Loading...
HomeMy WebLinkAboutMINUTES - 11102015 - C.13RECOMMENDATION(S): APPROVE and AUTHORIZE the Chief Engineer, Contra Costa County Flood Control and Water Conservation District (FC District), or designee, to execute Contract Amendment No. 1 with Environmental Science Associates, to increase the payment limit by $35,000 to a new payment limit of $590,042, and add planning and project development services for the Lower Walnut Creek Restoration Project, with no change to the original term, Martinez area. (100% Flood Control District Zone 3B Funds) FISCAL IMPACT: This project is 100% funded by Flood Control Zone 3B (Walnut Creek watershed) funds. BACKGROUND: On June 25, 2013, the Board of Supervisors authorized the FC District to remove the lowest 4 miles of the Army Corps of Engineers’ “Walnut Creek Project” from Corps oversight. The FC District sought this removal to return the facility to local control and permit the FC District to manage it in a more sustainable manner. Legislation was subsequently introduced to selectively deauthorize Lower Walnut Creek from the system. This legislation was approved APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 11/10/2015 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Candace Andersen, District II Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor ABSENT:Federal D. Glover, District V Supervisor Contact: Carl Roner (925) 313-2213 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: November 10, 2015 David J. Twa, County Administrator and Clerk of the Board of Supervisors By: Stacey M. Boyd, Deputy cc: Steve Kowalewski, Deputy Chief Engineer, Mike Carlson, Flood Control, Paul Detjens, Flood Control, Carl Roner, Flood Control, Catherine Windham, Flood Control C. 13 To:Contra Costa County Flood Control District Board of Supervisors From:Julia R. Bueren, Public Works Director/Chief Engineer Date:November 10, 2015 Contra Costa County Subject:Contract Amendment with Environmental Science Associates, for Lower Walnut Creek Restoration Project, Martinez area. Project No. 7520-6B8285 BACKGROUND: (CONT'D) by Congress and signed by President Obama on June 10, 2014. With the facility under local control, the FC District has the ability to proceed with the Lower Walnut Creek Restoration Project, which encompasses the lowest 4 miles of Walnut Creek and Pacheco Creek. The objective of this project is to transform this stretch of channel to a sustainable flood control facility. This amendment provides for the following: a. Additional funds to provide floodplain core analysis; b. Additional funds to provide hydraulic modeling of ecologically significant flows; c. Additional funds to provide for sea level rise modeling; and d. Provide for additional modeling and analysis services to be performed by Contractor. CONSEQUENCE OF NEGATIVE ACTION: If the amendment is not approved, the consultant will not be able to perform the additional work or be paid for it. CHILDREN'S IMPACT STATEMENT: