HomeMy WebLinkAboutMINUTES - 06162015 - C.08RECOMMENDATION(S):
(1) APPROVE plans, specifications, and design for the Buchanan Field Airport East Ramp Hangar Taxi Lane
Reconstruction Project. Project No. 4853-4651-FAS-6X5323
(2) DETERMINE that O.C. Jones & Sons, Inc. (“O.C. Jones”), the lowest monetary bidder, has complied with the
requirements of the County’s Outreach Program for this project, as provided in the project specifications; and
FURTHER DETERMINE that O.C. Jones has submitted the lowest responsive and responsible bid for the project.
(3) AWARD the construction contract for the above project to O.C. Jones in the listed amount ($1,317,751.00) and
the unit prices submitted in the bid, and DIRECT that O.C. Jones shall present two good and sufficient surety bonds,
as indicated below, and that the Public Works Director, or designee, shall prepare the contract.
(4) ORDER that, after the contractor has signed the contract and returned it, together with the bonds as noted below
and any required certificates of insurance or other required documents, and the Public Works Director has reviewed
and found them to be sufficient, the Public Works Director, or designee, is authorized to sign the contract for this
Board.
(5) ORDER that, in accordance with the project specifications and/or upon signature of the contract by the Public
Works Director, or designee, bid bonds posted by the bidders are to be exonerated and any checks or cash submitted
for security shall be returned.
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 06/16/2015 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I
Supervisor
Candace Andersen, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
ABSENT:Federal D. Glover, District V
Supervisor
Contact: Kevin Emigh, 925-313-2233
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: June 16, 2015
David Twa, County Administrator and Clerk of the Board of Supervisors
By: Stacey M. Boyd, Deputy
cc:
C. 8
To:Board of Supervisors
From:Julia R. Bueren, Public Works Director/Chief Engineer
Date:June 16, 2015
Contra
Costa
County
Subject:Contract for the Buchanan Field Airport East Ramp Hangar Taxi Lane Reconstruction Project, Concord area.
RECOMMENDATION(S): (CONT'D)
(6) ORDER that, the Public Works Director, or designee, is authorized to sign any escrow agreements prepared for
this project to permit the direct payment of retentions into escrow or the substitution of securities for moneys
withheld by the County to ensure performance under the contract, pursuant to Public Contract Code Section 22300.
(7) DELEGATE, pursuant to Public Contract Code Section 4114, to the Public Works Director, or designee, the
Board’s functions under Public Contract Code Sections 4107 and 4110.
(8) DELEGATE, pursuant to Labor Code Section 6705, to the Public Works Director, or to any registered civil or
structural engineer employed by the County, the authority to accept detailed plans showing the design of shoring,
bracing, sloping, or other provisions to be made for worker protection during trench excavation covered by that
section.
(9) DECLARE that, should the award of the contract to O.C. Jones be invalidated for any reason, the Board would
not in any event have awarded the contract to any other bidder, but instead would have exercised its discretion to
reject all of the bids received. Nothing in this Board Order shall prevent the Board from re-awarding the contract to
another bidder in cases where the successful bidder establishes a mistake, refuses to sign the contract, or fails to
furnish required bonds or insurance (see Public Contract Code Sections 5100-5107).
FISCAL IMPACT:
The construction contract will be funded 100% Airport Enterprise Funds.
BACKGROUND:
The above project was previously approved by the Board of Supervisors, plans and specifications were filed with the
Board, and bids were invited by the Public Works Director. On May 19, 2015, the Public Works Department received
bids from the following contractors:
BIDDER, TOTAL AMOUNT, BOND AMOUNTS
O.C. Jones & Sons, Inc.: $1,317,751.00; Payment: $1,317,751.00; Performance: $1,317,751.00
Ghilotti Bros., Inc.: $1,398,613.00
Granite Rock Company: $1,448,630.00
A. Teichert & Son, Inc. (dba Teichert Construction): $1,481,040.00
RGW Construction, Inc.: $1,507,715.00
The bidder listed first above, O.C. Jones, submitted the lowest responsive and responsible bid, which is $80,862.00
less than the next lowest bid.
The Public Works Director has reported that O.C. Jones documented an adequate good faith effort to comply with the
requirements of the County’s Outreach Program, as provided in the project specifications, and the Public Works
Director recommends that the construction contract be awarded to O.C. Jones.
The Public Works Director recommends that the bid submitted by O.C. Jones is the lowest responsive and
responsible bid, and this Board concurs and so finds.
The Board of Supervisors previously determined that the project is exempt from the California Environmental Quality
Act as a Class 1(c) Exemption, and a Notice of Exemption was filed with the County Clerk on April 2, 2015.
The general prevailing rates of wages, which shall be the minimum rates paid on this project, have been filed with
the Clerk of the Board, and copies will be made available to any party upon request.
CONSEQUENCE OF NEGATIVE ACTION:
CONSEQUENCE OF NEGATIVE ACTION:
Construction of the project would be delayed, and the project might not be built.
CHILDREN'S IMPACT STATEMENT:
Not applicable.