Loading...
HomeMy WebLinkAboutMINUTES - 12151987 - 1.19 TO, BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONVERSATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: December 15, 1987 SUBJECT: Contract Award Recommendation: Drainage Area 44B - Line D Project Project No. 7547-6D8223-86, Walnut Creek Area Specific Requests air Recommendation(s) A Background b Justification RECOMMENDED ACTION: AWARD the contract for furnishing labor and materials for the subject project to Heide and Williams , Inc. , the low bidder, in the amount of $77 ,067.65 and at the unit prices submitted; and REQUIRE the contractor to present surety bonds for Payment and Faithful Performance in the amounts of $38,533.83 and $77,067.65, respectively. DIRECT the Chief Engineer to prepare the contract for the project. AUTHORIZE the Chief Engineer to sign the contract on behalf of the Board subject to the Chief Engineer having reviewed and found sufficient all required documents, including the contract signed by the contractor, the aforementioned surety bonds , and a certificate of insurance. DIRECT that, in accordance with the project specifications and/or upon the execution of the contract by the Chief Engineer any bid bonds posted by the bidders be exonerated and any checks or cash submitted for bid security be returned. FINANCIAL IMPACT: The project , including engineering and appropriate overhead charges, is funded by Drainage Area 44B. Continued on attachment: X yes Signature: Recommendation of County Administrator Recommendation of Board Committee Approve Other: `— Signature(s): Action of Board on: D E C 1. 5 1981 Approved as Recommended_ _X� Other Vote of Supervisors I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN 114- Unanimous (Absent ) AND ENTERED ON THE MINUTES OF THE Ayes: Noes: BOARD OF SUPERVISORS ON DATE SHOWN. A seent- Absta n: 1987 Attested DEC� 5 Orig. Div.: Public Works-Construction Phil Batchelor cc: County Administration Clerk of the Board of Auditor-Controller Supervisors and County Design Administrator Accounting Contractor BJK/sa By_4�L , DEPUTY bo:15.t12 REASONS FOR RECONIMIENDATION/BACKGROUND: The plans and specifications were approved and the project advertised for bids by the Board of Supervisors on November 3, 1987. The bids were received and opened at 255 Glacier Drive, Martinez, California , on Thursday, December 3, 1987. The construction bids received were as follows: 1.. Heide & Williams $ 77,067.65 c:. Hess Construction Company $ 81 ,984.00 3. Mountain Cascade $ 86,496.00 4. Pfister Excavating $ 93,161.00 5. Edward J. Pestana Construction $ 93,690.00 6. Tyson & Sons $ 94,999.24 7. Anderson Pacific Engineering $ 98,680.00 8. Whiteside Construction $ 99,400.00 9. Dutra Construction Co. , Inc. $110,680.00 10. Richard Sawdon $115,970.00 11. . Carone Brothers $118,377.00 114'.. Pleasanton Engineering Contr. $135,740.00 The Engineer's estimated construction cost was $93,000.00. CONSEQUENCES OF NEGATIVE ACTION: