HomeMy WebLinkAboutMINUTES - 12151987 - 2.1 (2) J
TO: BOARD OF SUPERVISORS Contra
FROM: HARVEY E. BRAGDON, C,. sta
DIRECTOR OF COMMUNITY DEVELOPMENT C` i '•7
DATE: DECEMBER 1, 1987
SUBJECT: PUBLIC WORKS DEPARTMENT APPEAL OF CONDITION OF APPROVAL 7.A.
(CONCERNING FRONTAGE IMPROVEMENTS) FOR DEVELOPMENT PLAN 3056-86
AND SUBDIVISION 6883 AS APPROVED BY THE SAN RAMON VALLEY REGIONAL
PLANNING COMMISSION
SPECIFIC REQUEST(S) OR RECOMMENDATIONS(S) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
Sustain the appeal by the Public Works Department by approving the
Conditions of Approval for Development Plan 3056-86 and Subdivision
6883 including revised Conditions of Approval 7.A. and 7.J. as
contained in Exhibit A.
FISCAL IMPACT
None.
BACKGROUND/REASONS FOR RECOMMENDATIONS
The subject applications were first scheduled before the San Ramon
Valley Regional Planning Commission on February 18, 1987 and
subsequently rescheduled to March 4, 1987. The March 4, 1987
hearing was continued to April 1 , 1987 and subsequently postponed
to the April 29, 1987 hearing by the Commission.
At their April 29, 1987 hearing, the San Ramon Valley Regional
Planning Commission approved the subject application with
Conditions of Approval for frontage improvements that were less
extensive than that recommended by the Public Works Department (see
Condition of Approval 7 .A. of Exhibit B) . In making their approval,
the Commission considered testimony by the Alamo Improvement
Association and the Association for the Preservation of Danville
Boulevard which favored the reduced frontage improvements. The
Public Works Department filed a letter of appeal relative to the
reduced frontage improvement requirements. Subsequent to th
CONTINUED ON ATTACHMENT: xx YES SIGNA
_ RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDAT OF B COMMITTEE
APPROVE OTHER
SIGNATURE(S) :
ACTION OF BOARD ON December 15, 1987 APPROVED AS RECOMMENDED X OTHER
VOTE OF SUPERVISORS
- X I HEREBY CERTIFY THAT THIS IS A
UNANIMOUS (ABSENT 2 ) TRUE AND CORRECT COPY OF AN
AYES: NOES: ACTION TAKEN AND ENTERED ON THE
ABSENT: ABSTAIN: MINUTES OF THE BOARD OF
SUPERVISORS ON THE DATE SHOWN.
cc: Community Development (CDD) - Orig. ATTESTED December 15, 1987
County Administrator PHIL BATCHELOR, CLERK OF
Public Works Department THE BOARD OF SUPERVISORS
Wilson Development Company (via CDD) AND COUNTY ADMINISTRATOR
Raymond Vail and Associates (via CDD)
BY , DEPUTY
en3:CofA-7A.bo
ASA:gms
12/1/87
Public Works Department Appeal
" of Condition of Approval 7 .A.
Page 2 of 2
filing of their letter of appeal, the Public Works Department staff
has .met several times with the applicant and representatives of the
Alamo Improvement Association and the Association for the
Preservation of Danville Boulevard to resolve the problem. As a
result of these meetings, revised frontage requirements (as
reflected in the revision to Condition of Approval 7.A as contained
in Exhibit A) were developed that are acceptable to all of the
attendees at these meetings and reflect the Public Works Department
concern for traffic safety and the local Association' s desire to
ensure that Danville Boulevard retain its rural ambience as
outlined in the San Ramon Valley General Plan. At the June 3 , 1987
hearing of the San Ramon Valley Regional Planning Commission, the
Commission reconsidered and revised Condition of Approval 7.J. The
revision changed the requirement to "convey to the County, by Offer
of Dedication, additional right of way on Danville Boulevard" to a
requirement to "observe an additional setback of 6 feet on Danville
Boulevard to provide for the possible future width of 72 feet" (see
Condition of Approval 7 .J of Exhibit B) . 'To further the
understanding that Danville Boulevard, in accordance with the San
Ramon Valley General Plan, is to be widened along this frontage
only as much as is needed for traffic safety, it has been agreed to
by the Public Works Department and the local Alamo associations
that Condition of Approval 7 .J. should not refer to an ultimate
width of 72 feet for Danville Boulevard at this location.
Condition of Approval 7.J. has been revised to reflect this
agreement (see Exhibit A) .
ASA:gms
en3 :CofA-7A.bo
12/1/87
EXHIBIT A
CONDITIONS FOR APPROVAL OF FINAL DEVELOPMENT PLAN 3056-86 AND SUBDIVISION 6883
1. This approval is based upon the Final Development Plan, related exhibits,
and Tentative Subdivision Map dated received by the Community Development
Department February 10, 1987, together with additional plans received March
25, 1987, for not more than 30 residential units. A revised site plan
shall be submitted to the Zoning Administrator for review and approval .
The plan shall provide additional setback for the three structures fronting
on Danville Boulevard, such that none is located within 15 feet of the
existing right of way. This application is approved subject to final
adoption of 2695-RZ.
2. Prior to issuance of a building permit, elevations and architectural design
of buildings and structures, including carports, trash enclosures, etc. ,
shall be subject to final review and approval by the County Zoning Adminis-
trator. The roofs and exterior walls shall be free of such objects as air
conditioning equipment, television aerials, etc:, or screened from view.
Samples of materials and colors for exterior of units shall be submitted
for review and approval . Exterior lights shall be deflected so that lights
shine onto applicant's property and not toward adjacent properties. All
units shall have house numbers or unit identification visible at all times
which may require illumination.
3. Prior to the issuance of building permits, landscape and irrigation plans,
shall be submitted for review and approval by the County Zoning Adminis-
trator. Landscaping and irrigation shall be installed prior to occupancy.
A. The proposed trees on the site shall be a minimum of 15 gallons in
size. The proposed shrubs on the site shall be a minimum of 5 gallons
in size. Evergreen trees shall be required along the northern
property line. The applicant should demonstrate that the planting
will maintain the privacy of adjoining residential units.
B. Trees and other landscape features within the public right-of-way are
subject to review and approval by the Public Works Department.
C. Consideration shall be given to contoured earth mounding for land-
scaping along the street frontage.
4. A sign directory displaying the numbers and location of all dwelling units
in a diagram manner shall be posted at the vehicular entrance and main
pedestrian entrance to the project in a location and of a size easily read-
able from entering vehicles. The directory shall include annunciations as
may be required by the fire district. A project identified sign not to
exceed 10 square feet in area, may be utilized at the driveway entrance.
5. Development shall be consistent with the geotechnical report submitted with
the application. Grading plans shall be subject to review and approval by
the County Geologist prior to issuance of grading or building permit.
6. If archaeologic materials are uncovered during grading, trenching or other
on-site excavation, earthwork within 30 meters of these materials shall be
stopped until a professional archaeologist who is certified by the Society
of California Archaeology (SCA) and/or the Society of Professional
Archaeology (SOPA) has had an opportunity to evaluate the significance of
the find and suggest appropriate mitigation measures, if they are deemed
necessary.
2.
7. Comply with drainage, road improvement, traffic and utility requirements as
follows:
A. In accordance with Section 92-2.006 of the County Ordinance Code, this
subdivision shall conform to the provisions of the County Subdivision
Ordinance (Title 9) . Any exceptions therefrom must be specifically
listed in this conditional approval statement. Requirements of the
Ordinance include the following:
1. Widen Danville Boulevard as necessary, to provide for 44 foot
wide pavement and construct a 10 foot wide raised and landscaped
median island along the Danville Boulevard frontage as delineated
by the Public Works Department. Stripe the pavement along the
frontage to provide for two 11-foot travel lanes and for a 5-foot
bike lanes on each side of the road and for a 12-foot wide dual
left turn land adjacent to the median island. Construct a 6-foot
wide meandering sidewalk located outside of the roadway area
conforming to the existing sidewalk to the north. The frontage
improvements, including the sidewalk and pavement, shall be
configured so as to preserve the trees along the easterly edge of
the road. The raised median shall be of a uniform 10 foot width
with rounded ends. The applicant shall coordinate the land-
scaping plan with the Alamo Improvement Association, the Associa-
tion for the Preservation of Danville Boulevard, and R-7A's
Boulevard of Trees Committee prior to submitting it to the
County. The plan shall contain provisions for an irrigation
system and for maintenance by the property owner for a period of
5 years or until such time as a landscaping district (e.g. , LL-2)
is formed, whichever occurs first. The final landscape plan
shall be subject to review of the Public Works Department and the
review and approval of the Zoning Administrator. NOTE: These
road improvements shall be considered part of the transition of
Danville Boulevard from a residential area of Alamo to the down-
town area of Alamo to the north. The Public Works Department
will develop a detailed plan, including the concept of raised
median islands, for this transition section of Danville
Boulevard. This plan will be coordinated with the Alamo Improve-
ment Association and the Association for the Preservation of
Danville Boulevard. If these organizations decide that the
raised median island concept is not feasible, then the require-
ments for the raised median islands in this condition of approval
shall become void.
2. Installing street lights on Danville Boulevard and applying for
annexation to Lighting District L-100 for maintenance of the
street lights. The final number and location of the lights will
be determined by the County Traffic Engineer.
3.
3. Dedicate a 7+ foot wide public utility and access easement for
utilities and sidewalk adjacent to the existing right of way.
B. Relinquish abutter's rights of access along Danville Boulevard with
the exception of the access way.
C. Prevent storm drainage, originating on the property and conveyed in a
concentrated manner, from draining across the sidewalks and driveways.
D. Furnish proof to the Public Works Department, Engineering Services
Division, of the acquisition of all necessary rights of entry, permits
and/or easements fo.r the. construction of off-site, temporary or
permanent, road and drainage improvements.
E. Comply with the drainage fee requirements for Drainage Area 13 as
adopted by the Board of Supervisors.
F. Convey to the County of Contra Costa, by Grant Deed, the future
"development rights" over that portion of the property traversed by
San Ramon Creek. The area for which the "development rights" are to
be deeded shall be determined by using the criteria outlined in
Chapter 914-10, "Easements", of the Subdivision Ordinance.
G. Execute a recordable agreement which states thatthe developer and the
owner and the future owners of the property will hold harmless Contra
Costa County and the Flood Control District in the event of damage to
the improvements as a result of creek-bank failure or erosion.
H. Creek bank improvements shall be subject to the approval of the Public
Works Department and the County Geologist. Contra Costa County and
the Flood Control District will not accept responsibility for the
maintenance of such improvements.
I . Prior to issuance of building permits, file the Final Map for
i
Subdivision 6883.
J. This development shall observe an additional setback of 6 feet on
Danville Boulevard.
K. 1) Contribute $1,600 per dwelling unit to a Road Improvement Fee
Trust (Fund No. 819200-0800) designated for road improvements to
Danville Boulevard.
OR, AT THE OPTION OF THE DEVELOPER.
4.
2) Construct improvements, of an equivalent value, to Danville
Boulevard subject to the review and approval of the Public Works
Department.
L. Mitigate the impact of additional stormwater runoff from this develop-
ment on downstream creeks by either of the following methods:
1) Removing 1 cubic yard of channel excavation material from the
inadequate portion of San Ramon Creek near Chaney Road for each
50 square feet of new impervious surface area created by the
development. All excavating material shall be disposed of off-
site by the developer at his cost. The site selection, land
rights, and construction staking will be by the Flood control
District.
OR, AT THE OPTION OF THE DEVELOPER,
2) Contribute to the County Deficiency Development Fee Trust (Fund
No 812100-0800) a drainage fee of $0.10 per square feet of new
impervious surface area created by the development. Within 12
months of receipt of the contribution, the Flood Control District
will use the monies to implement the subject improvements. The
added impervious surface area created by the development will be
based on the Flood Control District's standard impervious surface
area ordinance.
8. The turnaround feature at the driveway entrance shall be eliminated and the
two parking spaces at that area reoriented as indicated on revised plans
received March 25, 1987. the minimum setback distance for the center
building on Danville Boulevard (Bldg. #4) shall be 10 feet.
9. The entire creek channel area of San Ramon Creek from the westerly top of
bank to the east property line shall be dedicated to the County for recrea-
tional trail purposes, as indicated on revised plans received March 25,
1987 and by letter from the applicant to the Alamo Parks and Recreation
Committee R 7-A of March 25, 1987. Final trail location and alignment
shall be determined by the Zoning Administrator prior to filing of the
Parcel Map.
10. The guide for development and use provisions shall be the Multiple Resi-
dential District (M-17) . Any proposal or request to modify these require-
ments shall be made by recommendation from the Homeowner's Association to
the Community Development Department to be determined by the Zoning
Administrator prior to issuance of a building permit.
11. Covenants, Conditions and Restrictions, Articles of Incorporation and
By-Laws for mandatory homeowners' association shall be submitted with the
Final Subdivision Map, subject to review by the Community Development
Department. These documents shall include provision for establishment,
ownership and maintenance of the common open space and recreation areas,
fencing, drainage maintenance, etc.
5.
The following statements are not conditions of approval ; however, the applicant
should be aware of these comments prior to filing the Tentative Subdivision Map
or attempting to secure building permits.
1. Development shall be subject to the ordinance requirements of the San Ramon
Valley Fire Protection District.
2. The Building Inspection Department, Grading Division:
A. A grading permit will be required for the earthwork necessary to
develop units proposed by the subject Development Plan.
B. Submit 4 copies of plans showing the existing contours, the extent of
the proposed grading, drainage improvements and general site develop-
ment, projected cut and fill volumes and cost estimate of proposed
grading to the county Building Inspection Department, Grading Section.
C. Prior to the issuance of building and/or grading permits a preliminary
soil investigation report, prepared by a licensed soil engineer will
be prepared. It shall report on the ability of the site to support
the improvements anticipated, and shall include recommended foundation
design to achieve maximum stability of the proposed structures.
Grading plans submitted to the County shall be signed by the soil
engineer.
3/25/87
4/17/87
5/1/87
5/20/87
11/30/87
DPU/3056-86C.BT
EXHIBIT B
REVISED CONDITIONS FOR APPROVAL OF FINAL DEVELOPMENT PLAN 3056-86 & SUBDIVISION
6883 (As Approved June 3, 1987 by the San Ramon Valley Regional Planning Com-
mission. )
1. This approval is based upon the Final Development Plan, related exhibits,
and Tentative Subdivision Map dated received by the Community Development
Department February 10, 1987, together with additional plans received March
25, 1987, for not more than 30 residential units. A revised site plan
shall be submitted to the Zoning Administrator for review and approval .
The plan shall provide additional setback for the three structures fronting
on Danville Boulevard, such that none is located within 15 feet of the ex-
isting right of way. This application is approved subject to final adop-
tion of 2695-RZ.
2. Prior to issuance of a building permit, elevations and architectural design
of buildings and structures, including carports, trash enclosures, etc. ,
shall be subject to final review and approval by the County Zoning Adminis-
trator. The roofs and exterior walls shall be free of such objects as air
conditioning equipment, television aerials, etc. , or screened from view.
Samples of materials and colors for exterior of units shall be submitted
for review and approval . Exterior lights shall be deflected so that lights
shine onto applicant's property and not toward adjacent properties. All
units shall have house numbers or unit identification visible at all times
which may require illumination.
3. Prior to the issuance of building permits, landscape and irrigation plans,
shall be submitted for review and approval by the County Zoning Adminis-
trator. Landscaping and irrigation shall be installed prior to occupancy.
A. The proposed trees on the site shall be a minimum of 15 gallons in
size. The proposed shrubs on the site shall be a minimum of 5 gallons
in size. Evergreen trees shall be required along the northern proper-
ty line. The applicant should demonstrate that the planting will
maintain the privacy of adjoining residential units.
B. Trees and other landscape features within the public right-of-way are
subject to review and approval by the Public Works Department.
C. Consideration shall be given to contoured earth mounding for landscap-
ing along the street frontage.
4. A sign directory displaying the numbers and location of all dwelling units
in a diagram manner shall be posted at the vehicular entrance and main pe-
destrian entrance to the project 'in a location and of a size easily read-
able from entering vehicles. The directory shall include annunciations as
may be required by the fire district. A project identified sign not to
exceed 10 square feet in area, may be utilized at the driveway entrance.
5. Development shall be consistent with the geotechnical report submitted with
the application. Grading plans shall be subject to review and approval by
the County Geologist prior to issuance of grading or building permit.
2.
6. If archaeologic materials are uncovered during grading, trenching or other .
on-site excavation, earthwork within 30 meters of these materials shall be
stopped until a professional archaeologist who is certified by the Society
of California Archaeology (SCA) and/or the Society of Professional Archae-
ology (SOPA) has had an opportunity to evaluate the significance of the
find and suggest appropriate mitigation measures, if they are deemed neces-
sary.
7. Comply with drainage, road improvement, traffic and utility requirements as
follows:
A. In accordance with Section 92-2.006 of the County Ordinance Code, this
subdivision shall conform to the provisions of the County Subdivision
Ordinance (Title 9) . Any exceptions therefrom must be specifically
listed in this conditional approval statement. Requirements of the
Ordinance include the following:
1. Constructing a 6-foot sidewalk conforming to the existing side-
walk on the adjacent property to the north, placed within a pub-
lic utilities easement (see Condition of Approval 7.J. below) .
2. Installing street lights on Danville Boulevard and applying for
annexation to Lighting District L-100 for maintenance of the
street lights. The final number and location of the lights will
be determined by the County Traffic Engineer.
B. Relinquish abutter's rights of access along Danville Boulevard with
the exception of the access way.
C. Prevent storm drainage, originating on the property and conveyed in a
concentrated manner, from draining across the sidewalks and driveways.
D. Furnish proof to the Public Works Department, Engineering Services
Division, of the acquisition of all necessary rights of entry, permits
and/or easements for the construction of off-site, temporary or perma-
nent, road and drainage improvements.
E. Comply with the drainage fee requirements for Drainage Area 13 as
adopted by the Board of Supervisors.
F. Convey to the County of Contra Costa, by Grant Deed, the future "de-
velopment rights" over that portion of the property traversed by San
Ramon Creek. The area for which the "development rights" are to be
deeded shall be determined by using the criteria outlined in Chapter
914-10, "Easements", of the Subdivision Ordinance.
G. Execute a recordable agreement which states that the developer and the
owner and the future owners of the property will hold harmless Contra
Costa County and the Flood Control District in the event of damage to
the improvements as a result of creek-bank failure or erosion.
3.
H. Creek bank improvements shall be subject to the approval of the Public
Works Department and the County Geologist. Contra Costa County and
the Flood Control District will not accept responsibility for the
maintenance of such improvements.
I . Prior to issuance of building permits, file the Final Map for Subdivi-
sion 6883.
J. This development shall observe an additional setback of 6 feet on
Danville Boulevard.
K. 1) Contribute $1,600 per dwelling unit to a Road Improvement Fee
Trust (Fund No. 819200-0800) designated for road improvements to
Danville Boulevard.
OR, AT THE OPTION OF THE DEVELOPER.
2) Construct improvements, of an equivalent value, to Danville Boul-
evard subject to the review and approval of the Public Works De-
partment.
L. Mitigate the impact of additional stormwater run-off from this devel-
opment on downstream creeks by either of the following methods:
1) Removing 1 cubic yard of channel excavation-material from the
inadequate portion of San Ramon Creek near Chaney Road for each
50 square feet of new impervious surface area created by the de-
velopment. All excavating material shall be disposed of offsite
by the developer at his cost. The site selection, land rights,
and construction staking will be by the Flood Control District.
OR, AT THE OPTION OF THE DEVELOPER,
2) Contribute to the County Deficiency Development Fee Trust (Fund
No 812100-0800) a drainage fee of $0.10 per square feet of new
impervious surface area created by the development. Within 12
months of receipt of the contribution, the Flood Control District
will use the monies to implement the subject improvements. The
added impervious surface area created by the development will be
based on the Flood Control District's standard impervious surface
area ordinance.
8. The turnaround feature at the driveway entrance shall be eliminated and the
two parking spaces at that area reoriented as indicated on revised plans
received March 25, 1987. the minimum setback distance for the center
building on Danville Boulevard (Bldg. #4) shall be 10 feet.
9. The entire creek channel area of San Ramon Creek from the westerly top of
bank to the east property line shall be dedicated to the County for recrea-
tional trail purposes, as indicated on revised plans received March 25,
1987 and by letter from the applicant to the Alamo Parks and Recreation
4.
Committee R7-A of March 25, 1987. Final trail location and alignment shall
be determined by the Zoning Administrator prior to filing of the Parcel
Map.
10. The guide for development and use provisions shall be the Multiple Resi-
dential District (M-17) . Any proposal or request to modify these require-
ments shall be made by recommendation from the Homeowner's Association to
the Community Development Department to be determined by the Zoning Admin-
istrator prior to issuance of a building permit.
11. Covenants, Conditions and Restrictions, Articles of Incorporation and By-
Laws for mandatory homeowners' association shall be submitted with the Fi-
nal Subdivision Map, subject to review by the Community Development Depart-
ment. These documents shall include provision for establishment, ownership
and maintenance of the common open space and recreation areas, fencing,
drainage maintenance, etc.
The following statements are not conditions of approval ; however, the applicant
should be aware of these comments prior to filing the Tentative Subdivision Map
or attempting to secure building permits.
1. Development shall be subject to the ordinance requirements of the San Ramon
Valley Fire Protection District.
2. The Building Inspection Department, Grading Division:
A. A grading permit will be required for the earthwork necessary to de-
velop units proposed by the subject Development Plan.
B. Submit 4 copies of plans showing the existing contours; the extent of
the proposed grading, drainage improvements and general site develop-
ment, projected cut and fill volumes and cost estimate of proposed
grading to the County Building Inspection Department, Grading Section.
C. Prior to the issuance of building and/or grading permits a preliminary
soil investigation report, prepared by a licensed soil engineer will
be prepared. It shall report on the ability of the site to support
the improvements anticipated, and shall include recommended foundation
design to achieve maximum stability of the proposed structures. Grad-
ing plans submitted to the County shall be signed by the soil engi-
neer.
ASA:aa;gms
wr9:3056r.t12
12/3/87