a workshop for the County Planning
Commission, the Transportation, Water, and Infrastructure Committee, and the
Board of Supervisors at $5,000 and conduct a workshop at $2,000 each year
thereafter.
- Develop and conduct workshop for County elected officials. $5,000
- Annual cost to hold workshop. $2,000
5.Report on Green Infrastructure planning progress. (2017, 18, 19,
20)This entails preparing a report each year outlining the progress on
developing and implementing the County’s Green Infrastructure Plan at $5,000
per year.
- Annual cost to report on Green Infrastructure Plan progress. $5,000
Provision C.3.j.ii. Early Implementation of Green Infrastructure Projects (No Missed
Opportunities)
1. Prepare and maintain a list of public and private GI projects, and
infrastructure projects that could include GI measures. (2017, 18, 19,
20)This would entail reviewing all development projects and developing a list
of GI projects and other projects that could include GI at $5,000, and reviewing
our current CIP project lists to determine which projects could include a GI
04-10-17 TWIC Mtg Packet Pg 86 of 270
9
component at $5,000. There would also be an annual cost to update and
maintain the list at $1,000 per year for each list.
- Prepare list of public and private GI projects. $10,000
- Annual cost to update project lists. $2,000
2. Prepare a status summary for each public and private GI project.
(2017, 18, 19, 20) The intent of this requirement is to report how each public
and private project is incorporating Green Infrastructure elements, and explain
why Green Infrastructure was not added to those projects that do not have a
Green Infrastructure element. These status summaries would be provided in the
Annual Report. This would entail researching and drafting a summary report for
each private development project each year at $3,000 and for each public
project each year at $3,000.
- Annual cost to provide project status reports. $6,000
Provision C.3.j.iii. Participate in Processes to Promote Green Infrastructure
1. Influence regional, state, and federal agencies to fund and incorporate
GI measures into local projects. (2017, 18, 19, 20) This requires an
annual effort to track political, grant, and financial processes at all levels of
government and advocate for the development of Green Infrastructure, the need
for additional funding, and ways to increase efficiencies. It is assumed this
would be performed at the regional level (for example BASMAA) and would result
in a cost share for the County and staff coordination of $5,000 each year.
- Annual cost to advocate for Green Infrastructure. $5,000
2.Report on participation goals. (2017, 18, 19, 20) It is assumed this would
be performed at a regional level and would entail the County's share in an effort
to report on the goals and outcomes of participating in the promotion and
advocacy for Green Infrastructure each year at $5,000.
- Annual cost to develop participation goals. $5,000
3. Prepare a plan and schedule for new advocacy efforts. (2019) This is
required in the 2019 Annual Report. It is assumed this would be performed at a
regional level and would entail the County's share in an effort to develop a plan
of new and ongoing efforts to promote and advocate for Green Infrastructure at
$5,000.
- Prepare an advocacy plan and schedule. $5,000
Provision C.3.j.iv. Tracking and Reporting Progress
1. Develop regionally consistent tracking method for Green
Infrastructure. (2019) The intent is to have a tracking system that has
04-10-17 TWIC Mtg Packet Pg 87 of 270
10
information from each jurisdiction (in a format that is consistent throughout the
Bay Area) of Green Infrastructure, treated area, and connected and disconnected
impervious areas for both public and private projects. The system must also
provide information necessary to develop reasonable assurance analysis for
TMDL waste load allocations. It is assumed this would be developed at a
regional level, possibly through SFEI or BASMAA, with a required cost share from
the County at $10,000 and staff coordination costs of $10,000.
- Develop tracking method for Green Infrastructure. $20,000
2. Report progress on tracking methods each year. (2017, 18, 19, 20)
This will entail reviewing the activities for the year, extracting information from
the regional tracking entity, and preparing a report for the Annual Report at
$2,000.
- Annual cost to report on tracking method. $2,000
3.Submit tracking methods and status in 2019 Annual Report. (2019)
This information would have been developed in the two items above so no
additional cost is needed.
- No additional cost for this item.
04-10-17 TWIC Mtg Packet Pg 88 of 270
11
TRASH
Meeting the Trash Load Reduction Schedule
for Unincorporated Contra Costa County
A requirement of the current Municipal Regional Permit (MRP 2.0)
Updated April 10, 2017
I. Objective and Purpose
The following is the objective and purpose of the Trash Load Reduction
requirement in the Municipal Regional Permit 2.0:
- Eliminate trash in our waterways and receiving water bodies
The following are observations of the Trash Load Reduction requirements:
- Full trash capture devices installed in drainage inlets or in drainage systems is
the preferred trash load reduction measure
- Creek clean-ups have been devalued as a trash load reduction measure
- Trash load reduction offsets are a temporary solution
- The County did not meet the required 60% load reduction by 2016, however,
neither did nine of the 19 cities in the County
II.Trash Load Reduction Process and Cost
The following is a step by step process and resultant costs to meet the Trash Load
Reduction requirements specified in the Municipal Regional Permit 2.0:
Provision C.10.a Trash Reduction Requirements
a.i. Meet the prescribed trash reduction targets. (2017, 2019)
The County must reduce trash discharges by 70% by July 1, 2017, and
80% by July 1, 2019. In addition, the County should have achieved 60%
reduction by July 1, 2016. If the 60% reduction milestone is not
achieved, then the County must prepare a plan and schedule for
implementing additional trash load reduction control actions to meet 70%.
The County did not reach the 60% milestone, achieving 43% by July 1,
2016. Meeting this requirement will entail developing a plan and schedule
at $25,000 in 2016 and 2018. The plan to meet 70% load reduction by
July 2017 includes four key elements: full trash capture devices, on-land
cleanups, community-based trash abatement measures, and direct
discharge controls. These four key elements and their estimated
implementation costs are described in more detail below.
04-10-17 TWIC Mtg Packet Pg 89 of 270
12
- Develop plan and schedule for 2016 and 2018. $25,000 each
Full Trash Capture Devices. There are two types of full trash capture:
screens or similar features that capture trash at individual storm drain
inlets, or hydrodynamic separators on trunk storm drain lines that capture
trash coming from many individual inlets. The County is proposing to
invest $300,000 to install full trash capture devices (screens) in storm
drain inlets located in high and very high trash generation areas. Based
on a 2013 project to install individual full trash capture devices, the
average construction cost is about $600 per unit. Adding to the cost of
construction the cost of project planning, development, design, and
construction management at $400 brings the total cost per unit to $1,000.
In early 2017 the County advertised a project to install screens and the
average of the three lowest bidders was $738, so using a total unit cost of
$1,000 is still reasonable. With this budget, the County will be able to
retrofit about 300 storm drain inlets. Annual maintenance costs, utilizing
a Vactor truck, driver, and assistant, are estimated at $600 per unit three
times a year for a total annual unit cost of $1,800. As a project, individual
screen inserts can be installed fairly quickly and will be utilized in the first
two years. Trash separators are much larger facilities and must go
through a full design process, including environmental review, and take
about two years to plan and install. In the last three years of the permit
three trash separators will be installed at an average cost of $800,000
each. The cost for separators can vary widely depending on the
treatment area, utilities, traffic, etc. It is also assumed that maintenance
costs for trash separators, cleaned three times a year, are $10,000 per
unit. Even though separators have a high initial capital cost, the annual
costs are much less providing a more cost effective lifecycle cost
investment.
- Convert drainage inlets to full trash capture (2017). $300,000
- Convert drainage inlets to full trash capture (2018). $300,000
- Annual cost to maintain 300 full trash capture inlets. $540,000
- Install three hydrodynamic trash separators (2019 - 2020).
$2,400,000
- Annual cost to maintain three trash separators. $30,000
On-Land Clean Up. The County currently has a contract with a debris
hauler that provides general pickup service of trash along the County's
roadways and within the unincorporated communities. This contract
would be expanded to include trash pickup in additional areas, and/or
more frequent pickup in the existing service area at $200,000.
- Additional on-land cleanup services. $200,000
Community-based Trash Abatement Measures. Trash abatement in
heavy trash load areas will be more effective if they are supported by the
community and the community actively participates. An example of a
04-10-17 TWIC Mtg Packet Pg 90 of 270
13
community-based trash abatement measure would be the proposed
Adopt-a-Spot program, an extension of the County’s successful Adopt-a-
Road program. In this case, a person, group of neighbors, or a
neighborhood would adopt a drainage inlet or other trash collection
feature and actively maintain it. This would entail researching and
identifying feasible community-based trash abatement measures and
where they could be applied at $5,000, developing a specific abatement
measure, such as the Adopt-a-Spot program, going through the program
approval process, and getting it set up and operating at $25,000, and
ongoing annual operational costs at $10,000.
- Develop a community-based trash abatement program. $5,000
- Implement an Adopt-a-Spot program (or other program). $25,000
- Annual operational costs. $10,000
Direct Discharge Control. This control measure and compliance costs
are discussed in more detail later on in provision e.ii.
a.ii. Update trash generation areas. (2016) Trash generation areas were
developed, mapped, and submitted in February 2014 using the best data
at the time. Based on information and observations since then, the
County must update the trash generation areas with the 2016 Annual
Report. This will entail analyzing data from the trash generation areas,
determine if the trash generation areas are in the correct trash generation
rate category (Low, Moderate, High, or Very High), and update the Trash
Generation Area Maps at $25,000.
- Updating the Trash Generation Area Maps. $25,000
a.ii.a. Establishes full trash capture systems as the standard. Requires
trash prevention and control actions be equivalent to or better than full
trash capture systems, and defines this as "essentially no trash discharge
except in very large storm flows”.
- There is no cost for this item
a.ii.b. Modify private storm drain systems to include full trash capture.
(2018) The County must ensure that trash from private storm drains
that drain to public drainage facilities is captured with full trash capture
systems or the equivalent. The County must map all properties greater
than 10,000 ft.² that drain directly to public drainage systems by July
2018, indicate the trash generation rate category they are in, and indicate
their trash control status. The County has 3129 acres in the Moderate
trash generation rate category, 1348 acres in the High trash generation
rate category, and 131 acres in the Very High trash generation rate
category. These numbers represent the acres of trash generation
categories that are within the Urban Limit Line plus a few key major roads
04-10-17 TWIC Mtg Packet Pg 91 of 270
14
that connect communities. Meeting this requirement will entail developing
a map of 10,000 ft.² parcels at $25,000, develop an inventory of and map
private drainage systems throughout the County that drain to public
systems at $50,000, determine the trash capture status of parcels that
drain to public drainage systems at $10,000, develop a legal means to
require full trash capture devices on private property at $50,000, and
implement full trash capture requirements on private land at $25,000.
- Modify private storm drain systems. $160,000
a.iii. Install mandatory minimum full trash capture systems. The
County must install and maintain full trash capture devices to treat runoff
from 157 acres (30% of the County’s retail/wholesale land area). This
requirement was in MRP 1.0 and was completed with the help of grant
funding. There is no additional cost for MRP 2.0.
- No additional costs.
b.i.a. Develop a Maintenance Plan to ensure maintenance of full trash
capture devices. (2017, 18, 19, 20) The County must maintain full
trash capture devices to prevent flooding, plugging of the 5 mm screen, or
overflow of the device’s trash storage reservoir. Inspection must occur at
least once a year, and in High or Very High trash generation rate category
areas at least twice per year. The capacity of a device’s trash storage
reservoir cannot exceed 50% at the time of inspection. This will entail
developing a maintenance checklist to ensure appropriate data is gathered
with each inspection and developing a maintenance schedule, by trash
generation rate category, at $25,000, developing an acceptable
maintenance report format to include the trash storage capacity at the
time of maintenance at $10,000, and budget the cost to maintain full
trash capture devices at $1,800 each per year. The County currently has
139 full trash capture devices in place. The cost to maintain the current
full trash capture devices was part of MRP 1.0. The cost increase
associated with MRP 2.0 is noted in provision C.10.a.i above.
- Develop maintenance plan for full trash capture devices. $35,000
- Additional annual cost of maintenance included in C.10.a.i.
b.i.b. Maintain maintenance records and report annually on
effectiveness of full trash capture devices. (2017, 18, 19,
20)The County must retain specific information for each full trash
capture device, including the date of maintenance, capacity of the trash
storage reservoir, any flooding or special problems, any damage that
would reduce its function, etc. This information must be reported each
year with the Annual Report. All this information will be developed with
the maintenance plan identified above, so the only additional cost is for
the Annual Report at $3,000 per year.
04-10-17 TWIC Mtg Packet Pg 92 of 270
15
- Annual cost to prepare the Annual Report maintenance log. $3,000
b.i.c. Annual certification of full trash capture systems. (2017, 18, 19,
20)The County must certify each year that their full trash capture
systems meet permit compliance. Areas that drain to full trash capture
systems are considered to be in a Low trash generation rate category.
The cost to develop the certification for the Annual Report is $1,000 per
year.
- Annual cost to provide certification. $1,000
b.ii.a. Document trash management actions other than full trash
capture devices. (2017) The County must identify and document
Other Trash Control Actions, defined as all actions other than full trash
capture systems. Documentation must include a description of the action,
level of implementation, timing and frequency of implementation,
standard operating procedures, location, drainage area affected, tracking
and enforcement procedures, etc. The County is contemplating several
additional control measures such as increasing street sweeping in
commercial areas, providing street sweeping in areas currently not swept,
expanding the Adopt-a-Road program to include visual assessments to get
credit for trash collection, installing curb and gutter in areas with roadside
ditches to facilitate street sweeping, or converting roadside ditches to bio-
retention facilities, which also act as trash capture devices. This will entail
evaluating each potential trash control action, developing a tracking
system to gather the required data and provide information for the Annual
Report to achieve approximately 27% credit towards the 70% goal at
$25,000.
- Document trash management actions. $25,000
b.ii.b. Conduct visual assessments to determine effectiveness of other
trash management actions. (2019) The County must conduct visual
assessments of each trash generation area that has Other Trash
Management Actions to determine their effectiveness (full trash capture
devices are handled separately). This would entail conducting
observations along sidewalks, curbs and gutters, and other places
associated with trash generation, at locations covering at least 10% of the
trash management area’s street miles, and at a frequency consistent with
the estimated trash generation rates at $50,000.
- Conduct visual assessments. $50,000
b.iii. Calculate trash discharge reduction each year. (2017, 18, 19,
20)The County must calculate the reduction in trash discharge to
receiving waters based on the formula provided in MRP 2.0 and submit it
with each Annual Report. This will entail gathering the required data to
perform the calculation at $5,000 each year.
04-10-17 TWIC Mtg Packet Pg 93 of 270
16
- Annual calculation of trash discharge reduction. $5,000
b.iv. Develop a source control strategy. (2019) The County may adopt
source control actions to reduce trash load reductions, which may be
valued at up to 10% of the total required load reduction. An example of
a source control action would be adopting a ban on plastic bags. This was
proposed two years ago and the Board decided not to go forward at that
time for a variety of reasons. However, considering the current statewide
ban on plastic bags and the value of load reduction this represents, the
Committee authorized staff to explore implementing this source control
measure at their October 13, 2016 meeting. Developing a strategy would
involve identifying possible source control measures, evaluating those
measures, determining the feasibility of viable measures, and developing
a recommendation and draft strategy for review and approval at $5,000.
Adopting a ban on polystyrene food containers would entail preparing an
environmental document at $5,000, coordinating with surrounding cities
at $25,000, developing an ordinance at $10,000, going through the
ordinance review process at $25,000, and the ordinance approval process
at $10,000. Enforcing a ban on plastic bags would entail taking a quick
representative sample of retail and commercial establishments to
determine percentage of compliance at $5,000, then a more systematic
monitoring of all applicable establishments over a longer period of time to
include outreach, awareness, and enforcement at $10,000 per year.
- Develop a source control strategy. $5,000
- Adopt a ban on polystyrene containers. $75,000
- Initial assessment of plastic bag ban compliance. $5,000
- Annual cost of monitoring plastic bag ban. $10,000
b.v. Develop receiving water monitoring program, with tools and
protocols, and conduct the monitoring. (2018, 19, 20) BASMAA
will be developing the receiving water monitoring program. The cost to
the County will be a share of the start-up costs to develop the program in
2018 at $10,000 and an annual cost to maintain the receiving water
monitoring program at $5,000.
- Develop receiving water monitoring program cost share. $10,000
- Annual cost to manage the program. $5,000
c.Select trash hotspots and conduct cleanups. This requirement is the
same as MRP 1.0, so there are no additional costs with the new MRP 2.0.
- No additional costs.
d.Prepare amendments to the Trash Load Reduction Plan. (2016,
18)This will entail preparing amendments to the County’s Trash Load
04-10-17 TWIC Mtg Packet Pg 94 of 270
17
Reduction Plan to meet the required load reduction of 70% by 2017 and
80% by 2019. These costs are included in section C.10.a.i.
- There is no additional cost for this item.
e.i. Evaluate creek and shoreline cleanups as a trash control
measure. (2017, 18) The County is allowed to utilize creek and
shoreline cleanups as an offset to the trash load reduction requirement.
The offset is calculated from a formula contained in MRP 2.0. Based on
the formula, the County will receive 1% offset for every 12.4 cubic yards
of trash picked up, with a maximum offset of 10%. A small cleanup can
fill up one or two 6-yard debris boxes and an average cleanup can fill up
one 20-yard debris box. A standard 10 wheel dump truck in our
Maintenance Division holds about 10 cubic yards. In 2019 the volume
will be increased to 37.6 cubic yards of trash to receive a 1% offset. To
meet this offset will entail identifying partners to conduct creek an d
shoreline cleanups, determining the cost to coordinate and conduct the
cleanups, calculating the percent offset to the trash load reduction target,
evaluating their benefit to meeting the County’s requirement at $25,000,
and analysis of its annual effectiveness at $5,000 per year.
- Evaluate creek cleanups as a control measure. $25,000
- Annual analysis of effectiveness. $5,000
e.ii. Evaluate direct trash discharge control measures to help meet
the trash load requirement. (2017, 18) The County is allowed an
offset to the trash load reduction requirement for controlling direct
discharges of trash to receiving waters from non-storm drain system
sources. The offset is calculated from a formula contained in MRP 2.0.
The formula results in the same trash volumes as C.10.e.i, 12 cubic yards
in 2017 and 38 cubic yards in 2019. The maximum offset is 15%.
Cleaning up homeless encampments along creeks would be the most
applicable example of a direct discharge of trash from a non-storm drain
system source. The County has been spending over $100,000 a year on
homeless encampment cleanups with MRP 1.0. Unfortunately, homeless
encampments are usually re-populated within a couple of weeks. This
trash discharge control measure would have to prevent re-population of
homeless encampments to be effective. This will entail taking a
leadership role and coordinating with various County departments, non-
profit organizations, and cities to develop an effective homeless
encampment removal plan, determining the responsible agency for
implementing the various components of the plan for the applicable
creeks in the County, and determining the responsible agency for
enforcement of the plan to prevent re-population at $50,000. The County
share to implement and enforce the plan each year at $300,000 (minus
$100,000 existing costs in MRP 1.0) and analysis of its annual
effectiveness at $5,000 per year.
04-10-17 TWIC Mtg Packet Pg 95 of 270
18
- Develop a homeless encampment removal plan. $50,000
- Annual cost to implement and enforce the plan. $200,000
- Annual analysis of effectiveness. $5,000
f.v.b. Prepare non-compliance report IF the County does not meet the
trash load reductions required in 2017 or 2019. If the County does
not meet 70% trash load reduction by 2017 or 80% load reduction by
2019, a noncompliance report must be prepared and submitted to the
Regional Board. The report must include a plan and schedule to
implement full trash capture systems, or equivalent, to attain the required
reduction. It is assumed that the fallback plan is to convert all inlets in
non-attainment areas to full trash capture. The County has about 7,300
drainage inlets, of which 1,740 are located in Moderate, High, or Very
High trash generation areas. It is assumed that 10% of the 1,740
conversions to full trash capture would present an operational problem
and require extensive modifications of the storm drain inlet to resolve.
For example, if a drainage inlet is functioning marginally in collecting
stormwater and a full trash capture device would cause flooding, then
perhaps an additional inlet would need to be installed just downstream to
handle the overflows. Implementing this option would entail identifying
the drainage inlets in the non-attainment areas and assessing their ability
to be converted to full trash capture at $50,000, develop the non-
compliance report at $25,000, develop a project and install full trash
capture devices in 1,566 drainage inlets at $1,000 per inlet ($600
installation plus $400 in project planning, development, design, and
construction management), develop a project and construct drainage inlet
modifications for 174 drainage inlets at $5,000 per inlet, and budget the
cost to maintain these additional full trash capture devices at $1,800 each
per year.
Note: These activities and costs will not be necessary if the required
trash load reduction targets are attained.
- Drainage system assessment. $50,000
- Develop the non-compliance report. $25,000
- Convert drainage inlets to full trash capture. $870,000
- Modify inlets to accommodate full trash capture. $1,570,000
- Annual cost to maintain 1,740 full trash capture inlets. $3,100,000
04-10-17 TWIC Mtg Packet Pg 96 of 270
19
MERCURY
Meeting the Mercury Load Reduction Schedule
for Unincorporated Contra Costa County
A Requirement of the Current Municipal Regional Permit (MRP
2.0)
Updated April 10, 2017
Objective and Purpose
The following are the objectives and purpose of the Mercury Load Reduction
requirement in the Municipal Regional Permit 2.0:
- Meet the TMDL schedule for all permitees in the San Francisco Bay Area to
remove 48 grams per year by the end of the permit term
- Implement and test a variety of control measures to remove Mercury
- Identify and abate source properties
The following are observations of the Mercury Load Reduction requirements:
- Green Infrastructure is the most favored overall control measure.
- Old industrial and old urban land uses are considered the overall primary
source of Mercury, other than source properties.
II.Mercury Load Reduction Process and Cost
The following is a step by step process to meet the Mercury Load Reduction
requirements specified in the Municipal Regional Permit 2.0:
Note: Many of the control measures to reduce PCB loads will also reduce Mercury
loads, so the cost to comply with almost all the Mercury provisions is included in
the compliance costs for PCBs.
Provision C.11: Reducing Mercury Levels in the Bay
a.i. Implement control measures to reduce Mercury. The County must
implement source and treatment control measures to reduce Mercury
loads, with a specific requirement to reduce 1.37 grams per year by July
2020. All co-permittees within the County must reduce Mercury loads by
9 grams per year by 2020. The County's share of that load reduction,
based on population as of January 2015, is 15.26%. The cost to
implement the control measures identified in this provision is covered in
the provisions outlining the control measures.
-No additional cost for this item.
04-10-17 TWIC Mtg Packet Pg 97 of 270
20
a.ii.1. Identify current and proposed watersheds or management areas
with control measures. (2016) The County must identify the
watersheds or management areas (portions of watersheds) where
Mercury control measures are currently being implemented and where
new control measures will be implemented. This activity is also required
for PCBs and the cost to meet this Mercury provision is included in the
PCB costs.
-No additional cost for this item.
a.ii.2. Identify current and new control measures. (2016) The County
must identify the various types of control measures that are currently
being implemented (primarily street sweeping) and control measures that
will be implemented. Control measures can include abating source
properties, constructing green infrastructure treatment facilities, sweeping
streets in management areas, cleaning drainage inlets, redeveloping
contaminated areas, diverting stormwater from pump stations to sewer
treatment plants, and flushing streets. This activity is also required for
PCBs and the cost to meet this Mercury provision is included in the PCB
costs.
Note: It should be noted that like PCBs, Mercury attaches to sediment
particles, so control measures that remove sediment are an effective way
to remove Mercury. However, while PCBs can be highly concentrated in
source properties, Mercury is dispersed more evenly throughout the
watershed, so control measures that focus on remediating source
properties is not as effective with Mercury as with PCBs.
-No additional cost for this item.
a.ii.3. Develop implementation schedule. (2016, 17, 18, 19, 20) The
County must develop a schedule to implement new control measures.
This activity is also required for PCBs and the cost to meet this Mercury
provision is included in the PCB costs.
-No additional cost for this item.
a.ii.4. Implement control measures to meet load reduction
requirements. (2018, 2020) The County must implement control
measures to reduce Mercury by at least 1.37 grams per year with Green
Infrastructure. The calculation of load reduction is based on the land-use
type of the drainage area flowing to the control measure. Treating
sediment laden stormwater draining from, or preventing sediment from
mobilizing in, areas with Old Industrial land uses yields a load reduction of
1.3 grams per acre per year, while Old Urban land uses yields 0.215
grams per acre per year, and New Urban/Other land uses yields 0.033
grams per acre per year. "Old" land use areas are those generally
04-10-17 TWIC Mtg Packet Pg 98 of 270
21
constructed before 1980 and "New" constructed after 1980. This activity
is also required for PCBs and the cost to meet this Mercury provision is
included in the PCB costs.
-No additional cost for this item.
a.iii.1. Develop a Progress Report on implementation of control
measures. (2016) The County must develop a progress report by April
2016 outlining the steps taken to develop a list of watersheds, identify
control measures, and justify the selection of watersheds using monitoring
data. This activity is also required for PCBs and the cost to meet this
Mercury provision is included in the PCB costs.
-No additional cost for this item.
a.iii.2. Develop an implementation status report for each Annual Report.
(2016, 17, 18, 19, 20) The County must develop a status report each
year that includes the number, type, and location of control measures
(included in C.11.a.ii.2), the description, scope, and start date of the
control measures plus implementation progress milestones and schedule
for milestone achievement (partially included in C.11.a.ii.2 and
C.11.a.ii.3), and indicate the roles and responsibilities of each participating
co-permittee where multiple jurisdictions are involved. This activity is also
required for PCBs and the cost to meet this Mercury provision is included
in the PCB costs.
-No additional cost for this item.
a.iii.3. Annual updates of control measures and implementation
milestone achievement. (2017, 18, 19, 20) The County must
update the report required in section a.iii.2 above each year. This activity
is also required for PCBs and the cost to meet this Mercury provision is
included in the PCB costs.
-No additional cost for this item.
b.i. Develop an assessment methodology to quantify Mercury load
reductions. (2016) The MRP 2.0 includes a load reduction accounting
system based on land-use. The system provides a certain load reduction
credit by treating sediment laden stormwater draining from or preventing
sediment from mobilizing in areas with Old Industrial, Old Urban, and New
Urban/Other land-uses. BASMAA will be developing the assessment
methodology based on this accounting system to satisfy this requirement.
This activity is also required for PCBs and the cost to meet this Mercury
provision is included in the PCB costs.
-No additional cost for this item.
04-10-17 TWIC Mtg Packet Pg 99 of 270
22
b.ii. Calculate the Mercury load reduction achieved through the
control measures each year. (2017, 18, 19, 20) The County must
calculate the reduction in Mercury load reduction with each of the control
measures implemented and operating during the year. This activity is also
required for PCBs and the cost to meet this Mercury provision is included
in the PCB costs.
-No additional cost for this item.
b.iii.1. Submit the assessment methodology to the Executive Officer.
(2016) This requirement is being met by BASMAA with no additional cost
to the County.
-No additional cost for this item.
b.iii.2. Provide Mercury load reductions each year in the Annual Report.
(2017, 18, 19, 20) This is included in b.ii above, so there are no
additional costs.
-No additional cost for this item.
b.iii.3 Submit an update of the assessment methodology to the
Executive Officer. (2018) This update will be performed by BASMAA
at no additional cost to the County.
-No additional cost for this item.
c.i. Implement a minimum amount of green infrastructure projects
to reduce Mercury loads. (2020) This activity is also required for
PCBs and the cost to meet this Mercury provision is included in the PCB
costs.
-No additional cost for this item.
c.ii.1 Implement green infrastructure projects to reduce Mercury loads
by a specified amount. (2020) All co-permittees in the County must
reduce PCB loads by 9 grams per year by June 30, 2020. The County's
share of that (15.26%) is 1.37 grams per year. Each permittee may meet
this requirement individually or all co-permittees may meet this
requirement collectively with agreement through the Clean Water
Program. To meet the Mercury load requirement of 1.37 grams per year
would require treating 1.5 acres of Old Industrial land uses or 9.1 acres of
Old Urban land uses. The County is required to reduce PCBs by 3.51
grams per year with Green Infrastructure. To meet this PCB load
reduction would require treating 58.0 acres of Old Industrial land uses or
165.4 acres of Old Urban land uses. This calculation includes a 70%
efficiency factor, which is the default factor approved by the Regional
Board. The PCB acreage to meet load reduction targets is much greater
04-10-17 TWIC Mtg Packet Pg 100 of 270
23
than the Mercury load reduction acreage, so meeting the PCB requirement
will also meet the Mercury requirement. As a result, the cost to meet the
Mercury requirements for this section is included in the cost to meet the
PCB requirements.
-No additional cost for this item.
c.ii.2. Prepare a reasonable assurance analysis on the effectiveness of
Green Infrastructure projects. (2020) The reasonable assurance
analysis must demonstrate how Green Infrastructure will be implemented
to achieve load reduction goals by the five counties in the Bay Area with
MRP permits, and achieve reductions of at least 10,000 grams per year by
2040. The report must be scientifically rigorous including documentation
of all model development, model runs, and required peer review. This
analysis and report will be prepared by BASMAA. This activity is also
required for PCBs and the cost to meet this Mercury provision is included
in the PCB costs.
-No additional cost for this item.
c.iii.1. Prepare report on the quantitative relationship between Green
Infrastructure and Mercury load reduction. (2018) This report will
be prepared by BASMAA with no additional cost to the County.
-No additional cost for this item
c.iii.2. Prepare report on amount and characteristics of land area
treated by Green Infrastructure. (2020) This report must estimate
the area of land treated by Green Infrastructure and the land-use type of
the treatment area for the years 2020, 2030, and 2040. The report will
be prepared by BASMAA at no additional cost to the County.
-No additional cost for this item.
c.iii.3. Submit a reasonable assurance analysis. (2020) This reporting
requirement is included in section C.11.c.ii.2.
-No additional cost for this item.
c.iii.4. Prepare report on the amount of Mercury removed with Green
Infrastructure (2019, 20) This report must estimate the amount of
Mercury load reductions achieved with Green Infrastructure during the
term of the permit. This activity is also required for PCBs and the cost to
meet this Mercury provision is included in the PCB costs.
-No additional cost for this item.
04-10-17 TWIC Mtg Packet Pg 101 of 270
24
d.i. Prepare implementation plan and schedule to achieve TMDL
waste-load allocations. (2020) The County must provide an
implementation plan and schedule to implement control measures to meet
load reduction requirements and prepare a reasonable assurance analysis
that the control measures will attain the TMDL waste-load allocations by
2028. BASMAA will provide an overall framework for the reasonable
assurance analysis, but each permittee will have to develop the analysis
for their particular control measures. The costs for this provision is
included in the more specific requirements outlined below.
d.ii.1. Identify control measures to be implemented. (2020) The
implementation plan must identify all technically and economically feasible
control measures that will be implemented by the County. The
reasonable assurance analysis must demonstrate that the control
measures will meet the County’s proportional share of the TMDL waste-
load allocations by 2028. While much of this work will be covered by the
requirements in the PCB provision, there will be some additional work
needed. This will entail identifying control measures at $2,000 and
preparing the reasonable assurance analysis at $5,000.
- Identify control measures and perform assurance analysis. $7,000
d.ii.2. Develop a schedule to implement control measures. (2020) The
County must develop a schedule to implement the control measures in the
implementation plan. This activity is also required for PCBs and the cost
to meet this Mercury provision is included in the PCB costs.
-No additional cost for this item.
d.ii.3. Evaluate overall effectiveness of control measures. (2020) For
each control measure the County must quantify the Mercury load
reduction based on field testing results or agreed to equivalencies, identify
the capital construction costs and annual maintenance costs, identify any
significant environmental impacts resulting from implementation, and
develop metrics and calculate efficiencies on a unit basis for comparison
purposes. This activity is also required for PCBs and the cost to meet this
Mercury provision is included in the PCB costs.
-No additional cost for this item.
d.iii. Submit the plan and schedule in the 2020 Annual Report. The
cost for this provision is included in the more specific requirements
outlined above.
-No additional cost for this item.
04-10-17 TWIC Mtg Packet Pg 102 of 270
25
e.i.-iii. Implement a risk reduction program. (2016, 17, 18, 19, 20) This
provision requires development of a risk reduction program to reduce
health risks to those people likely to consume fish caught in San Francisco
Bay. This was also a requirement of MRP 1.0 and implemented through
the Regional Monitoring Program, so there is no additional cost for MRP
2.0.
-No additional cost for this item.
04-10-17 TWIC Mtg Packet Pg 103 of 270
26
POLYCHLORINATED BIPHENYLS (PCBs)
Meeting the PCB Load Reduction Schedule
for Unincorporated Contra Costa County
A Requirement of the Current Municipal Regional Permit (MRP
2.0)
Updated April 10, 2017
I. Objective and Purpose
The following are the objectives and purpose of the Polychlorinated Biphenyls
(PCBs) Load Reduction requirement in the Municipal Regional Permit 2.0:
- Meet the TMDL schedule for San Francisco Bay to remove 3 kg/year by the end
of the permit term
- Implement and test a variety of control measures to remove PCBs
- Identify and abate source properties
- Establish PCB management during building demolition activities
The following are observations of the PCB Load Reduction requirements:
- Green Infrastructure is the most favored overall control measure
- Old industrial and old urban land uses are considered the overall primary source
of PCBs other than source properties
II.PCB Load Reduction Process and Cost
The following is a step by step process and resultant costs to meet the PCB Load
Reduction requirements specified in the Municipal Regional Permit 2.0. This cost
analysis is based on the assumption that the County must meet its own PCB load
reduction targets. This presumes that Bay Area permitees, collectively, are not able
to meet the overall TMDL goal and the requirement devolves to the counties, and
that Contra Costa County permitees, collectively, are also not able to meet load
reduction targets.:
Provision C.12: Reducing PCB Levels in the Bay
a.i. Implement control measures to reduce PCBs. (2018, 2020)
All co-permitees within Contra Costa County must reduce PCB loads by 90
grams per year by 2018 and 560 grams per year by 2020. The 90 gram
load reduction in 2018 is carried forward, so the 560 gram load reduction
in 2020 includes the 2018 load reduction, leaving a balance of 470 grams.
04-10-17 TWIC Mtg Packet Pg 104 of 270
27
The County's share of that load reduction, based on population as of
January 2015, is 15.26%. The County must therefore implement source
and treatment control measures to reduce PCBs by 13.73 grams per year
by 2018 and a total of 85.45 grams per year by 2020.
The cost to implement the control measures identified in this provision is
covered in the provisions outlining the specific control measure.
- No additional cost for this item
a.ii.1 Identify current and proposed watersheds or management areas
with control measures. (2016) The County must identify the
watersheds or management areas (portions of watersheds) where PCB
control measures are currently being implemented and where new control
measures will be implemented. This will entail identifying where control
measures are currently being implemented at $1,000, and analyzing and
identifying where new control measures can be implemented at $10,000.
- Identify watersheds/management areas with control measures.
$11,000
a.ii.2. Identify current and new control measures. (2016) The County
must identify the various types of control measures that are currently
being implemented (primarily street sweeping) and control measures that
will be implemented. PCB molecules attach themselves to sediment
particles, so control measures that settle out or capture sediment particles
are most effective. Control measures can include abating “source
properties” (properties where PCBs were stored or used in industrial
processes), constructing green infrastructure treatment facilities,
sweeping streets in management areas, cleaning drainage inlets,
redeveloping and remediating contaminated areas, diverting stormwater
to sewer treatment plants, flushing streets, and managing debris during
building demolition and renovation. This will entail identifying the various
types of current control measures being used and analyzing and
determining what type of control measure would be most appropriate in
the new management areas. These costs are included in C.12.a.ii.1
above.
Note: The County is proposing four control measures, 1) identifying
source properties throughout the unincorporated County and referring
them to the Regional Board, 2) developing a large scale treatment project
in the North Richmond Pump Station drainage, 3) construct curb and
gutter where none now exists to facilitate street sweeping in and around
Old Industrial areas, and 4) construct Green Infrastructure projects
throughout the unincorporated County.
- There is no additional cost for this item
04-10-17 TWIC Mtg Packet Pg 105 of 270
28
a.ii.3. Develop implementation schedule. (2016, 17, 18, 19, 20) The
County must develop a schedule to implement new control measures at
$10,000, and update it as necessary each year at $1,000 per year.
- Develop implementation schedule. $10,000
- Annual cost to update schedule. $1,000
a.ii.4. Implement control measures to meet load reduction
requirements. (2018, 2020) The County must implement control
measures to reduce PCBs by 13.73 grams by 2018 and a total of 85.45
grams by 2020. It is assumed the County will avail itself of the 67% load
reduction credit for implementing a demolition control program in 2019,
leaving a 33% load reduction balance of 28.48 grams by 2020 (reduced
from 85.45 grams). The 67% credit goes into effect in 2019, so the 2018
load reduction requirement of 13.73 grams is not reduced. In addition,
provision C.12.c.ii.1 requires a minimum of 3.51 grams of the total 2020
load reduction through Green Infrastructure.
The load reduction calculation is based on the land-use type of the
drainage area flowing to the control measure. Treating sediment laden
stormwater draining from, or preventing sediment from mobilizing in,
areas with Old Industrial land uses yields a load reduction of 0.0865
grams per acre per year, while Old Urban land uses yields 0.0303 grams
per acre per year, New Urban land uses yields 0.0035 grams per acre per
year, and Open Space land uses yields 0.0043 grams per acre per year.
"Old" land use areas are those generally constructed before 1980 and
"New" are those areas constructed after 1980. To meet the total load
requirement of 28.48 grams through treatment only would require
treating 329 acres of Old Industrial land uses, 940 acres of Old Urban land
uses, 8137 acres of New Urban land uses, or 6623 acres of Open Space
land uses. Based on the load reduction yields per acre, it makes sense to
focus on areas with Old Industrial and Old Urban land uses.
The County is proposing four control measures to meet PCB load
reduction requirements as follows:
Source Properties. This measure would identify properties with very
high concentrations of PCBs due to historic uses of the property. The
County could then proceed to abate the PCBs or refer the property to the
Regional Board for investigation and abatement. If the property is
referred to the Regional Board, the County must submit a plan with the
referral that describes how the County will prevent PCBs from leaving the
site, or from entering the storm drain system. The County would receive
50% of the load reduction credit for properties referred to the Regional
Board upon referral, and the remaining 50% credit would be received
upon completion of the abatement. If the County abates the property,
100% of the load reduction would be credited upon completion.
Abatement projects can take many years. The load reduction credit for
04-10-17 TWIC Mtg Packet Pg 106 of 270
29
these types of properties is 4.035 grams per acre per year, substantially
more than the credit for Old Industrial land uses! A one-acre site referred
to the Regional Board each year could result in about 2 grams credit. To
implement this control measure the County would need to identify
potential parcels for testing at $10,000, and conduct field testing to
determine if there are excessive levels of PCBs at $25,000. If a parcel is
identified and assuming it will be referred to the Regional Board, then the
County would need to prepare a referral letter with documentation at
$10,000, develop a containment plan to prevent PCBs from entering the
storm drain system at $10,000, implement the containment project at
$25,000, and maintain the containment feature at $10,000 per year. The
County has been looking at properties in likely areas but has only
discovered one potential site, so it is assumed this control measure will
only yield 1.0 grams per year.
Cost for possibly 1.0 gram of PCBs. $80,000
Annual cost to maintain containment features. $10,000
North Richmond Pump Station. This measure would divert dry
weather flows to the West County Wastewater District to remove PCB
laden sediments from stormwater runoff. In addition, first flush wet
weather events would be diverted for treatment. The County conducted a
pilot stormwater diversion project at the North Richmond Pump Station in
2015. That project resulted in 0.00064 grams of PCBs removed in 9.5
work-days (eight hour days), and 0.00084 grams of PCBs removed in one
wet weather first flush event. Assuming the Pump Station can divert dry
weather type flows for treatment 330 days per year and divert five first
flush wet weather events per year, the PCB load reduction would be
0.0262 grams per year. To implement this control measure the County
would need to install a permanent connection from the Pump Station to
the Wastewater District manhole in Gertrude Avenue at $50,000,
negotiate a permit/agreement with the Wastewater District to treat the
diverted flows at $10,000, and pay a connection fee to the Wastewater
District at $15,000. Load reductions could be increased by doubling the
discharge rate to 200 gallons per minute and operating 24 hours per day
for 330 days per year. This would increase load reduction to 0.137 grams
per year, but would likely require increased testing equipment to
safeguard the Wastewater District treatment process at $25,000 and likely
double the connection fee to $30,000. This project would only be
financially feasible if there were no treatment charges for the roughly
95,000,000 gallons diverted to the treatment plant each year. The project
would be feasible if the diverted stormwater was viewed as a resource in
conjunction with some other re-use project allowing treatment costs to be
paid from other sources. To develop this type of re-use project would
likely take a year or two to negotiate. Further load reduction increases
could be achieved by modifying the Pump Station to maximize flows to the
Wastewater District by adding a storage component to capture all flows
yet not exceed the capacity of the Wastewater District pipe system. This
04-10-17 TWIC Mtg Packet Pg 107 of 270
30
would be an expensive project and one not contemplated during this
permit term.
One time capital cost for 0.0262 grams of PCBs per year. $75,000
One time capital cost for 0.137 grams of PCBs per year. $115,000
Annual cost to treat 95 million gallons. $Unknown
Enhanced Street Sweeping. This measure would construct curb and
gutter in and around Old Industrial land uses where none currently exist,
allowing sediment to be picked up by street sweeping. Street sweeping is
not effective without curb and gutter. To implement this control measure
the County would need to identify areas with Old Industrial land uses
where installing curb and gutter would be feasible at $25,000, developing
and building a project to install curb and gutter along 10 blocks (200 feet
long blocks) at $90 per lineal foot (curb and gutter plus 18 inches of
pavement), assuming no drainage work is necessary (big assumption),
and conducting additional street sweeping at $50,000 per year. The
capital project to implement this control measure would take two years to
plan and build. It is assumed this control measure will yield 1.0 grams of
PCBs.
Develop feasibility analysis. $25,000
Capital cost for 1.0 grams of PCBs. $180,000
Annual cost of Street sweeping. $50,000
Green Infrastructure. This measure would construct Green
Infrastructure projects, mostly in areas with Old Industrial and Old Urban
land uses. Projects in Old Industrial areas would be located where
installation of curb and gutter was not feasible but conversion of an
existing roadside ditch to a bio-retention facility would work. Both public
and private Green Infrastructure projects count in calculating the load
reduction. It is assumed that private projects will be able to treat 10
acres per year of a mix of Old Industrial and Old Urban land use, with an
equivalent load reduction of 0.5 grams per year in 2016, 2017, 2018,
2019, and 2020. This would entail identifying all Green Infrastructure
projects proposed by developers, determining the land-use category and
area draining to the Green Infrastructure project, and tracking other
information required by the Load Reduction Calculator at $5,000 per year.
The County would need to meet the balance of its requirements by
implementing Green Infrastructure projects on public property. This
would entail identifying the target acreage needed to be treated in Old
Industrial or Old Urban land use areas and developing projects to treat
the drainage area at a unit treatment cost of $215,000 per acre (based on
the 255 Glacier Drive Parking Lot bio-retention project that treated 1.35
acres at a cost of $290,000) and an annual maintenance cost of $3,000
per treated acre. Given the assumptions with the other control measures
of 1.0 grams from Source Properties, 0.14 grams from the Pump Station,
04-10-17 TWIC Mtg Packet Pg 108 of 270
31
1.0 grams from Street Sweeping, and 0.5 grams per year from private
Green Infrastructure projects, the public Green Infrastructure project
component will have to yield load reductions of 10.09 (13.73 – 3.64)
grams in 2018, and 17.39 grams in 2020. The overall 2020 load reduction
(28.48) is reduced by the 2018 load reduction (10.09) to determine the
balance of load reduction requirement in 2020 (17.39) including private
development in 2019 (0.5) and 2020 (0.5). To meet the load reduction
requirement of 10.09 grams in 2018 would require treating 116.6 acres of
Old Industrial land use area or 333.0 acres of Old Urban land use area. It
is assumed 225 acres of a mix of these two land uses will be treated to
meet the requirement. This acreage would be multiplied by the treatment
cost of $215,000 per treated acre and reduced by the 70% efficiency
factor for Green Infrastructure approved by the Regional Board. Using
the same methodology to determine the load reduction requirement costs
for 2020, it is assumed that the contribution from private projects will hold
steady at 10 acres per year with a load reduction of 0.5 grams per year,
so the balance of 17.39 grams will have to be picked up with public Green
Infrastructure retrofit projects. The cost to the County would be treating
approximately 390 acres of mixed land-use at a unit treatment cost of
$215,000 per acre with a 70% efficiency factor, and an annual
maintenance cost of $3,000 per treated acre. This would represent the
worst case cost scenario using the assumptions noted above.
Note: The permit allows implementation collaboratively with other
jurisdictions within the County or within the region, which may reduce unit
costs.
It should also be noted these costs were peer-reviewed by a consultant in
the stormwater field. The consultant indicated costs to construct Green
Infrastructure in the Bay Area to treat 1 acre of drainage ranges from
$200,000 up to $365,000. This report used a cost of $215,000 per acre,
based on a Public Works Department project, which is at the low end of
the range. More recent work by the same consultant indicates that
average costs in Southern California are about $110,000 per treated acre.
However, since there are enough differences in soils, climate, and
institutional arrangements between there and the Bay Area, this analysis
continues to use $215,000 per treated acre.
- Implement control measures (2018). $69,100,000
- Implement control measures (2020). $119,800,000
- Annual cost to track private Green Infrastructure projects. $5,000
- Annual maintenance costs (2018). $675,000
- Annual maintenance costs (2019). $675,000
- Annual maintenance costs (2020). $1,845,000
a.iii.1. Develop a Progress Report on implementation of control
measures. (2016) The County must develop a progress report by April
2016 outlining the steps taken to develop a list of watersheds, identify
04-10-17 TWIC Mtg Packet Pg 109 of 270
32
control measures, justify the selection of watersheds using monitoring
data, and report on contamination sites referred to the Regional Board at
$5,000.
- Develop Progress Report. $5,000
a.iii.2. Develop an implementation status report for each Annual Report.
(2017, 18, 19, 20) The County must develop a status report each year
that includes the number, type, and location of control measures (included
in C.12.a.ii.2), the cumulative listing of all PCB contaminated sites referred
to the Regional Board (included in C.12.a.ii.2), the description, scope, and
start date of the control measures plus implementation progress
milestones and schedule for milestone achievement (partially included in
C.12.a.ii.2 and C.12.a.ii.3), and indicate the roles and responsibilities of
each participating co-permittee where multiple jurisdictions are involved
all at $3,000.
- Annual cost to do the status report for the Annual Report. $3,000
a.iii.3. Annual updates of control measures, sites referred to the
Regional Board, and implementation milestone achievement.
(2017, 18, 19, 20) The County must update the report required in
section C.12.a.iii.2 above each year. This cost is included in the provision
C.12.a.iii.2 above.
- No additional cost for this item.
a.iii.4. Develop alternative load reduction distribution criteria
(optional). (2017) The County must identify and document an
alternative method of distributing load reductions within the County, only
if it chooses to do so. This would be done in conjunction with all co-
permittees within the Clean Water Program. The current method of load
reduction distribution is based on the proportional population of each co-
permittee within the County, and there is no reason to believe an
alternate method would be needed or desired.
- There is no additional cost for this item, unless an alternative load
reduction distribution is needed. Developing an alternative load
reduction distribution criteria would cost approximately $25,000.
b.i. Develop an assessment methodology to quantify PCB load
reductions. (2016) The MRP 2.0 includes a load reduction accounting
system based on land-use. The system provides a certain load reduction
credit by treating sediment laden stormwater draining from or preventing
sediment from mobilizing in areas with Old Industrial, Old Urban, New
Urban, and Open Space land-uses. BASMAA will be developing the
assessment methodology based on this accounting system to satisfy this
04-10-17 TWIC Mtg Packet Pg 110 of 270
33
requirement. The work has been included in this year's BASMAA budget
so no additional costs from the County will be needed.
- No additional cost for this item
b.ii. Calculate the PCB load reduction achieved through the control
measures each year. (2017, 18, 19, 20) The County must calculate
the reduction in PCB load reduction with each of the control measures
implemented and operating during the year. BASMAA is developing a
Permittee Load Reduction Credit Calculator to facilitate this calculation.
The County will receive a 67% load reduction credit if it implements a
program to manage building and construction demolition debris containing
PCBs (provision C.12.f). Meeting this requirement will entail gathering the
specified data and entering it into the Load Reduction Calculator at $5,000
per year.
- Annual calculation of PCB load reduction. $5,000
b.iii.1. Submit the assessment methodology to the Executive Officer.
(2016) This requirement is being met by BASMAA with no additional cost
to the County.
- No additional cost for this item
b.iii.2. Provide PCB load reductions each year in the Annual Report.
(2017, 18, 19, 20) This is included in C.12.b.ii above, so there are no
additional costs.
- No additional cost for this item
b.iii.3 Submit an update of the assessment methodology to the
Executive Officer. (2018) This update will be performed by BASMAA
at no additional cost to the County.
- No additional cost for this item.
b.iii.4 Develop alternative load reduction distribution criteria
(optional). (2019) This provision is similar to C.12.a.iii.4, except the
load reduction distribution alternative is specifically for implementing a
PCB containment program for demolition debris.
- There is no additional cost for this item, unless an alternative load
reduction distribution is needed. Developing and alternative load
reduction distribution criteria would cost approximately $25,000.
c.i. Implement a minimum amount of green infrastructure projects
to reduce PCB loads. (2020) The cost for this provision is included in
the more specific requirements outlined below.
04-10-17 TWIC Mtg Packet Pg 111 of 270
34
c.ii.1 Implement green infrastructure projects to reduce PCB loads by
a specified amount. (2020) All co-permitees in Contra Costa County
must use Green Infrastructure to reduce PCB loads by 23 grams by June
30, 2020. The County's share of that (15.26%) is 3.51 grams. Each co-
permittee may meet this requirement individually or all co-permitees may
meet this requirement collectively with agreement through the Clean
Water Program. To meet the load requirement of 3.51 grams per year
would require treating 40.6 acres of Old Industrial land uses or 115.8
acres of Old Urban land uses. It is assumed 78 acres of a mix of these
two land uses will be treated to meet the requirement. To calculate the
total cost, this acreage would be multiplied by $215,000 per treated acre
with a 70% default efficiency factor approved by the Regional Board.
These acreage quantities are significantly below those proposed in the
Green Infrastructure Section of provision C.12.a.ii.4, so this requirement is
covered in that prior section.
- There is no additional cost for this item.
c.ii.2. Prepare a reasonable assurance analysis on the effectiveness of
Green Infrastructure projects. (2020) The reasonable assurance
analysis must demonstrate how Green Infrastructure will be implemented
to achieve a load reduction of 3.0 kilograms by the five counties in the
Bay Area with MRP permits. The report must be scientifically rigorous
including documentation of all model development, model runs, and
required peer review. This analysis and report will be prepared by
BASMAA and will be included in their annual budget over the next two or
three years, so there will be no additional cost to the County. There will
be some coordination effort and review time required of County staff to
ensure County needs are met at $2,000.
- Cost to coordinate with the reasonable assurance analysis. $2,000
c.iii.1. Prepare report on the quantitative relationship between Green
Infrastructure and PCB load reduction. (2018) This report will be
prepared by BASMAA with no additional cost to the County.
- No additional cost for this item
c.iii.2. Prepare report on amount and characteristics of land area
treated by Green Infrastructure. (2020) This report must estimate
the area of land treated by Green Infrastructure and the land-use type of
the treatment area for the years 2020, 2030, and 2040. The report will
be prepared by BASMAA at no additional cost to the County, however, the
County will need to coordinate with and provide data to BASMAA for the
report at $5,000.
- Provide information for report. $5,000
04-10-17 TWIC Mtg Packet Pg 112 of 270
35
c.iii.3. Submit a reasonable assurance analysis. (2020) This reporting
requirement was included in section C.12.c.ii.2.
c.iii.4. Prepare report on the amount of PCBs removed with Green
Infrastructure (2019, 20) This report must estimate the amount of
PCB load reductions achieved with Green Infrastructure during the term of
the permit. This will entail analyzing test results and calculating load
reductions at $2,000 per year.
- Annual cost for report on load reduction. $2,000
d.i. Prepare implementation plan and schedule to achieve TMDL
waste-load allocations. (2020) The County must provide an
implementation plan and schedule to implement control measures to meet
load reduction requirements and prepare a reasonable assurance analysis
that the control measures will attain the TMDL waste-load allocations by
2030. BASMAA will provide an overall framework for the reasonable
assurance analysis, but each permittee will have to develop the analysis
for their particular control measures. The costs for this provision is
included in the more specific requirements outlined below.
d.ii.1. Identify control measures to be implemented. (2020) The
implementation plan must identify all technically and economically feasible
control measures that will be implemented by the County. The
reasonable assurance analysis must demonstrate that the control
measures will meet the County’s proportional share of the TMDL waste-
load allocations by 2030. This will entail identifying the control measures
at $5,000 and preparing the reasonable assurance analysis at $15,000.
- Identify control measures and perform assurance analysis. $20,000
d.ii.2. Develop a schedule to implement control measures. (2020) The
County must develop a schedule to implement the control measures in the
implementation plan at $5,000.
- Develop implementation schedule. $5,000
d.ii.3. Evaluate overall effectiveness of control measures. (2020)
BASMAA will assist the counties by developing a framework to guide this
work. However, for each control measure the County must quantify the
PCB load reduction based on field testing results or agreed to
equivalencies at $2,000, identify the capital construction costs and annual
maintenance costs at $2,000, identify any significant environmental
impacts resulting from implementation at $2,000, and develop metrics and
calculate efficiencies on a unit basis for comparison purposes at $10,000.
- Evaluate the effectiveness of control measures. $16,000
04-10-17 TWIC Mtg Packet Pg 113 of 270
36
d.iii. Submit the plan and schedule in the 2020 Annual Report. The
cost for this provision is included in the more specific requirements
outlined above.
e.i.-iii. Evaluate PCBs in public infrastructure facilities. (2018) This
provision requires collection of caulk samples from sealants in storm drain
facilities, between concrete curbs and street pavement, and other
infrastructure to determine the amount of PCBs present in the caulking
materials. BASMAA will be collecting the samples, performing the
analysis, and preparing the report to meet this requirement at no
additional cost to the County. There will be some coordination effort and
review time required of County staff to ensure County needs are met at
$2,000.
- Cost to coordinate with evaluation study. $2,000
f.i. Manage demolition debris to prevent PCBs from entering storm
drain systems. This provision requires development of a program to
manage PCB laden materials with concentrations of 50 ppm or greater
during the demolition of buildings to prevent pollutants from entering the
storm drain system. This requires preventing mobilization and transport
of PCBs through vehicle track out, airborne releases, soil erosion, or
stormwater runoff. This requirement applies to commercial, public,
institutional, and industrial structures, but does not apply to single-family
residential or wood-frame structures. The costs for this provision is
included in the more specific requirements outlined below.
f.ii.1. Develop demolition debris management protocols. (2019) The
County must demonstrate it has the necessary authority to require
management of PCBs during the demolition of applicable structures, a
method for identifying the applicable structures within the County's
jurisdiction, and management methods to ensure PCBs are not discharged
to the storm drain system. BASMAA will prepare a model ordinance and
develop a range of acceptable sample protocols for managing construction
debris during demolition activities at no additional cost to the County.
This will entail adapting the model ordinance to County format at $5,000,
shepherding the prospective ordinance through the County review and
approval process at $10,000, developing a mechanism to flag parcels with
applicable buildings in the permit database at $25,000, and adapting the
sample management protocols to the County’s business procedures and
incorporating them into the permit process at $5,000.
- Develop debris management protocols. $45,000
f.ii.2. Implement demolition debris management protocols. (2019)
The County must incorporate debris management protocols into its permit
and inspection system. Most of the cost for this provision is included in
04-10-17 TWIC Mtg Packet Pg 114 of 270
37
section C.12.f.ii.1 above. This will require training of office staff and field
inspectors on the new protocols at $5,000.
- Implement debris management protocols. $5,000
f.ii.3. Develop assessment methods to determine effectiveness of
demolition debris management protocols. (2019) This provision
requires development of an assessment methodology and data collection
program to determine the effectiveness of managing demolition debris to
reduce PCB loads. BASMAA will be developing the assessment
methodology and data collection program, and preparing the report to
meet this requirement at no cost to the County.
-No additional cost for this item
Note: It should be noted here that BASMAA will be taking on a significant
amount of technical studies to support permitees in meeting MRP 2.0
requirements. At this time it is assumed that all this work can be
accomplished with no increase in the annual "dues". However, due to the
complexity and amount of work involved with MRP 2.0 an increase in the
annual dues to BASMAA would seem likely, resulting in a proportional cost
increase to the County.
f.iii.1. Prepare annual status report on implementing demolition debris
management protocols. (2016, 17, 18) The County must report on
efforts to implement debris management protocols, such as developing
ordinances and implementation policies and procedures, obtaining
information needed for the various studies, incorporation of this
requirement into business practices and processes, and training at $2,000
each year.
- Annual cost to provide status report. $2,000
f.iii.2. Prepare exemption justification. (2017) This applies only to
jurisdictions requesting an exemption from these requirements, which the
County does not qualify for.
- No additional cost for this item
f.iii.3. Prepare status reports on implementing demolition debris
management protocols. (2020) This provision requires the County to
document how it has met the minimum requirements for implementing
debris management protocols at $2,000.
- Implementation status report. $2,000
04-10-17 TWIC Mtg Packet Pg 115 of 270
38
f.iii.4. Prepare report on applicable buildings. (2020) This provision
requires the County to track and report on the number of applicable
buildings issued a demolition permit each year, a running list of total
permits, and description of PCB control measures used. This will entail
developing a tracking system for demolition permits with the control
measures used at $10,000 and extracting the information and reporting
out at $1,000.
- Prepare reports on applicable buildings. $11,000
f.iii.5. Develop assessment methods to determine quantity of PCBs
removed with demolition debris management protocols. (2020)
This provision requires development of an assessment methodology and
data collection program to determine the quantities of PCBs removed by
managing demolition debris. BASMAA will be developing the assessment
methodology and data collection program, and preparing the report to
meet this requirement at no cost to the County.
- No additional cost for this item
g.i.-iii. Develop a fate and transport study of PCBs. (2017, 18, 20) This
provision requires development of a fate and transport study describing
biological uptake of PCBs in the San Francisco Bay margins. This study
will be developed by the San Francisco Estuary Institute at no additional
cost to the County.
- No additional cost for this item
h.i.-iii. Implement a risk reduction program. (2016, 17, 18, 19, 20) This
provision requires development of a risk reduction program to reduce
health risks to those people likely to consume fish caught in San Francisco
Bay. This was also a requirement of MRP 1.0 and implemented through
the Regional Monitoring Program, so there is no additional cost for MRP
2.0.
- No additional cost for this item
04-10-17 TWIC Mtg Packet Pg 116 of 270
04-10-17 TWIC Mtg Packet Pg 117 of 270
04-10-17 TWIC Mtg Packet Pg 118 of 270
04-10-17 TWIC Mtg Packet Pg 119 of 270
04-10-17 TWIC Mtg Packet Pg 120 of 270
04-10-17 TWIC Mtg Packet Pg 121 of 270
04-10-17 TWIC Mtg Packet Pg 122 of 270
TRANSPORTATION, WATER &
INFRASTRUCTURE COMMITTEE 7.
Meeting Date:04/10/2017
Subject:ACCEPT report on submittal of a grant proposal application for the
North Richmond Watershed Connections Project to the State Coastal
Conservancy.
Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE
COMMITTEE,
Department:Conservation & Development
Referral No.: 2
Referral Name: Review applications for transportation, water and infrastructure grants to
be prepared by the Public Works and Conservation and Development
Departments.
Presenter: John Steere, PWD Contact: John Steere (925)313-2281
Referral History:
This has not gone to the TWI Committee or the Board of Supervisors before.
Referral Update:
On February 17, 2017, the Public Works Department submitted an $862,400 grant proposal for
the “North Richmond Watershed Connections Project” (Watershed Connections) to the California
Coastal Conservancy. It was submitted as an application to the “Urban Greening San Francisco
Bay Area” Proposition 1 Grant. The Watershed Connections is comprised of three subprojects and
is a collaboration of the Contra Costa County Public Works Department (Transportation
Engineering and the Watershed Program), Urban Tilth, and The Watershed Project. These
subprojects are:
1. North Richmond Urban Farm/Fred Jackson Way Rain Gardens (led by Urban Tilth).
2. First Mile/Last Mile on Fred Jackson Way, a Green/Complete Streets project (led by the Contra
Costa County Public Works Department).
3. Watershed Connections Route, Clean and Green Streets/Adopt-a-Block Program (led by The
Watershed Project).
The grant submittal packet included the application, the project graphics, and 20 letters of both
support and in-kind contributions from Supervisor John Gioia, other County departments and
agencies, and local and national environmental and community organizations.
04-10-17 TWIC Mtg Packet Pg 123 of 270
Recommendation(s)/Next Step(s):
No action is necessary; submitted to the TWI Committee for its information. There was not
sufficient time between the formulation of the project in early January 2017 to submit the draft
proposal to the TWI Committee for its review. Please note that the Coastal Conservancy released
the San Francisco Bay Urban Greening Grant Request for Proposals in late December 2016.
Fiscal Impact (if any):
No fiscal impact if awarded grant. However, Contra Costa County would receive up to $862,400
in Proposition 1 funding if the County is awarded the full grant request.
Attachments
Maps & Graphics
Grant Application
Submittal Letter
Exhibit C
04-10-17 TWIC Mtg Packet Pg 124 of 270
NORTH RICHMOND WATERSHED CONNECTIONS
A MULTI-BENEFIT URBAN GREENING DEMONSTRATION PROJECT
Regional Map: North Richmond and Vicinity
RICHMOND
EL CERRITOSAN FRANCISCO BAY
WILDCAT CANYON
REGIONAL PARK
EL SOBRANTE
SAN
PABLO
PINOLE
NORTH
RICHMOND
NORTH
SAN PABLO BAY
Project
Location
SAN
P
A
B
L
O
C
R
E
E
K
WILDCAT CREEK
RHE
E
M
C
R
E
E
K
Neighborhood Scale Map
WILDC
AT
C
R
E
E
K
WILDC
AT
C
R
E
E
K T
R
AIL
A C C E S S R O A D
SAN P A B L O C R E E K
MARKET AVE
SILVER AVE
GROVE AVE FRED JACKSON WAY5TH STREETGIARAMITA STREETCHESLEY AVE RUMRILL ROADMARKET AVE
Project
LocationRAILROAD TRACKSSAN FRANCISCO BAY TRAILWILDCAT MARSH TRAILLANDFILL
LOOP TRAIL
RICHMOND PARKWAYNORTH
RICHMOND
SHORELINE
OPEN SPACE
WILDCAT MARSH
STAGING AREA
Trail Legend
Bay Trail - Complete
Bay Trail - Incomplete
Connector Trail - Complete
Connector Trail - IncompleteRAILROAD TRACKSPOINT PINOLE
REGIONAL
PARK
POINT
MOLATE
PARKS &
OPEN SPACE
10
DAVIS PARK
1
12
2 3
4
5
6
13
7
8
9
14
11
Natural & Cultural Features
Urban Tilth’s North Richmond Urban Farm
North Richmond Ball Park (City of Richmond)
Verde Elementary School / School Garden
Wildcat Creek / Creekside Trail
First & Market Community Garden
Macedonia Baptist Church
Community Center with Native Habitat Garden
Senior Apartments
Community Housing Development
Future Affordable Housing
Shields-Reid Park (City of Richmond)
San Pablo Creek
Project Pride with Native Habitat Garden
North Richmond Missionary Baptist Church
Watershed Connections Route
Adopt-A-Tree Program Area
1
2
3
4
5
6
7
8
9
10
11
12
13
14
WEST COUNTY
RECYCLING
CENTER
NORTH
RICHMOND
BALL PARK
VERDE
ELEMENTARY
SCHOOL &
GARDEN
NORTH
RICHMOND
FARM
SHIELDS
REID
PARK
GOLDEN BEAR
TRANSFER
STATION
WEST CONTRA
COSTA SANITARY
LANDFILL
WEST COUNTY
WASTEWATER
IRON TRIANGLE
NEIGHBORHOOD
NORTH
04-10-17 TWIC Mtg Packet Pg 125 of 270
NORTH RICHMOND WATERSHED CONNECTIONS
A MULTI-BENEFIT URBAN GREENING DEMONSTRATION PROJECT
04-10-17 TWIC Mtg Packet Pg 126 of 270
NORTH RICHMOND WATERSHED CONNECTIONS
A MULTI-BENEFIT URBAN GREENING DEMONSTRATION PROJECT
Design Plan:
North Richmond Urban Farm Rain Gardens
Rain Garden
Project Area
04-10-17 TWIC Mtg Packet Pg 127 of 270
NORTH RICHMOND WATERSHED CONNECTIONS
A MULTI-BENEFIT URBAN GREENING DEMONSTRATION PROJECT
0’ 40’ 80’
Design Plan:
Fred Jackson Way First Mile/Last Mile Connection Project (page 1 of 3)
NORTH
PLANTING STRIP
04-10-17 TWIC Mtg Packet Pg 128 of 270
NORTH RICHMOND WATERSHED CONNECTIONS
A MULTI-BENEFIT URBAN GREENING DEMONSTRATION PROJECT
EE
0’ 40’ 80’
Design Plan:
Fred Jackson Way First Mile/Last Mile Connection Project (page 2 of 3)
NORTH
04-10-17 TWIC Mtg Packet Pg 129 of 270
NORTH RICHMOND WATERSHED CONNECTIONS
A MULTI-BENEFIT URBAN GREENING DEMONSTRATION PROJECT
GROVE AVE
0’ 40’ 80’
Design Plan:
Fred Jackson Way First Mile/Last Mile Connection Project (page 3 of 3)
NORTH
04-10-17 TWIC Mtg Packet Pg 130 of 270
8800000001111
11999444555
3333333666699 111999999990000000066669999999999
5555511113333
5555544441111
11110000000111111111
5544444444222222222
33333333330000000088888888
4444333333000000000
55555555111115555555
888880000000002222155555333333335555555182611111188888888811111111777777777
44444411111111117777777777
555511166
333311117777777
333344444555511111777777744444444111111
11111111155555555555555555555555555555555444444666666633333222888888
33330001111
1166222222222
1111666666663330000
66611111111
11111111199999999222222777777
1177777444111
777722224444
111177222222222222222
111111188888888822222222222222222
55556666888
111111111555555555550000011111888000000000000000000000000000011111888888887774
11188888855555222222 55555552222223333319111555555555555000999999955555555555556666666999991666663377777733333333333333331119933333333333333333555555511155522225555
555566663333333333333330000555555555511111111444444444455555577
11166622000
11111666633333999999
11555444477
1111111111555555555555333377777 5555544400000033333335555555500000117777330000000
1111555533300033333344444444111155555333338888
111118888888833335555
11199993333222
111118888844444000
111117733333333
3333333311111111144444444411117722222
3366888817559111199999999111118888888
111188882222299999999
111117777333333111
11555444999
6666661111111166666666660033333333111111111
3330004444555555555558888844444441111111111111330011333337777766666 666610000555551177775552222222244001155555522211133333366666600005555556666666111111155544444449999999993494444444111111555555400114444111111777
3333330000000444444433333311111133333333333366666611000333000000000008888888333333311155555550000999999955550000000000555555222299222333333336666666666600000000000000000000000000005555555500001111555225555551117777736611113311116666555555666677755554445555555555555555555555555555544448883333333330000000555555552222222222999911155222211111
3333444411118887777666
33333555555222255555555555555555555555555555555500000000000004155555555333333322222220000661199999999333311996600000666332220000555555555222222888888555441111118855666666
66666222222211
888880000000000444444400000000000333615555555555550000000004444444344444455666688555500888883333322222222888888888331122224444444111111166111111115555555552222222299999999666071111888855335555555555555552222222226666611155555500000000002222222555555555510000555550000444442999999944444422220000000011116655555333333333333446644111116666666111116666662222228888888888 111116666655533333333444444416116 111111666666622221111
11166664444111111111111888888888335555555 111117722666666
11166664444444000
111111777336666666
1111555333333333333334444
111111666666444444440000000 111116666666333333339999991111111888888886666665555
115522255511552222999999115555555552222222220000
11111115555555555555111 5555555111111144444444441111555533334444
1111111555555544444466666666
111117774440000000
11115522225 333222555517711111111155555555544444444444
115544444444444444
111111111777777771111111111
11166622333
111111555555333333332222222222
111111111111554444444118888000000111
155555554441111111111111555555544444442222222 16500188888885550
1111111555544441111
111188883333000000550099
111111166666666222222255555
1111111882222266
111166622255
111118888844444445555
111118883333333333333333333
1111177777772222111
411111111122222222222211774444444444
111177777772222222444444444111111888888888888555555444444444 11111111111199999999999999933333333333333336666666666
111444444666666666666
1188822000
1111111666662222222222229999
111117777444455
16633366
442200001111888822555
11117777111111122222222221111188888444444444888888
11111118888844444111
117777777744444422222222
11111555555533333333344444444444
117444444440000000000
1116666600000001166622200000
11111111666663333333333
11111111444445555555558888888888
11882222000000182111115555111111122211118888884444444000000
1116666633333333336666
11883366666666
1111111555555522222227777
11188844449999
1111117777777110000011111777744444444444442222220011111170777777111777733333444
11111888888883333999999
1116622266
11773334444
1177777333322222211999000000001111181177
111117777777735555
115555555555553333333333333377777
118881133
111888884444444888888
1118888111666
111111177777744444444433333333
118822229999
111188881117777
111177777770001111
11115544333
1111111772220000
11177033333311888855557777111199999990000011111
155544442222
11199992222200000
111177777222221111
111115555553311
118885555566
1117773334444
11111115555555355555 5555550000000088881443111177775555500111777771188
111188822299999
1117777111188881777772222222222211111177775555551111111188888881111666666
1177722288 1117777773333333333333
111666660001155550011116662211
11177777773333333300
111111888884444411
1111111111555555555555533333333333333333333333333333333222211222211118888888883344001111111115555555555533333333
155555555522222222000044444444222222221111111116666666662222222211111111
117777722222777
44255511555555222222226666666665550088 55522225111111555554477777
11155522288888
11111155553666555555555554444444488888555555555555554444444000022220099999999
1115555541
11111666666666666622222
1111111111666666660000
2222222222111111111111888888844555
1188886665555
111111188885333
555555555555555559999999933333332299993333333222225555511111118888833333333
555555555555555555555555555555111888777333
111118888888119999999
111188885555555555555
11111777777772222555
117777733333111
111777777444444411
3333333444444333333333344444400000033366600000011166666666111133333333333334444000000 55555222222222220000044443333300000000011118888333333333444444443333333333000011111888888883333333366666666666
11111111 7777777 333333333 777777777
11772299
1733
1111 77 444 5555
1188884444333333
1111188888333337777777
116663300
4444442222222555551111666666222200000
11111777773333311111
111111177777733355
1155555446444444433333333333666666 6611777744444111122222335555111333333444444445555555555555555555555555555111111111118888888888888888822222333333
333366333331111111118888822222222222
444442222233333444443334444444555555000000000662222224444555555888844000008844444444442222222222226666666666666666444000133333444444411111111555551111111166663333331111117777733333333999333335557777662222666633355557777755555555555511111111111115555555555111111111888888888 555555111111133333333333333444555333334999444422222222244444422222222225555555551111155555222228888111111116666666444111
16616 1111166222211
111111111666666666666666662222222222222225555555
111166664444222
1111111888884444455
11188888899999911111111
11111111188885533
11111188888555555000000000
111111888833300
1533333
11555227777
1177777733355555
111111111118888888888333333333377777777
11111555555555555555
111777111115555
111111155577778
11111199999911111666
1111111118888888888444444444555555
1111118888222222
111117772222222222222
1773335555555
1111555533333888888888
11118833333222222
1111542222
1111155555444446666666666633333331111166666
155536666
11111111177777222555555
1111177777777777733333333333338888888888
11111188882222288888
1111118888811115555
1188111115511111111111111166666622222244444
119922222666666
111117777111333
111111188888111666
1555533388888
111777777777774444442222222
1111111111116666666622222233333333
1117772222244444
111111555588
1111111555666688888888
111188888111111777777718220
1111111118888888881111111188888888
1111117777773333333333333
177771777
11111166666666444444555555
118888333333222222
15555666611
1166666666333333377
1115555000000
111111888889999555555
1155555553333
11115555554444000000
111111116666666622222225555555
111188888888882222222222225555555
1111111118229999
111777111177
11111116666633337777777
111773377
111111116666666333333333333
111111777773333111
1777709
111111 9999 2222 222
111115555555555511111
22222222222222222111111111777777
1111111555555555555555555555555555555000000000000000000
1111111111111117777777777744446666666111111111117339999999
1111111111177744411111 111111111777777744444444
222222200000000000000
666000222 6610
555555222
55577222226611666600221111114444455555888888 557766SHIELDS-RIED PARK
(CITY OF RICHMOND)
TRAIL
NORTH RICHMOND
BALL PARK
VERDE ELEMENTARY SCHOOL
WIL DC AT CREEK
041000909043334444443444444444443 785784440000111140133
55555
3333222232603North Richmond Tree Opportunity Sites
Clean and Green Adopt-a-Tree Program
0 0.035 0.070.0175
Miles
Assumed Non-Owner Occupied
Legend
Public Parks and Open Space
NORTH
Watershed Connections Route
###
###
Adopt-a-Tree Opportunity Site
118 potential locations
50 adopt-a-trees requested
dAssumed Owner Occupie
Design Plan:
Clean and Green Adopt-A-Tree Program
NORTH RICHMOND WATERSHED CONNECTIONS
A MULTI-BENEFIT URBAN GREENING DEMONSTRATION PROJECT 04-10-17 TWIC Mtg Packet Pg 131 of 2
SCC Prop 1 Application 1 December 2016
PROPOSITION 1 GRANT APPLICATION
Urban Greening Projects in San Francisco Bay Area
CONTACT INFO
Organization Contra Costa County Watershed Program
Contact Person John Steere, Watershed Planner Email john.steere@pw.cccounty.us
Phone 925-313-2281 Fax 925-313-2333
Address 255 Glacier Drive
City Martinez Zip 94553
PROJECT INFO
Project Name North Richmond Watershed Connections
Summary North Richmond Watershed Connections Project will implement a suite of multiple-
benefit urban greening projects in the unincorporated community of North
Richmond; to improve water quality and enhance the health of San Pablo and
Wildcat Creeks and their watersheds, while expanding the urban forest, reducing
heat islands, and improving this disadvantaged community’s awareness of and safe
access to their local natural resources with a 1.75-mile long “Walkable Watersheds”
urban trail.
Amount
Requested
$862,400 Total Project
Cost
$1,186,400 Amount of non-
state match
$324,000
Start Date October 1, 2017 End Date December 1, 2021
Project Type Planning Acquisition Implementation/Construction
Primary Project
Purpose
Improve Watershed Health Create Public Green Space
Increase Urban Forest Create or Restore Native Habitat
Improve Water Quality Stormwater Capture*
* Stormwater Capture Projects must be consistent with a Stormwater Resource Plan
Refer to the Project Eligibility section of the solicitation for more information
Are you applying to any other agencies for Prop 1 funding for this project? Yes No
If yes, which agency(ies)?
Acres 62 APNs (Acquisition
Only)
LOCATION INFO
County Contra Costa Specific Location Fred Jackson Way, North Richmond
Is the project located within a disadvantaged community as defined by the Department of Water
Resources Yes No Partially
Latitude
Format:
37.960306 Longitude
Format:
-122.36665822
What point is represented by the lat/longs
(eg., parking lot, center of site, etc):
Fred Jackson Way at Wildcat Creek – the approximate
latitudinal center of project along Fred Jackson Way
ELECTED OFFICIALS
Districts Number(s) Name(s)
State Senate 9 Senator Nancy Skinner
State Assembly 15 Assemblyman Tony Thurmond
Congressional 11 Congressman Mark DeSaulnier
04-10-17 TWIC Mtg Packet Pg 132 of 270
PROJECT DESCRIPTION
SCC Prop 1 Application 2 December 2016
PROJECT DESCRIPTION
Project Name North Richmond Watershed Connections
1.Need for the project.
North Richmond, a Community of Concern and Priority Development Area at the mouth of the San Pablo
Creek and Wildcat Creek watersheds, and in unincorporated Contra Costa County, is a disadvantaged
community facing a host of environmental, economic, and social challenges.
Built on an historic wetland, the community is plagued by poor infrastructure, and up until the 1980’s
was frequently inundated by floods. Many major streets have no sidewalks and some are lined with
drainage ditches, strewn with trash and/or illegally-dumped materials. Stormwater flows untreated into
San Pablo and Wildcat creeks, degrading their water quality and the watersheds’ health, as well as the
San Francisco Bay. Proximity to the West County Dump has heightened illegal dumping.
Wildcat Creek historically supported a steelhead run. The upper Wildcat Creek watershed is protected
by the East Bay Regional Park District, and the lower reaches have largely remained open and
unculverted, making it a strong candidate for restoration and habitat improvement. Rainbow trout have
been successfully reproducing in upper Wildcat Creek since their reintroduction in 1983. Additionally,
San Pablo Creek has been identified as a promising location for steelhead restoration. Water quality
improvements in these creeks are needed to protect and enhance fish habitat.
Fred Jackson Way is the primary travel corridor through North Richmond and intersects San Pablo and
Wildcat Creeks, offering opportunities for community access to these natural areas. Contra Costa
County has been awarded a $3.3 million federal grant to help enhance biking and walking access to
regional trails, parks and open spaces, transit, schools and jobs. The Project offers a significant and time-
sensitive opportunity to leverage these federal funds to close the community’s connectivity gap and
utilize urban greening elements, such as street trees, rain gardens, and educational signage to improve
water quality, watershed health, neighborhood walkability and increase the community’s connection to
its natural spaces. The Project will also create a much-needed visual amenity to help reduce illegal
dumping outside of the nearby dump.
A dearth of street trees is the result of haphazard 1940s era residential development patterns, red-
lining, and a history of farming, horticultural and industrial uses. Rising temperatures due to climate
change, increased hardscape, and a lack of urban canopy, have contributed to urban temperatures that
can exceed 115 degrees in the summer. Recognized as a community with high vulnerability to heat
impacts by the Contra Costa Health Services Department and the County’s Climate Action Plan (CAP),
North Richmond’s need for increased urban forest is identified in the CAP for reducing urban heat
islands to improve community health and to help mitigate climate change. This project’s street tree
planting will help address this need. In addition, lack of public tree opportunity sites and narrow
sidewalks requires an urban greening project with broad community support, to set a precedent for
combining private property and public right-of-way to benefit the whole community.
The community faces an urgent need to improve poor air quality. Nearly twenty percent of residents in
this area live in close proximity to railways and freight transportation infrastructure, a significant source
of unhealthy levels of particulate matter air pollution. Urban greening, as part of this project, can help
capture some of the particulate matter, including dust and coal dust blown from open railway cars.
2.Goals and objectives.
The North Richmond Watershed Connections Project knits together multiple-benefit urban greening
projects and key watershed features in the heart of the disadvantaged North Richmond community to:
04-10-17 TWIC Mtg Packet Pg 133 of 270
PROJECT DESCRIPTION
SCC Prop 1 Application 3 December 2016
Improve water quality in both San Pablo and Wildcat Creeks by constructing rain gardens (design
funded by previous SCC grant) to treat urban runoff, as well as by reducing and removing trash and
debris from the creeks and watersheds through Adopt-a-Block cleanups, increased trash and
recycling receptacles, and community engagement and education.
Enhance the health of the San Pablo and Wildcat Creek watersheds, through rain gardens
installation, trash reduction and removal, and community engagement and education.
Leverage concurrent County-led “complete street” pedestrian and bicycle transit improvements to
benefit the watershed and enhance the community
Expand the urban forest and reduce heat islands by planting street trees
Connect residents with their natural landscape, improve public health, and inspire watershed
stewardship through improved pedestrian and bicycle access to natural and public space by visually
linking these elements via a walkable 1.75-mile “Watershed Connections” route.
Protect and Enhance Anadromous Fish Habitat by improving water quality in Wildcat and San Pablo
Creeks.
3.Project Description.
The North Richmond Watershed Connections Project (Project) knits together a suite of multi-benefit
green infrastructure projects and key watershed features into a 1.75 mile-long urban trail. This walkable
and bike-friendly route showcases creative responses to the North Richmond community’s need for
cleaner, greener, safer, and more walkable neighborhoods. A collaboration between Contra Costa
County and the local nonprofit organizations Urban Tilth and the Watershed Project, the Project will
leverage concurrent County-led pedestrian and bicycle access street improvements on Fred Jackson
Way to construct linear rain gardens, plant trees along streets, trails, and in parks, and promote the
community’s improved access to natural and public space by visually linking these elements via
“Watershed Connections” route.
First, the Urban Tilth North Richmond Farm Fred Jackson Way Rain Gardens will replace existing
roadside drainage ditches along approximately 700 feet of Fred Jackson Way with bioretention facilities
and road frontage improvements. The proposed rain garden and native vegetation will capture and treat
3,110,400 gallons of urban runoff annually, removing trash and pollutants before it is discharged to San
Pablo Creek. This project and educational signage will help improve water quality of San Pablo and
Wildcat creeks and enhance the health of both watersheds. The project’s associated sidewalk and bike
lane will tie in to Contra Costa County’s First Mile/Last Mile project on Fred Jackson Way, closing the gap
to complete the Watershed Connections route to San Pablo Creek on the north end.
Second, Contra Costa County will install approximately 37 street trees along Fred Jackson Way between
Grove Avenue and the Wildcat Creek Trail. The First Mile/Last Mile Tree Installations project will
leverage federal Active Transportation Project grant funding for the Fred Jackson Way First Mile/Last
Mile project, which increases pedestrian and bicycling infrastructure to improve community access
along a primary travel corridor. The North Richmond Watershed Connections Project will provide the
street trees, community outreach and engagement to select the street tree species consistent with the
desired community identity, as well as installation of an automated irrigation system to establish the
trees, tree stakes, and tree grates. The tree grates will be ADA accessible to promote walking and access
for all users. The federal transportation grant will fund a portion of the tree installation costs, thus
providing matching funds for this project.
Third, The Watershed Project (TWP) will lead the Clean and Green Adopt-a-Tree, Adopt-a-Block
Cleanups and Watershed Connections Route elements. The projects aim to: 1) increase the urban
canopy by planting 50 street trees in collaboration with homeowners; 2) lead County-funded Adopt-a-
block cleanups, anticipated to remove 4,500 pounds of trash from the creeks and watersheds annually,
as well as leverage ongoing trash reduction efforts by providing “jewel boxes” (artful trash and recycling
04-10-17 TWIC Mtg Packet Pg 134 of 270
PROJECT DESCRIPTION
SCC Prop 1 Application 4 December 2016
receptacles) at litter hot spots and 3) improve watershed awareness, access and walkability with
wayfinding, artwork and interpretive elements along the Watershed Connections route.
While the Project was developed to achieve the greatest benefits to water quality, watershed health,
urban forest, community health, as well as resource awareness and stewardship, some elements of the
project could be scaled based on available budget while still achieving significant benefits.
4.Future Phases.
The North Richmond Watershed Connections Project is part of a long-term North Richmond Urban
Greening and Resiliency Plan and leverages existing community programs to broaden the project’s
reach. The successful implementation of these highly visible pilot urban greening projects will deepen
public awareness and support of future multiple-benefit projects in the neighborhood. Importantly it
will set a precedence for a sustainable partnership model for project design and implementation and
community-based stewardship.
5.Site Description.
The Project is in the heart of the unincorporated and disadvantaged community of North Richmond, a
historic wetland near the mouth of Wildcat and San Pablo Creeks. These highly urbanized watersheds
are historically quick to flood and slow to drain, and soil compaction, paving and development from
farmland to residential, commercial and industrial uses has worsened the situation. There is little or no
existing storm drain infrastructure in this zone.
The lower reaches of both creeks cross Fred Jackson Way, which like many major streets in this area, has
no sidewalks and is lined with earthen drainage ditches strewn with litter, trash and illegally dumped
materials. Stormwater collected in these ditches flows untreated into the two creeks. The Wildcat Creek
Trail is a partially completed Connector Trail between the San Francisco Bay and Ridge Trails.
The site of the Urban Tilth Farm Fred Jackson Way Rain Gardens is currently unpaved and includes an
earthen roadside ditch to convey stormwater. Sparse vegetation consists of weeds and fennel. Runoff
from Fred Jackson Way adjacent to Urban Tilth’s farm site currently drains primarily south to Wildcat
Creek, with the northernmost portion draining to San Pablo Creek, via a trash-strewn roadside ditch. A
portion of the ditch may lie within an archaeological site; an archaeologist will be consulted during the
current project design. The site is owned and maintained by Contra Costa County. The farm, to open in
2018, will be a community resource, a gathering place providing fresh, healthy food, and local job
opportunities. The farm will also be the permanent home of Urban Tilth’s Basins of Relations program,
which trains local young people with basic job skills in watershed restoration and stewardship.
First Mile/Last Mile Tree Installations will be located along Fred Jackson Way between Grove Avenue
and the Wildcat Creek Trail. The federally funded First Mile/Last Mile Project will improve the pedestrian
and bicycle infrastructure along this primary travel corridor by reducing the vehicle travel lanes and
converting that space to bicycle or pedestrian improvements. The street improvements are within the
currently paved area, therefore, are exempt from C.3 requirements. The proposed greening efforts and
street trees goes beyond regulatory requirements.
The Watershed Connections Route threads 1.75 miles through the community and connects San Pablo
Creek, North Richmond Urban Farm, ballpark, transit stops, First Mile/Last Mile improvements, Wildcat
Creek and Trail, and Verde Elementary School. The Adopt-a-Tree and Adopt-a-Block projects will be
located in this area.
The Regional Map, Site Scale Map and Design Plans are included in a single pdf file as Exhibit A. Site
photos are included separately as jpeg files as Exhibit B.
04-10-17 TWIC Mtg Packet Pg 135 of 270
PROJECT DESCRIPTION
SCC Prop 1 Application 5 December 2016
6.Specific Tasks.
# Task Name Description
1 Fred Jackson Way Rain
Gardens
Complete design and permitting for rain gardens and associated frontage
improvements. Construction to include: clearing & grubbing, grading; sidewalk
construction; curb & gutter; subdrain pipe installation and storm drain tie-in; rain
garden construction: grading, soils; planting; interpretive signage installation.
Trash and plant surveys performed pre and post construction of rain garden.
2 First Mile/Last Mile Tree
Installations
Planning, Permitting and Design, Community outreach for tree species selection,
etc.; tree installation; assessment and reporting
3 Neighborhood Adopt-a-
Tree Program
Outreach: Recruit homeowners and community members for tree adoption and
continued tree care resources and support; tree planting; assessment and
reporting
4 Clean and Green Adopt-a-
Block Cleanups
Community outreach and education; monthly cleanup events, trash removal
assessment and reporting
5 Watersheds Connections
Route
Community outreach and education; develop signage and interpretive elements;
installation; assessment and reporting
6 Project Administration,
Evaluation and Reporting
Project administration, evaluation and reporting of project tasks
7.Work Products.
●Final Plans Specifications and Estimates for the rain gardens and all site improvements
●Regular grant reporting and photo documentation of all project elements and post-project data
collected during implementation of the grant project.
●Construct a 3,475 s.f. rain garden to treat 3,110,400 gallons of stormwater annually
●Establish 3,475 s.f. of native planting, including trees
●Plant 87 street trees to increase tree canopy cover from 10% to 30%.
●Obtain permits and approvals. Collect homeowner adopt-a-tree agreements and provide a
template for the county. Conduct tree planting events. Document locations and species in a
street tree database.
●Establish a sustainable approach to urban greening and tree maintenance in partnership with
the county, NGO’s, community partners and residents. Develop BMP’s, standard construction
details, approved street tree lists based on the Richmond Urban Forestry Master Plan.
●Prevent stormwater pollution by instigating behavioral change by constructing 19
environmental education features that improve watershed awareness and installing 3 litter
receptacles at key locations to prevent littering.
●Coordinate and report results of regular cleanups and trash collection as part of the Clean and
Green Adopt a Block program, funded by the County as matching costs.
8.Measuring Success.
Effectiveness of the suite of projects will be evaluated using varying methods. The effectiveness of the
rain garden will be assessed in two ways by Urban Tilth’s Watershed Technicians: 1) photo-
documentation of litter (trash surveys) in the drainages pre and post construction, allowing for simple
quantification of trash prevented from being entrained in stormwater runoff and discharged into San
Pablo Creek. 2) pre and post-construction plant surveys to evaluate successful establishment of the rain
garden plantings. Ongoing management and maintenance will be conducted by Contra Costa County
Public Works, or Urban Tilth’s Watershed Technicians under contract with the County.
All of the street tree locations and species will be entered into a collective street tree database. Ongoing
04-10-17 TWIC Mtg Packet Pg 136 of 270
PROJECT DESCRIPTION
SCC Prop 1 Application 6 December 2016
management and maintenance will be conducted by County Public Works on County property or by
TWP and trained homeowner and community members using Adopt-a-Tree resources on private
property. TWP staff and green collar corps interns will conduct annual monitoring and manage the
County’s street tree database. Adaptive management will include a post-pilot project program
evaluation and recommendations for improving effectiveness.
TWP’s cleanup activities and school-based programs will be collecting data and photos and comparing it
to current program records. TWP tracks the number of residents engaged through outreach and
volunteer activities, volume of trash removed through cleanups. Interpretive elements, educational
signage and artwork are intended to instigate behavioral change. Effectiveness will be measured in
reduction of trash collected during cleanup activities by TWP and community partners, city and county-
maintained receptacles, and dumping hot spots.
9.Project Maps and Graphics.
The Regional Map, the Site Scale Map and Design Plans are included in a single pdf file as Exhibit A. Site
photos are included separately as jpeg files as Exhibit B.
Storm water Resource Plan (if applicable).
Not applicable. The project’s primary purpose is to enhance the health of the San Pablo and Wildcat
Creek watersheds through a suite of multiple-benefit urban greening projects across a disadvantaged
neighborhood, which includes tree planting to increase the urban forest, community engagement and
education, increased trash receptacles for litter reduction, improved access to natural resources, as well
as a stormwater capture project. The stormwater capture element is an important piece but not the
primary purpose and does not represent the multi-faceted nature of the project, therefore a Storm
Water Resource Plan is not required for this project.
04-10-17 TWIC Mtg Packet Pg 137 of 270
PROJECT DESCRIPTION
SCC Prop 1 Application 7 December 2016
GRANT APPLICATION – PRELIMINARY BUDGET AND SCHEDULE
In the budget matrix below, relist the tasks identified in #4 above and for each provide: 1) the estimated
completion date for the task, 2) the estimated cost of the task, and 3) the funding sources (applicant,
Conservancy, and other) for the task. The table will automatically sum the totals for each row and
column. To do this, highlight the whole table and hit F9.
REQUEST MATCHING FUNDS
Task
# Task Completion
Date
Coastal
Conservancy
Applicant’s
Funding
(includes in-
kind)
Other
Funds Total Cost
1 Fred Jackson Way
Rain Gardens
12/01/2020 $400,000 $0 $0 $400,000
2 First Mile/Last Mile
Tree Installations
10/1/2021 $234,000 $0 $224,000 $458,000
3 Adopt-a-Tree
Program
12/01/2020 $70,000 $0 $0 $70,000
4 TWP Clean and
Green Adopt-a-
Block Cleanups
12/01/2020 $0 $100,000 $0 $100,000
5 Wayfinding,
interpretive
elements, and
mosaic trash cans
12/01/2020 $80,000 $0 $0 $80,000
6 Project
Administration,
Evaluation and
Reporting
12/01/2021 $78,400 $0 $0 $78,400
TOTAL $862,400 $100,000 $224,000 $1,186,400
Categories of Matching Funds
Please divide total Applicant Funding and Other Funding into the following categories:
Applicant Funds Other Funds
Cash $95,000 State $0
In kind $0 Non State $224,000
Total (should equal total
above)
$95,000 Total (should equal total
above)
$224,000
In kind match could include donated: staff time, volunteer time, donated materials, bargain sales, etc.
04-10-17 TWIC Mtg Packet Pg 138 of 270
PROP 1 ADDITIONAL INFORMATION
SCC Prop 1 Application 8 December 2016
PROPOSITION 1 GRANT APPLICATION – ADDITIONAL INFORMATION
For each question unless otherwise specified, please limit your answer to one concise paragraph. See
grant application instructions for more information. Questions should be answered by all applicants,
enter “not applicable” if a specific question does not pertain to your project.
1.Proposition 1 Goals. Which of the following purposes of Chapter 6 of Proposition 1 are achieved by
the project (check all that apply):
Protect and increase the economic benefits arising from healthy watersheds, fishery
resources and in-stream flow.
Implement watershed adaptation projects for which Grantee has consulted with the state
and local conservation corps and included their services if feasible (for restoration and
ecosystem protection projects only). Grantees must submit a completed Corps Consultation
Review Document. The process for obtaining this required consultation is described in
Appendix D.
Restore river parkways throughout the state, including but not limited to projects pursuant
to the California River Parkways Act of 2004 and urban river greenways.
Protect and restore aquatic, wetland and migratory bird ecosystems including fish and
wildlife corridors and the acquisition of water rights for in-stream flow.
Fulfill the obligations of the state of California in complying with the terms of multiparty
settlement agreements related to water resources.
Remove barriers to fish passage.
Collaborate with federal agencies in the protection of fish native to California and wetlands
in the central valley of California.
Implement fuel treatment projects to reduce wildfire risks, protect watersheds tributary to
water storage facilities and promote watershed health.
√Protect and restore rural and urban watershed health to improve watershed storage
capacity, forest health, protection of life and property, storm water resource
management, and greenhouse gas reduction.
√Protect and restore coastal watersheds including but not limited to, bays, marine
estuaries, and near shore ecosystems.
√Reduce pollution or contamination of rivers, lakes, streams, or coastal waters, prevent
and remediate mercury contamination from legacy mines, and protect or restore natural
system functions that contribute to water supply, water quality, or flood management.
√Assist in the recovery of endangered, threatened, or migratory species by improving
watershed health, instream flows, fish passage, coastal or inland wetland restoration, or
other means, such as natural community conservation plan and habitat conservation plan
implementation.
Assist in water-related agricultural sustainability projects.
04-10-17 TWIC Mtg Packet Pg 139 of 270
PROP 1 ADDITIONAL INFORMATION
SCC Prop 1 Application 9 December 2016
1.Regional Significance: Describe the regional significance of the project. Through this round the
Conservancy seeks to support qualifying urban greening projects, such as water retention and
storage, and shade trees for heat relief, which are layered with other community public benefits
consistent with the Conservancy’s mandate and authorities.
Implementation of the North Richmond Watershed Connections Project will have regional
significance. This suite of projects was chosen for their combined benefits: water quality
improvements, watershed health, public access to natural resources, and public health benefits to
the North Richmond community. Second, as these highly visible and community-supported projects
were chosen to be the first implemented from the North Richmond Urban Greening and Resiliency
Plan, their successful completion will help catalyze further engagement and implementation of
urban greening in the community. Third, these project help develop the Bay Trail linkages via
creating connections between the City of Richmond’s Yellow Brick Road Project, the Wildcat Creek
Trail, and the planned San Pablo Creek Trail.
2.Sustainability. Described how the project will deliver sustainable outcomes in the long-term. Who
will operate and maintain the project?
The Project’s various components will be operated and maintained by different entities. The Fred
Jackson Way Rain Gardens will be maintained by Contra Costa County Public Works or Urban Tilth’s
Watershed Technicians under contract with the County. The First Mile/Last Mile Tree Installations will
be maintained by the County’s Transportation Engineering Department. In the Adopt-a-Tree program,
TWP will have homeowner agreements as to the long-term maintenance of the trees. TWP will utilize
best management practices, construction details and specifications from the City of Richmond Urban
Forestry plan, and will provide supplies and oversee planting activities, document the trees in the online
inventory database and monitor the trees during the plant establishment period including watering
them for the first two years, while recruiting and educating green collar kids, neighbors and
homeowners for continued tree care and providing resources and support to ensure that the urban
canopy will thrive and provide multiple benefits to the community. The Watershed Connections route
will be operated and maintained by the County and its partners. The additional trash and recycling
containers will be serviced and maintained by Richmond Sanitary Services.
3.Disadvantaged Communities. Does the project benefit a disadvantaged community? Proposition 1
defines a disadvantaged community as “a community with an annual median household income that
is less than 80 percent of the statewide annual median household income.” (CA Water Code Section
79505.5.) The Department of Water Resources has developed an online map viewer which shows
the maps of California’s disadvantaged communities, based on census data including the American
Community Survey. Communities are defined at different geographic scales, including county,
census tract and census place. Please indicate if the project is located in a disadvantaged
community. Whether or not the project is in a disadvantaged community, it may provide benefits to
one. If the project benefits a disadvantaged community, please explain (job training, clean water,
etc.)
The project is located in the disadvantaged community of North Richmond, with the project site split
between disadvantaged and severely disadvantaged community block groups. The project will benefit
the residents in multiple ways: through cleaner water in the San Pablo and Wildcat Creeks, healthier and
greener watersheds, increased access to green and public spaces to support increased recreational
opportunities and a healthier population, job training opportunities, reduced litter and illegal dumping,
increased tree canopy to reduce urban temperatures, a greater awareness of and connection to local
natural assets, and improved pride of place.
04-10-17 TWIC Mtg Packet Pg 140 of 270
PROP 1 ADDITIONAL INFORMATION
SCC Prop 1 Application 10 December 2016
4.Consistency with State Coastal Conservancy Strategic Plan (as revised June 2015): Identify which
goals and objectives of the California State Coastal Conservancy the project will promote or
implement and quantify how much progress the project will make towards the Conservancy’s
numeric goals for each cited objective.
The project will support the following State Coastal Conservancy Strategic Plan goals and objectives:
●The project will promote Goal 2: Expand the system of coastal public access ways, open-space areas,
parks and inland trails that connect to the coast by implementing OBJECTIVE 2A: Develop projects
that expand opportunities for barrier-free access to and along the coast and coastal trails. The
project will link the North Richmond community with Wildcat Creek Trail and extend community
access toward the future San Pablo Bay Trail. The project will progress the Conservancy one project
toward their goal.
●The project will promote Goal 5: Enhance biological diversity, improve water quality, habitat, and
other natural resources within coastal watersheds by implementing OBJECTIVE 5G: Implement
projects to improve water quality to benefit coastal and ocean resources. The project will improve
water quality in the San Pablo and Wildcat Creeks and enhance the health of these two watersheds
through rain gardens, native vegetation and tree planting, litter reduction and removal, and
community outreach and education. The project will progress the Conservancy one project toward
their goal.
●The project will promote Goal 7: Enhance the resiliency of coastal communities and ecosystems to
the impacts of climate change by implementing OBJECTIVE 7F: Implement projects that reduce
greenhouse gases by increasing carbon sequestration, or by supporting land uses that reduce energy
consumption including vehicle miles traveled, as well as and OBJECTIVE 7G: Implement tree and
vegetation planting projects that reduce urban heat islands and provide other benefits such as
reduced energy use, improved air quality, enhanced stormwater management, and improved
quality of life. The projects installation of trees and native vegetation, as well as the improved
pedestrian and bicycling transit opportunities will increase carbon sequestration, reduce energy
consumption, reduce urban heat islands, improve air quality, enhance stormwater management and
improve quality of life. The project will progress the Conservancy one project toward their goal.
●The project will promote Goal 9: Expand environmental education efforts to improve public
understanding, use and stewardship of coastal resources by implementing OBJECTIVE 9A: Support
programs and events that improve public understanding of coastal resources; OBJECTIVE 9B:
Support the design and installation of interpretive or educational displays and exhibits related to
coastal, watershed, and ocean-resource education, maritime history, and climate-change;
OBJECTIVE 9C: Construct or improve regional environmental education centers that educate the
public about environmental issues affecting the coast and inland watersheds; through the project’s
community education and outreach by Urban Tilth’s activities, classes and signage at the North
Richmond Farm, by Contra Costa County’s community outreach program, and TWP’s outreach and
engagement in tree adoptions and care, Walkable Watersheds, and watershed cleanups. The project
will progress the Conservancy one program, one exhibit and one center toward their goal.
●The project will promote Goal 12: Improve public access, recreation, and educational facilities and
programs in and around San Francisco Bay, along the coast, the ridgelines, in urban open spaces,
and natural areas by implementing OBJECTIVE 12B: Implement projects that provide recreational
facilities such as picnic and staging areas, docks and piers, campgrounds, parking lots, interpretive
signs, interpretive or educational centers, and natural play spaces; OBJECTIVE 12H: Develop plans
for regionally significant public access trails and community connectors, including links between the
Bay Trail, Ridge Trail, Water Trail, and Coastal Trail, and links between regional trails and urban
04-10-17 TWIC Mtg Packet Pg 141 of 270
PROP 1 ADDITIONAL INFORMATION
SCC Prop 1 Application 11 December 2016
communities; OBJECTIVE 12I: Construct regionally significant public trails and community
connectors, including links between the Bay Trail, Ridge Trail, Water Trail, and Coastal Trail, and links
between regional trails and urban communities. Through the project’s rain garden, signage and
educational activities at Urban Tilth’s North Richmond Farm, improved safe public access to the
creeks, farm, trails, and park, and the Walkable Watersheds route will progress the Conservancy one
project, one plan and one connector toward their goals.
5.Consistency with California Water Action Plan.
a.Identify which goals of the California Water Action plan the project will promote or
implement.
The project promotes two objectives of the California Water Action Plan. The project supports the
restoration of important species and habitat by protecting Wildcat Creek, one of the last few creeks in
the East Bay with protected fish species habitat, and serving as an important wildlife corridor that needs
enhancement for improved water quality and cooler stream temperatures. Second, the project supports
a more resilient, sustainably managed water resources system (water supply, water quality, flood
protection, and environment) that can better withstand inevitable and unforeseen pressures in the
coming decades through improving the health of San Pablo and Wildcat Creek watersheds with rain
gardens and native vegetation and tree planning.
b.Identify the Integrated Watershed Management Plan(s) and/or any other regional or
watershed plans that apply to the specific project area. For each, list those goals, objectives,
priority actions, etc. that the project will promote or implement.
The project will support four of the SF Bay Area IRWM overarching goals: First, the project will provide
environmental sustainability through improving water quality and watershed health, as well as
increased urban forest, economic and social sustainability in a disadvantaged community through
improved safe access to community and green spaces, job training opportunities, and increased
community engagement and environmental stewardship. Second, the project will help protect and
improve Bay water quality through improving water quality of San Pablo and Wildcat Creeks which flow
into the Bay, and improving watershed health and function through reduction of litter and increase of
urban forest and native vegetation in the Wildcat and San Pablo watersheds, and through community
involvement and water resource education via Watershed Connections route. Third, the project will
improve regional flood management by constructing rain gardens and planting native vegetation to
reduce stormwater runoff volumes in flood prone areas. Fourth, through the construction of rain
gardens and planting native vegetation, community education, as well as litter reduction and removal, in
the watersheds that drain to creeks, wetlands, and the Bay, the project will protect, enhance, and
maintain environmental resources and habitats.
6.Consistency with Other State Plans. If the proposed project will help to implement or promote the
goals of any of the other State Plans listed below, check that plan and specify which goals,
objectives, priority actions, etc. will be furthered by the project in 1-3 sentences.
✓ California @ 50 Million: The Environmental Goals and Policy Report
The project will reduce petroleum use and steward natural resources to ensure that they store
carbon, are resilient, and enhance other environmental benefits through improved pedestrian
and bicycling access to public and green spaces, increased community awareness to natural
resources, and increased tree and native vegetation planting.
04-10-17 TWIC Mtg Packet Pg 142 of 270
PROP 1 ADDITIONAL INFORMATION
SCC Prop 1 Application 12 December 2016
✓ A Climate Adaptation Strategy/Safeguarding California: Reducing Climate Risk Plan
The project will reduce climate risks through improved pedestrian and bicycling access to public
and green spaces, increased community awareness to natural resources, and increased tree and
native vegetation planting.
✓ CA Wildlife Action Plan
The project will support Goal 2.3 (Water Quality, Quantity, and Availability): Maintain and improve
water quality and water quantity and availability vital for sustaining ecosystems.
California Aquatic Invasive Species Management Plan
California Essential Habitat Connectivity Strategy for Conserving a Connected California
State and Federal Species Recovery Plans (specify the plan)
Habitat Conservation Plans/Natural Community Conservation Plans (specify the plan)
California Coastal Sediment Management Master Plan
Completing the California Coastal Trail
✓ Other relevant state or regional plan(s) (specify the plan)
The North Richmond Watershed Connections Project includes sub-projects identified through
development of the North Richmond Urban Greening and Resiliency Plan. Additionally, the project
will support:
The City of Richmond Urban Greening Master Plan through the proposed urban greening
projects.
The County’s Climate Action Plan through improving pedestrian and bicycling transit
opportunities to reduce carbon emissions, increased urban forest to reduce heat islands (of
which North Richmond is a priority) and increase carbon sequestration.
The North Richmond Community Vision Plan for Shoreline by San Francisco Estuary Partnership
by enhancing public access to Wildcat Creek Trail.
The Bay Trail Plan by expanding access toward the Bay Trail.
7.Best Available Science. Describe how the project is consistent with best available science.
The project incorporates a rain garden, a proven and effective best available science practice for urban
stormwater management. Soil structure and vegetation associated with rain garden and bioretention
facilities promote infiltration, storage, slow release, and treatment of stormwater runoff to more closely
mimic natural conditions. Bioretention has been proven to provide runoff flow control via detention,
attenuation, and losses due to infiltration, interception, and evapotranspiration. In addition, increasing
the urban forest has been shown to be an important measure to control urban temperatures, increase
carbon dioxide absorption and help mitigate climate change.
8.Sea Level Rise Vulnerability: If the project involves a site that is close to a shoreline (i.e. potentially
flooded or eroded due to climate change), please identify vulnerabilities of the site in relation to
flooding, erosion, and sea level rise/storm surges for the years 2050 and 2100 (assume 16 inches
and 55 inches of sea level rise respectively). Describe any strategies you have considered for
addressing Sea Level Rise. Specify the expected lifespan or duration of the project.
This project is planned concurrently to the Adapting to Rising Tides Program, led by San Francisco Bay
04-10-17 TWIC Mtg Packet Pg 143 of 270
PROP 1 ADDITIONAL INFORMATION
SCC Prop 1 Application 13 December 2016
Conservation and Development Commission to increase the resilience of Bay Area communities to sea
level rise and storm events. The Project addresses sea level rise vulnerability by incorporating urban
greening improvements that will help alleviate localized flooding associated with lack of stormwater
infrastructure.
9.Vulnerability from Climate Change Impacts Other than Sea Level Rise: Using appropriate models,
predictions or trends, describe how the project objectives or project may be vulnerable to impacts
(fire, drought, species and habitat loss, etc.) from climate change, other than sea level rise, coastal
erosion or flooding. Identify design, siting, or other measures incorporated into the project to
reduce these vulnerabilities.
The project site is in a historic floodplain that experiences high groundwater levels and flooding
conditions. In addition, the community has been identified as high vulnerability to heat resulting from
climate change. This project seeks to mitigate these issues by installing rain gardens and planting native
species, thereby increasing infiltration and reducing volumes of stormwater runoff to reduce flooding, as
well as by increasing the urban forest to reduce urban heat islands.
10.Environmental Review: Projects funded by the Coastal Conservancy must be reviewed in
accordance with the California Environmental Quality Act (“CEQA”). CEQA does not apply to projects
that will not have either a direct or indirect effect on the environment. For all other projects, if the
project is statutorily or categorically exempt under CEQA, no further review is necessary. If the
proposed project is not exempt, it must be evaluated by a public agency that is issuing a permit,
providing funding, or approving the project, to determine whether the activities may have a
significant effect on the environment. The evaluation results in a “Negative Declaration (Neg Dec),”
“Mitigated Negative Declaration (MND),” or “Environmental Impact Report.”
The proposed project…. (select the appropriate answer):
Is not a project under CEQA. Briefly specify why.
Is exempt under CEQA. Provide the CEQA exemption number and specify how the project meets
the terms of the exemption.
Requires Neg Dec, MND, or EIR. Specify the lead CEQA agency (the agency preparing the
document) and the (expected) completion date. Please note that the Conservancy will need to
review and approve any CEQA document. For more information on CEQA, visit:
http://ceres.ca.gov/topic/env_law/ceqa/flowchart/index.html .
The Urban Tilth’s Fred Jackson Way Rain Gardens will required MND due to archeological concerns.
Contra Costa County Public Works Department will be the lead agency, with CEQA documentation
expected to be completed Spring 2018.
The tree planning component of the project is not a project under CEQA due to Class 4 exemption:
minor alteration to land.
11.Willing Seller: Projects that involve acquisition of property must involve a willing seller. If your
project includes property acquisition, please describe the status and expected conclusion of
landowner negotiations.
Not applicable. The project does not involve acquisition of property.
12. Project and Applicant History: Provide a history of the project, and any background information not
provided in the project description. Is the project related to any previous or proposed Coastal
04-10-17 TWIC Mtg Packet Pg 144 of 270
PROP 1 ADDITIONAL INFORMATION
SCC Prop 1 Application 14 December 2016
Conservancy projects? If so, which ones and how are they related?
Urban Tilth has been awarded a planning grant from the State Coastal Conservancy for the design of the
project plus two creek restoration demonstration sites, and for submitting applications for necessary
regulatory permits; the planned completion date for this work is at the end of 2017. The current grant
application would provide funding for completing permit negotiations and any minor changes to the
design required by the permitting agencies, and for construction of the rain garden Project on Fred
Jackson Way. (Creek restoration demonstration sites are anticipated to be funded under a separate
source.)
13.Support: List the public agencies, non-profit organizations, elected officials, and other entities and
individuals that support the project.
The following public agencies, non-profit organization, and elected officials have submitted Letters
of Support to communicate their support and participation in the proposed project. The letters are
included in Exhibit C.
Project Partners (2):
a.Urban Tilth
b.The Watershed Project
Agency and Non-Profit Collaborators (providing in-kind support) (9)
c.Contra Costa County Supervisor John Gioia
d.Contra Costa County Dept. of Conservation and Development, John Kopchik
e.Contra Costa Health Services Dept., Safe Routes to School Program
f.City of Richmond, City Manager’s Office
g.American Rivers
h.Natural Resources Defense Council (NRDC)
i.Neighborhood House of North Richmond
j.Reach Fellowship
k.West County Waste Water District
Community/Non Profit Group Support (8)
l.North Richmond Municipal Advisory Council (Don Gilmore, Chair)
m.North Richmond Missionary Baptist Church
n.YES Families (Richmond based non-profit)
o.Citizens for East Shore Parks (CESP)
p.Verde Elementary School (Principal)
q.Contra Costa County Resource Conservation District
r.Earth Team
s.N Richmond Community Housing and Development Corporation
t.California Urban Streams Partnership
14.New Technology. Does the project employ new or innovative technology or practices? If yes,
describe those technologies and/or practices.
The incorporation of rain gardens, particularly constructed in the right of way, are relatively new to this
area. As the rain gardens will be a demonstration project, the effectiveness and sustainability of this
type of urban greening project under these specific conditions will likely have a significant impact on its
usage in the larger area moving forward.
04-10-17 TWIC Mtg Packet Pg 145 of 270
PROP 1 ADDITIONAL INFORMATION
SCC Prop 1 Application 15 December 2016
15.Need for Conservancy Funds: What would happen to the project if no funds were available from the
Conservancy? What project opportunities or benefits could be lost and why if the project is not
implemented in the near future?
The project takes advantage of current momentum and community support for urban greening and the
environment. The also project leverages and builds upon $3.8 million in federal grant monies awarded
for the First Mile/Last Mile street improvements under the Active Transportation Program. And, it sees
the Fred Jackson Way Raingardens, whose design is currently grant-funded, to construction. If the
projects proposed in this application are not funded and are not then able to be implemented
concurrently with the street improvements, the difficulty and cost of the projects will be significantly
increased. Retrofitting new street improvements at a later date to include the proposed urban greening
elements would not only mean higher costs, but also fail to take advantage of newly increased access
and potentially enhanced awareness of and stewardship for the community’s natural resources.
16.Greenhouse Gas Emissions/Climate Change: If the proposed project will result in production of
greenhouse gas emissions (including construction impacts and vehicle miles travelled as part of a
public access component), describe the measures your project includes to reduce, minimize or avoid
greenhouse gas emissions through project design, implementation construction, or maintenance.
What, if any, are the possible sources or sinks of greenhouse gases for your project, such as carbon
sequestration from habitats at the site? If one of the project goals is to sequester carbon (reduce
greenhouse gas concentrations), how do you intend to ensure continued long term sequestration
while achieving project objectives? Do you have any plans to seek carbon credits for the carbon
sequestration activities on the project site?
As the project leverages the First Mile/Last Mile street improvements to increase safe pedestrian and
bicycling transit to community centers, green spaces, transit and job opportunities, the project will
result in less use of vehicles and the reduction of greenhouse gas emissions. The urban greening
approach was chosen as it offers greater climate change mitigation opportunities, is more sustainable in
a summer-dry climate, and as installation and maintenance is less expensive, it can be more frequently
implemented in the community. In addition, the use of local materials for construction and planting
lowers the project’ carbon footprint. As the street improvements will permanently reduce vehicle travel
in this neighborhood and the trees and native vegetation planted in this project will be maintained, the
long term reduction of greenhouse gas emissions and increased carbon sequestration will be sustained.
The County is not seeking carbon credits for this project.
04-10-17 TWIC Mtg Packet Pg 146 of 270
04-10-17 TWIC Mtg Packet Pg 147 of 270
04-10-17 TWIC Mtg Packet Pg 148 of 270
04-10-17 TWIC Mtg Packet Pg 149 of 270
04-10-17 TWIC Mtg Packet Pg 150 of 270
04-10-17 TWIC Mtg Packet Pg 151 of 270
04-10-17 TWIC Mtg Packet Pg 152 of 270
04-10-17 TWIC Mtg Packet Pg 153 of 270
04-10-17 TWIC Mtg Packet Pg 154 of 270
04-10-17 TWIC Mtg Packet Pg 155 of 270
04-10-17 TWIC Mtg Packet Pg 156 of 270
04-10-17 TWIC Mtg Packet Pg 157 of 270
04-10-17 TWIC Mtg Packet Pg 158 of 270
04-10-17 TWIC Mtg Packet Pg 159 of 270
04-10-17 TWIC Mtg Packet Pg 160 of 270
04-10-17 TWIC Mtg Packet Pg 161 of 270
04-10-17 TWIC Mtg Packet Pg 162 of 270
04-10-17 TWIC Mtg Packet Pg 163 of 270
04-10-17 TWIC Mtg Packet Pg 164 of 270
04-10-17 TWIC Mtg Packet Pg 165 of 270
04-10-17 TWIC Mtg Packet Pg 166 of 270
04-10-17 TWIC Mtg Packet Pg 167 of 270
04-10-17 TWIC Mtg Packet Pg 168 of 270
04-10-17 TWIC Mtg Packet Pg 169 of 270
04-10-17 TWIC Mtg Packet Pg 170 of 270
04-10-17 TWIC Mtg Packet Pg 171 of 270
04-10-17 TWIC Mtg Packet Pg 172 of 270
04-10-17 TWIC Mtg Packet Pg 173 of 270
04-10-17 TWIC Mtg Packet Pg 174 of 270
04-10-17 TWIC Mtg Packet Pg 175 of 270
TRANSPORTATION, WATER & INFRASTRUCTURE
COMMITTEE 8.
Meeting Date:04/10/2017
Subject:CONSIDER report on Local, State, and Federal Transportation Related Issues and take
ACTION as appropriate.
Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE,
Department:Conservation & Development
Referral No.: 1
Referral Name: REVIEW legislative matters on transportation, water, and infrastructure.
Presenter: John Cunningham, DCD Contact: John Cunningham
(925)674-7883
Referral History:
This is a standing item on the Transportation, Water, and Infrastructure Committee referral list and meeting agenda.
Referral Update:
In developing transportation related legislative issues and related proposals to bring forward for consideration by
the Transportation, Water, and Infrastructure Committee (TWIC), staff receives input from the Board of Supervisors
(BOS), references the County's adopted Legislative Platforms, coordinates with our legislative advocates, partner
agencies and organizations, and consults with the Committee itself.
This report includes three sections, 1) LOCAL, 2) STATE, and 3) FEDERAL.
1) LOCAL
Accessible Transit: The issue of accessible transit is of ongoing interest to the County. During the development of Measure
X and continuing into 2017, County staff has been advocating for a review and improvements to the accessible system
consistent with the position of the Board of Supervisors. One obstacle in making progress on this topic was highlighted in a
sales tax transportation expenditure plan report to the BOS in 2015, "...accessible transit responsibilities are diffused
(geographically and organizationally) throughout the county resulting in no single agency or organization falling naturally into a
leadership role...". The accessible transit portion of that report starts at the bottom of the page here:
http://64.166.146.245/public//print/ag_memo_pdf_popup.cfm?seq=22697&rev_num=0&mode=CUSTOM#page=17
In March, the Committee directed staff to reach out to CCTA on the status of the planned accessible transit study. Staff will
bring an verbal update to April Committee meeting and is requesting guidance.
Status of Transportation Funding and County Road Projects: In February, the Committee received a report regarding
the status of County road project and maintenance activities entitled "Reduction in State Gas Tax and the Impact to County
of Contra Costa Streets and Roads " In summary, due to declining revenues, substantial cuts are necessary. That report is
available here:
http://64.166.146.245/docs/2017/TWIC/20170202_865/875_02-13-17TWICAGNDApkt.pdf#page=65
Due to rapid movement at the State on Senate Bill 1 (discussed below) staff will bring a verbal update to the Committee on this
issue.
RECOMMENDATION: DISCUSS local legislation and issues of note and take ACTION as appropriate.
04-10-17 TWIC Mtg Packet Pg 176 of 270
2) STATE
Legislative Report
The legislative report from the County's legislative advocate, Mark Watts, is attached (April TWIC State Leg Report.pdf). Mr.
Watts is unable to be present at the April meeting, County staff will coordinate with him to bring updates to the Committee.
School Siting Update: The California Department of Education (CDE) initiated an effort to revise Title 5 which contains the
language that addresses school site selection and design. The County has been engaged on this issue for a number of years due
to our experience with school sites in East Contra Costa County.
March 28, 2017
The BOS approved a letter (03-28-17 SIGNED - PITCH to CDE-TomTorlaksonReSchools-Title5.pdf) signed
by the Planning Integration Team For Community Health (PITCH) member Departments, Public Works,
Health Services, Conservation and Development.
The California Department of Education (CDE) gave a presentation in Sacramento regarding the Title 5
update. CDE staff took questions and comments. County staff provided testimony as follows: 1) summarized
the letter from PITCH that was approved that morning, 2) indicated that the guidance in Title 5 is ignored by
some districts, and 3) that without reform of school siting practices the State may face a situation that played
out in Manitoba, Canada. A new school opened without adequate pedestrian infrastructure, a student (Carina
Denisenko) was killed by a car when attempting to cross a street. In response, the provincial legislature passed
a new law, "The Public Schools Amendment Act (Pedestrian Safety at New Schools)" aka "Carina's
Law".
April 3, 2017
County staff met with Oakley Union Elementary School District staff regarding their school population
projections and plans for new school sites. The meeting was positive, the District has two idle sites which are
both within the Urban Limit Line and the city limits of Oakley.
State Legislation
Please see the attached document, Positions on Legislation of Interest – 2017 for a summary of bills being tracked by staff
and our legislative advocate. Bills of particular interest to the County are highlighted in the table and summarized below:
Senate Constitutional Amendment 2 (SCA-2) Motor vehicle fees and taxes: restriction on expenditures:
appropriations limit: This legislation was originally packaged with the Assembly and Senate Transportation Funding bills
(AB1/SB1) and discussed at the BOS. This Constitutional Amendment will protect transportation revenues from being "raided"
for purposes other than transportation.
Senate Constitutional Amendment 6 (SCA-6) Local transportation measures: special taxes: voter approval :
Similar to SCA-2, this legislation was originally packaged with AB1/SB1 and discussed at the BOS. This Constitutional
Amendment will lower the threshold to 55% for transportation related taxes.
AB-342 Vehicles: automated speed enforcement: five-year pilot program: TWIC previously supported investigating
the proposal which has been in development for a number of years until the printing of this years formal bill. Further, related
direction was provided by TWIC to staff in conjunction with our Complete Streets/Vision Zero implementation effort,
"Directed staff to proceed with implementation of complete streets processes per Board Resolution 2016/374 and
include vision zero and automated speed enforcement concepts in the implementation."
RECOMMENDATION: DISCUSS state legislation and issues of note and take ACTION as appropriate.
3) FEDERAL
No written staff report in April.
Attached is a report (Federal Budget Update.pdf) from the California State Association of Counties describing the proposed
elimination and cuts in the Trump administration's budget proposal. Transportation, water, infrastructure related excerpts are
included below:
Among other things, the administration’s proposal would eliminate FY 17 funding for:
TIGER Grants ($499 million);
Western Drought Relief Efforts ($100 million).
Programs that are targeted for FY 17 cuts include:
04-10-17 TWIC Mtg Packet Pg 177 of 270
Community Development Block Grants ($1.5 billion cut);
Capital Investment Program/Transit ($447 million cut);
RECOMMENDATION: DISCUSS any federal issues of note and take ACTION as appropriate.
Recommendation(s)/Next Step(s):
CONSIDER report on Local, State, and Federal Transportation Related Issues and take ACTION as appropriate.
Fiscal Impact (if any):
There is no fiscal impact.
Attachments
April TWIC State Leg Report
03-28-17 SIGNED - PITCH to CDE-TomTorlaksonReSchools-Title5
Positions on Legislation of Interest - 2017
Bill Text - SCA-2 Motor vehicle fees and taxes_ restriction on expenditures_ appropriations limit_
Bill Text - SCA-6 Local transportation measures_ special taxes_ voter approval_
Bill Text - AB-342 Vehicles_ automated speed enforcement_ five-year pilot program_
AB342-Safe Streets Act 2017
Federal Budget Update
04-10-17 TWIC Mtg Packet Pg 178 of 270
Smith, Watts &Hartmann, LLC.
Consulting and Governmental Relations
925 L Street, Suite 220 Sacramento, CA 95814
Telephone: (916) 446-5508 Fax: (916) 266-4580
MEMORANDUM
TO: Transportation, Water, and Infrastructure Committee
FROM: Mark Watts
DATE: March 31, 2016
SUBJECT: April Report
Legislature
Transportation funding
During this past month significant discussions were conducted by the Governor,
the Speaker and the Pro Tem, as well as the two Transportation Committee
Chairs concerning the goal of passing a transportation-funding package before
the upcoming Legislative Spring break. Publicly, however, most of the month
was generally quiet with SB 1 by Senator Beall passing several key committees,
and is now pending hearing in the Senate Appropriations Committee.
Representatives of the Administration met with advocates and stakeholders
related to the legislative effort on March 16th to update the status of discussions
and urge even greater efforts to persuade members of the Legislature of the
urgency to act to address the growing transportation problems of maintenance,
repair, and capacity improvements.
Finally, on Wednesday, March 29, the Governor, the Senate President Pro
Tem, the Speaker of the Assembly, and other legislative leaders &
administration officials announced a deal to fund our state’s transportation
system. For the last several weeks, leadership in both houses, as well as staff
from the Governor’s Office and the California State Transportation Agency,
have been negotiating the final details of the comprehensive transportation
funding package, based largely on the great work done by Senator Jim Beall
and Assembly Member Jim Frazier over the last two years. The funding
package is a $5.2 billion plan, with new revenues coming from increasing
gasoline and diesel excise taxes, an increase in diesel sales tax, a new
transportation fee based on the value of vehicles, and a fee on zero emission
04-10-17 TWIC Mtg Packet Pg 179 of 270
2
vehicles. The proposal would fund local streets & roads, state highways, public
transit, and active transportation.
On March 30, SB 1 was amended to incorporate the new “deal points”, as was
the companion measure, SCA 2 (and an identical measure, ACA 12), which
provides “lock-box” protections to the new revenues package, as well as an
exemption for the new revenues from the state and local calculations of the
State Appropriations Limit.
The two Senate bills are scheduled for hearing on April 3 in the Senate
Appropriations committee, and are anticipated for Senate Floor Action on April
4th. To ensure complete airing of the bills contents, the Assembly will consider
SB 1 (informational overview only), so that when SB 1 is in the Assembly, they
can expedite the process on the package, likely a Floor vote by April 5th.
Material provided by the administration follows, at the end, that depicts program
funding within and near Contra Costa County
Summary of SB 1 Key Elements
STATEWIDE INVESTMENT PROGRAMS (50%)
Fix-it-First Highways $15 billion
Bridge and Culvert Repair $4 billion
Trade Corridor Investments $3 billion
Solutions for Congested Commute
Corridors
$2.5 billion
Parks Funding for Ag, Off-Highway
Vehicle & Boating
$800 million
STIP (State Share) $275 million
Freeway Service Patrol $250 million
California Public Universities
Transportation Research
$70 million
Local or Regional Investment Programs (50%)
Fix-it-First Local Roads $15 billion
Transit Capital and Operations $7.5 billion
Local Partnership Funds $2 billion
Active Transportation Program
Bicycle and Pedestrian
$1 billion
04-10-17 TWIC Mtg Packet Pg 180 of 270
3
Investments
STIP (Local Share) $825 million
Local Planning Grants $250 million
TOTAL $52.4 billion
Other Key Transportation Legislation
AB 28 (Frazier)
This bill re-enacts the California Department of Transportation's (Caltrans')
authority that expired on January 1, 2017, to indefinitely assume the role of the
United States Department of Transportation (U.S. DOT) for National
Environmental Policy Act (NEPA) decision-making.
The authority has supported this important measure, which was approved at
each committee stop in the Senate and by the full Senate on March 16th with a
unanimous vote, 39-0. The bill received final concurrence approval in the
Assembly and was approved by the Governor and Chaptered on MRCH 29.
Autonomous Vehicles
At least 11 bills have been introduced pertaining to Autonomous
Vehicles (AV) in the legislature. Most have been “spot” bills, while a
couple of the bills seek to provide legislative guidance on the
statutory framework for deployment of AVs. Earlier in the month, the
DMV filed proposed regulations related to AVs. The Administration is
firm in its resolve to complete the regulatory process with final
regulations in place by November or December 2017. The AV bills
will bear close monitoring to ensure the provisions of AB 1592
remain unaffected.
New Bills of Interest
SB 423 (Cannella)
This bill, relating to design professionals, is a re-introduction of
legislation of interest to the authority that failed passage in 2016, SB
885. In essence, SB 423 prohibits contracts that require state
licensed design professionals, including engineers, land surveyors,
04-10-17 TWIC Mtg Packet Pg 181 of 270
4
architects, and landscape architects, to defend claims made against
other persons or entities involved in construction projects. A design
professional’s Errors & Omissions professional liability insurance
does not provide coverage for the defense of claims against other
persons and entities involved in construction projects. It only covers
claims related to the negligent acts of the design professional.
Regional Measure 3
Legislation to establish Regional Measure 3 (RM 3) is still under
development in Sacramento and plans remain for introduction and
enactment in 2017. Out of recognition that discussions in the Capitol
are focused on completing a statewide transportation-funding
package by the Legislative Spring Break RM 3 legislation will be
deferred for the time being distraction while these efforts continue.
Meanwhile, several local agencies having already adopted RM 3
priority project lists including BART, Alameda County Transportation
Commission and the Contra Costa Transportation Authority.
Administration Fact Sheet Information
(Selected information)
SB 1 Funding Package Estimates - 10 years
Regional
SHOPP: $2.515 billion
State Maintenance: $200 million
Local Partnership: $590 million
Contra Costa County
STIP Share: $29 million
County Roads: $232 million
New City Streets and Roads Funds
City of ANTIOCH $25.85
City of BRENTWOOD $13.45
City of OAKLEY $ 9.19
City of PITTSBURG $15.52
City of CLAYTON $ 2.57
City of CONCORD $29.68
City of MARTINEZ $ 8.48
City of PITTSBURG $15.52
04-10-17 TWIC Mtg Packet Pg 182 of 270
5
City of PLEASANT HILL $ 7.80
City of WALNUT CREEK $16.0
City of EL CERRITO $ 5.58
City of HERCULES $ 5.67
City of PINOLE $ 4.29
City of SAN PABLO $ 7.05
City of DANVILLE $ 9.81
City of DUBLIN $13.12
City of LAFAYETTE $ 5.70
City of LIVERMORE $20.17
City of MORAGA $ 3.78
City of ORINDA $ 4.29
City of PLEASANTON $17.16
City of SAN RAMON $17.93
City of WALNUT CREEK $16.02
STATE TRANSIT ASSISTANCE ‐ New Funding
Central Contra Costa Transit Authority $6,816,934
Eastern Contra Costa Transit Authority $3,129,116
Western Contra Costa Transit Authority $3,496,221
Livermore‐Amador Valley Transit Authority $2,896,046
04-10-17 TWIC Mtg Packet Pg 183 of 270
Contra
Costa
County
Department of Conservation &
Development
30 Muir Road
Martinez, CA 94553
Phone: (855) 323‐2626
John Kopchik, Director
Health Services Department
50 Douglas Drive
Suite 310
Martinez, CA 94553
Phone: (925) 957‐5400
Dr. William Walker, Director
Department of Public
Works
255 Glacier Drive
Martinez, CA 94553
Phone: (925) 313‐2000
Julia R. Bueren, Director
March 28, 2017
Tom Torlakson, Superintendent of Public Instruction
California Department of Education
1430 N St, Sacramento, CA 95814
Subject: Title 5 School Siting and Design Standards Review
Dear Superintendent Torlakson:
This letter responds to the California Department of Education’s (Department) School Facilities & Transportation
Services Division request for input on its review of Title 5 which was initiated in late 2016. Contra Costa County
(County) welcomes this review as we have witnessed gaps in state school siting practices relative to contemporary
land use and transportation planning statutes and principles. Specifically, the County urges the Department to
conform school siting practices with State and local policies to ensure that the siting of new schools does not
violate goals related to student safety, growth management, greenhouse gas reduction, health in all policies,
agricultural preservation, complete streets, and general public health.
The County recognizes the significant link between the built environment and public health. This recognition led
the Board of Supervisors to create a staff level committee in 2007, the Planning Integration Team for Community
Health (PITCH). PITCH is comprised of staff from three Departments, Conservation and Development, Health
Services, and Public Works. Respectively, these Departments are responsible for land use/transportation planning,
public health, and engineering. PITCH advises the Board of Supervisors on policies and strategy related to land
development, grant applications, policy changes, infrastructure investment, etc.
Given the significant and enduring effect that schools have on the character and safety of the community
surrounding school sites, the Board of Supervisors directed PITCH to develop this response to the Title 5 revision
effort. We have organized this response as follows:
I. Immediately below is the policy context in which the PITCH Departments developed comments.
II.Below the policy context we provide broader recommendations that don’t lend themselves to direct
insertion in to the existing Title 5 text.
III.Attached are specific, recommended revisions entered directly in the body of the Title 5 text.
I. Policy Context
Numerous policies guide land development and transportation infrastructure investment at both the local and state
levels. School sites, which are defining institutions in our communities, have a substantial impact on the safety
and character of the surrounding community, and serve a vulnerable population, are often not developed to be
consistent with the adopted policies listed below.
04-10-17 TWIC Mtg Packet Pg 184 of 270
Because schools are exempt from complying with local ordinances they are frequently inconsistent with many
local and state policies that are enacted to combat sprawl, achieve greenhouse emission goals, ensure safe and
efficient transportation, and protect public health. The policies include:
Local Policies
Urban Limit Line: Contra Costa County voters approved an Urban Limit Line (ULL) in 1990. In 2006
voters passed a new Measure which affirmed and extended the ULL protection to 2026. The ULL limits
urban development to certain areas of the County and helps to preserve farmland, open space, and combat
sprawl.
Currently, schools are being planned and built outside the ULL undermining growth restrictions approved
by the voters.
Complete Streets: Contra Costa County’s Complete Streets policy was adopted by General Plan revision
in 2008 and pre-dates the State Complete Streets Act. The policy was reaffirmed and expanded in 2016
with the Board of Supervisors Adoption of an updated Complete Streets Policy. Complete Streets
recognizes that streets serve many users and should accommodate users of all ages, abilities, and modes
including cyclists, pedestrians, transit users and the mobility impaired.
When schools are located as infrastructure islands in rural or agricultural areas it is not financially
possible to provide adequate transportation infrastructure throughout the school attendance boundaries to
accommodate student cyclists and pedestrians. These sites are often well outside of established transit
routes, promote increased vehicular travel, and make it unsafe and impractical to get to school by using
active transportation such as walking and bicycling because there are no sidewalks or adequate facilities
for student cyclists.
Climate Action Plan: In December 2015, Contra Costa County adopted a Climate Action Plan that
outlines how we will reduce greenhouse gas emissions in our County. The Climate Action Plan has goals
and requirements regarding green buildings; the State should ensure that the Title 5 update recognizes
local sustainability and green building policies, as well as comply with State policies. The Climate Action
Plan sets goals for increasing active transportation in our County with specific targets around number of
weekday bike trips, implementing the Safe Routes to School program, and reducing the number of vehicle
miles traveled.
State Policies
Complete Streets Act of 2008: Similar to Contra Costa County’s local policy, the state Complete Streets
Act (AB 1358/2008) directs that transportation facilities be planned, designed, operated, and maintained
to provide safe mobility for all users, including bicyclists, pedestrians, transit vehicles, etc. appropriate to
the function and context of the facility.
When the State facilitates the development of schools in disconnected areas, it compromises the ability
for local jurisdictions to adhere to complete streets policies.
Greenhouse Gas (GHG) Reduction Legislation (AB32 – 2006, SB375 – 2008, SB743 – 2013):
Through various mechanisms, this State legislation dictates how GHG’s are to be reduced. Given that
land development is most often a local activity, the successful implementation of these mandates often
fall to local agencies to implement through changes to land development and infrastructure investment
practices.
04-10-17 TWIC Mtg Packet Pg 185 of 270
Though local jurisdictions are implementing these policies at the city/county level, the State school siting
program impedes implementation of this legislation by facilitating the development of school sites in
remote areas, thereby driving up vehicle miles traveled.
Recognizing this issue, in the California Air Resources Board’s (CARB) original draft implementation
guidance for AB 32, the reform of school siting practices was included. In the final version, the guidance
was removed without explanation.
Health in all policies: The State adopted a Health in All Policies (HIAP) approach to improve the health
of all people by incorporating health considerations into collaborative decision-making across sectors and
policy areas. The HIAP effort includes 22 State agencies and departments that fall under the Health In All
Policies Task Force which is in turn overseen by the Strategic Growth Council.
While efforts are made through the HIAP program to improve health through policy changes, the State
school siting program conflicts with this effort by facilitating the development of school sites in remote
areas. This practice limits the ability for students to use active transportation to make the
home/school/home trip. Concurrently, the State practices compromise safety for those that do walk/bike
to school because it is not financially possible to construct adequate non-motorized transportation
infrastructure connecting remote schools to the communities they serve.
Similar to CARB’s GHG reduction effort, this issue was acknowledged by the State early during HIAP
implementation. The original draft strategies for implementing HIAP included addressing school siting
practices. Subsequent revisions to the HIAP removed school siting reform activities.
II. Broad Policy Recommendations
Establish Clear Authority/Responsibility: The County has had numerous conversations with local
school districts and state officials on school siting practices over the years that reveal a lack of clarity
regarding authority on school siting practices. It would appear that a vacuum of responsibility exists that
does not foster comprehensive planning or accountability:
In discussing and advocating for school siting policy changes with State staff a common response is,
“local school districts are responsible, we merely provide guidance”.
In discussing and advocating for a change in school siting practices with local school districts a
common response is, “we are just following state policies”.
When the County advocates for better decision making a common response is, “school districts are
exempt from local ordinances”.
Administering a massive public investment program such as school construction requires a process with
clear lines of authority and responsibility. Ultimately, the lack of clear responsibilities and effective
policies has led to adversarial situations. Please see the attached letters for examples.
Develop Financial Incentives and Disincentives: In Contra Costa, and we assume in other Counties
with rural areas, one significant reason schools are developed on remote or agricultural land is the lower
cost. Addressing this fundamental issue will be necessary to make policy changes effective. The State
should consider implementing financial incentives and disincentives.
Develop Compulsory Requirements: There are substantial existing statutes and guidance related to
school siting. Site selection, safety considerations, access, consultation with local land use agencies are all
in this guidance. A compulsory component should be included with any policy changes to ensure
effective implementation.
04-10-17 TWIC Mtg Packet Pg 186 of 270
Encourage/Incentivize Cooperation between Developers and School Districts: There are existing
policies that facilitate consultation between school districts and the local land use agencies. In practice,
some of the more successful school sites are a product of coordination between developers and school
districts. The State should investigate methods to encourage, incentivize or require coordination between
developers and school districts.
Enforce Urban Limit Line (ULL)/Urban Growth Boundary (UGB): At a minimum, the state should
respect locally approved growth control measures and institute some minimal subsidiarity by prohibiting
school districts from acquiring and developing school sites outside of adopted ULLs/UGBs. This would
help establish consistency with local priorities and direct growth to where it can best be served. Absent an
outright prohibition, the state could adopt incentives and/or disincentives that would help protect the
ULL/UGB.
Expand Authority of Local Agency Formation Commissions (LAFCO): The two main purposes of
LAFCOs per the Cortese-Knox-Hertzberg Act are 1) discourage sprawl, and 2) encourage planned,
orderly, coordinated, logical development. This authority directly addresses the problems experienced
statewide with school siting practices.
Ensure Complete Streets Consistency: The following approach would help to bring school siting
practices into consistency with State and local policies relative to complete streets, active transportation,
safe routes to school, greenhouse gas reduction, and health in all policies.
1) The school board may only approve the purchase of a school site if the board also:
Makes findings with substantial evidence in the record that the proposed site complies
with, or will ultimately comply with, all applicable guidance in Title 5, Guide to School
Site Analysis and Development, and School Site Selection and Approval Guide. These
findings should provide enough relevant information or data and reasonable inferences
to support the conclusion that the proposed site complies with the aforementioned
policy documents,(as they may be amended or superseded from time to time), and
Approves a preliminary multimodal (bus, automobile, pedestrian, bicycle, active)
circulation and safety plan (spanning both immediate site access and attendance
boundaries) approved by a licensed traffic engineer representing the Department of
Transportation.
Must establish that it is reasonable to project that all necessary, multi‐modal
transportation infrastructure will be in place concurrent with the opening of the school
(secured bond, projects on local capital improvement plan for instance)
2) The school board may only approve a final school design if the board also:
Makes findings with substantial evidence in the record that the proposed site will comply
with all applicable guidance in Title 5, Guide to School Site Analysis and Development,
and School Site Selection and Approval Guide upon opening of the school. These findings
should provide enough relevant information or data and reasonable inferences to
support the conclusion that the proposed site complies with the aforementioned policy
documents, as they may be amended or superseded from time to time,
Approves a final multimodal (bus, automobile, pedestrian, bicycle, active) circulation and
safety plan (spanning both immediate site access and attendance boundaries) approved
by a licensed traffic engineer representing the Department of Transportation.
Establish that all necessary, multi‐modal transportation infrastructure will be in place
concurrent with the opening of the school.
04-10-17 TWIC Mtg Packet Pg 187 of 270
G:\Transportation\Cunningham\MEMO-LETTER\Letter\2017\SIGNEDCOMDEV\Transportation\Legislation and Correspondence - BOS, DCD\2017\SIGNED SEALED FULL BO, RES, ORD04-10-17 TWIC Mtg Packet Pg 188 of 270
Department of
Conservation and
Development
30 Muir Road
Martinez, CA 94553
Phone: 1-855-323-2626
August 24, 2016
Eric Volta, Superintendent
Liberty Union High School District
20 Oak Street
Brentwood, CA 94513
Contra
Costa
County
John Kopchik
Director
Aruna Bhat
Deputy Director
Jason Crapo
Deputy Director
Maureen Toms
Deputy Director
Kara Douglas
Assistant Deputy Director
Victoria Mejia
Business Operations Manager
Subject: LUHSD Purchase of APN #s: 011210028, 011210027, 011210026
Dear Superintendent Volta:
It has come to the County's attention that last year the Liberty Union High School District
(LUHSD) purchased Assessor's Parcel Number (APN) 011210028 south of Discovery Bay at the
end of Kellogg Creek Road. Public Resources Code §21151.2 and Government Code §65402
require, among other actions, that school districts notify the local planning department and
planning commission prior to any acquisition. To my knowledge, the County received no such
notification. These notifications help keep the County informed of activities in the
unincorporated areas. In addition, these statutes help to promote collaboration between our two
agencies through the reporting and investigative activities mentioned in the code.
We understand that this latest acquisition is expanding LUHSD's existing holdings immediately
to the north (APNs 011210027 and 011210026) which were purchased in 2010. I understand that
these two parcels were also purchased without the notification required in the aforementioned
code sections.
If the subject parcels are to be developed such that they produce a positive community asset,
include safe, sufficient access, and result in an adequate California Environmental Quality Act
analysis, a collaborative process with the County will be critical. In this light, the land
acquisitions without the required notifications are of concern to the County as we have
responsibility for the transportation network surrounding the facility.
04-10-17 TWIC Mtg Packet Pg 189 of 270
g:\transportation\cunningham\memo-letter\letter\2016\signed\08-24-16 - DCDto Eric Volta reLHUS Purchase of APN's
Eric Volta, Superintendent
August 23, 2016
I would appreciate it if we could meet to review our options for communicating and coordinating
on these matters. If you or members of your staff could please contact me ( 67 4-7819,
john.kopchik@dcd.cccounty.us) or John Cunningham, Principal Planner (925-674-7833,
john.cunningham@dcd.cccounty.us) at your earliest convenience I would appreciate it.
Sincerely,
K~cror
o tra Costa County Department of Conservation and Development
cc:
Federal D. Glover, Supervisor-District V
Mary N. Piepho, Supervisor -District III
Bryan Montgomery, City Manager-Oakley
Gustavo Vina, City Manager-Brentwood
Julie Bueren, Director-Public Works Department
Dan Peddycord, Director of Public Health-Health Services
Catherine Kutsuris, Interim General Manager -Discovery Bay CSD
Attachment: 5th High School Site Area Map
04-10-17 TWIC Mtg Packet Pg 190 of 270
04-10-17 TWIC Mtg Packet Pg 192 of 270
04-10-17 TWIC Mtg Packet Pg 193 of 270
Contra Costa County Comments on Title 5 Revision Process. Revisions are in redline/strikeout format.
Annotations/comments on the revisions are in [brackets and in typewriter font].
Title 5. Education
Division 1. California Department of Education
Chapter 13. School Facilities and Equipment
Subchapter 1. School Housing
Article 1. General Standards
§ 14001. Minimum Standards.
Educational facilities planned by school districts shall be:
(a) Evolved from a statement of educational program requirements which reflects the school district's educational goals
and objectives.
(b) Master-planned to provide for maximum site enrollment..
(c) Located on a site which meets California Department of Education standards as specified in Section 14010.
(d) Designed for the environmental comfort and work efficiency of the occupants.
(e) Designed to require a practical minimum of maintenance.
(f) Designed to meet federal, state, and local statutory requirements for structure, fire, and public safety.
(g) Designed and engineered with flexibility to accommodate future needs.
(h) Located and designed to support reductions of greenhouse gasses and vehicle miles traveled consistent with state
goals.
(i) Include access infrastructure, at the time of school opening, consistent with the 2008- Complete Streets Act.
[Reflects authority established with the “safety” references in EDC § 17251 (c) and (f)].
Note: Authority cited: Sections 17251(b) and 33031, Education Code. Reference: Sections 17017.5 and 17251(b),
Education Code.
HISTORY
1. Amendment filed 9-23-77; effective thirtieth day thereafter (Register 77, No. 39).
2. Amendment of text and adoption of Note filed 11-12-93; operative 12-13-93 (Register 93, No. 46).
3. Amendment of Note filed 10-30-2000; operative 10-30-2000 pursuant to Government Code section
11343.4(d) (Register 2000, No. 44).
5 CCR § 14001, 5 CA ADC § 14001
04-10-17 TWIC Mtg Packet Pg 194 of 270
Title 5. Education
Division 1. California Department of Education
Chapter 13. School Facilities and Equipment
Subchapter 1. School Housing
Article 2. School Sites
§ 14010. Standards for School Site Selection.
All districts shall select a school site that provides safety and that supports learning. The following standards shall apply
to site selection and be addressed in a written report provided to the governing board, the district advisory committee,
and the local land use agency [requirements are consistent with EDC § PART 10.5. SCHOOL FACILITIES:
Schoolsites: 17211]:
(a) The net usable acreage and enrollment for a new school site shall be consistent with the numbers of acres and
enrollment established in the 2000 Edition, “School Site Analysis and Development” published by the California
Department of Education and incorporated into this section by reference, in toto, unless sufficient land is not available
or circumstances exist due to any of the following:
(1) Urban or suburban development results in insufficient available land even after considering the option of eminent
domain.
(2) Sufficient acreage is available but it would not be economically feasible to mitigate geological or environmental
hazards or other site complications which pose a threat to the health and/or safety of students and staff.
(3) Sufficient acreage is available but not within the attendance area of the unhoused students or there is an extreme
density of population within a given attendance area requiring a school to serve more students on a single site.
Choosing an alternate site would result in extensive long-term bussing of students that would cause extreme financial
hardship to the district to transport students to the proposed school site.
(4) Geographic barriers, traffic congestion, inadequate transportation infrastructure for student cyclists, pedestrians,
and/or other wheeled/active transportation, high vehicle speeds, or other constraints throughout the attendance
boundary would cause extreme school access issues for the school district and the community at large. financial
hardship for the district to transport students to the proposed school site. [Regarding the struck out text,
excepting special needs students, school districts are not obligated to provide transportation.
Regardless, the listed issues DO create a hardship for parents, students, and local jurisdictions
who, when school districts site schools in remote areas, are left to somehow get students safety
to/from school sites which are often infrastructure islands surrounded by rural landscape.]
(b) If a school site is less than the recommended acreage required in subsection (a) of this section, the district shall
demonstrate how the students will be provided an adequate educational program including physical education as
described in the district's adopted course of study.
(c) The property line of the site even if it is a joint use agreement as described in subsection (o) of this section shall be
at least the following distance from the edge of respective power line easements:
(1) 100 feet for 50-133 kV line.
(2) 150 feet for 220-230 kV line.
(3) 350 feet for 500-550 kV line.
(d) If the proposed site is within 1,500 feet of a railroad track easement, a safety study shall be done by a competent
professional trained in assessing cargo manifests, frequency, speed, and schedule of railroad traffic, grade, curves, type
and condition of track need for sound or safety barriers, need for pedestrian and vehicle safeguards at railroad
crossings, presence of high pressure gas lines near the tracks that could rupture in the event of a derailment,
04-10-17 TWIC Mtg Packet Pg 195 of 270
preparation of an evacuation plan. In addition to the analysis, possible and reasonable mitigation measures must be
identified. [Roadways and automobiles are a more substantial threat to student safety than railroads.
Implementation of the County’s “Ensure Complete Streets Consistency” proposal will help to ensure an
appropriate review of roadway safety, on par with the railroad language]
(e) The site shall not be adjacent to a road or freeway that any site-related traffic and sound level studies have
determined will have safety problems or sound levels which adversely affect the educational program.
(f) Pursuant to Education Code sections 17212 and 17212.5, the site shall not contain an active earthquake fault or
fault trace.
(g) Pursuant to Education Code sections 17212 and 17212.5, the site is not within an area of flood or dam flood
inundation unless the cost of mitigating the flood or inundation impact is reasonable.
(h) The site shall not be located near an above-ground water or fuel storage tank or within 1500 feet of the easement
of an above ground or underground pipeline that can pose a safety hazard as determined by a risk analysis study,
conducted by a competent professional, which may include certification from a local public utility commission.
(i) The site is not subject to moderate to high liquefaction or landslides.
(j) The shape of the site shall have a proportionate length to width ratio to accommodate the building layout, parking
and playfields that can be safely supervised and does not exceed the allowed passing time to classes for the district.
(k) The site shall be easily accessible from arterial roads and shall allow minimum peripheral visibility from the planned
driveways in accordance with the Sight Distance Standards established in the “Highway Design Manual,” Table 201.1,
published by the Department of Transportation, July 1, 1990 edition, and incorporated into this section by reference, in
toto.
(l) The site shall not be on major arterial streets with a heavy traffic pattern as determined by site-related traffic
studies including those that require student crossings unless mitigation of traffic hazards and a plan for the safe arrival
and departure of students appropriate to the grade level has been provided by city, county or other public agency in
accordance with the “School Area Pedestrian Safety” manual published by the California Department of Transportation,
1987 edition, incorporated into this section by reference, in toto. [Considering the wealth of new, relevant
statutes and policies that the state has developed over the past 10 years this language should be
rewritten. Contemporary references (as opposed to the 1987 School Area Pedestrian Safety
document)should be referenced including, the 2008 Complete Streets Act, Health In All Policies,
AB32/SB375 concepts, Caltrans Smart Mobility Framework, and the numerous revisions to the Highway
Design Manual.]
(m) Existing or proposed zoning of the surrounding properties shall be compatible with schools in that it would not pose
a potential health or safety risk to students or staff in accordance with Education Code Section 17213 and Government
Code Section 65402, the multimodal circulation and safety plan, and other available studies of traffic surrounding the
site.
(n) The site shall be located within the proposed attendance area to accommodate and encourage student walking and
active transportation avoid extensive bussing unless bussing is used to promote ethnic diversity. Accommodation shall
be documented in the multimodal circulation and safety plan. [The comment is reflective of the County’s
comment, “Ensure Complete Streets Consistency”]
(o) The site shall be selected to promote joint use of parks, libraries, museums and other public services, the acreage
of which may be included as part of the recommended acreage as stated in subsection (a) of this section.
(p) The site shall be conveniently located for public services including but not limited to fire protection, police
protection, public transit and trash disposal whenever feasible. 04-10-17 TWIC Mtg Packet Pg 196 of 270
(q) The district shall consider environmental factors of light, wind, noise, aesthetics, and air pollution in its site selection
process.
(r) Easements on or adjacent to the site shall not restrict access or building placement.
(s) The cost and complications of the following shall be considered in the site selection process and should not result in
undue delays or unreasonable costs consistent with State Allocation Board standards:
(1) Distance of utilities to the site, availability and affordability of bringing utilities to the site.
(2) Site preparation including grading, drainage, demolition, hazardous cleanup, including cleanup of indigenous
material such as serpentine rock, and off-site development of streets, curbs, gutters and lights.
(3) Eminent domain, relocation costs, severance damage, title clearance and legal fees.
(4) Long-term high landscaping or maintenance costs.
(5) Existence of any wildlife habitat that is on a protected or endangered species list maintained by any state or federal
agency, existence of any wetlands, natural waterways, or areas that may support migratory species, or evidence of any
environmentally sensitive vegetation.
(t) If the proposed site is on or within 2,000 feet of a significant disposal of hazardous waste, the school district shall
contact the Department of Toxic Substances Control for a determination of whether the property should be considered a
Hazardous Waste Property or Border Zone Property.
(u) At the request of the governing board of a school district, the State Superintendent of Public Instruction may grant
exemptions to any of the standards in this section if the district can demonstrate that mitigation of specific
circumstances overrides a standard without compromising a safe and supportive school environment.
Note: Authority cited: Sections 17251(b) and 33031, Education Code. Reference: Sections
17212, 17212.5, 17213, 17251(b) and 17251(f), Education Code.
HISTORY
1. Renumbering of former section 14010 to section 14011 and new section filed 11-12-93; operative 12-13-93
(Register 93, No. 46). For prior history, see Register 77, No. 39.
2. Amendment of section and Note filed 10-30-2000; operative 10-30-2000 pursuant to Government Code section
11343.4(d) (Register 2000, No. 44).
5 CCR § 14010, 5 CA ADC § 14010
04-10-17 TWIC Mtg Packet Pg 197 of 270
Title 5. Education
Division 1. California Department of Education
Chapter 13. School Facilities and Equipment
Subchapter 1. School Housing
Article 2. School Sites
§ 14011. Procedures for Site Acquisition - State-Funded School Districts.
A state-funded school district is defined as a school district having a project funded under Chapter 12.5 (commencing
with Section 17070.10) of the Education Code. A state-funded school district, before acquiring title to real property for
school use, shall obtain written approval from the California Department of Education using the following procedures:
(a) Request a preliminary conference with a consultant from the School Facilities Planning Division and in consultation
review and evaluate sites under final consideration.
(b) Contact the School Facilities Planning Division of the California Department of Education to obtain a “School
Facilities Planning Division Field Site Review,” form SFPD 4.0, published by the California Department of Education, as
last amended in December 1999 and incorporated into this section by reference, in toto, which lists the site options in
order of merit according to the site selection standards delineated in Section 14010.
(c) Prepare a statement of policies as delineated on the “School Facilities Planning Division School Site Report,” form
SFPD 4.02, as last amended in December 1999 and incorporated into this section by reference, in toto, covering the
range and organization of grades to be served, the transportation of pupils, and the ultimate maximum pupil enrollment
to be housed on the site. Prepare a statement showing how the site is appropriate in size as justified by the school
district's Facilities Master Plan, including acreage increases above the California Department of Education
recommendation made to compensate for off-site mitigation. A school district may choose, in place of a master plan, a
developer fee justification document or a five-year plan if it addresses enrollment projections, needed schools, and site
sizes.
(d) Prepare maps showing present and proposed school sites, significant roads or highways, unsanitary or hazardous
installations, such as airports or industries and the indicated boundary of the pupil attendance area to be served as
delineated on form SFPD 4.02.
(e) Meet with appropriate local government, recreation, and park authorities to consider possible joint use of the
grounds and buildings and to coordinate the design to benefit the intended users as required by Education Code Section
35275.
(f) Give written notice to the local planning agency having jurisdiction to review the proposed school site or addition to
an existing school site and request a written report from the local planning agency of the investigations and
recommendations for each proposed site with respect to conformity with the adopted general plan as required by Public
Resources Code Section 21151.2 and Government Code Section 65402 and provide documentation to the California
Department of Education (CDE) demonstrating the notice and report request to the local planning agency. CDE shall not
provide any administrative, procedural, or financial support to the school district without fulfillment of this requirement.
[This requirement is in response to our experience with school districts not being aware of or
disregarding the referenced sections of the code. Please see the County’s 8-24-16 letter to the
Liberty Union High School District (LUHSD) attached to our Title 5 Comment letter. The letter to
LUHSD is also available here: www.cccounty.us/no-notice]
(g) Comply with Education Code Sections 17212 and 17212.5, with particular emphasis upon an engineering
investigation made of the site to preclude locating the school on terrain that may be potentially hazardous:
(1) The geological and soils engineering study shall address all of the following:
(A) Nature of the site including a discussion of liquefaction, subsidence or expansive soils, slope, stability, dam or flood
inundation and street flooding.
(B) Whether the site is located within a special study zone as defined in Education Code Section 17212.04-10-17 TWIC Mtg Packet Pg 198 of 270
(C) Potential for earthquake or other geological hazard damage.
(D) Whether the site is situated on or near a pressure ridge, geological fault or fault trace that may rupture during the
life of the school building and the student risk factor.
(E) Economic feasibility of the construction effort to make the school building safe for occupancy.
(2) Other studies shall include the following:
(A) Population trends
(B) Transportation
(C) Water supply
(D) Waste disposal facilities
(E) Utilities
(F) Traffic hazards
(G) Surface drainage conditions
(H) Other factors affecting initial and operating costs.
(h) Prepare an environmental impact report, or negative declaration in compliance with the Environmental Quality Act,
Public Resources Code, Division 13, (commencing with Section 21000 with particular attention to Section 21151.8). As
required by Education Code Section 17213, the written findings of the environmental impact report or negative
declaration must include a statement verifying that the site to be acquired for school purposes is not currently or
formerly a hazardous, acutely hazardous substance release, or solid waste disposal site or, if so, that the wastes have
been removed. Also, the written findings must state that the site does not contain pipelines which carry hazardous
wastes or substances other than a natural gas supply line to that school or neighborhood. If hazardous air emissions
are identified, the written findings must state that the health risks do not and will not constitute an actual or potential
danger of public health of students or staff. If corrective measures of chronic or accidental hazardous air emissions are
required under an existing order by another jurisdiction, the governing board shall make a finding that the emissions
have been mitigated prior to occupancy of the school.
(i) Consult with, or demonstrate that the lead agency, if other than the district preparing the environmental impact
report or negative declaration, has consulted with the appropriate city/county agency and with any air pollution control
district or air quality management district having jurisdiction, concerning any facilities having hazardous or acutely
hazardous air emissions within one-fourth of a mile of the proposed school site as required by Education Code Section
17213.
(j) For purposes of Environmental Site Assessment, school districts shall comply with Education Code sections
17210.1, 17213.1, and 17213.2.
(k) Follow the recommendations of the State Superintendent of Public Instruction report based upon the Department of
Transportation, Division of Aeronautics, findings, if the proposed site is within two miles of the center line of an airport
runway or proposed runway as required by Education Code Section 17215.
04-10-17 TWIC Mtg Packet Pg 199 of 270
(l ) Follow the standards for school site selection in Section 14010 of this article.
(m) Conduct a public hearing by the governing board of the school district as required in Education Code Section
17211 to evaluate the property using the standards described in Section 14010 of this article. The school district's
facility advisory committee may provide an evaluation of the proposed site to the governing board.
(n) Submit the request for exemption from a standard in Section 14010 of this article, with a description of the
mitigation that overrides the standard, to the California Department of Education.
(o) Certify there are no available alternative school district-owned sites for the project deemed usable for school
purposes by the California Department of Education or certify that the school district intends to sell an available
alternative school district-owned site and use the proceeds from the sale for the purchase of the new school site.
Note: Authority cited: Sections 17251(b) and 33031, Education Code. Reference: Sections
17070.50, 17072.12, 17210.1, 17211, 17212, 17213 and 17251(b), Education Code.
HISTORY
1. Renumbering and amendment of section 14010 to section 14011 and adoption of Note filed 11-12-93; operative 12-
13-93 (Register 93, No. 46).
2. Amendment of section heading, section and Note filed 10-30-2000; operative 10-30-2000 pursuant to Government
Code section 11343.4(d) (Register 2000, No. 44).
5 CCR § 14011, 5 CA ADC § 14011
04-10-17 TWIC Mtg Packet Pg 200 of 270
Title 5. Education
Division 1. California Department of Education
Chapter 13. School Facilities and Equipment
Subchapter 1. School Housing
Article 2. School Sites
§ 14012. Procedures for Site Acquisition - Locally-Funded School Districts.
A locally-funded school district is defined as a school district with a project not applying for funding from any state
program administered by the State Allocation Board as defined in Chapter 12.0 (commencing with Section 17000) or
Chapter 12.5 (commencing with Section 17070.10) of the Education Code. A locally-funded school district, before
acquiring title to real property for school use, shall:
(a) Evaluate the property using the standards established in Section 14010 and items (e) through (l ) in Section 14011;
(b) Comply with terms of the complaint investigation described in Section 14012(d); and
(c) May request advice from the California Department of Education as described in Education Code Section 17211(a).
(d) Prepare documentation of and retain for purposes of a complaint investigation the exemption from the standard in
Section 14010 of this article with a description of the mitigation that overrides the standard. Locally-funded school
districts may request from the California Department of Education a review of the adequacy of the mitigation measure.
(e) Comply with Education Code section 17268 regarding potential safety or health risks to students and staff.
Note: Authority cited: Sections 17251(b) and 33031, Education Code. Reference: Sections
17251(a) and (b) and 17268, Education Code.
HISTORY
1. New section filed 11-12-93; operative 12-13-93 (Register 93, No. 46).
2. Repealer of former section 14012 and renumbering of former section 14013 to new section 14012, including
amendment of section heading, section and Note, filed 10-30-2000; operative 10-30-2000 pursuant to Government
Code section 11343.4(d) (Register 2000, No. 44).
5 CCR § 14012, 5 CA ADC § 14012
04-10-17 TWIC Mtg Packet Pg 201 of 270
Title 5. Education
Division 1. California Department of Education
Chapter 13. School Facilities and Equipment
Subchapter 1. School Housing
Article 2. School Sites
§ 14013. Procedures for Site Acquisition - Locally-Funded Districts. [Renumbered]
Note: Authority cited: Section 39001(b), Education Code. Reference: Sections 17700 et. seq., 39101(a), and
39101(b), Education Code.
HISTORY
1. New section filed 11-12-93; operative 12-13-93 (Register 93, No. 46).
2. Renumbering of former section 14013 to section 14012 filed 10-30-2000; operative 10-30-2000 pursuant
to Government Code section 11343.4(d) (Register 2000, No. 44).
5 CCR § 14013, 5 CA ADC § 14013
04-10-17 TWIC Mtg Packet Pg 202 of 270
Title 5. Education
Division 1. California Department of Education
Chapter 13. School Facilities and Equipment
Subchapter 1. School Housing
Article 4. Standards, Planning and Approval of School Facilities
§ 14030. Standards for Development of Plans for the Design and Construction of School Facilities.
The following standards for new schools are for the use of all school districts for the purposes of educational
appropriateness and promotion of school safety:
(a) Educational Specifications.
Prior to submitting preliminary plans for the design and construction of school facilities, and as a condition of final plan
approval by CDE, school board-approved educational specifications for school design shall be prepared and submitted to
the California Department of Education based on the school district's goals, objectives, policies and community input
that determine the educational program and define the following:
(1) Enrollment of the school and the grade level configuration.
(2) Emphasis in curriculum content or teaching methodology that influences school design.
(3) Type, number, size, function, special characteristics of each space, and spatial relationships of the instructional area
that are consistent with the educational program.
(4) Community functions that may affect the school design. [Substantial detail and examples should be added
to remove ambiguity]
(b) Site Layout.
Parent drop off, bus loading areas, and parking, and non-motorized access shall be separated or otherwise designed to
allow students to enter and exit the school grounds safely unless these features are unavailable due to limited acreage
in urban areas or restrictive locations, specifically [Comments are consistent with authority established in the
“safety” references in EDC § 17251 (c) and (f)].
:
(1) Buses do not pass through parking areas to enter or exit school site unless a barrier is provided that prevents
vehicles from backing directly into the bus loading area.
(2) Parent drop off area is adjacent to school entrance and separate from bus area and staff parking.
(3) Vehicle traffic pattern does not interfere with foot traffic patterns. Foot traffic does not have to pass through
entrance driveways to enter school. Crosswalks are clearly marked to define desired foot path to school entrance.
(4) Parking stalls are not located so vehicles must back into bus or loading areas used by parents. Island fencing or
curbs are used to separate parking areas from loading/unloading areas.
(5) To provide equal access to insure the purposes of the least restrictive environment, bus drop off for handicapped
students is in the same location as for regular education students.
(6) To ensure safe, efficient access an active transportation plan for the school’s entire attendance boundary shall be
developed. [consistent with authority established in the “safety” references in EDC § 17251 (c) and
(f)]
(7) Bicyclist and pedestrian access to school sites shall be encouraged through prioritized access and bicycle parking.
(c) Playground and Field Areas. 04-10-17 TWIC Mtg Packet Pg 203 of 270
Adequate physical education teaching stations shall be available to accommodate course requirements for the planned
enrollment, specifically:
(1) A variety of physical education teaching stations are available to provide a comprehensive physical education
program in accordance with the district's adopted course of study (including hardcourt, field area and indoor spaces).
(2) The physical education teaching stations are adequate for the planned student enrollment to complete the minimum
instruction and course work defined in Education Code Sections 51210(g), 51220(d) and 51225.3(a)(1)(F).
(3) Supervision of playfields is not obstructed by buildings or objects that impair observation.
(4) Joint use for educational purposes with other public agencies is explored. Joint use layout with parks is not
duplicative and fulfills both agencies' needs.
(d) Delivery and Utility Areas.
Delivery and service areas shall be located to provide vehicular access that does not jeopardize the safety of students
and staff:
(1) Delivery/utility vehicles have direct access from the street to the delivery area without crossing over playground or
field areas or interfering with bus or parent loading unless a fence or other barrier protects students from large vehicle
traffic on playgrounds.
(2) Trash pickup is fenced or otherwise isolated and away from foot traffic areas.
(e) Future Expansion.
Site layouts shall have capability for expansion without substantial alterations to existing structures or playgrounds:
(1) Site layout designates area(s) for future permanent or temporary additions that are compatible with the existing
site plans for playground layout and supervision.
(2) Utilities to the expansion area are included in the plans and have the capacity to accommodate anticipated growth.
(3) Exits, corridors, stairs, and elevators are located to accommodate capacity of additions, particularly in such
buildings added as the multi-purpose/cafeteria, administration, gymnasium/or auditorium.
(f) Placement of Buildings.
Building placement shall consider compatibility of the various functions on campus and provide optimum patterns of
foot traffic flow around and within buildings. Site layout of buildings, parking, driveways, and physical education areas
shall be adequate to meet the instructional, security and service needs of the educational program:
(1) Building placement is compatible with other functions on campus; e.g., band room is not next to library.
(2) Physical relationship of classrooms, auxiliary, and support areas allows unobstructed movement of staff and
students around the campus.
(3) Building placement has favorable orientation to wind, sun, rain, and natural light.
(4) Restrooms are conveniently located, require minimum supervision, and, to the extent possible, are easily accessible
from playground and classrooms.
04-10-17 TWIC Mtg Packet Pg 204 of 270
(5) Parking spaces are sufficient for staff, visitors, and students (where applicable).
(6) The campus is secured by fencing and electronic devices such as code entries, electronic monitoring or motion
sensors when needed.
(g) Classrooms.
Classrooms at new school sites shall have adequate space to perform the curriculum functions for the planned
enrollment as described in the school district's facility master plan, specifically:
(1) Classroom size standards:
(A) General classrooms, grades one through twelve are not less than 960 square feet. Classrooms proposed of less than
960 square feet require written justification to be submitted to and approved by the State Superintendent of Public
Instruction. Adjacent instructional space shall be included in the calculation of square feet for purposes of approving
classroom design.
(B) Proposed classrooms of less than 960 square feet have written justification consistent with the educational program
and curriculum indicating that the district's education program can be delivered in the proposed size classrooms.
(2) Total classroom space meets or exceeds the capacity planned for the school using the district's classroom loading
standards in accordance with State Allocation Board policy.
(3) Consideration is given to some classrooms which are easily alterable in size and shape at a reasonable cost.
(4) Conduit/cabling and outlets are available for technology in each classroom to provide network and stand alone
equipment related to the planned and future potential educational functions.
(h) Specialized Classrooms and Areas.
Specialized classrooms shall be designed to reflect the function planned for that portion of the educational program. If
any of the following classrooms are needed, these standards apply:
(1) Small-Group Areas.
(A) Small-group instruction areas are not included in the computation of classroom size unless the area is an integral
part of the classroom and can be visibly supervised by a teacher from the classroom.
(B) Small-group instruction areas are designed to allow for collaborative learning opportunities where appropriate to
support the regular education program and are located in the vicinity of classrooms.
(2) Kindergarten Classrooms.
(A) Kindergarten classroom size for permanent structures is not less than 1350 square feet, including restrooms,
storage, teacher preparation, wet and dry areas.
(B) Kindergarten classrooms are designed to allow supervision of play yards (unless prevented by site shape or size)
and all areas of the classroom.
(C) Play yard design provides a variety of activities for development of large motor skills.04-10-17 TWIC Mtg Packet Pg 205 of 270
(D) Classrooms are located close to parent drop-off and bus loading areas.
(E) Storage, casework, and learning stations are functionally designed for use in free play and structured activities;
e.g., shelves are deep and open for frequent use of manipulative materials.
(F) Windows, marking boards, sinks, drinking fountains, and furniture are appropriate heights for kindergarten-age
students.
(G) Restrooms are self-contained within the classroom or within the kindergarten complex.
(3) Special Education Classrooms and Areas.
(A) A new school designates at least 240 square feet for the resource specialist program and provides additional space
in accordance with the allocations in Education Code Section 17747(a)as larger enrollments are being planned.
(B) A new school designates at least 200 square feet for the speech and language program which is close to classrooms
when an individualized instruction program is necessary.
(C) A new school designates office area for the psychologist/counseling program which provides for confidentiality and
may be shared with other support service programs.
(D) Special day classrooms are at least the same size as regular education classrooms at that site and are properly
equipped for the students who will occupy the space, for their age and type of disabling condition.
(E) The square footage allowance in Education Code Section 17747(a) for special day class programs is used for the
design of classroom space and other space on the campus to support the special education program. The support space
includes but is not limited to speech specialist area, psychologist, counseling offices and conference area.
(F) Special day classrooms are distributed throughout the campus with age appropriate regular education classrooms.
(G) A cluster of two special day classrooms may be considered if support or auxiliary services (e.g., bathrooming,
feeding, physical or occupational therapy) are needed to serve the students throughout the school day.
(H) A conference area is available to conduct annual individualized education program meetings for each special
education student.
(I) Medical therapy units, if planned for the site, are close to visitor parking areas and accessible after school hours.
(i) Laboratories shall be designed in accordance with the planned curriculum.
(1) Science laboratory:
(A) Size is at least 1300 square feet including storage and teacher preparation area.
(B) Science laboratory design is consistent with the requirements for proper hazardous materials management specified
in both the “Science Facilities Design for California Public Schools,” published by the California Department of Education, 04-10-17 TWIC Mtg Packet Pg 206 of 270
1993, and the “Science Safety Handbook for California Public Schools,” published by the California State Department of
Education, 1999.
(C) Accommodations are made for necessary safety equipment and storage of supplies; e.g., fire extinguisher, first aid
kit, master disconnect valve for gas.
(D) Secured storage areas are provided for volatile, flammable, and corrosive chemicals and cleaning agents.
(E) Properly designated areas are provided with appropriate ventilation for hazardous materials that emit noxious
fumes, including a high volume purge system in the event of accidental release of toxic substances which may become
airborne.
(F) Exhaust fume hoods, eye washes, deluge showers are provided.
(G) Floor and ceiling ventilation is provided in areas where chemicals are stored.
(H) Room is provided for movement of students around fixed-learning stations.
(I) There is the capability for technology which complements the curriculum.
(J) Classrooms are flexibly designed to insure full student access to laboratory stations and lecture areas.
(2) Consumer Home Economics laboratory:
(A) There is room for movement of students around fixed learning stations.
(B) Cooking equipment reflects current home food preparation practices and/or commercial food preparation
simulation.
(C) There is the capability for technology which complements portions of the curriculum, such as fashion design,
consumer economics, and nutritional analysis of foods.
(D) There is space for industrial or home sewing equipment consistent with the planned curriculum.
(E) There is storage for student projects and supplies.
(F) Space for work tables is provided for such activities as cutting fabric or completing interior design projects.
(G) Lecture area is provided.
(H) At least 1300 square feet is allocated for each laboratory.
(I) If part of the planned program, space for a child care area or for a laboratory to teach child growth and development
is provided.
(3) Industrial and Technology/Education Laboratory: 04-10-17 TWIC Mtg Packet Pg 207 of 270
(A) Room is provided for movement of students around fixed learning stations.
(B) Flexible stations with sufficient outlets and power source for industrial type equipment is provided.
(C) Space is provided for various simulations of job-related experiences and laboratory work stations.
(D) There is capability to utilize technology which complements the curriculum, such as computer-aided graphics,
electronics and specialized tools.
(E) There is lecture area within each laboratory or near the laboratory area where appropriate.
(F) There are accommodations for necessary health and safety equipment, such as fire extinguisher and first aid kit.
(G) Secured storage areas for volatile, flammable and corrosive chemicals and cleaning agents are provided where
appropriate.
(H) There are properly designated areas with appropriate ventilation for the use of hazardous material that emit
noxious fumes or excessive dust particles.
(I) Proper storage and removal access for hazardous waste materials is provided in each laboratory using such
materials.
(4) Computer Instructional Support Area:
(A) If a standard classroom is being designated as a computer laboratory, size is at least 960 square feet.
(B) Room is provided for movement of students around learning stations.
(C) Sufficient outlets, power sources, and network links for the amount of equipment are provided.
(D) Proper ventilation is provided.
(E) Room provides for security of equipment.
(F) Lighting minimizes screen glare and eye strain.
(j) Gymnasium, Shower/Locker shall be designed to accommodate multiple use activities in accordance with the
planned enrollment:
(1) The gymnasium is secured from other parts of the campus for evening and weekend events or for public use
purposes.
(2) The shower/locker area is of sufficient size to allow students enrolled in the physical education program to shower
and dress each period.
04-10-17 TWIC Mtg Packet Pg 208 of 270
(3) Toilets are available for the public in facilities intended for shared community use other than in shower/locker areas.
(4) Office space is provided for physical education teachers.
(5) Space is available for specialized age-appropriate physical education activities such as weight lifting, exercise
equipment usage, aerobics.
(k) Auxiliary Areas.
(1) Multipurpose/cafeteria area (indoor or outdoor) shall be adequately sized and flexibly designed to protect students
from the elements and to allow all students adequate eating time during each lunch period and to accommodate such
uses as physical education activities, assemblies, and extracurricular activities:
(A) Tables and benches or seats are designed to maximize space and allow flexibility in the use of the space.
(B) The location is easily accessible for student and community use, but is close to street for delivery truck access.
(C) Stage/platform may have a dividing wall to be used for instructional purposes but is not intended as a classroom.
(D) Area for the cafeteria line is designed for the flow of traffic for each lunch period.
(E) Design of kitchen reflects its planned function; e.g., whether for food preparation or warming only.
(F) Space is available for refrigeration and preparation of foods to accommodate maximum number of students planned
for the school.
(G) Office, changing, and restroom area for food preparation staff is available and shall comply with local department of
health requirements.
(H) Ceiling height allows for clearance of light fixtures for physical education activities.
(2) Administrative Office.
The administrative office shall have sufficient square footage to accommodate the number of staff for the maximum
enrollment planned for the school consistent with the master plan for the school district and shall be designed to
efficiently conduct the administrative functions, specifically:
(A) Students have direct confidential access to pupil personnel area.
(B) Counter tops are accessible for an age-appropriate population both at a standing and wheelchair level.
(C) Clerical staff have a clear view of nurse's office.
(D) The nurse's office has a bathroom separate from staff bathroom(s) in administration area.
(E) Space for private conference and waiting area is available. 04-10-17 TWIC Mtg Packet Pg 209 of 270
(F) Capability for such computer networking functions as attendance accounting and communicating to each classroom
is considered.
(G) A faculty workroom is available for a staff size proportionate to the student population.
(3) Library/Media Center and Technology.
Library space shall be proportional to the maximum planned school enrollment. The size shall be no less than 960
square feet. However, to allow adaptation for changing technology and communication systems, the following is
recommended:
-two square feet per unit of a.d.a. (average daily attendance) for elementary;
-three square feet per unit of a.d.a. for middle or junior high (grades 6-8);
-four square feet per unit of a.d.a. for high school. In addition:
(A) Provide security for technology and media equipment.
(B) Space and capability for computer terminals is considered for student use, research and report writing.
(C) Visual supervision from circulation desk is available to study areas, stack space, and student work centers.
(D) Design for open and closed-circuit television, dedicated phone line, electrical outlets for stand-alone computers, and
conduit connecting all instructional areas is considered.
(l ) Lighting.
Light design shall generate an illumination level that provides comfortable and adequate visual conditions in each
educational space, specifically:
(1) Ceilings and walls are white or light colored for high reflectance unless function of space dictates otherwise.
(2) Lights do not produce glare or block the line of sight.
(3) Window treatment allows entrance of daylight but does not cause excessive glare or heat gain.
(4) Fixtures provide an even light distribution throughout the learning area.
(5) Light design follows the California Electrical Code found in Part 3 of Title 24 of the California Code of Regulations.
(m) Acoustical.
Hearing conditions shall complement the educational function by good sound control in school buildings, specifically:
(1) The sound-conditioning in a given space is acoustically comfortable to permit instructional activities to take place in
this classroom.
(2) Sound is transmitted without interfering with adjoining instructional spaces; e.g., room partitions are acoustically
designed to minimize noise.
04-10-17 TWIC Mtg Packet Pg 210 of 270
(3) The ventilation system does not transmit an inordinate sound level to the instructional program.
(n) Plumbing.
Restroom stalls shall be sufficient to accommodate the maximum planned enrollment and shall be located on campus to
allow for supervision.
(1) Refer to Part 5, Title 24, of the California Code of Regulations.
(2) Outdoor restrooms having direct outside access are located in areas that are visible from playground and are easily
supervised.
(o) Year-Round Education.
If a school is being planned for multitrack year-round operation, additional space shall be provided for associated
needs:
(1) Additional space is available for storage of records for staff for all tracks. Additional storage space for the supplies
and projects of off-track students is considered.
(2) Storage and planning space is available for off-track teachers or teachers not assigned to a classroom.
(p) American Disabilities Act.
Schools shall comply with standards established by the American Disabilities Act (Public Law 101-336, Title II).
(q) Child Care Programs.
Schools shall comply with the requirements set forth in Education Code Section 39113.5 regarding plans and
specifications for new schools being designed to provide appropriate space to accommodate before-school and after-
school child care programs.
(r) Exemptions.
At the request of the governing board of a school district, the State Superintendent of Public Instruction may grant
exemptions to any of the standards in this section if the district can demonstrate that the educational appropriateness
and safety of a school design would not be compromised by an alternative to that standard.
Note: Authority cited: Sections 17251(c) and 33031, Education Code. Reference: Sections
17047(a), 17251(c), 17310, 51210(g), 51220(d) and 51225.3, Education Code.
HISTORY
1. Amendment of section and NOTE filed 9-23-77; effective thirtieth day thereafter (Register 77, No. 39).
2. Amendment of article heading, repealer and adoption of section heading and text, and amendment of Note filed 11-
12-93; operative 12-13-93 (Register 93, No. 46).
3. Amendment of subsections (a), (b)-(b)(1), (g)(1)(A), (i)(1)(B), (n)-(n)(1) and (p)-(r), new subsection (i)(4)-
(i)(4)(F), and amendment of Note filed 10-30-2000; operative 10-30-2000 pursuant toGovernment Code section
11343.4(d) (Register 2000, No. 44).
5 CCR § 14030, 5 CA ADC § 14030 04-10-17 TWIC Mtg Packet Pg 211 of 270
Title 5. Education
Division 1. California Department of Education
Chapter 13. School Facilities and Equipment
Subchapter 1. School Housing
Article 4. Standards, Planning and Approval of School Facilities
§ 14031. Plan Approval Procedures for State-Funded School Districts.
(a) Each state-funded school district shall submit preliminary plans following the standards in Section 14030 including
site utilization, elevations and floor plan drawings that describe the spaces and give the square footage and educational
specifications to the California Department of Education for approval. Prior to preparation of final plans, the school
district shall obtain approval of the preliminary plans from the California Department of Education.
(b) Each state-funded school district shall submit final plans including grading, site utilization, elevation, floor, lighting,
and mechanical working drawings and any alterations to the educational specifications to the California Department of
Education for approval.
(c) Each state-funded school district shall submit the request for exemption from a standard in Section 14030 of this
article, with a description of how the educational appropriateness and safety of a school design would not be
compromised by deviation from the standard, to the California Department of Education.
(e) Each state-funded school district shall submit a multi-modal circulation and safety plan spanning the entire
attendance boundary approved by a traffic engineer representing the Department of Transportation. [comment
references the “Ensure Complete Streets Consistency” comments in the County’s 3-28-17 letter. Letter
is also available here: ]
Note: Authority cited: Sections 17251(c) and 33031, Education Code. Reference: Sections 17017.5(c) and 17251(c),
Education Code.
HISTORY
1. Amendment filed 9-23-77; effective thirtieth day thereafter (Register 77, No. 39).
2. Repealer and adoption of section heading and text, and adoption of Note filed 11-2-93; operative 12-13-93 (Register
93, No. 46).
3. Amendment of section heading, section and Note filed 10-30-2000; operative 10-30-2000 pursuant to Government
Code section 11343.4(d) (Register 2000, No. 44).
5 CCR § 14031, 5 CA ADC § 14031
04-10-17 TWIC Mtg Packet Pg 212 of 270
Title 5. Education
Division 1. California Department of Education
Chapter 13. School Facilities and Equipment
Subchapter 1. School Housing
Article 4. Standards, Planning and Approval of School Facilities
§ 14032. Plan Approval for State-Funded School Districts.
The California Department of Education shall notify the district, the district's architect and the Department of General
Services that the preliminary and final plans comply with the standards set forth in Section 14030. Approvals for either
preliminary or final plans are in effect for a maximum of two years from the date of signed approval. School districts
may request an extension of preliminary or final plan approvals if the time line exceeds one year.
Note: Authority cited: Sections 17251(c) and 33031, Education Code. Reference: Sections
17024, 17070.50 and 17251(c), Education Code.
HISTORY
1. Amendment filed 9-23-77; effective thirtieth day thereafter (Register 77, No. 39).
2. Amendment of section heading and text, and adoption of Note filed 11-12-93; operative 12-13-93 (Register 93, No.
46).
3. Amendment of section heading, section and Note filed 10-30-2000; operative 10-30-2000 pursuant to Government
Code section 11343.4(d) (Register 2000, No. 44).
5 CCR § 14032, 5 CA ADC § 14032
04-10-17 TWIC Mtg Packet Pg 213 of 270
Title 5. Education
Division 1. California Department of Education
Chapter 13. School Facilities and Equipment
Subchapter 1. School Housing
Article 4. Standards, Planning and Approval of School Facilities
§ 14033. Applicability of Plan Standards to Locally-Funded School Districts.
(a) Locally-funded districts shall use the plan standards set forth in Section 14030.
(b) Locally-funded districts may request assistance from the California Department of Education to review plans and
specifications for any new school construction or rehabilitation project.
(c) Locally-funded districts need not submit preliminary and final plans to the California Department of Education.
(d) Locally-funded districts shall prepare documentation of and retain for purposes of a complaint investigation the
exemption from the standard in Section 14030 of this article, with a description of how the educational appropriateness
and safety of a school design would not be compromised by deviation from the standard. Locally-funded districts may
request from the California Department of Education a review of the adequacy of the mitigation measure.
(e) Locally-funded districts shall continue to comply fully with the requirements of Article 3 (commencing with Section
17280) and Article 6 (commencing with Section 17365) of Chapter 2, Part 23 of the Education Code (The Field Act) and
submit all plans and specifications to the Department of General Services, Office of the State Architect for review and
approval prior to executing a contract for the construction or alteration of a public school building or expending any
public funds for such a project.
Note: Authority cited: Sections 17251(c) and (d) and 33031, Education Code. Reference: Sections
17251(d), 17280 and 17365, Education Code.
HISTORY
1. Renumbering of former section 10433 to section 14035 and new section filed 11-12-93; operative 12-13-93
(Register 93, No. 46).
2. Repealer of former section 14033 and renumbering of former section 14034 to new section 14033, including
amendment of section heading, section and Note, filed 10-30-2000; operative 10-30-2000 pursuant to Government
Code section 11343.4(d) (Register 2000, No. 44).
5 CCR § 14033, 5 CA ADC § 14033
04-10-17 TWIC Mtg Packet Pg 214 of 270
Appendix A Site Selection Process
When a school district is planning to acquire a site for a school, it must take various factors into
consideration. The School Facilities Planning Division has developed three work sheets to assist the
district in assessing potential sites and making preliminary selections. The work sheets, which are
included in this appendix, outline a set of 12 primary criteria governing school site selection and
consists of three components: Site Selection Criteria, Site Selection Evaluation, and a Comparative
Evaluation of Candidate Sites. These components allow for a comprehensive examination of sites to
determine strengths and weaknesses (Site Selection Criteria); a ranking of each site (Site Selection
Evaluation); and finally, a comparison of sites by the rating factors and total scoring (Comparative
Evaluation of Candidate Sites). The criteria are consistent with the California Education
Code, California Code of Regulations, Title 5, California Public Resources Code, and the California
Department of Education policies and guidelines.
Although these standards are not the sole criteria to be considered by a school district's site selection
committee, the committee may find them useful in evaluating various sites, identifying at least three
acceptable sites from which a final choice can be made, and, eventually, explaining the site selection
process to interested entities.
Each primary element listed on the Site Selection Criteria work sheet contains secondary measures
that provide the committee the opportunity to apply a specific set of guidelines to each potential site
and aid in the analysis of a site. The secondary criteria may also be used by the committee to
understand better the types of data needed in identifications, selection, and final acquisition of a school
site. After considering both primary and secondary standards on the work sheet, the committee should
rank the sites in order of acceptability by completing the second and third work sheets.
June 1998
California Department of Education
Site Selection Criteria
Part 1
Site Identification Grade Level
Location Gross Acres Estimated Value
Safety (These factors must be avoided.)
Adjacent to or near roadways with a high speed or volume [Speed is a greater threat
to student safety than volume. School sites are inherently
subject to substantial volumes of traffic. It is the speed of
that traffic that must be addressed. (as reflected in the
establishment of school zones in the statutes) of traffic with no
separated, non-motorized facilities.
Within 1,500 feet of railroad tracks
Within two miles of an airport runway
Close to high-voltage power lines
Close to high-pressure lines, for example natural gas, gasoline sewer or water lines
Contaminants/toxics in the soil or groundwater, such as from landfills, dumps, chemical plants,
refineries, fuel tanks, nuclear plants, or agricultural use of pesticides or fertilizer, etc.*
Close to high decibel noise sources
Close to open-pit mining
On or near a fault zone or active fault
OK Potential
Problem
04-10-17 TWIC Mtg Packet Pg 215 of 270
Location
Safe walking areas Adequate infrastructure, consistent with state and local complete streets
policies, ensuring non-motorized access throughout the school attendance boundary.
Centrally located to avoid extensive transporting and Closely integrated with the transportation
network of the attendance boundary of the school to minimize and increase the safety of student
travel distance
Compatible with current and probable future zoning regulations
including Urban Limit Lines/Urban Growth Boundaries.
Close to, and integrated with libraries, parks, museums, and other
community services
Favorable orientation to wind and natural light
Environment
Located so as to make active transportation/school access attractive and possible.
Free from sources of noise that may impede the instructional process
Free from air, water and soil pollution
Free from smoke, dust, odors, and pesticide spray
Provides aesthetic view from and of the site
Compatible with the educational program
Soils
Proximity to faults or fault traces Stable
subsurface and bearing capacity Danger of
slides or liquefaction Percolation for septic
system and drainage Adequate water table
level
Existing land fill is reasonably well compacted
Note: A geological hazard report must be conducted to determine soil and seismic conditions.
04-10-17 TWIC Mtg Packet Pg 216 of 270
June 1998
Topography
Feasibility of mitigating steep grades
Rock ledges or outcroppings
Surface and subsurface drainage
Level area for playfields
OK Potential
Problem
Size and Shape
Net acreage consistent with standards of California Department of Education as noted in
“School Site Analysis and Development”
Length-to-width ratio does not exceed 2:1
Sufficient open play area and open space
Potential for expansion for future needs
Area for adequate and separate bus loading and parking
Safe, adequate, bicycle parking proximate/convenient to classrooms.
Accessibility
Obstacles such as crossings on major streets and intersections, narrow or winding streets, heavy
traffic patterns
Access and dispersal roads
Natural obstacles such as grades or gullies
Freeway access for bus transportation
Routing patterns for foot non-motorized
traffic
Remote areas (with no sidewalks) where students walk to and from school
Easily reachable by emergency response vehicles
Non-motorized infrastructure throughout the attendance boundary consistent with state and local
Complete Streets policies.
Public Services
Fire and police protection, including firelines
Available public transportation
Trash and garbage disposal
Utilities
Availability of water, electricity, gas, sewer
Feasibility of bringing utilities to site at reasonable cost
Restrictions on right of way
Cost
Full-cost accounting identifies capital, operating/maintenance costs for outside agencies.
Reasonable costs for purchase of property, severance damages, relocation of residents and
businesses, and legal fees
Reasonable costs for site preparation including, but not limited to, drainage, parking,
driveways, removal of existing buildings, and grading
04-10-17 TWIC Mtg Packet Pg 217 of 270
June 1998
Availability
On the market for sale
Title clearance
Condemnation of buildings and relocation of residents
OK Potentia
l
Public Acceptance
Public acceptance of the proposed site
Receptivity of city or county planning
commission Zoned for prime
agriculture or industrial use Negative
environmental impact report
Coordination and consistency of proposed school with future community plans
Comments:
\\ds.contra-costa.org\DCD\Groups\Transportation\SchoolIssues\Schools-CDE\CCC Title 5 Comments.docx
04-10-17 TWIC Mtg Packet Pg 218 of 270
Positions on Legislation of Interest – 2017 (Information Updated from Last Month is in bold/italics) State Legislation Bill Status CC County ABAG BAAQMD CCTA CSAC LofC MTC Summary Notes AB 1 (Frazier) Transportation Funding As of 01/19/17 Referred to Coms. on TRANS. and NAT. RES. SupportSupport (Porsia Dates); Support (Kiana Valentine) Support Support Would create the Road Maintenance and Rehabilitation Program to address deferred maintenance on the state highway system and the local street and road system. The bill would require the California Transportation Commission to adopt performance criteria, consistent with a specified asset management plan, to ensure efficient use of certain funds available for the program. The bill would provide for the deposit of various funds for the program in the Road Maintenance and Rehabilitation Account, which the bill would create in the State Transportation Fund. AB 28 (Frazier): DOT: environmental review process: federal pilot program Approved by Gov Support SupportSupport Support Current federal law requires the United States Secretary of Transportation to carry out a surface transportation project delivery pilot program, under which the participating states assume certain responsibilities for environmental review and clearance of transportation projects that would otherwise be the responsibility of the federal government. Current law, until January 1, 2017, provided that the State of California consents to the jurisdiction of the federal courts with regard to the compliance, discharge, or enforcement of the responsibilities it assumed as a participant in the pilot program. This bill would reinstate the operation of the latter provision. NEPA Delegation, standalone bill AB 342 (Chiu) Vehicles: Automated Speed Enforcement: Five-Year Pilot In Transportation Committee and Committee on Privacy and Consumer Protection Watch Watch Staff Support AB 342 gives local transportation authorities in the City of San Jose and the City and County of San Francisco the authority to install automated speed enforcement (ASE) systems over a five-year pilot period, in order to protect the safety of vulnerable travelers, such as children, the elderly, and bicyclists, in the two municipalities. 04-10-17 TWIC Mtg Packet Pg 219 of 270
Bill Status CC County ABAG BAAQMD CCTA CSAC LofC MTC Summary Notes SB 1 (Beall) Transportation Funding As of 12/06/16 From printer. May be acted upon on or after January 5. Support Support Support (Porsia Dates); Support (Kiana Valentine) Support Support Would create the Road Maintenance and Rehabilitation Program to address deferred maintenance on the state highway system and the local street and road system. The bill would require the California Transportation Commission to adopt performance criteria, consistent with a specified asset management plan, to ensure efficient use of certain funds available for the program. This bill contains other related provisions and other existing laws. SB 80 (Wieckowski) California Environmental Quality Act: Notices As of 01/09/17 Referred to Com. on EQ. Concerns WATCHRegarding CEQA, this is an act to amend Sections 21092.2, 21092.3, 21108, 21152, and 21167 of the Public Resources Code, relating to environmental quality. SCA-2 (Newman) Motor Vehicle Fees and Taxes: Restriction on Expenditures. As of 01/19/17 From printer. May be acted upon on or after February 18. Referred to Coms. on T. & H. and E. & C.A. Watch (Dorothy Johnson); Pending (Kiana Valentine) Watch This is a resolution to propose to the people of the State of California an amendment to the Constitution of the State, by amending Sections 1, 5, and 6 of Article XIX thereof, and by amending Section 1 of Article XIX A thereof, relating to transportation. SCA-6 Local transportation measures: special taxes: voter approval. (2017-2018) 3/29/17 Committee on Gov’t and Finance. AB 179 (Cervantes) 01/19/17 From printer. May be heard in committee February 18. Pending (Dorothy Johnson); Watch (Kiana Valentine) WATCH N/A An act to amend Section 14502 of, and to add Sections 14506.7 and 14516 to, the Government Code, relating to transportation. This bill would require the commission to create an Environmental Justice Advisory Committee, comprised of at least 5 members, to advise the commission in its allocation and programming of transportation moneys and any other pertinent transportation policy matters. The bill would require that the members of the committee represent communities disproportionately burdened by, and vulnerable to, high levels of pollution and other environmental justice issues, and would require that the commission appoint only individuals nominated by environmental justice organizations and community groups to that committee. An act to amend Section 14502 of, and to add Sections 14506.7 and 14516 to, the Government Code, relating to transportation. 04-10-17 TWIC Mtg Packet Pg 220 of 270
Bill Status CC County ABAG BAAQMD CCTA CSAC LofC MTC Summary Notes AB 174 (Bigelow) 01/19/17 From printer. May be heard in committee February 18. Pending (Dorothy Johnson); Watch (Kiana Valentine) WATCH N/A Existing law creates the California Transportation Commission, with various powers and duties relative to the programming of transportation capital projects and allocation of funds to those projects pursuant to the state transportation improvement program and various other transportation funding programs. Existing law provides that the commission consists of 13 members, 11 voting members, of which 9 are appointed by the Governor subject to Senate confirmation, 1 is appointed by the Senate Committee on Rules, and 1 is appointed by the Speaker of the Assembly, and 2 Members of the Legislature who are appointed as nonvoting ex officio members. This bill would require that at least one voting member reside in a rural county with a population of less than 100,000 individuals. An act to amend Section 14502 of the Government Code, relating to transportation. AB 13 – 580 Marine Highway (Eggman) 01/19/17 Referred to Com. On Trans. WATCHNO POSITION N/A Existing law provides that the Department of Transportation has full possession and control of all state highways and associated property, and sets forth the powers and duties of the department with respect to the operation, maintenance, and improvement of state highways. This bill would require the department to implement and oversee the —580 Marine Highway corridor project to reduce traffic by facilitating a permanent shift in container traffic away from truck transport to marine transport between the Port of Oakland and the Port of Stockton. The bill would require that the project be funded by an appropriation in the Budget Act of 2017 of $85,000,000. AB 65 Transportation Bond Debt Service (Patterson) 01/19/17 Referred to Com. On Trans. WATCHWATCH N/A Existing law provides for transfer of certain vehicle weight fee revenues to the Transportation Debt Service Fund to reimburse the General Fund for payment of current year debt service on general obligation bonds issued for transportation purposes, including bonds issued for high-speed rail and associated purposes pursuant to the Safe, Reliable High-Speed Passenger Train Bond Act for the 21st Century (Proposition 1A of 2008). This bill would specifically exclude from payment under these provisions the debt service for Proposition 1A bonds. An act to amend Section 16965 of the Government Code, relating to transportation.04-10-17 TWIC Mtg Packet Pg 221 of 270
Bill Status CC County ABAG BAAQMD CCTA CSAC LofC MTC Summary Notes AB 17 Transit Pass Program: free or reduced-fare transit passes (Holden) WATCHWATCH N/A This bill would create the Transit Pass Program to be administered by the department. The bill would require the Controller of the State of California to allocate moneys made available for the program, upon appropriation by the Legislature, to support transit pass programs that provide free or reduced-fare transit passes to specified pupils and students. The bill would require the department to develop guidelines that describe the criteria that eligible transit providers, as defined, are required to use to make available free or reduced-fare transit passes to eligible participants, as defined, and to ensure that moneys from the program are used to expand eligibility or further reduce the cost of a transit pass under existing programs. The bill would exempt the development of those guidelines from the Administrative Procedure Act. The bill would require eligible transit providers and eligible participants to enter into agreements for the distribution of free or reduced-fare transit passes to students. This bill would require the department to develop performance measures and reporting requirements to evaluate the effectiveness of the program, including an annual update of the number of free or reduced-fare transit passes distributed to pupils and students and whether the program is increasing transit ridership among pupils and students. The bill would set a minimum allocation of $20,000 for each eligible transit provider and would provide for the distribution and allocation of remaining moneys by formula to eligible transit providers. AB 467 Modernizing Voter Access to Transportation Tax Expenditure Plan (Mullin) 02/13/17 Introduced, Assembly Local Government Committee – hearing date to be set. SUPPORTThis bill increases electronic access to transportation tax expenditure plans and preserves local resources by allowing transportation authorities to post these plans online in lieu of printing them in a county voter information handbook. This bill requires that information regarding online access to these plans and details on how to obtain free printed copies be included in the voter information guide and sample ballot.04-10-17 TWIC Mtg Packet Pg 222 of 270
Adopted Positions on Legislation of Interest – 2017 (Federal Legislation) (Information Updated from Last Month is in bold/italics) Bill Status CC County ABAG BAAQMD CCTA CSAC LofC MTC Summary Notes G:\Transportation\Legislation\2017\Positions on Legislation of Interest - 2017.docx 04-10-17 TWIC Mtg Packet Pg 223 of 270
SHARE THIS:
SCA-2 Motor vehicle fees and taxes: restriction on expenditures: appropriations limit.(2017-2018)
AMENDED IN SENATE MARCH 30, 2017
AMENDED IN SENATE MARCH 29, 2017
CALIFORNIA LEGISLATURE— 2017–2018 REGULAR SESSION
SENATE CONSTITUTIONAL
AMENDMENT
No. 2
Introduced by Senator New man
(Coauthors: Senators Atkins, Beall, Dodd, Hertzberg, Hill, McGuire, and Mendoza)
(Coauthor: Assembly Member Frazier)
January 18, 2017
A resolution to propose to the people of the State of California an amendment to the Constitution of
the State, by amending Section 1 of Article XIX A thereof, by adding Section 15 to Article XIII B
thereof, and by adding Article XIX D thereto, relating to transportation.
LEGISLATIVE COUNSELʹS DIGEST
SCA 2, as amended, Newman. Motor vehicle fees and taxes: restriction on expenditures: appropriations limit.
(1) Article XIX of the California Constitution restricts the expenditure of revenues from taxes imposed by the
state on fuels used in motor vehicles upon public streets and highways to street and highway and certain mass
transit purposes, and restricts the expenditure of revenues from fees and taxes imposed by the state upon
vehicles or their use or operation to state administration and enforcement of laws regulating the use, operation,
or registration of vehicles used upon the public streets and highways, as well as to street and highway and
certain mass transit purposes. These restrictions do not apply to revenues from taxes or fees imposed under the
Sales and Use Tax Law or the Vehicle License Fee Law.
This measure would add Article XIX D to the California Constitution to require revenues derived from vehicle fees
imposed under a specified chapter of the Vehicle License Fee Law to be used solely for transportation purposes.
The measure would prohibit these revenues from being used for the payment of principal and interest on state
transportation general obligation bonds that were authorized by the voters on or before November 8, 2016. The
measure would prohibit the revenues from being used for the payment of principal and interest on state
transportation general obligation bonds issued after that date unless the bond act submitted to the voters
expressly authorizes that use. The measure would also prohibit the Legislature from borrowing these revenues,
purposes other than transportation except as specified, or using them for purposes, as defined.
Home Bill Information California Law Publications Other Resources My Subscriptions My Favorites
04-10-17 TWIC Mtg Packet Pg 224 of 270
(2) Article XIII B of the California Constitution prohibits the total annual appropriations subject to limitation of the
state and each local government from exceeding the appropriations limit of the entity of the government for the
prior year, as adjusted.
This measure would exclude appropriations of certain revenues associated with the Road Repair and
Accountability Act of 2017 from the appropriations subject to constitutional limitation.
(3) Article XIX A of the California Constitution requires the deposit of a specified portion of the sales and use tax
on diesel fuel in the Public Transportation Account in the State Transportation Fund, and restricts the expenditure
of those revenues to certain transportation and mass transportation purposes. Article XIX A prohibits the
Legislature from borrowing these revenues and from using these revenues other than as specifically permitted by
Article XIX A.
This measure would restrict additional portions of the sales and use tax on diesel fuel to expenditure on certain
transportation planning or mass transportation purposes and require those revenues to be deposited in the
Public Transportation Account. The measure would prohibit the Legislature from temporarily or permanently
diverting or appropriating these additional revenues for other than certain transportation planning or mass
transportation purposes, or from borrowing, except as specified, these additional revenues.
Vote: 2/3 Appropriation: no Fiscal Committee: yes Local Program: no
WHEREAS, Transportation revenues raised by the Road Repair and Accountability Act of 2017 should be
constitutionally protected for transportation purpose; purposes; and
WHEREAS, By so doing, Californians are assured revenues raised by that act are spent to repair streets and
bridges, address years of deferred maintenance on highways and local roads, improve mobility and public transit,
and invest in needed transportation infrastructure to benefit all Californians; now, therefore, be it
Resolved by the Senate, the Assembly concurring, That the Legislature of the State of California at its 2017–18
Regular Session commencing on the fifth day of December 2016, two-thirds of the membership of each house
concurring, hereby proposes to the people of the State of California that the Constitution of the State be
amended as follows:
First— That Section 15 is added to Article XIII B thereof, to read:
SEC. 15. “Appropriations subject to limitation” of each entity of government shall not include appropriations of
revenues from the Road Maintenance and Rehabilitation Account created by the Road Repair and Accountability
Act of 2017, or any other revenues deposited into any other funds pursuant to the act. No adjustment in the
appropriations limit of any entity of government shall be required pursuant to Section 3 as a result of revenues
being deposited in or appropriated from the Road Maintenance and Rehabilitation Account created by the Road
Repair and Accountability Act of 2017 or any other account pursuant to the act.
Second— That Section 1 of Article XIX A thereof is amended to read:
SECTION 1. (a) The Legislature shall not borrow revenues from the Public Transportation Account, or any
successor account, and shall not use these revenues for purposes, or in ways, other than those specifically
permitted by this article.
(b) The Public Transportation Account in the State Transportation Fund, or any successor account, is a trust
fund. The Legislature may not change the status of the Public Transportation Account as a trust fund. Funds in
the Public Transportation Account may not be loaned or otherwise transferred to the General Fund or any other
fund or account in the State Treasury.
(c) All revenues specified in paragraphs (1) through (3), inclusive, of subdivision (a) of Section 7102 of the
Revenue and Taxation Code, as that section read on June 1, 2001, shall be deposited no less than quarterly into
the Public Transportation Account (Section 99310 of the Public Utilities Code), or its successor. The Legislature
may not take any action which temporarily or permanently diverts or appropriates these revenues for purposes
other than those described in subdivision (d), or delays, defers, suspends, or otherwise interrupts the quarterly
deposit of these funds into the Public Transportation Account.
(d) Funds in the Public Transportation Account may only be used for transportation planning and mass
transportation purposes. The revenues described in subdivision (c) are hereby continuously appropriated to the
Controller without regard to fiscal years for allocation as follows:04-10-17 TWIC Mtg Packet Pg 225 of 270
(1) Fifty percent pursuant to subdivisions (a) through (f), inclusive, of Section 99315 of the Public Utilities Code,
as that section read on July 30, 2009.
(2) Twenty-five percent pursuant to subdivision (b) of Section 99312 of the Public Utilities Code, as that section
read on July 30, 2009.
(3) Twenty-five percent pursuant to subdivision (c) of Section 99312 of the Public Utilities Code, as that section
read on July 30, 2009.
(e) For purposes of paragraph (1) of subdivision (d), “transportation planning” means only the purposes
described in subdivisions (c) through (f), inclusive, of Section 99315 of the Public Utilities Code, as that section
read on July 30, 2009.
(f) For purposes of this article, “mass transportation,” “public transit,” and “mass transit” have the same
meaning as “public transportation.” “Public transportation” means:
(1) (A) Surface transportation service provided to the general public, complementary paratransit service
provided to persons with disabilities as required by 42 U.S.C. 12143, or similar transportation provided to people
with disabilities or the elderly; (B) operated by bus, rail, ferry, or other conveyance on a fixed route, demand
response, or otherwise regularly available basis; (C) generally for which a fare is charged; and (D) provided by
any transit district, included transit district, municipal operator, included municipal operator, eligible municipal
operator, or transit development board, as those terms were defined in Article 1 of Chapter 4 of Part 11 of
Division 10 of the Public Utilities Code on January 1, 2009, a joint powers authority formed to provide mass
transportation services, an agency described in subdivision (f) of Section 15975 of the Government Code, as
that section read on January 1, 2009, any recipient of funds under Sections 99260, 99260.7, 99275, or
subdivision (c) of Section 99400 of the Public Utilities Code, as those sections read on January 1, 2009, or a
consolidated agency as defined in Section 132353.1 of the Public Utilities Code, as that section read on January
1, 2009.
(2) Surface transportation service provided by the Department of Transportation pursuant to subdivision (a) of
Section 99315 of the Public Utilities Code, as that section read on July 30, 2009.
(3) Public transit capital improvement projects, including those identified in subdivision (b) of Section 99315 of
the Public Utilities Code, as that section read on July 30, 2009.
(g) All revenues specified in Sections 6051.8 and 6201.8 of the Revenue and Taxation Code, as those sections
read on January 1, 2018, shall be deposited no less than quarterly into the Public Transportation Account, or its
successor. Except as provided in Sections 16310 and 16381 of the Government Code, as those sections read
on January 1, 2018, the Legislature may not take any action that temporarily or permanently diverts or
appropriates these revenues for purposes other than those described in subdivision (d), or delays, defers,
suspends, or otherwise interrupts the quarterly deposit of these revenues into the Public Transportation Account.
Third— That Article XIX D is added thereto, to read:
Article XIX D VEHICLE LICENSE FEE REVENUES FOR TRANSPORTATION PURPOSES
SECTION 1. (a) Notwithstanding Section 8 of Article XIX, revenues derived from vehicle fees imposed under the
Vehicle License Fee Law pursuant to Chapter 6 (commencing with Section 11050) of Part 5 of Division 2 of the
Revenue and Taxation Code, or its successor, over and above the costs of collection and any refunds authorized
by law, shall be used solely for transportation purposes, as defined by Section 11050 of the Revenue and
Taxation Code, as that section read upon enactment of the Road Repair and Accountability Act of 2017.
(b) The revenues described in subdivision (a) shall not be used for the payment of principal and interest on state
transportation general obligation bonds that were authorized by the voters on or before November 8, 2016, nor
shall those revenues be used for payment of principal and interest on state transportation general obligation
bond acts approved by the voters after that date, unless the bond act expressly authorizes that use.
(c) Except as provided in Sections 16310 and 16381 of the Government Code, as those sections read on
January 1, 2018, the Legislature shall not borrow the revenues described in subdivision (a), and shall not use
these revenues for purposes, or in ways, other than as authorized in subdivisions (a) or (b).
04-10-17 TWIC Mtg Packet Pg 226 of 270
SHARE THIS:
SCA-6 Local transportation measures: special taxes: voter approval.(2017-2018)
AMENDED IN SENATE MARCH 29, 2017
CALIFORNIA LEGISLATURE— 2017–2018 REGULAR SESSION
SENATE CONSTITUTIONAL
AMENDMENT
No. 6
Introduced by Senator Wiener
February 13, 2017
A resolution to propose to the people of the State of California an amendment to the Constitution of
the State, by amending Section 4 of Article XIII A thereof, and by amending Section 2 of Article XIII C
thereof, relating to transportation.
LEGISLATIVE COUNSELʹS DIGEST
SCA 6, as amended, Wiener. Local transportation measures: special taxes: voter approval.
The California Constitution conditions the imposition of a special tax by a city, county, or special district upon the
approval of 2/3 of the voters of the city, county, or special district voting on that tax, except that certain school
entities may levy an ad valorem property tax for specified purposes with the approval of 55% of the voters
within the jurisdiction of these entities.
This measure would require that the imposition, extension, or increase of a special tax by a local government for
the purpose of providing funding for transportation purposes, as specified, be submitted to the electorate and
approved by 55% of the voters voting on the proposition. The measure would also make conforming and
technical, nonsubstantive changes.
The California Constitution provides that a proposed amendment of the constitution, upon submission to, and
approval by, the voters takes effect the day after the election unless the measure provides otherwise.
This measure would provide that the amendments of the constitution in this measure shall take effect on the
date of the election.
Vote: 2/3 Appropriation: no Fiscal Committee: no Local Program: no
Resolved by the Senate, the Assembly concurring, That the Legislature of the State of California at its 2016–17
2017–18 Regular Session commencing on the fifth day of December 2016, two-thirds of the membership of
Home Bill Information California Law Publications Other Resources My Subscriptions My Favorites
04-10-17 TWIC Mtg Packet Pg 227 of 270
each house concurring, hereby proposes to the people of the State of California that the Constitution of the
State be amended as follows:
First— That Section 4 of Article XIII A thereof is amended to read:
SEC. 4. Except as otherwise provided by Section 2 of Article XIII C, a city, county, or special district, by a two-
thirds vote of its voters voting on the proposition, may impose a special tax within that city, county, or special
district, except an ad valorem tax on real property or a transactions tax or sales tax on the sale of real property
within that city, county, or special district.
Second— That Section 2 of Article XIII C thereof is amended to read:
SEC. 2. Notwithstanding any other provision of this Constitution:
(a) A tax imposed by any local government is either a general tax or a special tax. A special district or agency,
including a school district, has no authority to levy a general tax.
(b) A local government shall not impose, extend, or increase any general tax unless and until that tax is
submitted to the electorate and approved by a majority vote. A general tax is not deemed to have been
increased if it is imposed at a rate not higher than the maximum rate so approved. The election required by this
subdivision shall be consolidated with a regularly scheduled general election for members of the governing body
of the local government, except in cases of emergency declared by a unanimous vote of the governing body.
(c) Any general tax imposed, extended, or increased, without voter approval, by any local government on or
after January 1, 1995, and prior to November 6, 1996, may continue to be imposed only if that general tax is
approved by a majority vote of the voters voting in an election on the issue of the imposition, which election is
held no later than November 6, 1998, and in compliance with subdivision (b).
(d) (1) Except as otherwise provided in paragraph (2), a local government shall not impose, extend, or increase
any special tax unless and until that tax is submitted to the electorate and approved by two-thirds of the voters
voting on the proposition. A special tax is not deemed to have been increased if it is imposed at a rate not higher
than the maximum rate so approved.
(2) The imposition, extension, or increase of a special tax, as may otherwise be authorized by law, by a local
government for the purpose of providing funding for transportation purposes requires the submittal of the tax to
the electorate and approval of 55 percent of the voters voting on the proposition. A tax provides funding for
transportation purposes if 100 percent of the net revenues from the tax, after collection and administrative
expenses, is dedicated to transportation programs and projects.
Third— That the amendments to Section 4 of Article XIII A and Section 2 of Article XIII C of the California
Constitution made by this measure shall take effect on the date of the election at which they are approved by
the voters.
04-10-17 TWIC Mtg Packet Pg 228 of 270
SHARE THIS:Date Published: 03/22/2017 04:00 AM
AB-342 Vehicles: automated speed enforcement: five-year pilot program.(2017-2018)
AMENDED IN ASSEMBLY MARCH 21, 2017
CALIFORNIA LEGISLATURE— 2017–2018 REGULAR SESSION
ASSEMBLY BILL No. 342
Introduced by Assembly Member Chiu
(Principal coauthor: Senator Wiener)
(Coauthor: Assembly Member Chu)
(Coauthor: Senator Beall)
February 07, 2017
An act to amend, repeal, and add Section 70615 of the Government Code, to amend, repeal, and add
Section 10878 of the Revenue and Taxation Code, and to amend, repeal, and add Section 9800 of,
and to add and repeal Article 3 (commencing with Section 22425) of Chapter 7 of Division 11 of, the
Vehicle Code, relating to vehicles.
LEGISLATIVE COUNSELʹS DIGEST
AB 342, as amended, Chiu. Vehicles: automated speed enforcement: five-year pilot program.
Existing law establishes a basic speed law that prohibits a person from driving a vehicle upon a highway at a
speed greater than is reasonable or prudent given the weather, visibility, traffic, highway conditions, and in no
event at a speed that endangers the safety of persons or property. Existing law does not expressly authorize
the use of automated speed enforcement in this state.
This bill would authorize, no later than January 1, 2019, the City of San Jose (San Jose) and the City and County
of San Francisco (San Francisco) to implement a 5-year pilot program utilizing an automated speed enforcement
system (ASE system) for speed limit enforcement on certain streets, if the system meets specified
requirements, including that the presence of a fixed or mobile ASE system is clearly identified by signs, as
specified, and trained peace officers or other trained designated municipal employees are utilized to oversee the
operation of the fixed and mobile ASE systems. The bill would require San Jose and San Francisco to adopt an
ASE System Use Policy, as specified, and develop uniform guidelines for, among other things, the processing and
storage of confidential information. The bill would provide that a speed violation that is recorded by an ASE
system is subject to a civil penalty in an amount not to exceed $100.
Home Bill Information California Law Publications Other Resources My Subscriptions My Favorites
04-10-17 TWIC Mtg Packet Pg 229 of 270
The bill would, among other things, provide for the issuance of a notice of violation, an initial review, an
administrative hearing, and an appeals process, as specified, for a violation enforced by an ASE system. The bill
would also authorize the processing agency to assess delinquent fees, as specified, if payment of the civil penalty
is not received within a specified time. The bill would require the Department of Motor Vehicles to refuse to
renew the registration of a vehicle if, among other things, the owner has not paid the civil penalty and delinquent
fees, except as specified. The bill would require the department to remit all penalties and delinquent fees
collected, after deducting its own administrative fees, to the processing agency.
Existing law provides that payments for specified penalties, including penalties for offenses relating to the parking
of a vehicle, required to register or transfer the registration of a vehicle, constitute a lien on the vehicle on which
the payments are due or that was involved in the offenses, and on any other vehicle owned by the owner of
that vehicle.
This bill would, until January 1, 2024, also include payments for penalties for offenses related to the ASE system
operated by San Jose or San Francisco for which a notice of violation has been served on the owner or recipient
of a reissued citation and any delinquent fees added to the penalty as constituting a lien on the specified vehicles.
Existing law transfers the responsibility and authority for the collection of specified delinquent amounts, including
penalties for offenses relating to the standing or parking of a vehicle, from the department to the Franchise Tax
Board.
This bill would, until January 1, 2024, also transfer to the board the responsibility and authority to collect
penalties for offenses related to the ASE system operated by San Jose or San Francisco for which a notice of
violation has been served on the owner or recipient of a reissued notice of violation and any delinquent fees
added to the penalty.
This bill would make legislative findings and declarations as to the necessity of a special statute for the City of
San Jose and the City and County of San Francisco.
Existing constitutional provisions require that a statute that limits the right of access to the meetings of public
bodies or the writings of public officials and agencies be adopted with findings demonstrating the interest
protected by the limitation and the need for protecting that interest.
This bill would make legislative findings to that effect.
Vote: majority Appropriation: no Fiscal Committee: yes Local Program: no
THE PEOPLE OF THE STATE OF CALIFORNI A DO ENACT AS FOLLOWS:
SECTION 1. The Legislature finds and declares all of the following:
(a) Speed is a major factor in traffic collisions that result in fatalities or injuries.
(b) Law enforcement and other local agencies employ a variety of methods to reduce speeding, including traffic
engineering, education, and enforcement.
(c) Traffic speed enforcement is critical to the efforts of municipalities in California to reduce factors that
contribute to traffic collisions that result in fatalities or injuries.
(d) Additional tools, including automated speed enforcement, are available to assist cities in addressing excessive
speeding and speed-related crashes.
(e) Automated speed enforcement (ASE) offers a high rate of detection, and in conjunction with education,
traffic engineering, and law enforcement measures, it can significantly improve traffic safety and prevent traffic
related fatalities and injuries.
(f) Multiple ASE programs implemented in other states and cities outside of California have proven successful in
reducing speeding and addressing traffic safety concerns.
(g) In the City of San Jose and the City and County of San Francisco, fatal and injury collisions are often
concentrated on specific corridors of the street network where drivers travel at excessive speeds. ASE can be
deployed to detect and deter excessive speeding on streets that have a documented speeding problem as
demonstrated by an aggregation of traffic collisions caused by excessive speed.
04-10-17 TWIC Mtg Packet Pg 230 of 270
(h) Enforcing speed limits using ASE systems on streets where speeding drivers negatively impact traffic safety is
a reliable and cost-effective means to prevent further fatalities and injuries and would be in the public interest. On
a pilot basis, this act authorizes the City of San Jose and the City and County of San Francisco to implement ASE
programs for a five-year period, which will commence the day that the ASE system has been activated but not
later than January 1, 2019. The City of San Jose and the City and County of San Francisco would have the
authority to use ASE on a street or portions of a street that have a documented speeding problem as
demonstrated through a high incidence of speed-related traffic collisions pursuant to the methodology described
in this act.
(i) The City of San Jose and the City and County of San Francisco would be required to submit to the
transportation committees of the Legislature an evaluation on the effectiveness of the ASE pilot program
implemented in their respective jurisdictions on traffic safety pursuant to requirements described in this act. The
City of San Jose and the City and County of San Francisco would also be required to submit an ASE System
Report to their respective governing body pursuant to the requirements described in this act.
(j) To protect the privacy interests of persons who are issued notices of violation under an ASE program, the
Legislature finds and declares that the photographic, video, or other visual or administrative records generated
by the program shall be confidential, and shall be made available only to alleged violators and to governmental
and law enforcement agencies solely for the purpose of enforcing these violations and assessing the impacts of
the ASE system as required by this act.
(k) Prior to implementing ASE enforcement, the governing body of the City of San Jose and the City and County
of San Francisco that oversees the ASE program in their respective jurisdictions shall adopt an ASE System Use
Policy and approve an ASE System Impact Report pursuant to the requirements described in this act.
SEC. 2. Section 70615 of the Government Code is amended to read:
70615. (a) The fee for filing any of the following appeals to the superior court is twenty-five dollars ($25):
(1) An appeal of a local agency’s decision regarding an administrative fine or penalty under Section 53069.4.
(2) An appeal under Section 40230 of the Vehicle Code of an administrative agency’s decision regarding a
parking violation.
(3) An appeal under Section 99582 of the Public Utilities Code of a hearing officer’s determination regarding an
administrative penalty for fare evasion or a passenger conduct violation.
(4) An appeal under Section 186.35 of the Penal Code of a law enforcement agency’s determination regarding
the placement of an individual’s information in a shared gang database.
(5) An appeal under Section 22428 of the Vehicle Code of a hearing officer’s determination regarding a civil
penalty for an automated speed violation, as defined in Section 22425 of the Vehicle Code.
(b) This section shall remain in effect only until January 1, 2024, and as of that date is repealed, unless a later
enacted statute that is enacted before January 1, 2024, deletes or extends that date.
SEC. 3. Section 70615 is added to the Government Code, to read:
70615. (a) The fee for filing any of the following appeals to the superior court is twenty-five dollars ($25):
(1) An appeal of a local agency’s decision regarding an administrative fine or penalty under Section 53069.4.
(2) An appeal under Section 40230 of the Vehicle Code of an administrative agency’s decision regarding a
parking violation.
(3) An appeal under Section 99582 of the Public Utilities Code of a hearing officer’s determination regarding an
administrative penalty for fare evasion or a passenger conduct violation.
(4) An appeal under Section 186.35 of the Penal Code of a law enforcement agency’s determination regarding
the placement of an individual’s information in a shared gang database.
(b) This section shall become operative on January 1, 2024.
SEC. 4. Section 10878 of the Revenue and Taxation Code is amended to read:
04-10-17 TWIC Mtg Packet Pg 231 of 270
10878. (a) Notwithstanding Sections 10877 and 10951, the responsibility and authority for the collection of the
following delinquent amounts, and any interest, penalties, or service fees added thereto, shall be transferred
from the department to the Franchise Tax Board:
(1) Registration fees.
(2) Transfer fees.
(3) License fees.
(4) Use taxes.
(5) Penalties for offenses relating to the standing or parking of a vehicle for which a notice of parking violation
has been served on the owner, and any administrative service fee added to the penalty.
(6) Unpaid tolls, toll evasion penalties as described in Section 40252 of the Vehicle Code, and any related
administrative or service fees.
(7) Any court-imposed fine or penalty assessment, and any administrative service fee added thereto, that is
subject to collection by the department.
(8) Penalties for offenses detected by an automated speed enforcement system operated by the City of San
Jose or the City and County of San Francisco for which a notice of violation has been served on the registered
owner or recipient of a reissued notice of violation and any delinquent fees added to the penalty.
(b) Any reference in this part to the department in connection with the duty to collect these amounts shall be
deemed a reference to the Franchise Tax Board.
(c) The amounts collected under subdivision (a) may be collected in any manner authorized under the law as
though they were a tax imposed under Part 10 (commencing with Section 17001) that is final, including, but not
limited to, issuance of an order and levy under Article 4 (commencing with Section 706.070) of Chapter 5 of
Division 2 of Title 9 of Part 2 of the Code of Civil Procedure in the manner provided for earnings withholding order
for taxes. Part 10 (commencing with Section 17001), 10.2 (commencing with Section 18401), or 10.7
(commencing with Section 21001), or any other applicable law shall apply for this purpose in the same manner
and with the same force and effect as if the language of Part 10, 10.2, or 10.7, or the other applicable law is
incorporated in full into this authority to collect these amounts, except to the extent that the provision is either
inconsistent with the collection of these amounts or is not relevant to the collection of these amounts.
(d) Even though the amounts authorized by this section are collected as though they are taxes, amounts so
received by the Franchise Tax Board shall be deposited into an appropriate fund or account upon agreement
between the Franchise Tax Board and the department. The amounts shall be distributed by the department from
the appropriate fund or account in accordance with the laws providing for the deposits and distributions as
though the moneys were received by the department.
(e) For any collection action under this section, the Franchise Tax Board may utilize the contract authorization,
procedures, and mechanisms available either with respect to the collection of taxes, interest, additions to tax,
and penalties pursuant to Section 19376, or with respect to the collection of the delinquencies by the
department immediately prior to the time this section takes effect.
(f) The Legislature finds that it is essential for fiscal purposes that the program authorized by this section be
expeditiously implemented. Accordingly, Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of
Title 2 of the Government Code shall not apply to any standard, criteria, procedure, determination, rule, notice,
or guideline established or issued by the Franchise Tax Board in implementing and administering the program
required by this section.
(g) Any standard, criteria, procedure, determination, rule, notice, or guideline, that is not subject to the
provisions of Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government
Code pursuant to subdivision (f), shall be approved by the Franchise Tax Board, itself.
(h) The Franchise Tax Board may enter into any agreements or contracts necessary to implement and
administer the provisions of this section. The Franchise Tax Board in administering this section may delegate
collection activities to the department. Any contracts may provide for payment of the contract on the basis of a
percentage of the amount of revenue realized as a result of the contractor’s services under that contract.
04-10-17 TWIC Mtg Packet Pg 232 of 270
However, the Franchise Tax Board, in administering this part, may not enter into contracts with private collection
agencies as authorized under Section 19377.
(i) The amendments made to this section by the act adding this subdivision shall apply commencing with the
effective date of the act adding this subdivision.
(j) This section shall remain in effect only until January 1, 2024, and as of that date is repealed, unless a later
enacted statute that is enacted before January 1, 2024, deletes or extends that date.
SEC. 5. Section 10878 is added to the Revenue and Taxation Code, to read:
10878. (a) Notwithstanding Sections 10877 and 10951, the responsibility and authority for the collection of the
following delinquent amounts, and any interest, penalties, or service fees added thereto, shall be transferred
from the department to the Franchise Tax Board:
(1) Registration fees.
(2) Transfer fees.
(3) License fees.
(4) Use taxes.
(5) Penalties for offenses relating to the standing or parking of a vehicle for which a notice of parking violation
has been served on the owner, and any administrative service fee added to the penalty.
(6) Unpaid tolls, toll evasion penalties as described in Section 40252 of the Vehicle Code, and any related
administrative or service fees.
(7) Any court-imposed fine or penalty assessment, and any administrative service fee added thereto, that is
subject to collection by the department.
(b) Any reference in this part to the department in connection with the duty to collect these amounts shall be
deemed a reference to the Franchise Tax Board.
(c) The amounts collected under subdivision (a) may be collected in any manner authorized under the law as
though they were a tax imposed under Part 10 (commencing with Section 17001) that is final, including, but not
limited to, issuance of an order and levy under Article 4 (commencing with Section 706.070) of Chapter 5 of
Division 2 of Title 9 of Part 2 of the Code of Civil Procedure in the manner provided for earnings withholding order
for taxes. Part 10 (commencing with Section 17001), 10.2 (commencing with Section 18401), or 10.7
(commencing with Section 21001), or any other applicable law shall apply for this purpose in the same manner
and with the same force and effect as if the language of Part 10, 10.2, or 10.7, or the other applicable law is
incorporated in full into this authority to collect these amounts, except to the extent that the provision is either
inconsistent with the collection of these amounts or is not relevant to the collection of these amounts.
(d) Even though the amounts authorized by this section are collected as though they are taxes, amounts so
received by the Franchise Tax Board shall be deposited into an appropriate fund or account upon agreement
between the Franchise Tax Board and the department. The amounts shall be distributed by the department from
the appropriate fund or account in accordance with the laws providing for the deposits and distributions as
though the moneys were received by the department.
(e) For any collection action under this section, the Franchise Tax Board may utilize the contract authorization,
procedures, and mechanisms available either with respect to the collection of taxes, interest, additions to tax,
and penalties pursuant to Section 19376, or with respect to the collection of the delinquencies by the
department immediately prior to the time this section takes effect.
(f) The Legislature finds that it is essential for fiscal purposes that the program authorized by this section be
expeditiously implemented. Accordingly, Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of
Title 2 of the Government Code shall not apply to any standard, criteria, procedure, determination, rule, notice,
or guideline established or issued by the Franchise Tax Board in implementing and administering the program
required by this section.
(g) Any standard, criteria, procedure, determination, rule, notice, or guideline, that is not subject to the
provisions of Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government
04-10-17 TWIC Mtg Packet Pg 233 of 270
Code pursuant to subdivision (f), shall be approved by the Franchise Tax Board, itself.
(h) The Franchise Tax Board may enter into any agreements or contracts necessary to implement and
administer the provisions of this section. The Franchise Tax Board in administering this section may delegate
collection activities to the department. Any contracts may provide for payment of the contract on the basis of a
percentage of the amount of revenue realized as a result of the contractor’s services under that contract.
However, the Franchise Tax Board, in administering this part, may not enter into contracts with private collection
agencies as authorized under Section 19377.
(i) This section shall become operative on January 1, 2024.
SEC. 6. Section 9800 of the Vehicle Code is amended to read:
9800. (a) Payments for any of the following, and any interest, penalties, or service fees added thereto, required
to register or transfer the registration of a vehicle, constitute a lien on the vehicle on which they are due or that
was involved in the offense, and on any other vehicle owned by the owner of that vehicle:
(1) Registration fees.
(2) Transfer fees.
(3) License fees.
(4) Use taxes.
(5) Penalties for offenses relating to the standing or parking of a vehicle for which a notice of parking violation
has been served on the owner, and any administrative service fee added to the penalty.
(6) Any court-imposed fine or penalty assessment, and any administrative service fee added thereto, which is
subject to collection by the department.
(7) Penalties for offenses detected by an automated speed enforcement system operated by the City of San
Jose or the City and County of San Francisco for which a notice of violation has been served on the owner or
recipient of a reissued citation and any delinquent fees added to the penalty.
(b) Notwithstanding subdivision (a), if a person is cited for a foreign registered auxiliary dolly, semitrailer, or
trailer having been operated without current year registration or valid California permits or registration, an
amount equal to the minimum registration fees or transfer fees, and any penalty added thereto, from the date
they became due, shall, by election of the power unit operator, constitute a lien upon the California registered
power unit that was pulling the dolly, semitrailer, or trailer. However, this subdivision is not applicable if the
citation is issued at a scale operated by the Department of the California Highway Patrol and registration for the
vehicle can be issued there immediately upon payment of the fees due.
(c) Every lien arising under this section expires three years from the date the fee, tax, or penalty first became
due unless the lien is perfected pursuant to subdivision (d).
(d) A lien is perfected when a notice is mailed to the registered and legal owners at the addresses shown in the
department’s records and the lien is recorded on the electronic vehicle registration records of the department. A
perfected lien shall expire five years from the date of perfection.
(e) Employees and members of the Department of the California Highway Patrol assigned to commercial vehicle
scale facilities may possess and sell trip permits approved by the Department of Motor Vehicles.
(f) This section shall remain in effect only until January 1, 2024, and as of that date is repealed, unless a later
enacted statute that is enacted before January 1, 2024, deletes or extends that date.
SEC. 7. Section 9800 is added to the Vehicle Code, to read:
9800. (a) Payments for any of the following, and any interest, penalties, or service fees added thereto, required
to register or transfer the registration of a vehicle, constitute a lien on the vehicle on which they are due or that
was involved in the offense, and on any other vehicle owned by the owner of that vehicle:
(1) Registration fees.
(2) Transfer fees.04-10-17 TWIC Mtg Packet Pg 234 of 270
(3) License fees.
(4) Use taxes.
(5) Penalties for offenses relating to the standing or parking of a vehicle for which a notice of parking violation
has been served on the owner, and any administrative service fee added to the penalty.
(6) Any court-imposed fine or penalty assessment, and any administrative service fee added thereto, which is
subject to collection by the department.
(b) Notwithstanding subdivision (a), if a person is cited for a foreign registered auxiliary dolly, semitrailer, or
trailer having been operated without current year registration or valid California permits or registration, an
amount equal to the minimum registration fees or transfer fees, and any penalty added thereto, from the date
they became due, shall, by election of the power unit operator, constitute a lien upon the California registered
power unit that was pulling the dolly, semitrailer, or trailer. However, this subdivision is not applicable if the
citation is issued at a scale operated by the Department of the California Highway Patrol and registration for the
vehicle can be issued there immediately upon payment of the fees due.
(c) Every lien arising under this section expires three years from the date the fee, tax, or penalty first became
due unless the lien is perfected pursuant to subdivision (d).
(d) A lien is perfected when a notice is mailed to the registered and legal owners at the addresses shown in the
department’s records and the lien is recorded on the electronic vehicle registration records of the department. A
perfected lien shall expire five years from the date of perfection.
(e) Employees and members of the Department of the California Highway Patrol assigned to commercial vehicle
scale facilities may possess and sell trip permits approved by the Department of Motor Vehicles.
(f) This section shall become operative on January 1, 2024.
SEC. 8. Article 3 (commencing with Section 22425) is added to Chapter 7 of Division 11 of the Vehicle Code, to
read:
Article 3. Automated Speed Enforcement System
22425. (a) As used in this article, the following definitions shall apply:
(1) “Automated speed enforcement system” or “ASE system” means a fixed or mobile radar or laser system or
any other electronic device that utilizes automated equipment to detect a violation of speeding laws and is
designed to obtain a clear photograph, video recording, or other visual image of a vehicle license plate.
(2) “Automated speed violation” means a violation of a speed law detected by an ASE system operated
pursuant to this article.
(3) “City of San Jose,” “City and County of San Francisco,” or “municipality” means any department, bureau,
division, or unit of the City of San Jose or the City and County of San Francisco, respectively.
(b) The City of San Jose and the City and County of San Francisco may establish a program utilizing an ASE
system for speed limit enforcement on streets or portions of streets with speed limits that are 50 miles per hour
or less and that have had three or more speed-related fatal, severe, or other visible injury collisions occur within
a one-half mile distance of each other, over a five-year period a documented incidence of collisions resulting in
fatalities or injuries as evidenced by either a three-year fatality and injury collision rate, or a three-year fatality
rate, that is higher than the three-year collision and fatality rates published by the Department of Transportation
for comparable roadways, based on the most recent available local or state collision data, and the primary or
secondary collision factor identified on the California Highway Patrol form 555 is an unsafe speed violation. and
fatality data.
(c) ASE is not authorized on freeways.
(d) If a school zone is located on a street or portion of a street that is eligible for an ASE system pursuant to
subdivision (b), and the posted speed limit is 30 miles per hour or higher when children are not present, the City
of San Jose and the City and County of San Francisco may use automated speed enforcement two hours before
the regular school session begins and two hours after regular school session concludes.
04-10-17 TWIC Mtg Packet Pg 235 of 270
(e) An ASE system for speed limit enforcement may be utilized pursuant to subdivision (b) if the program meets
all of the following requirements:
(1) Is operated in cooperation with a law enforcement agency.
(2) Clearly identifies the presence of the fixed or mobile ASE system by signs stating “Photo Enforced,” along
with the posted speed limit. The signs shall be visible to traffic traveling on the street from the direction of travel
for which the ASE system is utilized, and shall be posted at all locations in the corridors or zones enforced by an
ASE system where there is a posted speed limit sign. Signs shall also be placed at additional locations as may be
determined necessary by the Department of Transportation through discussions with the California Traffic
Control Devices Committee.
(3) Identifies vehicles containing a mobile ASE system with distinctive markings, including information that the
system is being operated for “Photo Enforcement” purposes.
(4) Identifies the streets or portions of streets that have been approved for enforcement using an ASE system
and the hours of enforcement on the municipality’s Internet Web site, which shall be updated whenever the
municipality changes locations that are enforced with the mobile ASE system or hours of enforcement.
(5) (A) Utilizes trained peace officers or other trained designated municipal employees who oversee the
operation of mobile and fixed ASE systems and maintain control over all enforcement activities, including the
determination of when a notice of violation should be issued.
(B) Peace officers or other designated municipal employees shall be properly trained in both of the following:
(i) The use of an ASE system, including, but not limited to, the operation, set-up, and testing of the system
deployed by the municipality.
(ii) The enforcement of traffic and speeding laws in a course approved and certified by the Commission on Peace
Officer Standards and Training or an operator course meeting equivalent standards.
(C) The municipality shall retain documentation of the successful completion of any required training by any
peace officer or designated municipal employee that oversees the operation of an ASE system and the
enforcement activities.
(6) Ensures that the ASE system is regularly inspected and certifies that the system is installed and operating
properly. Each camera unit shall be calibrated in accordance with the manufacturer’s instructions, and at least
once a year by an independent calibration laboratory. Documentation of the regular inspection, operation, and
calibration of the ASE system shall be retained until the date on which the ASE system has been permanently
removed from use.
(7) Conducts an engineering and traffic survey as set forth in Section 40802.
(8) Utilizes fixed and mobile ASE systems that provide real-time notification when violations are detected.
(f) Prior to enforcing speed laws utilizing ASE systems, the municipality shall do both of the following:
(1) Administer a public information campaign for at least 30 calendar days prior to the initial commencement of
the program, which shall include public announcements in major media outlets and press releases. The public
information campaign shall include information on when ASE systems will begin detecting violations, the streets,
or portions of streets, where fixed or mobile ASE systems will be utilized, and the city’s Internet Web site,
where additional information about the program can be obtained. Notwithstanding that additional fixed or mobile
ASE systems may be added to the program, no further public announcement by the municipality shall be
required.
(2) Issue warning notices rather than notices of violation for violations detected by the ASE systems during the
first 90 calendar days of enforcement under the program. Notwithstanding that If additional fixed or mobile ASE
systems may be added to the program, are utilized on additional streets after the initial program
implementation, the municipality shall not be required to issue further warning notices. notices rather than
notices of violation for violations detected by the new ASE systems during the first 30 calendar days of
enforcement for the additional streets added to the program.
(g) The local governing body shall adopt an ASE System Use Policy prior to implementing an ASE program. The
ASE System Use Policy shall include the specific purpose for the ASE system, the uses that are authorized, the
rules and processes required prior to that use, and the uses that are prohibited. The policy shall include the data
04-10-17 TWIC Mtg Packet Pg 236 of 270
or information that can be collected by the ASE system and the individuals who can access or use the collected
information, and the rules and processes related to the access or use of the information. The policy shall also
include provisions for protecting data from unauthorized access, data retention, public access, third-party data
sharing, training, auditing, and oversight to ensure compliance with the ASE System Use Policy. The ASE System
Use Policy shall be made available for public review at least 30 calendar days prior to adoption by the local
governing body.
(h) The local governing body also shall approve an ASE System Impact Report prior to implementing an ASE
program. The ASE System Impact Report shall include all of the following information:
(1) Description of the ASE system and how it works.
(2) Proposed purpose of the ASE system.
(3) Locations that the ASE system may be deployed and traffic data for these locations.
(4) Assessment of potential impact of the ASE system on civil liberties and civil rights and any plans to safeguard
those public rights.
(5) Fiscal costs for the ASE system, including program establishment costs, ongoing costs, and program funding.
(6) The ASE System Impact Report shall be made available for public review at least 30 calendar days prior to
adoption by the governing body.
(i) The municipality shall develop uniform guidelines that shall be approved by the local law enforcement agency
for both of the following:
(1) The screening and issuing of notices of violation.
(2) The processing and storage of confidential information and procedures to ensure compliance with
confidentiality requirements.
(j) Notices of violation issued pursuant to this section shall include a clear photograph, video recording, or other
visual image of the license plate and rear of the vehicle only, the Vehicle Code violation, the camera location, and
the date and time when the violation occurred. Notices of violation shall exclude images of the rear window area
of the vehicle.
(k) The photographic, video, or other visual evidence stored by an ASE system does not constitute an out-of-
court hearsay statement by a declarant under Division 10 (commencing with Section 1200) of the Evidence
Code.
(l) (1) Notwithstanding Sections 6253 and 6262 of the Government Code, or any other law, photographic,
video, or other visual or administrative records made by an ASE system shall be confidential. Public agencies shall
use and allow access to these records only for the purposes authorized by this article or to assess the impacts
of the ASE system.
(2) Confidential information obtained from the Department of Motor Vehicles for the administration of ASE
systems and enforcement of this article shall be held confidential, and shall not be used for any other purpose.
(3) Except for court records described in Section 68152 of the Government Code, or as provided in paragraph
(4), the confidential records and evidence described in paragraphs (1) and (2) may be retained for up to 60 days
after final disposition of the notice of violation. The municipality may adopt a retention period of less than 60
days in the ASE System Use Policy. Administrative records described in paragraph (1) may be retained for up to
120 days after final disposition of the notice of violation. Notwithstanding any other law, the confidential records
and evidence shall be destroyed in a manner that maintains the confidentiality of any person included in the
record or evidence.
(4) Notwithstanding Section 26202.6 of the Government Code, photographic, video, or other visual evidence
that is obtained from an ASE system that does not contain evidence of a speeding violation shall be destroyed
within five business days after the evidence was first obtained.
(m) Notwithstanding subdivision (l), the registered owner or an individual identified by the registered owner as
the driver of the vehicle at the time of the alleged violation shall be permitted to review the photographic, video,
or visual evidence of the alleged violation.
04-10-17 TWIC Mtg Packet Pg 237 of 270
(n) A contract between the municipality and a manufacturer or supplier of ASE systems shall allow the local
authority to purchase materials, lease equipment, and contract for processing services from the manufacturer or
supplier based on the services rendered on a monthly schedule or another schedule agreed upon by the
municipality and contractor. The contract shall not include provisions for payment or compensation based on the
number of notices of violation issued by a trained peace officer or other designated municipal employee, or as a
percentage of revenue generated, from the use of the ASE system. The contract shall include a provision that all
data collected from the ASE systems is confidential, and shall prohibit the manufacturer or supplier of ASE
systems from sharing, repurposing, or monetizing collected data for purposes other than those authorized in this
article. The municipality shall oversee and maintain control over all enforcement activities, including the
determination of when a notice of violation should be issued.
(o) Notwithstanding subdivision (n), a municipality may contract with a vendor for the processing of notices of
violation after a trained peace officer or other designated municipal employee has issued a notice of violation.
The vendor shall be a separate legal and corporate entity from, and unrelated or affiliated in any manner with,
the manufacturer or supplier of ASE systems used by the municipality. Any contract between the municipality
and a vendor to provide processing services may include a provision for the payment of compensation based on
the number of notices of violation processed by the vendor.
(p) An ASE system adopted pursuant to this article shall be activated no later than January 1, 2019, and may
operate for no longer than five years.
22426. (a) Notwithstanding any other law, a violation of Section 22350, or any other speed law, that is recorded
by an ASE system authorized pursuant to Section 22425 shall be subject only to a civil penalty, as provided in
subdivision (d), and shall not result in the department suspending or revoking the privilege of a violator to drive a
motor vehicle or in a violation point being assessed against the violator.
(b) The ASE system shall capture images of the rear license plate of vehicles that are traveling 10 miles per hour
or more over the posted speed limit and notices of violation shall only be issued to vehicles based on that
evidence.
(c) No more than one notice of violation shall be issued for a violation recorded from a specific license plate
within a 24-hour period.
(d) The total amount of the civil penalty, including any additional local fees by the municipality, for a speed
violation that is recorded and cited under this section shall not exceed one hundred dollars ($100).
(e) The written notice of violation shall be issued to the registered owner of the vehicle within 15 calendar days
of the date of the violation. The notice of violation shall include all of the following information:
(1) The violation, including reference to the local ordinance, state law, or federal statute or regulation that was
violated.
(2) The date, approximate time, and location where the violation occurred.
(3) The vehicle license number and the name and address of the registered owner of the vehicle.
(4) A statement that payment is required to be made no later than 30 calendar days from the date of mailing of
the notice of violation, or that the violation may be contested pursuant to Section 22427.
(5) The amount of the civil penalty due for that violation and the procedures for the registered owner, lessee, or
rentee to pay the civil penalty or to contest the notice of violation.
(6) An affidavit of nonliability, and information of what constitutes nonliability, information as to the effect of
executing the affidavit, and instructions for returning the affidavit to the processing agency. If the affidavit of
nonliability is returned to the processing agency within 30 calendar days of the mailing of the notice of violation,
together with proof of a written lease or rental agreement between a bona fide rental or leasing company and its
customer, which identifies the rentee or lessee, the processing agency shall serve or mail a notice of violation to
the rentee or lessee identified in the affidavit of nonliability.
(7) A notice to the registered owner that unless the registered owner pays the civil penalty or contests the
notice within 30 calendar days after the mailing of the notice of violation, or completes and files an affidavit of
nonliability, the renewal of the vehicle registration shall be contingent upon compliance with the notice of
violation. If the registered owner, by appearance or by mail, makes payment to the processing agency within 30
04-10-17 TWIC Mtg Packet Pg 238 of 270
calendar days after the mailing of the notice of violation, the civil penalty shall consist solely of the amount of the
original civil penalty.
(f) Revenues derived from any program utilizing an ASE system for speed limit enforcement shall be used to
recover program costs. Any remaining revenue shall be used only for pedestrian safety or other roadway traffic
safety improvements. improving roadway traffic safety.
22427. (a) For a period of 30 calendar days from the mailing of a notice of violation, a person may request an
initial review of the notice by the issuing agency. The request may be made by telephone, in writing, or in person.
There shall be no charge for this review. If, following the initial review, the issuing agency is satisfied that the
violation did not occur, or that extenuating circumstances make dismissal of the notice of violation appropriate in
the interest of justice, the issuing agency shall cancel the notice of violation. The issuing agency shall advise the
processing agency, if any, of the cancellation. The issuing agency or the processing agency shall mail the results
of the initial review to the person contesting the notice, and, if cancellation of the notice does not occur following
that review, include a reason for that denial, notification of the ability to request an administrative hearing, and
notice of the procedure adopted pursuant to subdivision (b) for waiving prepayment of the civil penalty based
upon an inability to pay.
(b) (1) If the person contesting the notice of violation is dissatisfied with the results of the initial review, the
person may, no later than 21 calendar days following the mailing of the results of the issuing agency’s initial
review, request an administrative hearing of the violation. The request may be made by telephone, in writing, or
in person.
(2) The person requesting an administrative hearing shall pay the amount of the civil penalty to the processing
agency. The issuing agency shall adopt a written procedure to allow a person to request an administrative
hearing without payment of the civil penalty upon satisfactory proof of an inability to pay the amount due. The
administrative hearing shall be held within 90 calendar days following the receipt of a request for an
administrative hearing. The person requesting the hearing may request one continuance, not to exceed 21
calendar days.
(c) The administrative hearing process shall include all of the following:
(1) The person requesting a hearing shall have the choice of a hearing by mail or in person. An in-person hearing
shall be conducted within the jurisdiction of the issuing agency.
(2) If the person requesting a hearing is a minor, that person shall be permitted to appear at a hearing or admit
responsibility for the automated speed violation without the necessity of the appointment of a guardian. The
processing agency may proceed against the minor in the same manner as against an adult.
(3) The administrative hearing shall be conducted in accordance with written procedures established by the
issuing agency and approved by the governing body or chief executive officer of the issuing agency. The hearing
shall provide an independent, objective, fair, and impartial review of contested automated speed violations.
(4) (A) The issuing agency’s governing body or chief executive officer shall appoint or contract with qualified
independent examiners or administrative hearing providers that employ qualified independent examiners to
conduct the administrative hearings. Examiners shall demonstrate the qualifications, training, and objectivity
necessary to conduct a fair and impartial review. The examiner shall be separate and independent from the
notice of violation collection or processing function. An examiner’s continued employment, performance
evaluation, compensation, and benefits shall not, directly or indirectly, be linked to the amount of civil penalties
collected by the examiner or the number or percentage of violations upheld by the examiner.
(B) (i) Examiners shall have a minimum of 20 hours of training. The examiner is responsible for the costs of the
training. The issuing agency may reimburse the examiner for those costs. Training may be provided through any
of the following:
(I) An accredited college or university.
(II) A program conducted by the Commission on Peace Officer Standards and Training.
(III) A program conducted by the American Arbitration Association or a similar organization.
(IV) Any program approved by the governing body or chief executive officer of the issuing agency, including a
program developed and provided by, or for, the agency.
04-10-17 TWIC Mtg Packet Pg 239 of 270
(ii) Training programs may include topics relevant to the administrative hearing, including, but not limited to,
applicable laws and regulations, enforcement procedures, due process, evaluation of evidence, hearing
procedures, and effective oral and written communication. Upon the approval of the governing body or chief
executive officer of the issuing agency, up to 12 hours of relevant experience may be substituted for up to 12
hours of training. Up to eight hours of the training requirements described in this subparagraph may be credited
to an individual, at the discretion of the governing body or chief executive officer of the issuing agency, based
upon training programs or courses described in this subparagraph that the individual attended within the last five
years.
(5) The peace officer or designated municipal employee who issues a notice of violation shall not be required to
participate in an administrative hearing. The issuing agency shall not be required to produce any evidence other
than, in proper form, the notice of violation or copy thereof, including the photograph, video, or other visual
image of the vehicle’s license plate, and information received from the Department of Motor Vehicles identifying
the registered owner of the vehicle. The documentation in proper form shall be prima facie evidence of the
violation.
(6) The examiner’s final decision following the administrative hearing may be personally delivered to the person
by the examiner or sent by first-class mail.
(7) Following a determination by the examiner that a person has committed the violation, the examiner may,
consistent with the written guidelines established by the issuing agency, allow payment of the civil penalty in
installments, or an issuing agency may allow for deferred payment or payments in installments, if the person
provides evidence satisfactory to the examiner or the issuing agency, as the case may be, of an inability to pay
the civil penalty in full. If authorized by the governing body of the issuing agency, the examiner may permit the
performance of community service in lieu of payment of the civil penalty.
(8) If a notice of violation is dismissed following an administrative hearing, any civil penalty, if paid, shall be
refunded by the issuing agency within 30 days.
22428. (a) Within 30 days after personal delivery or mailing of the final decision described in subdivision (c) of
Section 22427, the contestant may seek review by filing an appeal to the superior court, where the case shall be
heard de novo, except that the contents of the processing agency’s file in the case on appeal shall be received in
evidence. A copy of the notice of violation shall be admitted into evidence as prima facie evidence of the facts
stated in the notice. A copy of the notice of appeal shall be served in person or by first-class mail upon the
processing agency by the contestant. For purposes of computing the 30-day period, Section 1013 of the Code
of Civil Procedure shall be applicable. A proceeding under this subdivision is a limited civil case.
(b) The fee for filing the notice of appeal shall be as provided in Section 70615 of the Government Code. The
court shall request that the issuing agency’s file on the case be forwarded to the court, to be received within 15
calendar days of the request. The court shall notify the contestant of the appearance date by mail or personal
delivery. The court shall retain the fee under Section 70615 of the Government Code regardless of the outcome
of the appeal. If the appellant prevails, this fee and any payment of the civil penalty shall be promptly refunded by
the issuing agency in accordance with the judgment of the court.
(c) The conduct of the hearing on appeal under this section is a subordinate judicial duty that may be performed
by a commissioner or other subordinate judicial officer at the direction of the presiding judge of the court.
(d) If a notice of appeal of the examiner’s decision is not filed within the period set forth in subdivision (a), the
decision shall be deemed final.
(e) If the civil penalty has not been paid and the decision is adverse to the contestant, the processing agency
may, promptly after the decision becomes final, proceed to collect the civil penalty under Section 22426.
22429. If the payment of the civil penalty is not received by the person authorized to receive payment of the civil
penalty by the time and date fixed for appearance on the notice of violation under Section 22426, the processing
agency may assess delinquent fees, as determined by the issuing agency, and may proceed to collect the civil
penalty under Section 22426.
22429.5. (a) The City of San Jose and the City and County of San Francisco shall offer a diversion program for
certain low-income ASE system violation recipients to perform community service in lieu of paying the penalty
for an ASE system violation.
04-10-17 TWIC Mtg Packet Pg 240 of 270
(b) The City of San Jose and the City and County of San Francisco shall offer the ability for certain low-income
ASE system violation recipients to pay applicable fines and penalties over a period of time under a payment plan.
(c) Notwithstanding subdivisions (a) and (b), the City of San Jose and the City and County of San Francisco shall
reduce the applicable fines and penalties for individuals with household incomes less than 125 percent of the
Federal Poverty Level by 80 percent.
(d) The processing agency for the City of San Jose and the City and County of San Francisco shall not file or
electronically transmit to the department an itemization of unpaid civil penalties, including administrative fees,
for citations issued pursuant to this article when the owner is participating in a diversion program, payment plan,
or both, as outlined in subdivisions (a) and (b).
22430. (a) Except as provided in subdivision (c), the department shall refuse to renew the registration of a vehicle
if the registered owner has been mailed a notice of violation under this article, the processing agency has filed or
electronically transmitted to the department an itemization of unpaid civil penalties, including administrative fees
pursuant to Section 22431, and the owner has not paid the civil penalty and administrative fees, unless he or
she pays to the department, at the time of application for renewal, the full amount of all outstanding civil
penalties and administrative fees, as shown by records of the department.
(b) When the department receives the full amount of all outstanding civil penalties and administrative fees
pursuant to subdivision (a), it shall issue a receipt showing each civil penalty and the administrative fees that
have been paid, the processing agency for that penalty and fee, and a description of the vehicle involved in the
automated speed violations.
(c) The department shall not refuse to renew the registration of a vehicle under either of the following
circumstances:
(1) If the applicant provides the department with the abstract or notice of disposition of the violation for clearing
all outstanding civil penalties and administrative fees as shown by the records of the department.
(2) If the notice of violation was issued prior to the registered owner taking possession of the vehicle or if the
notice of violation was reissued to a third party.
22431. (a) The department shall remit all civil penalties and administrative fees collected, after deducting the
administrative fees authorized in subdivision (b), for each notice of violation for which penalties and
administrative fees have been collected, to the processing agency in the amount due. Within 45 days from the
time penalties are recorded by the department, the department shall inform the municipality which of its notices
of violation have been discharged.
(b) The department shall assess a fee for the recording of the notice of violation in an amount, as determined by
the department, that is no more than the amount sufficient to provide a total amount equal to its actual
administrative costs.
22431.5. The City of San Jose and the City and County of San Francisco shall each develop and submit to their
respective governing body an ASE System Report, two years after initial implementation of the ASE program and
at the end of the ASE pilot program, that includes all of the following information:
(a) A description of how the ASE system was used.
(b) Whether and how often any ASE system data was shared with outside entities, the name of any recipient
entity, the type or types of data disclosed, and the legal reason for the disclosure.
(c) A summary of any community complaints or concerns about the ASE system.
(d) Results of any internal audits, information about any violations of the ASE System Use Policy, and any
actions taken in response.
(e) Information regarding the impact the ASE system has had on the streets where the ASE system was
deployed.
(f) A summary of any public record act requests.
22432. The City of San Jose and the City and County of San Francisco shall each, on or before March first of the
fifth year in which the ASE system has been implemented, submit to the transportation committees of the
04-10-17 TWIC Mtg Packet Pg 241 of 270
Legislature an evaluation of the ASE system in their respective jurisdictions to determine the system’s impact on
highway safety and the system’s economic impact on the communities where the system is utilized. The report
shall be made available on the Internet Web sites of the two jurisdictions and shall include all of the following
information:
(a) Before and after data on the number and proportion of vehicles speeding between 10 to 19, inclusive, miles
per hour over the legal speed limit, 20 to 29, inclusive, miles per hour over the legal speed limit, 30 to 39,
inclusive, miles per hour over the legal speed limit, and every additional 10 miles per hour increment thereafter
on a street or portion of a street in which an ASE system is used to enforce speed limits. To the extent feasible,
the data should be collected at the same time of day, day of week, and location.
(b) The number of notices of violation issued under the program by month and year and the corridors or
locations where violations occurred and, to the extent feasible, the day of the week and time the violation
occurred.
(c) Before and after data on the number of traffic collisions, categorized by injury severity (such as property
damage only, complaint of pain, other visible injury, or severe or fatal injury) that occurred where ASE systems
are used relative to citywide data and the transportation mode of the parties involved.
(d) The number of violations paid, the number of delinquent violations, and the number of violations for which an
initial review is requested. For the violations in which an initial review was requested, the report shall indicate the
number of violations that went to initial review, administrative hearing, and de novo hearing, the number of
notices that were dismissed at each level of review, and the number of notices that were not dismissed after
each level of review.
(e) The costs associated with implementation and operation of the ASE systems, and revenues collected by
each jurisdiction.
22433. This article shall remain in effect only until January 1, 2024, and as of that date is repealed, unless a later
enacted statute that is enacted before January 1, 2024, deletes or extends that date.
SEC. 9. The Legislature finds and declares that a special statute is necessary and that a general statute cannot
be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the
unique circumstances with traffic speed enforcement in the City of San Jose and the City and County of San
Francisco.
SEC. 10. The Legislature finds and declares that Section 8 of this act, which adds Article 3 (commencing with
Section 22425) to Chapter 7 of Division 11 of the Vehicle Code, imposes a limitation on the public’s right of
access to the meetings of public bodies or the writings of public officials and agencies within the meaning of
Section 3 of Article I of the California Constitution. Pursuant to that constitutional provision, the Legislature
makes the following findings to demonstrate the interest protected by this limitation and the need for protecting
that interest:
In order to protect the personally identifiable information of California drivers, it is necessary that this act limit the
public’s right of access to that information.
04-10-17 TWIC Mtg Packet Pg 242 of 270
SAFE STREETS ACT OF 2017
ASSEMBLY BILL 342 (CHIU)
SUMMARY
AB 342 gives local transportation authorities in the City
of San Jose and the City and County of San Francisco the
authority to install automated speed enforcement (ASE)
systems over a five-year pilot period, in order to protect
the safety of vulnerable travelers, such as children, the
elderly, and bicyclists, in the two municipalities.
BACKGROUND
In response to hundreds of traffic collisions in the
region, both San Jose and San Francisco adopted Vision
Zero traffic safety initiatives, with the goal to eliminate
traffic fatalities and reduce severe injury crashes.
Annually in San Francisco, traffic collisions have caused
about 30 fatalities and more than 200 severe injuries;
and in San Jose, about 50 people have lost their lives
and more than 130 have been severely injured due to
traffic collisions.
70 percent of these fatal and severe collisions occur on
just a handful of streets and roads in San Francisco and
50 percent of fatal collisions occur on just 3 percent of
San Jose streets. Many of the streets with the highest
incidence of fatal and severe injury crashes are in
Communities of Concern, disproportionately impacting
these disadvantaged communities.
Unsafe speed is the single highest fault factor in fatal
and severe injury collisions in San Jose and San
Francisco. As a result, children going to school,
pedestrians heading to work, and elderly citizens
traveling home are put at risk every day.
In San Francisco, law enforcement issued more than
10,000 citations for speeding, a 44 percent increase
compared to the year before. As a result, the total
number of fatal and severe injury collisions caused by
speed dropped by more than 20 percent in 2014.
While these enforcement efforts help, local
transportation planners require additional enforcement
tools to combat this public health hazard.
THE PROBLEM
Across the United States, studies have shown that ASE
systems reduce the number of severe and fatal
collisions by as much as 58 percent. Despite an
established history, California law currently prohibits
the use of automated speed enforcement systems.
Studies have shown that speed is the leading factor
when determining fault in fatal and severe collisions,
yet existing enforcement efforts are not enough.
California must provide communities with the worst
traffic conditions the option to increase the expectation
of enforcement.
THE SOLUTION
AB 342 would authorize the use of automated
enforcement through a five-year pilot program in the
City of San Jose and the City and County of San
Francisco.
Specifically, AB 342 creates a very specific list of
prerequisites that must be met in order to implement
ASE systems in the two localities, including:
1.Location: Streets with a documented and
demonstrated speeding problem resulting in
fatalities and injuries, not freeways.
2.Public Notice: Signs displaying “Radar Enforced”
along ASE enforced corridors and visiting drivers
will be notified at major jurisdictional boundaries.
Public hearings and information campaign.
3.Citation type: Similar to a parking citation, no
points added to record, and flat max $100 citation
including fees.
4.Speed: ASE triggered only at 10 mph over posted
speed limit, with a maximum of 1 per day, per
vehicle.
5.Warning phase: Warnings will be issued for 90 days
at the start of the program, before any fines begin.
6.Privacy: Images of license plate, citations sent to
vehicle owners like a parking ticket, images and
records are kept confidential.
7.Adjudication: Owners may contest citation similar
to a parking ticket.
8.Equity: Accommodations for low-income drivers.
9.Revenue: program cost recovery and then re-
invested into building safe streets.
10.Camera Calibration: Regularly inspected and in
accordance with manufacturer’s instructions or at
minimum, once a year by a 3rd party lab.
11.Operation: Overseen by trained peace officers or
other trained city employees.
12.Oversight: An evaluation submitted after 5 years
assessing safety impacts.
04-10-17 TWIC Mtg Packet Pg 243 of 270
Support
San Francisco Mayor Edwin M. Lee (Sponsor)
San Jose Mayor Sam Liccardo (Co-Sponsor)
Association of California Insurance Companies
UCSF Department of Surgery at Zuckerberg San
Francisco General Hospital
Walk San Francisco
San Francisco County Transportation Authority
Tenants and Owners Development Corporation
Alliance for Retired Americans
CalWalks
CC Puede
FDR Dems
Greater Rincon Hill Community Benefit District
Independent Living Resource Center San Francisco
Livable City
Lower Polk Community Benefit District
Portola Neighborhood Association
South Beach / Rincon / Mission Bay Neighborhood
Association
Senior & Disability Action
sf.citi
San Francisco Bay Area Families for Safe Streets
SPUR
Safe Routes to School National Partnership
Silicon Valley Bicycle Coalition
Silicon Valley Independent Living Center
Duboce Triangle Neighborhood Association
The Friends of Monterey Boulevard
Stop4Aiden
San Francisco Municipal Transportation Agency
Los Angeles Walks
Shape Up San Francisco Coalition
San Francisco Health Improvement Partnership
Opposition
Peace Officers Research Association of California
California Association of Highway Patrolmen
FOR MORE INFORMATION
Kevin Hefner
Office of Assemblymember David Chiu
Kevin.Hefner@asm.ca.gov
04-10-17 TWIC Mtg Packet Pg 244 of 270
1
Subject:FW: CSAC Federal Budget Update
To: CSAC Board of Directors
County Legislative Coordinators
From: Cara Martinson, CSAC Legislative Representative & Federal Affairs Manager
Joe Krahn, Waterman & Associates, CSAC Federal Lobbyist
RE: Federal Budget Update
The following is an update from our federal lobbyists on the status of the federal budget and proposed spending cuts put
forth by the Trump Administration. It should be noted at the outset that while the list is daunting, there is significant
Democratic and Republican concern and opposition to this proposal.
Last week, the Trump administration sent to Capitol Hill a detailed list of suggested cuts that could be used to partially
offset its recent fiscal year 2017 supplemental spending request. All told, the president is asking Congress to approve $18
billion in current‐year spending reductions to help pay for $30 billion in new defense and border security funding. The
administration’s proposal would substantially reduce, or in some cases eliminate, fiscal year 2017 funding for a number
of programs that are of importance to California’s counties.
Among other things, the administration’s proposal would eliminate FY 17 funding for:
State Criminal Alien Assistance Program ($210 million);
Community Services Block Grants ($306 million);
Low‐Income Home Energy Assistance Program ($372 million);
Choice Neighborhoods Initiative ($125 million);
TIGER Grants ($499 million);
Senior Community Service Employment Program ($434 million); and,
Western Drought Relief Efforts ($100 million).
Programs that are targeted for FY 17 cuts include:
Payments‐in‐Lieu‐of‐Taxes ($51 million cut);
Community Development Block Grants ($1.5 billion cut);
Capital Investment Program/Transit ($447 million cut);
Economic Development Assistance grants ($97 million cut);
Pre‐Disaster Mitigation Grants ($20 million cut);
Mental Health Block Grants ($100 million cut);
Women Infants and Children Feeding Program ($200 million cut)
The suggested list of budget reductions has been met with a strong dose of skepticism by Republican appropriators,
particularly since some of the targeted programs are popular among GOP members. For their part, Democrats have
indicated that they are not open to any further reductions in nondefense discretionary spending for fiscal year 2017. At
this point, it is not clear whether the president would be willing to veto any funding measure that does not endorse these
–or other – cuts. However, with only four weeks left before the current Continuing Resolution expires, the White House
proposal adds a new level of uncertainty to budget negotiations.
04-10-17 TWIC Mtg Packet Pg 245 of 270
2
CSAC will keep the Board updated on federal budget issues as more information becomes available. In addition, the
National Association of Counties (NACo) is hosting a national conference call tomorrow, Tuesday, April 4 at 12 p.m.
Pacific Standard Time to discuss the most pressing federal policy issues facing county governments. Conference call
instructions: Call number: 1‐719‐955‐1371, Passcode: 605299.
Please feel free to contact me if you have any questions.
Thank you,
CARA B. MARTINSON
Legislative Representative & Federal Affairs Manager
CALIFORNIA STATE ASSOCIATION OF COUNTIES
1100 K Street, Suite 101
Sacramento, CA 95814
(916) 327-7500 x504
(916) 441-5507 - Fax
cmartinson@counties.org
www.csac.counties.org
Please consider the environment before printing this email.
04-10-17 TWIC Mtg Packet Pg 246 of 270
TRANSPORTATION, WATER &
INFRASTRUCTURE COMMITTEE 9.
Meeting Date:04/10/2017
Subject:COMMUNICATION/News Clippings
Submitted For: TRANSPORTATION, WATER & INFRASTRUCTURE
COMMITTEE,
Department:Conservation & Development
Referral No.: N/A
Referral Name: N/A
Presenter: John Cunningham, DCD Contact: John Cunningham
(925)674-7833
Referral History:
Communication items are added to the TWIC agenda on an as-needed basis.
Referral Update:
Communication Received: News, etc:
2/14/2017: Contra Costa Transportation Authority (CCTA): Notice of Preparation of an
Environmental Impact Report for the Countywide Transportation Plan
2/27/2017: CCTA: February 2017: Items of Interest to the Regional Transportation Planning
Committees
3/17/2017: CCTA: March 2017: Items of Interest to the Regional Transportation Planning
Committees
Recommendation(s)/Next Step(s):
RECEIVE communication and DIRECT staff as appropriate.
Fiscal Impact (if any):
N/A
Attachments
02-13-17, 2017 NOP CTP Transmittal Signed
February 15 2017 RTPC Memo
March 15 2017 RTPC Memorandum with Ord. 17-01
04-10-17 TWIC Mtg Packet Pg 247 of 270
04-10-17 TWIC Mtg Packet Pg 248 of 270
04-10-17 TWIC Mtg Packet Pg 249 of 270
04-10-17 TWIC Mtg Packet Pg 250 of 270
04-10-17 TWIC Mtg Packet Pg 251 of 270
04-10-17 TWIC Mtg Packet Pg 252 of 270
04-10-17 TWIC Mtg Packet Pg 253 of 270
04-10-17 TWIC Mtg Packet Pg 254 of 270
04-10-17 TWIC Mtg Packet Pg 255 of 270
04-10-17 TWIC Mtg Packet Pg 256 of 270
04-10-17 TWIC Mtg Packet Pg 257 of 270
04-10-17 TWIC Mtg Packet Pg 258 of 270
04-10-17 TWIC Mtg Packet Pg 259 of 270
Proposed RM3 Project List for Submittal to MTC
No Project Name Description Cost
(millions)
Funding
Available
(millions)
Funding
Needed
[RM3 Request]
(millions)
Bridge
Nexus
Regional
Prosperity
Sustain-
ability
State of
Good
Repair
Demand
Management
Freight Resilency Sources of
Available
Funds
(millions)
1 I-680/State Route 4 Interchange
Improvements – Phases 1, 2, and 3
Project will improve interchange in phases as follows:
Phase 1: Freeway to Freeway connectors for NB I-680 to WB SR-4
Phase 2: EB SR-4 to SB I-680 connector and improvements to the SR-4
interchange at Pacheco Boulevard.
Phase 3: Widen SR-4 between Morello Avenue in Martinez and SR-242
in Concord, and replace Grayson Creek Bridge
$292 $57 $235 x x x x STIP: 5.1
Measure C:
17.3, Measure
J: 35.0
2 I-80/San Pablo Dam Road (SPDR) Interchange
Improvements – Phase 2
Replace SPDR Interchange at I-80 and modify McBryde Avenue and
SPDR ramps. Includes provisions for bicyclists and pedestrians on San
Pablo Dam Road.
$80 $16 $64 x x x x STMP: 6.4,
STIP: 9.2
3 SR-4 Integrated Corridor Management (ICM)SR-4 from I-80 to SR-160: project includes adaptive ramp metering,
advanced traveler information, arterial management system, freeway
management system, and connected vehicle applications
$15 $0 $15 x x x
4 SR-4 Operational Improvements - Initial
Phase
Various operational improvements along SR-4 between I-680 and
Bailey Road, including additions of mixed flow lanes, High Occupancy
Vehicles (HOV) lanes and auxiliary lanes.
$144 $5 $139 x x Measure J
5 I-680 Forward*Implementation of seven strategies for I-680 including improving
efficiency of bus service (e.g. increased service, bus on shoulders,
expanded park and ride lots), providing first/last mile connections,
innovative operational strategies (e.g. ramp metering, decision
support system, integrated corridor management), cooling hot spots
(e.g. addition of auxiliary lanes), completing carpool/express lanes, and
preparing corridor for Connected Vehicles/Automated Vehicles.
$233 $23 $210 x x x x x Measure J I-
680 Reserve
6 Vasco-Byron Highway Connector Replace/upgrade existing Armstrong Road. Add new road segments
west of Armstrong Road to Vasco Road and east of Armstrong Road to
Byron Highway.
$87 $0 $87 x x x
7 West Contra Costa High Capacity Transit Study is underway to evaluate options for major transit investments
along I-80 corridor in Contra Costa. Conceptual alternatives currently
being evaluated include express bus on I-80, arterial-based bus rapid
transit (BRT) on San Pablo Avenue and 23rd Street, short- and mid-
term improvements on UPRR commuter rail, and a BART extension
from Richmond. Funding request is for project development. Cost
estimates being developed but initial review shows a range from $179
million to $4.1 billion. Cost reflects the implementation of BRT and
Express Bus on I-80 alternatives.
$424 $0 $424 x x x x
MTC Draft Principles
04-10-17 TWIC Mtg Packet Pg 260 of 270
No Project Name Description Cost
(millions)
Funding
Available
(millions)
Funding
Needed
[RM3 Request]
(millions)
Bridge
Nexus
Regional
Prosperity
Sustain-
ability
State of
Good
Repair
Demand
Management
Freight Resilency Sources of
Available
Funds
(millions)
MTC Draft Principles
8 Hercules Intermodal Transit Center Remaining phases includes track and signal work, fuel and optic lines
relocations, transit loop, promenade and civil plaza, landside
improvements, bay trail segments.
$97 $21 $76 x x x x Measure J
(various): 8.8,
Local: 5.1, STIP:
3.9, OBAG: 2.6,
Earmark: 0.7
9 Brentwood Transit Center Develop a transit center in the City of Brentwood. $52 $0 $52 x x x
10 Ferry Operations and Landside
Improvements
Provide funding for ferry operations and landside improvements in
Contra Costa.
$123 $53 $70 x x x x Measure J
11 Pedestrian and Bicycle Projects Various pedestrian and bicycle improvements aimed to provide access
to transit and improve regional trails along bridge corridors as well as
improvements to facilitate transit oriented developments
$162 $0 $162 x x x
12 Innovative Transportation Technologies Deploy new technologies to improve traffic conditions along bridge
corridors and prepare for Autonomous Vehicle/Connected Vehicles
$53 $0 $53 x x x x
13 BART Fleet Expansion Contra Costa contribution to BART's proposed fleet expansion $300 $0 $300 x x x x
14 Richmond San Rafael Bridge Congestion
Relief in the WB direction
Project aims to reduce congestion in the AM peak in the westbound
direction at the toll plaza.
$50 $0 $50 x x
$2,112 $175 $1,937
*Combines following projects in PBA: I-680 Northbound Managed Lane Completion through 680/24 and Operational Improvements between N. Main and Treat Blvd, I-680 Transit Improvements including Express Bus Service, ITS components, and Park & Ride Lots, and I-680 Northbound HOV lane extension between N. Main and SR-242.
Subtotal
04-10-17 TWIC Mtg Packet Pg 261 of 270
04-10-17 TWIC Mtg Packet Pg 262 of 270
04-10-17 TWIC Mtg Packet Pg 263 of 270
JRIGINAT,
CONTRA COSTA
trans P ortation
auth or ity
ORDINANCETT.OT
AN ORDINANCE OF THE CONTRA COSTA TRANSPORTATION AUTHORITY AMENDING
CHAPTER 1, ARTICLE IV, OF THE AUTHORITY,S ADMINISTRATIVE CODE TO REVISE
sEciloN 104.6 (Cl
WHEREAS, the Contra Costa Transportation Authority (the "Authority") adopted the Administrative
Code (the "Code") as Ordinance No. 90-01 on February 2L, L99O as amended through March 15,
2OL7; and
WHEREAS, the purpose of the Code is to assist the Authority in establishing and maintaining the
public trust, specifying the powers and duties of Authority officials, and promulgating policies and
procedures aimed at the efficient and effective operation of the Authority; and
WHEREAS, Chapter L of the Code establishes the powers and duties of the Authority officers, the
method of appointing Authority employees, and methods, procedures and systems of operation
and management of the Authority; and
WHEREAS, Chapter L, Article lV of the Authority's Administrative Code shall be amended to revise
Section tO4.6 (c)to allow a Board Ex-Officio Representative to also serve as an alternate to a Board
Commissioner; and
WHEREAS, the Representative will not be able to simultaneously serve at any given meeting as
both the representative and alternate; and
WHEREAS, the Board Ex-Officio Representative must be an Elected Official; and
WHEREAS, by allowing a Board Ex-Officio Representative to also serve as an alternate to a Board
Commissioner the Authority will have the opportunity to appoint the individual to serve on other
related transportation boards as a representative to the Authority.
NOW, THEREFORE, BE lT ORDAINED AS FOLTOWS that the Contra Costa Transportation
Authority hereby:
1) Amends Chapter L, Article lV of the Authority's Administrative Code to revise Section
104.6 (c) as provided for in Exhibit A, attached hereto and incorporated herein by
reference, to allow a Board Ex-Officio Representative to also serve as an alternate to a
Board Commissioner providing that the Representative does not serve simultaneously at
any given meeting as both the representative and the alternate.
04-10-17 TWIC Mtg Packet Pg 264 of 270
Ordinance 77-07
March 75,2077
Page 2
SEVERABILITY: lf any provision or clause of this Ordinance or the application thereof is held
unconstitutional or otherwise invalid by a court of competent jurisdiction, such invalidity shall not
affect other provisions, clauses, or applications of this Ordinance which can be implemented
without the invalid provision, clause, or application, it being hereby expressly declared that this
Ordinance, and each section, subsection, sentence, clause, and phrase hereof would have been
prepared, proposed, approved, adopted and/ or ratified irrespective of the fact that any one or
more sections, subsections, sentences, clauses, and/or phrases may be declared invalid or
u nconstitutional.
EFFECTIVE DATE: This ordinance shall be effective immediately upon adoption
PASSED AND ADOPTED by the Contra Costa Transportation Authority Board of Directors in Walnut
Creek, State of California, on March L5,2017, by the following vote:
AYES: Chair Butt, Vice Chair Glover, and Commissioners Abelson, Arnerich, Haskew,
Hudson, Mitchoff, Pierce, Romick, Taylor and Trotter
NOES:
ABSENT:
ABSTAIN:
None
None
None
Tom utt, Chair
This Ordinance 17-01was entered into at a
meeting of the Contra Costa Transportation
Authority held on March t5,2OL7, in Walnut
Creek, California, and shall become effective
as provided above.
Attest
\e,¿¡ln^u )'qr,u\
Tarienne Grover, Clerk of the Board
04-10-17 TWIC Mtg Packet Pg 265 of 270
Ordinance 77-07
March 75,2077
Page 3
EXI{IBIT A
CHAPTER 1
ADMINISTRATIVE CODE
OF THE
CONTRA COSTA TRANSPORTATION AUTHORITY
ARTICLE IV
OFFICERS AND DUT¡ES
04-10-17 TWIC Mtg Packet Pg 266 of 270
Ordinance 77-07
March 75,2077
Page 4
ARTICLE IV
OFFICERS AND DUTIES
L04.6 Representatives.
(a) The Board shall have the authority to establish by resolution,
representatives to the Authority, representing transportation and transit agencies and other
governmental entities interested or involved in transportation issues in Contra Costa. Each such
person shall be referred to as a "Representative". Representatives shall have the following
powers:
(1) the right to attend regular sessions of the Board and to participate
in the discussion of matters brought before the Board for consideration;
(21 the right to attend regular committee meetings of the Planning and
Administrative and Projects Committees of the Board and to participate in the discussion of
matters brought before such Committees;
(3) the right to attend regular meetings of such other Board
Committees and of such Standing and Advisory Committees as the Board may determine, and to
participate in the discussion of matters brought before such committees.
(b) Each Representative shall be designated by the entity represented from
among eligible candidates. Each such Representative shall be an Elected Official (i) elected to the
Board of Supervisors of, or to the council of a town or city located within, the County, and
appointed to the entity represented to the Authority, or (ii) elected to the legislative body of the
entity represented to the Authority, and elected at large or to represent a district or ward of such
entity which is located wholly or partially within the County. The Board may consider permitting
an appointed official as the Representative, if requested by the entity and evidence is provided
why an appointed official rather than an Elected Official is more beneficial in that particular
circumstance. Each Representative shall have an alternate designated by the entity represented
from among eligible candidates for Representative. Representatives shall hold office for one or
more terms of one year, subject to replacement by such Representative's alternate at the
discretion of the Board if such Representative has been absent from four consecut¡ve meetings of
the Board.
(c) Representatives shall not be Commissioners, but mav serve as an alternate,
provided that such Representat¡ve does not serve simultaneouslv at a meeting as both a
Representative and an alternate and is an Elected Official. Reoresentatives+n4shall have none of
the rights or powers of such Commissioners, unless serving as an alternate, except as expressly
provided herein. Without limiting the generality of the foregoing, such Representatives shall not:
04-10-17 TWIC Mtg Packet Pg 267 of 270
Ordinønce 77-07
March 75,2077
Page 5
(1) have the right to vote with respect to any matter brought before the
Board or any Board Committee or Standing or Advisory Committee;
(21 be counted for purposes of determining the number of persons
attending any meeting for quorum or voting purposes;
(3) be eligible for election or appointment as an officer of the Authority;
(4) be entitled to attendance fees or other compensation for
attendance at meetings of the Authority or any committee thereof;
(5) be entitled to attend or to otherwise participate in closed sessions
of the Board or any Standing or Advisory Committee thereof, unless expressly authorized to
attend and participate by the Board or Committee.
1.0 (d) The Board shall have the authority to establish such other
conditions and limitations with respect to Representatives as it deems necessary or advisable
| ¡emended on April27,7993; December 27,2077, March 75,20771
04-10-17 TWIC Mtg Packet Pg 268 of 270
transportation
authority
Administration ond Projects Committee STAFF REPORT
Meeting Date: March 2,20L7
Subject Adoption of Ordinance 17-01to Amend the @
Revisiens te Contra Costa Transportation Authority's (Authority|
Administrative Code, Chapter 1, Article lV, Section 10a.6 (c)
Summary of lssues The proposed revisions would clarify and make consistent various
sections of the Authority's Administrative Code, Chapter 1, Article lV,
Section 10a.6 (c).
Recommendations Staff seeks adoption of Ordinance 17-01 to approve appreval+Êthe
proposed revisions to amend the Authority's Administrative Code,
Chapter 1, Article lV, Section 104.6 (c).
Financial lmplications
Options
Attachments (Revísed
Attachment A)
None
1. Do not approve the recommendation to revise the Administrative
Code.
2. Suggest alternative language for the revision.
A. Ordinance 17-01to Amend the Authority's Administrative Code,
Chapter L. Article lV, Section 104.6 (c), with proposed revisiong
redline/strikeout - Revised
Changes from
Committee
None. The Committee wos advised thot on Ordinonce was being drafted
for odoption at the Authority Boord.
Background
Article lV, Section L04.6 (c)
This revision would provide language to allow for a Board Ex-officio Representative to also
serve as an alternate to a Board Commissioner providing that the Representative cannot
simultaneously at any given meeting serve as the representative and alternate. Currently the
administrative code language does not allow a Representative to also be an alternate.
04-10-17 TWIC Mtg Packet Pg 269 of 270
Administration and Projects Committee STAFF REPORT
March 2,20L7
Page 2 of 2
ln some instances, the Authority has an opportunity to appoint Commissioners to represent the
Authority on other related transportation boards. The Administrative Code, as written, is clear
that Representatives (ex-officio representatives) are not Commissioners, and Commissioner
Alternates are considered Commissioners. The Administrative Code clarifies the determination
that Representatives shall not be Commissioners for the following reasons:
L. Representatives do not have the right to vote;
2. Representatives cannot be counted for purposes of a meeting quorum;
3. Representatives are not eligible for election or appointment as an officer;
4. Representatives are not entitled to receive attendance fees or other compensation for
attendance at meetings; and
5. Representatives are not entitled to attend or participate in closed sessions of meetings.
The revision, as proposed, would not be in any conflict of these stated reasons because at any
particular meeting the Representative would either be the ex-officio representative or the
alternate, but not both. lf the representative was needed to sit as the alternate for a given
meeting the representative's alternate would take the representatives seat. Staff seeks
I the proposed revisions to the Authority'sr-
Administrative Code, Chapter 1, Article lV, Section 10a.6 (c)
04-10-17 TWIC Mtg Packet Pg 270 of 270