HomeMy WebLinkAboutMINUTES - 02031987 - 1.6 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFOkD, CHIEF ENGINEER DATE: February 3, 1987 SUBJECT: Contract Award Recommendation: Lane Drive Sewer Extension Project Project No. 7520-688622-86, Concord Area Specific Request(s) or Recommendation(s) & Background & Justification RECOMMENDED ACTION: As the Governing Board of the Contra Costa County Flood Control & Water Conservation District, AWARD the contract for furnishing labor and materials for the subject project to Mountain Cascade, Inc. , P.Q. Box 116, San Ramon, CA 94583, the low bidder, in the amount of $239,519.00 and at the unit prices submitted; and REQUIRE the contractor to present surety bonds for Payment and Faithful Performance in the amounts of $179,639.25 and $239,519.00, respectively. DIRECT the Chief Engineer to prepare the contract for the project. AUTHORIZE the Chief Engineer to sign the contract on behalf of the Board subject to the Chief Engineer having reviewed and found sufficient all required documents, including the contract signed by the contractor, the aforementioned surety bonds, and a certificate of insurance. DIRECT that, in accordance with the project specifications and/or upon the execution of the contract by the Grief Engineer, any bid bonds posted by the bidders be exonerated and any checks or cash submitted for bid security be returned. FINANCIAL IMPACT: The project, including engineering and appropriate overhead charges, is funded by the Flood Control District Zone 3B with participation by the State Department. of Water Resources under its subvention program for Flood Control projects. Continued on attachment: X yes Signature: ---i Recommendation of County Administrator Reco endation of and L mmi tee Approve Other: Signature(s): Action of Board on: FEB .1 1987 Approved as Recommended Uther Vote of Supervisors I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN V/Unanimous (Absent ) AND ENTERED ON THE MINUTES OF THE Ayes: Noes: BOARD OF SUPERVISORS ON DATE SHOWN. Absent: Abstain: Attested FEB 3 1987 Orig. Div.: Public Works-Construction Phil Batchelor cc: County Administration Clerk of the Board of Auditor-Controller Supervisors and County Design Administrator Accounting Contractor BJK/bb By ¢ L DEPUTY bo:3.t2 Lane Dr. Sewer Extension Feburary 3, 1987 REASONS FOR RECOMMENDATION/BACKGROUND: The plans and specifications were approved and the project advertised for bids by the Board of Supervisurs on December 2, 1986. The bids were received and opened at 255 Glacier Drive, Martinez, California, on Thursday, January 8, 1987. The construction bids received were as follows: 1. Pfister Excavating $253,721.00 2. V & PSI Backhoe 276,164..43 3. Fee Construction 282,610.00 4. MbM Construction 283,134.00 5. Manual C. Jardim 286,343.00 6. MJB Pipeline 289,441.00 7. Gulden State Pipeline 294,665.00 8. AcGuire & Hester 319,343.00 5. Gallagher & Burk 327 ,327 .00 10. J. Huizar & Sons 333,496.00 I.I. Antiocn Paving 350,096.00 12. Edward J. Pestana Construction 361,843.00 The Engineer' s estimated construction cost was $216,057.00. CONSEQUENCES OF NEGATIVE ACTION: Hindrance and/or delay to the Upper Pine Creek Project. 6JK/bb bu:3.t2