Loading...
HomeMy WebLinkAboutMINUTES - 02241987 - 1.94 File: 135-8509/B. 4 THE BOARD OF SUPERVISORS CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on February 24, 1987, by the following vote: AYES: Supervisors Powers , Fanden, Schroder, Torlakson & McPeak NOES: None ABSENT: None SUBJECT: Award of Contract for Remodeling for Training Room at 1305 'MacDonald Avenue, Richmond Budget Line Item No. 4423-4221 Authorization No. 0928-WH221B BIDDER TOTAL AMOUNT Bond Amounts All Phase Builders $27 , 500 which Labor & Materials $13 , 950 732 Leland Way includes Faithful Performance $27, 900 Livermore, CA 94550 $23, 925 Base Bid and $3 ,975 Add. Alt. No. l Edward A. Sparacino General Contractor Martinez, California A-1 Plus Construction San Ramon, California Tamal Construction Co. Richmond, California John M. DeRespini Construction Pleasant Hill, California Adonis Allied, Inc. El Cerrito, California TJ Construction Co. , Inc. Moraga, California The above-captioned project and the specifications therefor being approved, Addendum No. 1 being issued and bids being duly invited and received by the Director of General Services; and The Director of General Services recommending that the bid listed first above is the lowest responsible bid and this Board concurring and so finding; IT IS BY THE BOARD ORDERED that the contract for the furnishing of labor and materials for said work is awarded to said first listed bidder at the listed amount and at the prices submitted in said bid; and that said contractor shall present two good and sufficient surety bonds as indicated above; and that the General Services Department shall prepare the contract therefor; and Page 1 of 2 IT IS FURTHER ORDERED that after the contractor has signed the contract and returned it, together with bonds as noted above and any required certificates of insurance or other required documents, and the Director of General Services has reviewed and found them to be sufficient, the Director of General Services is authorized to sign the contract for this Board; and IT IS FURTHER ORDERED that in accordance with the project specifications and/or upon signature of the contract by the Director of General Services, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for bid security shall be returned. 1 hereby certify that this is a true and correct copy of an; on taken and v.itisrod on the minutes of the Board of supervisors on the date shown. ATTES'i D: . FEB 2 41987 WiL BATCHELOR, C:erk of the Board of Supervisorc and County Aministrator By ��h r . Deputy I Orig. Dept. General Services Dept. - Architectural Division cc: General Services Department Architectural Division G. S. Accounting Auditor-Controller Public Works Accounting Contractor (Via A.D. ) 13509B02. 20A GB:ml Page 2 of 2