Loading...
HomeMy WebLinkAboutMINUTES - 06092015 - C.174RECOMMENDATION(S): ADOPT Resolution No. 2015/168 granting a pipeline franchise to CPN Pipeline Company pursuant to the terms and conditions of County Ordinance No. 2013-19 and County Resolution No. 2013/305 for pipelines located in the unincorporated area of the County near Pittsburg, Brentwood and Oakley. FISCAL IMPACT: The pipeline franchise will generate approximately $19,600.00 commencing with calendar year 2014. The annual franchise payment will be calculated at the rate of $1.77 per cubic foot of pipeline within the County right-of-way. The number of cubic feet of pipeline will be calculated by taking the area of the inside diameter of the pipeline plus 1” and multiplying it by the length of the pipeline within the County right-of-way. The annual franchise fee rate of $1.77 per cubic foot will be increased annually by the change in the Consumer Price Index, all Urban Consumers for the San Francisco-Oakland-San Jose Area (1982-84 = 100), with December 2012 (239.53) as the base CPI month. BACKGROUND: On August 13, 2013, this Board adopted Ordinance No. 2013-19 (establishing regulations for granting pipeline franchises in County rights-of-way) and Resolution No. 2013/305 (establishing pipeline franchise fee amounts). CPN Pipeline Company has filed a written application with the County, dated December 4, 2013 wherein it has requested the granting of a pipeline franchise for the transportation of natural gas lines pursuant to the terms and conditions of County Ordinance No. 2013-19 and County Resolution No. 2013/305. CPN Pipeline Company also APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 06/09/2015 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Candace Andersen, District II Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor ABSENT:Federal D. Glover, District V Supervisor Contact: Carrie Ricci, (925) 313-2235 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: June 9, 2015 David Twa, County Administrator and Clerk of the Board of Supervisors By: June McHuen, Deputy cc: C.174 To:Board of Supervisors From:Julia R. Bueren, Public Works Director/Chief Engineer Date:June 9, 2015 Contra Costa County Subject:Granting of a Pipeline Franchise to CPN Pipeline Company BACKGROUND: (CONT'D) > provided a $5,000 deposit to cover all administrative costs associated with the granting of this pipeline franchise as required by Ordinance No. 2013-19 and Resolution No. 2013/305. Approval of Resolution No. 2015/168 will grant a pipeline franchise to CPN Pipeline Company for the pipelines shown in the table below for an initial term of 10 years. The pipelines were previously covered under an existing County pipeline franchise agreement which has since expired. Pipeline Name Type Diameter Length Brentwood East Natural Gas 10"1,635 ft Brentwood West Natural Gas 10"3,065 ft Marsh Creek 2 Lateral Natural Gas 8"1,723 ft Sellers Avenue Lateral Natural Gas 8"10,392 ft Stenzel Lateral Natural Gas 4"6,895 ft Taylor Slough No. 2 Natural Gas 4"843 ft CONSEQUENCE OF NEGATIVE ACTION: CPN Pipeline Company will not obtain the required authorization to operate and maintain their pipelines within the County right-of-way. ATTACHMENTS Resolution No. 2015/168 Exhibit 1 235' in County ROW 493' in County ROW HWY 4 WILLOW PASS RD KEVIN DR HILL STA STBAILEY RDALVES LNENES AVEMARIN AVEPAMELA DRKIM STMARYS AVEWELDON STVI R G I L S TPORT CHICAGO HWYAMBROSE AVESYCAMORE CTCLEARLAND DRALBERTS AVENORTH BROADWAY AVETINA STSTEELE DR LYNBROOK STMENDOCINO DRW A T E R S T RAMP F ST MARY ANN L N B ST E ST VIRGINIA DR LI S A A N N S T MEDANOS A V E C ST D ST SHARON PL G ST WINTERBROOK DR MANOR DRPAMELA CTCHANDLER CIRSTEELE CTHARVEY WAYRIVERSIDE PLCANAL RDMIMS AVE DESANIE CIR CLEARL A N D C I R ROY LN GREGORY DRBLAINE CT GO B L E D R DANIELLE PL SHARON STRHEA CTMICHAEL PLCHADWICK CIRBRADFORD STC O N N I E C T CASTLE CT SUMMERFIELD DRPUEBLO AVE CL I F F O R D C T VI R G I L C T KENNETH CTSHELLIE CTRIVERSIDE CTBEVERLY DRMARCIA CTLANCASTER LNFALLRIVER DR AMADOR CT GERALD CTDESANIE WAYSUT T E R C T HWY 4 WATER ST HILL ST RAMP C A N A L R D Legend 10" Los Medanos Pipeline 0 500250 Feet Exhibit 1