HomeMy WebLinkAboutMINUTES - 11172015 - C.38RECOMMENDATION(S):
(1) APPROVE the design, plans, and specifications for the above project.
(2) DETERMINE that the bid submitted by C. Overaa & Co. ("Overaa") complied with the requirements of the
County’s Outreach Program for this project, as provided in the project specifications, and FURTHER DETERMINE
that Overaa submitted a responsive and responsible bid for this project.
(3) AWARD the construction contract for the above project to Overaa in the amount of $1,846,000 and DIRECT that
the Public Works Director, or designee, prepare the contract.
(4) DIRECT that Overaa shall submit two good and sufficient security bonds (performance and payment bonds) in
the amount of $1,846,000 each.
(5) ORDER that, after the contractor has signed the contract and returned it, together with the bonds, evidence of
insurance, and other required documents, and the Public Works Director has reviewed and found them to be
sufficient, the Public Works Director, or designee, is authorized to sign the contract for this Board.
(6) ORDER that, in accordance with the project specifications and/or upon signature of the contract by the Public
Works
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 11/17/2015 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I Supervisor
Candace Andersen, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
Federal D. Glover, District V
Supervisor
Contact: Ramesh Kanzaria, (925)
313-2000
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board
of Supervisors on the date shown.
ATTESTED: November 17, 2015
David Twa, County Administrator and Clerk of the Board of Supervisors
By: Chris Heck, Deputy
cc: PW Accounting, PW CPM Division Manager/Project Manager, PW CPM Clerical, Auditor's Office, County Counsel's Office, County Administrator's
Office, County Administrator's Office
C. 38
To:Board of Supervisors
From:Julia R. Bueren, Public Works Director/Chief Engineer
Date:November 17, 2015
Contra
Costa
County
Subject:AWARD Construction Contract for Emergency and Imaging Department Expansion and Reconfiguration on the 3rd
Floor at CCRMC (WH504B)
RECOMMENDATION(S): (CONT'D)
Director, or designee, any bid bonds posted by the bidder is to be exonerated and any checks or
cash submitted for security shall be returned.
(7) AUTHORIZE the Public Works Director, or designee, to sign any escrow agreements prepared for this project to
permit the direct payment of retentions into escrow or the substitution of securities for moneys withheld by the
County to ensure performance under the contract, pursuant to Public Contract Code Section 22300.
(8) AUTHORIZE the Public Works Director, or designee, to order changes or additions to the work pursuant to
Public Contract Code Section 20142.
(9) DELEGATE, pursuant to Public Contract Code Section 4114, to the Public Works Director, or designee, the
Board’s functions under Public Contract Code Sections 4107 and 4110.
(10) DECLARE that, should the award of the contract to Overaa be invalidated for any reason, the Board would not
in any event have awarded the contract to any other bidder, but instead would have exercised its discretion to reject
the bid received.
FISCAL IMPACT:
100% Hospital Enterprise Funds.
BACKGROUND:
The main purpose of this project is to expand the Emergency Department (ED) fast track area at the Contra Costa
Regional Medical Center (CCRMC) to help decrease the number of annual patient visits to the ED. Currently, the ED
is operating at twice the design capacity.
The project, which involves approximately 5,960 square feet of interior modifications and improvements for fast
track and patient triage on the third floor (Emergency and Imaging Departments), will result in reconfiguration of
waiting and reception, triage and registration, exam rooms, medication room, radiology reading room, offices and
work areas requiring new partitions, suspended ceilings, flooring, painting, casework, plumbing, HVAC, electrical,
telephone/data communications, etc. The area of interior improvements is located in the west side of the five-story
hospital building.
Plans and specifications for the project have been prepared for the Public Works Department by HDR Architecture,
Inc. and have been filed with the Clerk of the Board by the Public Works Director. The construction cost estimate is
$3,079,000, and the general prevailing wage rates are on file with the Clerk of the Board of Supervisors and will be
the minimum rates paid on this project. Bids were received and opened by the Public Works Department on October
22, 2015, and the bid results are as follows:
BIDDER BASE BID
C. Overaa & Co., Richmond $1,846,000
Vila Construction Co., Richmond $1,898,158
Taber Construction, Concord $1,910,000
All three bids were below the Architect's Estimate of $3,079,000. Staff has evaluated the low bid submitted by
Overaa and their good faith effort documentation. Staff has determined that Overaa's bid is responsive and their good
faith effort documentation is in compliance with the County's Outreach Program. The Public Works Director
recommends that the Board award the construction contract for this project to Overaa, the lowest responsible and
responsive bidder, in the amount of $1,846,000, which is $1,233,000 less than the Architect’s Estimate.
The general prevailing rates of wages, which shall be the minimum rates paid on this project, are on file with the
Clerk of the Board, and copies are available to any party upon request.
CONSEQUENCE OF NEGATIVE ACTION:
If this project is not approved and authorized, the Emergency Department at the Contra Costa Regional Medical
Center will continue to operate at twice the design capacity.