APPROVE and AUTHORIZE the Chief Engineer, Contra Costa County Flood Control and Water Conservation
District (FC District), or designee, to execute an on–call contract with Fugro Consultants, Inc. (Consultant), in an
amount not to exceed $150,000 to provide on-call seismic assessment services, effective October 6, 2015, through
October 5, 2018, Countywide. (100% Flood Control District and Public Works Department Various Project Specific
Funds)
FISCAL IMPACT:
All costs associated with this on-call contract will not exceed $150,000 and will be funded by the Flood Control
District or Public Works Department under various project specific activities.
BACKGROUND:
The FC District provides regional flood protection and environmental stewardship for over 70 miles of streams, six
major dams, and 29 detention basins, countywide. An important part of managing this infrastructure is assessing its
ability to withstand various perils, such as earthquakes. As such, the FC District is initiating a seismic assessment
program for its flood
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 10/13/2015 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I Supervisor
Candace Andersen, District II
Supervisor
Karen Mitchoff, District IV
Supervisor
Federal D. Glover, District V
Supervisor
ABSENT:Mary N. Piepho, District III
Supervisor
Contact: Carl Roner, (925) 313-2213
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: October 13, 2015
David Twa, County Administrator and Clerk of the Board of Supervisors
By: June McHuen, Deputy
cc: David Twa, County Administrator, Thomas Geiger, County Counsel's Office, Robert R. Campbell, Auditor-Controller's Office, Mike Carlson, Flood
Control, Paul Detjens, Flood Control, Carl Roner, Flood Control, Beth Balita, Finance, Catherine Windham, Flood Control
C. 6
To:Contra Costa County Flood Control District Board of Supervisors
From:Julia R. Bueren, Public Works Director/Chief Engineer
Date:October 13, 2015
Contra
Costa
County
Subject:On-Call Consulting Services Agreement with Fugro Consultants, Inc., Countywide. Project No.: Various
BACKGROUND: (CONT'D)
control dams and other hydraulic structures. The FC District, at times, requires additional temporary services from
persons specially trained, experienced, expert, and competent to perform professional engineering and technical
services required for seismic assessment. For that reason, the FC District is entering into this Agreement with
Consultant. Under this Agreement, Consultant will provide professional engineering and technical services relating to
seismic assessment on an on-call basis for a variety of FC District and Public Works Department projects throughout
Contra Costa County.
CONSEQUENCE OF NEGATIVE ACTION:
Without the approval of the Board of Supervisors, the FC District will be unable to obtain on-call services for seismic
assessments.